0% found this document useful (0 votes)
36 views1 page

Pune Metro Line-3 Conductor Rail

Conductor rail

Uploaded by

Pawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Pune Metro Line-3 Conductor Rail

Conductor rail

Uploaded by

Pawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Details of Conductor Rail


A A

S.No Details Values

B 1 Rated voltage 750 V DC B

2 Maximum permanent operating voltage 900 V DC

C
3 Minimun operating voltage 500 V DC C

4 Designed vooltage of conductor rail 1000 V DC


D
5 Withstand capacity of transient faults 3000 V DC
D

Nominal current rating of the conductor rail at


6 4500 A
E
40 ̊C ( without exceeding 45 ̊ C heat rise ) E

7 Short circuit withstand capacity 50 kA for 1 sec


120 kA for 0.15 sec
F F

30 Years min
8 Design life { TS-Ch05 5.3.3.2
(a) }
G G

9 Nominal Resistance at 15 ̊ C ≤ 7 milliohm per km

10 Thickness of stainless steel in conductor rail 6mm Nominal


H H

11 Adhesive strength (Aluminium / stainless steel ) ˃ 60 kN on 90 mm


length
I
Short time temp I

Permissible max temperature rise for rise-1.39K


12
continous & short time rating of conductor Rail Continous temp
J
rise-0.50K J

13 Type of collection Bottom


GC IE Govt. Authority Project
EXECUTION ENTITY PMRDA Pune Metropolitan Region PMRDA
K
Maharaja Sayaji Gaikwad
Udyog Bhawan, Aundh, Development Authority Pune Metro Line-3 Megapolis Circle (Hinjewadi) to K
Pune, Maharashtra 411007 Civil Court (Shivaji Nagar) Corridor
Concessionaire
This drawing must not be passed on to any person or body not authorized by us to receive it nor be copied or otherwise made us either in full or in part
by such person or body without our prior permission in writing. Signature 9th Floor, “ Vikram Monarch” -
CTS No. 1115/A,
Pune IT City Metro Location
This drawing is the property of the Contractor (Siemens) and the Employer shall have the rights as provided under GCC Clause 1.10.
Shivajinagar,
Date 05/01/2023 05/01/2023 05/01/2023
Pune, Maharashtra. Rail Limited Title
Name F.Poulet S.Duflot S.Sulaiman This drawing has been proof checked in accordance with the requirement of
Recommended For Approval
contract document and found suitable for execution.
EPC Contractor
SIEMENS Ltd. (India)
CONDUCTOR RAIL
Designed By Checked By Approved By Signature Signature
RC-IN MO INF PE PROJ1, Plot No. 78,
JIL Jagatjit Industries Ltd, Sector 18,
SIEMENS Ltd. (India)
Gurgaon, Haryana 122015.
L Drawing No. L
OEM Rev Sheet 1of 1 Date Date Revision No.
PML3-SMO-XXX-XX-DR-E-002721
B 05/01/2023 General update FP SD SS B
Description of update OEM Rev Date Name Name Released For
A 07/07/2022 FIRST SUBMISSION KM SD SS Date Scale Size
Information Final Design (FD)
Path:

Note : Gate Review for EPC-E&M are ensuring the Internal Review As Built
General update A2 05/01/2023 Reviewed By Checked By Reviewed By Checked By 05/01/2023 1:2 A3
Rev. Date Description Drawn Chkd. Aprd. Coordination. Basic design (BD)