The document provides an estimate for the construction of a residential house for Shri Prem Ray in Dehradun, detailing the total plot area and covered area. It includes a breakdown of various construction items such as earthwork, flooring, concrete work, and masonry work, along with quantities, rates, and total amounts. The total estimated cost for the project is 5,18,604.76 INR.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views1 page

25 1 SL-signed

The document provides an estimate for the construction of a residential house for Shri Prem Ray in Dehradun, detailing the total plot area and covered area. It includes a breakdown of various construction items such as earthwork, flooring, concrete work, and masonry work, along with quantities, rates, and total amounts. The total estimated cost for the project is 5,18,604.76 INR.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ESTIMATE OF THE PROPOSED REDSIDENTIAL HOUSE OF SHRI PREM RAY S/O SHRI MAHENDRA RAY,

SITUATED AT KHASRA NO- 215, MAUZA - AAWALA TARLA, PARGANA PARWADOON, TEHSIL &
DISTT. DEHRADUN. (U.K.). TOTAL PLOT AREA - 87.82 SQ MT,
G/F COVERED AREA- 87.82 SQ MT, F/F COVERED AREA- 87.82 SQ MT,
MUMTY COVERED AREA- 11.15 SQ MT, TOTAL COVERED AREA - 186.79 SQ MT,
ITEM DESCRIPTION OF ITEM QTY. RATE UNIT AMOUNT

1 EARTH WORK ;-
A Earth Work in excativation in foundation 87.82 65.55 cum 5,756.60
B Plinth filing with sand underflooring I/C
ramming consolidating and dressing complete. 186.79 148.86 cum 27,805.55

2 FLOORING :-
40 MM thick marble flooring rubbed and polised
to granolethic finish under layer 28 mm thick
C.C.1:2:4 and top layer 12 mm thick with white
black marble chips of size lead in cement marble
powder 3:1 by Volume including cement slurry
etc. complet with ordinary cement light shade
pigment including 8 cm, thick 1:6:12 Base concrete, 2009.86 55 sqm 1,10,542.30
B Marbles chips skirting (up to 30 cm height rubbed
and polised to granolothic finisd top layer 6 mm
thick with white and black marble chips size
samllest to 4 mm nonimal size land in cement
marbles powder mix 3:1, with ordinary cement
light shade pigment-18 mm thick with under
layer of 12 mm thick cement plaster in 1:3 cement
morter) 945 110 sqm 1,03,943.40

3 CONCRETE WORK :-
Providing and laying cement concrete in
foundation footings and bases of columns
excludation the cost of centring and shutering in
in 1:4:8 motar. 21.04 1,250.00 cum 26,300.00

4 MASONARY WORK :-
A Ist Class brick work in foundation and plinth
in 1:6 cement sand morter. 14.57 1,251.20 cum 18,229.98
B Ist Class brick work in superstucture in cement
morter in 1:6. 39.55 1,401.85 cum 48,749.33
C Half brick masonary in 1:4 cement sand morter
in superstucture. 125.32 157.75 sqm 85,145.80
D Cut stone masonnary couresd R.M Mason. 69.01 1,335.05 cum 92,131.80

Balance C/D 5,18,604.76