0% found this document useful (0 votes)
33 views33 pages

1.jafar Business Center

The document outlines a project proposal for a Multi-Purpose Business Center in Dire Dawa, Ethiopia, planned by Jafar Mumade Abdir with an estimated investment of Birr 50,000,000. The project aims to address the shortage of business centers in the area by constructing a G+4 building that will provide various services including a supermarket, restaurant, and training centers. The proposal highlights the favorable investment climate in Ethiopia and the potential economic benefits such as job creation and increased public revenue.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views33 pages

1.jafar Business Center

The document outlines a project proposal for a Multi-Purpose Business Center in Dire Dawa, Ethiopia, planned by Jafar Mumade Abdir with an estimated investment of Birr 50,000,000. The project aims to address the shortage of business centers in the area by constructing a G+4 building that will provide various services including a supermarket, restaurant, and training centers. The proposal highlights the favorable investment climate in Ethiopia and the potential economic benefits such as job creation and increased public revenue.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 33

MULTI-PURPOSE BUSINESS

CENTER
DEVELOPMENT

PROJECT PROPOSAL

OWNER: - JAFAR MUMADE ABDIR

May, 2024
Dire dawa, Ethiopi
TABLE OF CONTENTS

CONTENTS PAGE

1. EXECUTIVE SUMMARY------------------------------------2

2. INTRODUCTION ------------------------------------------4

3. ANALYSIS OF PROJECT AREA --------------------------5

4. BACK GROUND OF PROMOTER ------------------------6

5. PROJECT RATIONALE AND OBJECTIVES---------------6

6. MARKET ENVIRONMENTS ------------------------------7

7. ORGANAZATION AND MANAGEMENT----------------10

8. PROJECT LOCATION AND LAND REQUIREMENT----------10

9. PROJECT COST ESTIMATION -------------------------10

10. BEGINNING BALANCE SHEET --------------------------

11

11. DEPRECIATION ------------------------------------------

14

12. ESTIMATE PROJECT REVENUE-------------------------

15

Page 2
13. PROFIT LOSS STATEMENT ----------------------------

15

14. ENVIRONMENTAL AND SOCIAL ASPECT------------

16

1. EXECUTIVE SUMMARY

In light of the current enabling policy environment formulated by FDRE for


private sector development both at national and regional level, create a
favorable condition for many foreign and domestic investors to invest their
capital in various sectors of the economy.

Thus, by realizing the current enabling investment climate in Ethiopia in


general and the investment opportunities in service sector in Dire Dawa
Administration in particular, the promoter of this project Mr. Jafar
Mumade has planned to be engaged in establishment of Multi-purpose
business center project.

The total investment capital of the project is estimated to be Birr


50,000,000 of which Birr 49,000,000 is allotted for fixed investment
while the remaining Birr 1,000,000 will be used as initial working capital.
Concerning to its financial source, Br. 15,000,000 i.e. (30%) will be

Page 3
covered by the promoter and the remaining Br. 35,000,000 i.e. (70%) is
covered from bank loan.

The specific area proposed for the establishment of this project in Dire
Dawa locally named as Gende Rige. The promoter of this investment
project to be forwarded to the dire dawa administration to acquire the
required 1000m2 of land for this project.

In general with the implementation of this project varies advantages like


employment public revenue generation and capital accumulation for
further investment venture can be promoted.

2. INTRODUCTION

A good investment climate fosters productive private investment.


Investment is the engine for growth and poverty reduction. It creates
opportunities and jobs for people. It expands the variety of goods and
services available and reduces their cost to the benefit of consumers. It
supports a sustainable source of tax revenues to fund other important
social goals. Moreover, many features of a good investment climate
including efficient infrastructure, courts, and finance markets improve the
lives of people directly, whether they work or engage in entrepreneurial
activities or not. Improving the investment climate, the opportunities and
incentives for firms to invest productively, create jobs, and expand is the

Page 4
key to sustainable progress in attacking poverty and improving living
standards (World Bank, 2005).

Despite the fact that, the significant role the private sector would play in
promoting national and regional development in the past few decades in
Ethiopia, the prevailed policy environment that has highly discouraged
the participation of private investors both foreign and domestic was made
the potential to be far from relaxation. This has resulted in hindering
national and regional socio-economic progress in almost all sectors of the
economy revealing the existing low productive capacity of the economy
and significant socio economic losses in various dimensions.

Recognizing the extent to which the past policy environment has highly
impeded the development of the national economy and the necessity to
promote private sector participation in various of investment ventures
that are believed to be ,more rewarding and compatible with me current
national and regional development objects and priorities the new
investment policy in the country has open the wider opportunity for
private sector participation.

Based on this, at present the private sector has started to mobilize and
invest their knowledge and financial resources in various investment
activities, which they assumed to be beneficial for them and to the
country.

3. ANALYSIS OF PROJECT AREA

3.1 Back Ground

Page 5
Geographically, Dire Dawa administration lies within 9 0 27' and 49 0N
latitude and and 41 0 38' and 21 0 19'E longitude. The city of Dire Dawa is
found at a distance of 501 kms far from Addis Ababa to the East and 306
kms far from Djibouti to south directions by road. The proximity to
Djibouti made Dire Dawa an outlet for export and inlet to import for the
eastern part of the country. Neighboring regions of Dire Dawa are the
Somali region in the North and West, and Oromyia region in the East and
South directions.

Dire Dawa City Administration is one of the two urban dominated


chartered administrations in Ethiopia. It has its own Charter established
by Proclamation No. 416/2004. The city is divided into 9 Kebeles that are
the lowest administrative units. The Administration is executing and
implementing its municipal and state functions though its formally
established institutions. Therefore, it is facilitating, supporting and
enabling the investment and development initiative of the administration
through its institutions and related legal and organizational instruments.

Regarding the social situation and characteristics of the population, Dire


Dawa serves as a home for people from nearly all parts of the country.
According to the Population Census Report of 2007 prepared by CSA, the
population of the city consists of people from nearly all ethnic groups of
the country. Of these groups, the Oromo, Somali, Amhara and Southern
Nations and Nationalities, Peoples constitute the larger composition in
their population size.

The general demographic situation of Dire Dawa City shows that there is a
fast population increase both from natural and migration causes. The
prospect for the speeding-up of the momentum of the population growth
of the city in the future is also higher as the size of the young age
population at present dominates its population structure. The total

Page 6
population of Dire Dawa Administration, as of July 2011, was projected to
be 377.000. From this, the population of the urban was projected to be
256,774, in the same year.

3.2 Infrastructure and Land Availability

The availability of well developed infrastructure and fair priced land are
among the conductive climate of investment opportunities in the city.
Telephone, road, power and waste disposal systems are major
infrastructural provision of the city. The city also has land resource which
can be accessed for investment activities in the inner parts and expansion
zones of the city.

A) Land availability and management: According to the DDA


structural plan (FUPI 2004) appropriate sizes of land has been allotted for
service activities. The study depicts that efforts have been done to
reserve sufficient areas in both the existing built-up and the expansion
areas that will lead to the provision of balanced service at all levels of the
city. Accordingly, the total area allocated for service is about 311ha.
Considerable size of this land has been allotted for commercial services
like rea estate development. The lease period for commercial activities
has been set as 70 years. The arrangement of the lease payment is based
on advance payment of lease 20%.

B) Physical Infrastructure and Facility

Road: Dire Dawa Administration has about a total road length of 346.24
km with different hierarchy and types and extended to different parts of
the city. From this 249.9 km is gravel, 56.94 km coble stone and 39.40 km
asphalt road of different standards. Other than this, the city is connected
to surrounding regions, other parts of the country and neighboring

Page 7
countries with gravel and asphalt roads. Therefore, the area is internally
and externally accessible and has proper links.

Telephone: According to Dire Dawa Administration Statistical Abstract,


dire Dawa, (2011), the current users of telephone service exceeds
113000. The GSM prepaid and post paid users are 110539 while the fixed
telephone users are about 12300. Dial up internet users are 393. Both
private and business users have the larger number of the constituents.
The existing service providing capacity is also higher to accommodate
diversified Telecom users. Therefore, Telecom service is accessible to
fulfill the project requirement to the standard.

Electricity: The major source of Dire Dawa city electricity supply is the
connected lines of the national grid system. According to According to
Dire Dawa Administration Statistical Abstract (2011), there are 25066
private, 259 industrial, 338 government and 3613 commercial customers
of electric from Dire Dawa substation. Based on the 200m2 transformer
coverage assumption, the total coverage of electricity in the built up area
of the city is estimated 53.3 %. The inner part of the city has more access
than the expansion areas. As this project will be established in the vicinity
of city, power access will be better, from connected line.

3.3 SERVICE FACILITIES

The major services required by the project includes, transport, training,


financial, and market aspects. The city is highly benefiting from road, rail
way and airline transport services. Both freight and passenger transport
services rendered to different parts of the country and to the neighboring
counties.

Page 8
There is TVT School administered by the government. Besides, there is
one big public university. Different private colleges and training center
are found in the area. Therefore, necessary man power capacity building
supports can be availed at the spot. Regarding the financial institutions
there are 20 banks and insurances found in the city. Therefore, loan and
risk transfer supports can be found within the project area.

LABOR FORCE POTENTIAL

Labor is an important element of the project requirements. The


unemployment situation of Dire Dawa city is higher compared to the
situation of the major towns of the country and the overall country total.
Currently the unemployment rate of Dire Dawa City is estimated at 22.9
%. This includes educated unemployed too. Therefore, the job seeker has
significant number. On the other hand there are numerous public and
private training centers engaged in offering different short and medium
term technical trainings.

4. BACK GROUND OF THE PROMOTER

The promoter, Mr. Jafar Mumade Abdir is a dynamic business man


engaged in various business lines here in Dire dawa. The promoter has
very good entrepreneur skills and long year of experience in generating,
managing and running various business lines.

The promoter is planning to engage in investment activities that benefit


the nation and the city, Dire Dawa. The promoter in its part believes that
to participate in Multi-purpose business center in Dire Dawa city and
hence there is strong self-interest by the promoter in fostering prosperity
in this country in general and in Dire dawa Administration in particular.

Page 9
5. PROJECT RATIONALE AND OBJECTIVES

5.1 PROJECT RATIONALE

It is to be noted that the insufficient number of business centers in the


town and concentration of the existing in the center of the town fail to
address the service to the new developed part of the town.

It is then evident that there is a considerable shortage of business centers


that can provide better and standard room services for different business
activities. Thus, a need arise to intervene in this activity to meet the
demand of the population in the town and for the absorption of the existing
and future potential market in this respect.

This project is initiated by the promoter aiming at constructing G+4


buildings whose ground and first floor will be provided on rent for different
business purposes while rooms on second floors will be used for rental
offices, training centers others services as required.

5.2 PROJECT OBJECTIVES

The general objective of the project is to develop G+4 multipurpose


building will be used as super market, bar &restaurant, modern shopping
center, cafeteria, internet café, guest house, men and women beauty
salon and other related services and to earn reasonable income to the
promoter of the project, the following goals are expected to be achieved.
These goals are:

Page 10
 To alleviate the existing service shortage of supermarket, bar
restaurant, modern shopping center, cafeteria, internet café,
guest house, men and women beauty salon and other related
services in Dire Dawa City;
 To exist profit to the owner
 Creating jobs and thereby reducing the rate of unemployment
 Contributing to the growth of the regional economy in general
and to growth of government revenue in terms of taxes and the
like,
 Demonstrating the importance of investing in developmental
sector.

6. MARKETING ENVIRONMENTS

Dire Dawa is the second largest city of the country where there is
sufficient infrastructural facilities such as an organized transportation (rail
way, air and bus transport) and communication ranging from automatic
telephone to internet service, modern postal service and the like. The
conducive urbanized atmosphere, disregarding the natural increasing rate
of population could attract the immigration of population to the town,
there by demanding additional social and economic service provision
among which the most important is Business center which is required to
get most of the important needs at one shop stop.

Compared to the growth of business activity and escalation of the size of


the town, it can be concluded that the new settlement areas lack this type
of services more over the central part of the town also did not get
sufficient modern one shop stop business center.

Generally, the center of town is occupied by old buildings and residential


houses that doesn’t fit to the standard of the town.

Page 11
7. PROJECT TECHNICAL STUDY

7.1. The project Description

Commercial center is a component of industrial sector and an essential

element of strong indstrial economy building process. Modern commercial

center development is a process addition in capital stock, adding value on

the hand and important instrument for attaining long term sustained

development which is crucial pave avenues for building strong industrial

economy.

7.2. PROJECT LOCATION AND LAND REQUIREMENT

The specific area proposed for the establishment of this project in Dire
Dawa locally named as Gende Rige. The promoter of this investment
project to be forwarded to the dire dawa administration to acquire the
required 1000m2 of land for this project.

7.3 Raw Materials And Inputs


Raw Materials

The principal raw materials required for the construction of proposed Real

estate development are cement, sand, Hollow blocks selected material,

gravel, bricks, reinforced structural steels, PVC pipes, Timber, Gypsum,

play wood, corrugated sheet metal, EGA sheets, Nail, window glass, sheet

metal, door and window frames (profiles), paints, Galvanized pipe, angle

Page 12
iron, pipes and fitting for kitchen batch room and toilet, kitchen wares,

bath room wares and toilet wares, etc.

UTILITIES

Among the major utilities required by the project electricity, water and
telephone are the important one. Through undertaking necessary dealing
with authorized suppliers, it is aimed at installing the utility lines at the
earlier period of the project.
Electric as a major source of energy for the project will be obtained from
EPCO connected electric source. However, the project will have its own
power generator as standby power source. The average annual electric
consumption of the project is expected to be up to 200KWH.

Diesel fuel also will be used as a complimentary energy supply for stand
by generator and its transport logistics. It will be deposited in normal time
for supplementary energy generation activities. The major water supply of
the project will own source from DDWFA. The expected annual water
consumption of the project is estimated at 400m3. The project will use
telephone service for managerial, technical and administrative purposes.

MANPOWER REQUIREMENTS

No Description unit Qty


1 manager No 2
2 Accountant No 3
3 Cashier No 1

Page 13
4 Typist No 1
5 Janitor No 4
6 Guards No 2
7 Others No 15
Total 28

7.4 Building Constructions

The construction of buildings consists of the following sequential activities.

- Grading and site preparation

- Foundation construction

- Framing

- Installation of Windows & doors

- Roofing

- Siding

- Rough electrical

- Rough plumbing

- Insulation

- Trim

- Painting

- Finish electrical

- Bathroom & kitchen counters & cabinets

Page 14
- Finish plumbing

- Flooring

- Hook up to sewer or installing of a septic system.

8. ORGANIZATION AND MANAGEMENT

Organization is a means by which the operational function and activities are


structured and assigned to organizational units represented by managerial
staff, supervisors and work force with the objective of coordinating the
performance of enterprise and the achievements of business targets.

The project has defined organizational frame work to maintain


coordinated and integrated performance throughout its life time. The
owner of the project has the overall ruling power and organizational policy
design role.

The day to day internal operation of the project will be administered,


coordinated, and managed by the firm administrator who will be
appointed by the owner. This manager will be engaged in planning,
financing. Staffing of the project employees and managing its logistic and
technical operation of the project. There is also residence engineer who is
in charge of the construction management and coordination works.

Page 15
The project is nearly followed more or less flat type of organizational
structure to effectively coordinate its performance accordingly. However,
necessary tasks categorized with respect to its nature and technical
relationships.

According to the requirement of proposed project, the organizational


structure of the project is designed on the basis of the number, size, and
types of activities to be undertaken by the project. The organizational
structure of the project will comprise general management and other
technical staff.

Page 16
9. PROJECT COST ESTIMATES

The total investment capital of the project is estimated to be Birr 50,000,000 of


which Birr 49,000,000 is allotted for fixed investment while the remaining Birr
1,000,000 will be used as initial working capital. Concerning to its financial
source, Br. 15,000,000 i.e. (30%) will be covered by the promoter and the
remaining Br. 35,000,000 i.e. (70%) is covered from bank loan.

9.1 Fixed Investment Cost

Fixed investment cost of the project under consideration includes building and
civil works, furniture, and others fixed investment costs. These are:-

A. Land lease.

Based on the currently operational lease regulation of the region, the payment of
land lease cost is birr 200,000 of which 10% (Birr 2,000,000) will be paid at the
beginning while the remaining Birr will be distributed over 30 years.

B. Construction and civil work Cost

The compound includes the constriction of buildings such as Building, parking


and other related rooms. Based on present day cost of construction material &
labor, the estimated total cost of these civil works (consultancy), is around Birr
48,000,000

C. Office furniture: -The estimated cost of office furniture and equipments


required by the proposed project is nearly Birr 700,000

D. Installation expense

Page 17
To make the project runs at its optimum the basic infrastructure as electric power
supply, telephone services, potable water pipe line, etc have to be installed.
Hence, the estimated cost of installation is Birr 300,000.
9.2 Operational Expense

A. Employee salary and wages

The total cost of employ salary is estimated Birr 400,000.

B. Utilities Expenses

No Description Total cost

1 Electricity 200,000

2 Telephone 200,000

3 Water expense 200,000

4 Total 600,000

C. Other operational cost

No Description Cost in Birr

1 Employee fringe benefit 70,000

2 Miscellaneous expense 50,000

3 Office consumable 80,000

4 Repair and maintenance 80,000

5 raw materials 6,700,000

Total 8,000,000

Page 18
PROJECT COST SUMMARY

No Description Cost in Birr

1 INITIAL INVESTMENT COST

Land Lease, Construction And Civil 48,000,000


Works Cost
Office furniture and fixture cost 700,000

Installation Expense 300,000

Total 49,000,000

2 OPERATIONAL COST

Employee salary and wages 400,000

Utilities expenses 600,000

Other operational cost 8,000,000

Total 9,000,000

3 Working capital 1,000,000

PROJECT TOTAL COST 50,000,000

Page 19
10. BEGINNING BALANCE SHEET

1. Asset

Current Asset ------------------------------------------ 1,000,000

Fixed Asset --------------------------------------------- 49,000,000

Total Asset ---------------------------------------------------------50,000,000

2. Liability

Current Liability---------------------------------------

Long term liability ------------------------------------- 35,000,000

3. Capital

Owner’s Equity ----------------------------------------- 15,000,000

Total capital --------------------------------------------------------- 50,000,000

Page 20
11. PROJECT REVENUE ESTIMATES

Annual revenue estimates in Birr is describe as follows:-

Description Project year


Source of revenue 1 2 3-10

Multipurpose real estate


rooms to be rented for 2,160,000 2,160,000 2,160,000
different purpose

Total revenue 2,160,000 2,160,000 2,252,000

12. DEPRECIATION

NO Description Original Method Annual Total


value depreciati depreciati
on on
1 Building 2,900,00 Straight 599,215 599,215

line

2 Office 300,000 Straight 33,538 33,538

furniture and line

equipment

Page 21
Total 632,753

13. PROFIT AND LOSS ESTIMATES OF PROJECT


Descrip Project year
tion 1 2 3 4 5 6 7 8 9 10

Fixed 19,350,

cost 041

Total
revenue
----- ---- 2,160,000 2,160,00 2,160,0 2,160, 2,160, 2,520, 2,520,0 2,520,000

0 00 000 000 000 00

Total 1,686,35 1,686,35 1,686,35 1,686,3 1,686, 1,686, 1,686, 1,686,3

operatin
4 4 1,686,354 4 54 354 354 354 54 1,686,354
g cost
Gross 1,686,35 1,686,35 473,646 473,646 473,646 473,64 473,64 833,64 833,64 833,646

Profit
4 4 6 6 6 6
(loss)
Income -- -- 165,776.1 165,776. 165,776 165,77 165,77 291,77 291,77 291,776.1

tax 35%
0 10 .10 6.1 6.1 6.1 6.1

Net -- -- 307,869. 307,869 307,86 307,8 307,8 541,8 541,86 541,869.

Income 90 .90 9.90 69.9 69.9 69.9 9.9 9

Page 22
14. ENVIRONMENTAL AND SOCIAL ASPECT OF THE
PROJECT
The proposed project has no environmental impact rather this type of investment
project could help to mitigate the environment in general and climate of the
project area in particular. Thus, this is an environmental friendly project that will
contribute much for the improvement of the environmental through using modern
technology. The project location is also ideal for the disposal and treatment of
wastes and the promoter is prepared to be a minimum polluter and environmental
friend through providing incentive to local people to grow seedling and manage
accordingly. On the other hand the positive social impact of the project on the
society is significant. The project creates employment opportunities for 26
peoples.

15. PROJECT IMPLEMENTATION STRATEGY


15.1 Project Formulation and Establishment
A. exchange of views and creating shared understanding
The project proposal and strategic planning management document shall be
distributed to all potential stakeholders such as concerned members of the family,
government institutions and to selected financer with a view of creating satisfactory
exchange of views and promote shared understanding in advance.
B. Determination of establishment phase target activities
During the project formulation and establishment phase, the following major tasks
are required to be successfully accomplished.
Registration, licensing and acquisitions of operations commencement authorization
Acquisitions of construction permits
Preparation of every legally required document
Page 23
Appointment of strong and capable implementation team
C. Promotion and Fund Raising
To prepare promotional strategic planning mgt guidelines
To prepare promotional ideas, materials, logistics and facilities
To conduct promotional tasks and build strong constituency of support
To evaluate the process of promotion and progress
To prepare fund raising strategic planning guideline
To assess and identify major project donors
To assess and identify the interests, rules, regulations and conditions of targeted and
prioritized financers
To prepare all necessary requirements of financers and apply for fund
To undertake follow ups and secure fund
D. Organizational Builds up
Establishing and organizing project office
Preparing project working and administrative systems and procedural guidelines
Commissioning construction
Purchase of all on and off site durable and consumer goods
Staff recruitment, orientation and employment
To conduct pre operational trial runs, checking the validity of all activities

15.2 Budgeting Implementation strategy


A. Budgeting concept Definition
The realization of any strategic decision needs proper identification and
understanding of project objectives, and necessary activities. Moreover,
determination of time phase out process and resources to the completion of each
task which calls for budget making process and existence of effective strategic
budgeting is a key implementation strategy for the success of project objectives. In
consideration to the significance of sound budgeting system and procedures, it has
been selected and proposed as one of the best implementation strategy.

Page 24
There is no doubt that the internal and external activities, resources, process and
output of any organization should be managed effectively and efficiently. To attain
short and long term objectives of the project the management must chart the entire
tasks in advance in a comprehensive and coordinated manner. A budget is a
comprehensive and coordinated plan expressed in financial term for the operation
and resources of a project for some specific period in the futures. A budget is the
plan of project’s expectation in clear & formal terms to avoid confusion and to
facilitate their attainability. Thus the roles and significances of budgeting are;
 To state the project’s expectation in clear and formal terms, to avoid confusion and to
facilitate their attainability
 To communicate expectation to all concerned
 To provide a detailed plan of action for reducing uncertain and proper direction of
institutional group and individual efforts
 To provide a means of measuring and controlling performance
 To coordinate all institutional, group and individual efforts towards the success of
project objectives.

Thus, it is inconsideration to the above roles and significance of budgets and


budgeting that we select it as the best implementation strategy.
B kinds/types of budgets & budget setting process
Although, there are various kinds/types of budget items, to simplify it, the types of
major budgets have been categorized in to four.
Sales budget
Operations budget
Financial budget
Capital budget
Statement of Smart objectives and goals is probably the starting point and pace
maker for all other types of budgets. The sources of sound project objectives/goals
are again the internal and external environments. Analysis of the patterns of project
internal and external environments, pinpointing project opportunities and challenges
with a focus on the demand for the project services, existence of external

Page 25
opportunities and internal capabilities, it is pertinent to define project objectives and
goals in clear and formal terms at the outset.
The objectives and goals of any project emanate the operations, financial and capital
budget needs. The project corporate level objectives and goals, operations and
capital budgets are required to be further apportioned for all core process which
together form corporate budget.
The process of setting sound budget is a complex and complicated process, because
of the involvement of various factors in it. However, budget setting process starts
with the determination of limiting factors at the outset. The most important project
limiting factors are,
The demand for the project services
The economic life of the project
Existence of factor and non factor inputs
External opportunities supporting the project ideas and internal capabilities to
establish, operate, manage and control etc are some among others. Based on the
above limiting factors, the first step of budget setting process starts with definitions
and establishment of project basic objectives and goals
Second step: at this stage, it is necessary to identify and describe all on and off site
activities necessary to successful achievement of stated objectives and goals,
determination of logical sequence of activity execution process, time phase out to
complete each task in clear and unambiguous terms. Third step: at this stage, it is
very important to assess identify and define the resource needs of all activities,
measure, quantify and state in clear and formal terms.
Fourth step
Group all activities according to their similarities
Establish major budget centers
Allocate the resources required to major and sub budget centers
Prepare objectives/goals, operations, financial and capital budgets at corporate, core
process and sub process and assign centre of responsibilities
B. ESSENTIALS OF BUDGET MGT

Page 26
To make the objectives and purposes of budgets productive and positive impact
generating we propose the following budget administration. It should be well
recognized that corporate and functional levels budgets are prepared by line
executives while the organization and implementation of budgeting is a staff
function. Joint efforts of all line execution and a staff function in the preparation,
administration organization and implementation of budgeting should be done in a
coordinated manner. To this effect there should exist the following systems of budget
administration.
The budget committee consists of all members of the management committee which
bring together all activities of different project functional unites.
The primary function, of the budget committee is to decide on the general policies of
the project and directs all project functional unites to prepare their respective
budgets.
Budget director/officer

The budget officer shall have the following tasks;


 To draw a detailed time table for the preparation of budgets.
 To calculate and consolidate individual budgets into the project master budget.
 To design and develop necessary budgeting systems and procedures.
 To design and develop budgeting formats.
 To generate accumulate and transfer budgeting parameters information data and
indicrs.
 To undertake satisfactory exchanges among all project concerned stakeholders on
budgets and budgeting
 To educate all concerned on budget and budgeting
 To undertake monitoring evaluation and control activities
 To prepare periodic or extra ordinary budgeting reports
 To disseminate the feedbacks of budgetary monitoring and evaluation to all concerned
stakeholders
 To suggest sound and workable recommendations for immediate corrective measures
Budget manual

Page 27
The budget manual is a written set of instruction which serves as a rule book and
reference for the implementation of a budget.

Budget management principles


o Existence of top management support
o Specific measurable achievable realistic and time bound goals.
o Existence of clearly defined assign ment of authority and responsibility
o Creation of canters of responsibility
o Existence of appropriate accounting system
o Budget education and effective communication
o Flexibility

15.3 PERFORMANCE MGT AND CONTROL

A. monitoring, Evaluation and control strategy


The success/ failure of any planned objectives should be known with certain degree
of accuracy. To this effect all activities, resources process and output should be
monitored evaluated and controlled timely and regularly. To undertake monitoring,
evaluation and controlling activities timely and regularly there should exist.
Clearly identified and defined description of planned objectives, outcomes output and
inputs.
Existence of, sound, and appropriate, indicators, which show, the success/ failure, of
the planned objective outcome, output and inputs used.
Appropriate source and means of verifying that the planned, objective outcome,
output and inputs were in accordance with/ deviated from the planned
Clearly stated important assumption with/without which the planned objective
would/would not be successful.
The role and significance of monitoring evaluation and control are briefly described
as follows.
 Monitoring

Page 28
Monitoring is a continuous and process oriented information gathering, and data
mining on what has happened, who did it, when, how much, for whom etc. aimed at
measuring the magnitude, time quality and impact of the initiative. Monitoring helps
to compare the input human, material financial etc output product/service result and
the outcome (achievement against the planned tasks. Effective monitoring must be
completely integrated into all tasks. Existence of sound monitoring system, enable
organization to make appropriate and timely decision making and ensures
transparency and accountability.
 Evaluation

Evaluation is the process of analyzing information and data gathered during


monitoring process. The evaluation system helps to think critically and search into
ways of achieving desirable results. It is a periodic process of reviewing monitoring
data and drawing sound conclusion from it. Good evaluation system enables
organization to analyze the pre and post patterns of existing and future plans and
search into ways of achieving desirable results.
 Control

Control is a managerial process of detecting errors of principles system, procedures


etc aimed at avoiding resource miss allocating unemployment, fraud, wastage and all
other misfortunes which hinder the success of planned objectives. Control enables
organization to continue their production of goods/ products without jeopardizing
internal and external resources for better future. Thus, an integrated monitoring and
evaluation system in a single whole enables organizations optimally benefit from
available resources through satisfaction of existing and potential customers in their
best interests.
The monitoring evaluation and control system should be designed to serve both the
strategic and operational phases. The monitoring evaluation and control system
designed for both strategic and operational phases are described as follows.
This is a continuous and systematic monitoring evaluation and control of the validity
of basic assumption under which it operates. Thus, a regular and continuous

Page 29
proactive check against the validity of planned strategy aimed at changing or
improving the condition of vital assumption.
Performance management and control is a managerial process of designing and
developing sound indicators parameters means and sources of verifications
necessary to measure activities resources, process and output of individuals, groups
and institutions against the targeted standards and come up with logical results
which would help to make sound decisions. Although there are numerous areas
whose performance are needed to be well managed and control, the most important
areas and performance management indicators used in laundry and dry cleaning
business are briefly identified and described as under.
Operational control strategy is designed to guide monitor and evaluate the progress
of all planned activities against their respective planned objectives as in meeting
targets representing the planning horizon. Accordingly, all planned activities shall
have the following basic system to be used as a monitoring evaluation and control
mechanisms.
Components of narrative description
 Objectives
 Outcome
 Output
 Input
Indicators that show
 Objectives have been achieved
 Planned outcome has been attained
 Desired output has been obtained
 Input are properly allocated and employed in all terms

Source and means of verification

Relevant means and source of verification shall be clearly identified and employed
accordingly;

Page 30
 Strategic planning documents
 Audit report
 Field visit and on site survey
 Past data etc shall be used

15.4 CHANGE MANAGEMENT IMPLEMENTATION STRATEGY


In connection with the application of the project strategic plan, certain changes are
inevitable and these changes may take place in a continuous/discontinuous process.
The fact that all types of changes must result in supportive, adverse or neutral
effects, necessitate management needs to identify and understand the types and
impacts of each planned changes, to be able to benefit from change offers and deal
with the challenges of changes.
In general, transformational, transactional, transitional and Incremental changes in
the project workflow process organizational culture and behavior are expected to
occur both at strategic and operational dimension of this proposal. The impact of all
of these changes should be managed in favor of the project at large
The following major implementation strategies are proposed to manage these
changes.
Work flow process

This is a targeted economy of scale process intervention, aimed at attaining cost


minimization, profit maximization, efficient service delivery and customer
satisfaction. To do this it is pertinent to understand the dynamics of project realities
in the changing world. To change the workflow process to desirable small scale the
following implementation strategy are proposed.
 To undertake a detailed task analysis and determine the condition, process and time
phase out for each task.
 To determine the resource requirements availability quality magnitude and cost
 Determination of technology and system requirements
 Determination of skill, profession and experience requirement

Page 31
 To design and develop strategic fit and incorporating human resources into system
integration
 Acquisition of top management support.
Organizational culture change implementation strategy

Change in organizational culture refers to change in project belief, values, strategy,


purpose and expectations. Conductive conditions to cultural changes proposed are
 To create appropriate environment for team work, process focus, action oriented and
low level decision making
 Outstanding and effective trial of many alternative tools and techniques and
selecting the most appropriate
 Building the skills and competence of management and staff
 Setting standards to measure performance
 Analysis and initiating corrective measures
Behavioral change implementation strategy

Organizational behavior refers to employee individual and collective behaviors. The


most challenging task is to manage employees’ behavior towards the success of
desired changes.
The following strategies are proposed for project organizational behavioral change
implementation and management
 Involving employees in planning and decision making process
 Promotion of rewarding and incentive system
 Promotion of employee career and skill development operational plan
 Avoiding under/over employment
 Promotion of transparent, accountable and non discriminatory data based decision
making practices
 Provision of clearly defined job description, evaluation, lines of authority and
responsibilities as well as lines of communication and information flows.
 Provision of management and leadership support and guidelines.

Page 32
Staff motivation strategy

Experiences has demonstrated that the most difficult and resistance to


organizational transformation and improvement process is the behavior of employee,
unless employees are properly managed motivated and participated in the process
the efforts of achieving planned objectives would carry meaningless. Moreover, the
fact that there are various knowledge skill, experience dedication commitment sense
of ownership belongingness moral ethics honesty, reliability etc. among employees
there exist differences in their effort contributing and performance results. Employers
contributing extra efforts and time require recognition need reward and
development. Because recognition, reward and development.

Page 33

You might also like