Measure Profile: Republic of The Philippines Department of Public Works and Highways

The document outlines a measure profile for the retrofitting and strengthening of permanent bridges in the BARMM region of the Philippines. It includes a yearly breakdown of bridge conditions, proposed construction years, and funding amounts for various bridges, with a total of 15 bridges targeted from 2023 to 2028. The document specifies the condition of each bridge, indicating whether they are in good, fair, poor, or bad condition, along with proposed funding for their retrofitting.

Uploaded by

Wilfredo Tabuan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Measure Profile: Republic of The Philippines Department of Public Works and Highways

The document outlines a measure profile for the retrofitting and strengthening of permanent bridges in the BARMM region of the Philippines. It includes a yearly breakdown of bridge conditions, proposed construction years, and funding amounts for various bridges, with a total of 15 bridges targeted from 2023 to 2028. The document specifies the condition of each bridge, indicating whether they are in good, fair, poor, or bad condition, along with proposed funding for their retrofitting.

Uploaded by

Wilfredo Tabuan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Measure Profile
PGS Measure:
Retrofitting/Strengthening of Permanent Bridges

Name of Project and/or Yearly Breakdown of Bridges (No.) Initial


District Implementing Year if N, Reason for Amount
other details of target Region Proposed Bridge Condition AGE Y/N Proposed Year
Engineering Office Offices Constructed exclusion (P'000)
(Bridge Name) Year
2023 2024 2025 2026 2027 2028 Grand Total

BARMM 8 7 15
Bridge Still in Good
Baraas Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Fair 1970 53 N 2026 20,000.00
Condition
Bridge Still in Good
Carasaan Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Fair 1970 53 N 2026 20,000.00
Condition
Danori Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Bad 1965 58 Y 2025 10,000.00
Bridge Still in Good
Diarong Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Fair 1970 53 N 2026 10,000.00
Condition
Ilian Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Poor 1965 58 Y 2024 15,000.00
Itil Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Poor 1965 58 Y 2024 20,000.00
Kabaturan Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Bad 1970 53 Y 2024 20,000.00
Bridge Still in Good
Liangan Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Fair 1970 53 N 2025 40,000.00
Condition
Bridge Still in Good
Maganding Br. 1 BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Fair 1970 53 N 2025 10,000.00
Condition
Bridge Still in Good
Maganding Br. 2 BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Fair 1970 53 N 2025 20,000.00
Condition
Maladi Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Poor 1965 58 Y 2024 55,000.00
Bridge Still in Good
Maliko Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Fair 1970 53 N 2025 10,000.00
Condition
Bridge Still in Good
Condition only
Matling Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Fair 1970 53 N 2025 35,000.00
Improve Deck
wearing surface
Bridge Still in Good
Miondas Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2024 Fair 1970 53 N 2025 10,000.00
Condition
Bridge Still in Good
Ramitan Br. BARMM Lanao del Sur 2nd RO/DEO 1 1 2023 Fair 1970 53 N 2025 20,000.00
Condition