ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.
0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
Research Designs & Standards Organisation
Manak Nagar, Lucknow-226011
TI-M-4.2.3-11
Master List of Maintenance Instructions, Instructions, report and Maintenance Manuals for
Traction Installation Directorate
1.0 Amendment History:
S. No. Amendment Date Version Reasons for Amendment
1. 04/10/2010 1.0 First Issue under new documentation
system for ISO9001.2008 approved by
EDTI on NP-2 of file TI/GEN ISO on
04/10/2010.
2. 01/07/2011 2.0 Second issue under inclusion of
Maintenance Instructions, Instructions,
report and Maintenance Manuals for
Traction Installation Directorate
3. 04/03/2013 3.0 Third issue under inclusion of
Maintenance Instructions, Instructions,
report and Maintenance Manuals for
Traction Installation Directorate
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 1 of 7
ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
2.0 Purpose
Master list of Maintenance Instructions, Instructions, report and Maintenance Manuals
for Traction Installation Directorate
3.0 Scope of Application
The copies of the documents shall be kept in Documentation Cell and on TI Server.
4.0 Procedure/ Details
List of maintenance instructions
These maintenance instructions should be available with the Zonal Railways HQ,
Sr.DEEs of the electrified Railways, the PSI & OHE Depot, In-charges of the Division or
any other Supervisor responsible for the effective implementation of these
instructions.
Responsibility of Distributions
The responsibility of prompt distribution of these instructions to the Zonal Railways
HQ level will be of RDSO. The responsibility of prompt distribution of these
instructions to the Sr.DEEs/TrD of the Division will be of CEDEs of Zonal Railways and
distribution of these instructions upto the Depot level/concerned Foreman will be of
Sr.DEE/TrD of the Division.
Responsibility of Implementation
The responsibility of effective monitoring implementation of these instructions will be
of the Zonal Railways within the Zonal Railways, Sr.DEE/TrD will be responsible for
arranging all Stores related materials for these instructions, while the Depot Inahcrge
will be responsibile for the quality of implementation and effective implementation of
these instructions. In each case decision regarding their implementation lies with the
CEDEs of the Zonal Railways based upon the local condition prevailing.
Maintenance Rev. Instruction regarding Description of the item
Instruction No.
TI/MI/0001 0 OHE, Insulators Failure of 25 kV pedestal insulator
and to use only solid core support
insulator.
TI/MI/0007 0 OHE, Insulators Use of disc insulator in case of 9
tonne solid core insulator of 25 kV
a.c. OHE
TI/MI/0008 0 OHE, Insulators Failure of 9 tonne insulator due to
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 2 of 7
ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
non provision of double eye
distance rod at BWA Location.
TI/MI/0009 0 OHE, Cross feeder Deleted and converted into
Instruction No.TI/IN/0008
TI/MI/0018 3 OHE, ATD Wintch type regulating equipment
TI/MI/0020 0 OHE, Cross feeder Deleted and converted into
Instruction No.TI/IN/0008
TI/MI/0021 0 Insulators Deleted and converted into
Instruction No.TI/IN/0006 & 0007
TI/MI/0025 1 Shunt capacitor Deleted and converted into
Instruction No.TI/IN/0002
TI/MI/0026 2 Capacitor bank Periodical maintenance instruction
and trouble shooting guidelines for
capacitor bank
TI/MI/0027 0 OHE conductor Development of 107 sqmm silver
bearing copper contact wire (Silver
content 0.1%)
TI/MI/0028 2 OHE, panto Overhead equipments (OHE) on
entanglement turn outs/cross over to avoid panto
entanglements
TI/MI/0029 3 OHE, ATD 3:1 ratio, 3-pulley type regulating
equipment
TI/MI/0031 0 PSI, control voltage Deleted and converted into
Instruction No.TI/IN/0001
TI/MI/0032 0 - Deleted and separate formate No.
TIF 0011 to 0019 have already
been issued
TI/MI/0033 0 - Deleted and separate formate No.
TIF 0011 to 0019 have already
been issued
TI/MI/0034 0 OHE, OOR Contact wire in out of run OHE
TI/MI/0035 1 OHE, ATD Provision of pipe on hex tie rod of
auto tensioning device
TI/MI/0036 0 Insulated Cd Cu Provision of insulated Cd Cu
Catenary catenary wire on the over line
structure on 25 kV AC Traction
System
TI/MI/0037 2 Contact wire – OHE Maintenance Instructions for OHE
fittings Contact Wire and associated fittings
TI/MI/0038 2 Transformer Inspection test schedule for traction
power transformer
TI/MI/0039 1 Transformer Schedule for periodic overhaul of
traction transformer
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 3 of 7
ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
TI/MI/0040 0 Insulator To measure the severity of polution
by brush wash method
TI/MI/0041 0 Lightening arrestor Maintenance Instructions for
Lightening arrestors
TI/MI/0042 0 Insulators Special Maintenance Instruction for
testing of 25 kV Porcelain &
Composite Insulator before
installation
TI/MI/0043 0 Tower Wagon Maintenance Instruction for 8-
Wheeler Tower Wagon
TI/MI/0044 0 Tower Wagon Special Maintenance Instruction for
4-Wheeler Tower Car
TI/MI/0045 0 OHE, ATD Maintenance Instructions for Gas
Auto tensioning device
TI/MI/0047 0 Insulated Catenary Special maintenance Instructions
for precautions while splicing
insulated Cd-Cu Catenary Wire
2.0 List of other instructions
These instructions should be available with the Zonal Railways HQ, CORE/Allahabad,
CPM Offices at site, Sr.DEEs of the Electrified Railways & the Construction Units
carrying out the electrification works.
3.0 Responsibility of distributions
These responsibilities of prompt distribution of these Instructions to the Zonal
Railways HQ and CORE/Allahabad will be of RDSO. The mplementation for prompt
distribution of these Instructions to the Construction Units of HQ or field units and
Sr.DEE/TrD of the Division will be of CEDEs the Zonal Railways. The responsibility of
distributing these Instructions to CPM and Field Unit of RE shall lie with
CEE/CORE/Allahabad.
4.0 Responsibility of Implementations
The responsibility of effective monitoring mplementation of these instructions will be
of CEDE of the Zonal Railways and CEE/CORE/Allahabad. CPM and the field Dy.CEEs
shall ensure adequate measures before forwarding the applications for EIG sanctions.
For the existing electrified sections, their implementation shall be ensured by the
Sr.DEE/TrD, in each case, decision regarding their implementation lies with the CEDEs
of the Zonal Railways based upon the local condition prevailing.
Instruction No. Instruction regarding Description of the item
TI/IN/0001 PSI, control voltage Instruction for booster transformer
and return conductors in 25 Kv AC
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 4 of 7
ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
Traction System. TI/IN/0017-
Guideline on protection scheme
with parallel operation of 2x21.6
MVA Traction Transformer.
TI/IN/0002 Shunt capacitor Guidelines for design of fixed
compensation for improving power
factor at 25 volt, 50 Hz traction
sub-station
TI/IN/0007 Insualtor Instruction for action to be taken in
case of failure for an insualtor
TI/IN/0008 Copper cross feeder Instruction for use of copper cross
feeders at switching stations
TI/IN/0009 OHE spider Instruction for splicing of 19/3.99
mm aluminium conductor (splider)
TI/IN/0011 TSS Guidelines for operating procedures
of TSS in Mumbai area
TI/IN/0012 Insulator Failure prone insulator, insulators
suspected to be failure prone and
those to be retained in service
TI/IN/0013 Insulator Action to be taken by the Division/
OHE Depot for handling of
composite insulator
TI/IN/0014 Dynamic reactive Instructions for use of dynamic
power compensation reactive power compensation.
TI/IN/P&S/0028- implementation of
feeder cut brake back up featuring
in different masts/types/feeder
protection module
TI/IN/0015 Lubrication of wire Instruction for lubrication of wire
rope rope
TI/IN/0016 Parallel operation of Guidelines for parallel operation of
Traction Transformer traction Power transformer on IR
TI/IN/0017 Protection Scheme Guidelines on protection scheme
with parallel operation of 2x21.6
MVA traction transformers
TI/IN/0018 Panto relay Application of existing panto flash
over relay of TSS for single line
scetion
TI/IN/0021 SCADA Instruction for increasing data
(01/2010) transfer speed of the traction
SCADA system on IR from 600
/1200 bps to minimum 9600 bps.
TI/IN/0022 Relay setting guide Setting guide lines for traction
lines transformer & 25 kV shunt
capacitor bank protection relay
developed as per RDSO
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 5 of 7
ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
specification no
TI/SPC/PSI/PROTCT/6070(9/08) for
25 kV ac traction sub station
TI/IN/0023 SCADA Instruction for operating RTU, with
(02/2010) power supply of 110 V DC in place
of 240V AC for existing traction
SCADA System on IR.
TI/IN/0024 Feeder Circuit Breaker For monitoring & analysis of feeder
Tripping Analysis circuit Breaker Tripping for 25 kV ac
Traction Systems.
TI/IN/0025(08/2010) Technical instruction for improving
reliability of traction SCADA System
on IR.
TI/IN/0026 Protection Scheme protection scheme and relay setting
guideline for 25 kV AC TSS provided
with 30 MVA traction transformer.
TI/IN/0027(10/2010) Numerical relay Technical instructions on
maintenance practices maintenance practices to be
adopted for numerical type
microprocessor based protection
relay modules for 25 kV ac traction
system on IR.
TI/IN/P & S/0028 Feeder Circuit breaker Implementation of feeder circuit
backup breaker back up feature in different
makes/types of feeder protection
modules provided in C&R Panels as
per old RDSO spec no
ETI/PSI/65(1/97)
TI/IN/0029 Vectorial Delta-I Technical instructions on important
relays aspects of relay settings of Vectorial
Delta-I relays as per RDSO spec no.
TI/SPC/PSI/PROTCT/1982
TI/IN/0030 Lightning Arrestors Instruction related to the
installation and commissioning of
42 kV lightning arrestors
*TI/INS/0003 & 0004 have not been issued.
5.0 List of important reports
Please refer for important reports master list TIM/0007.
List of maintenance manuals
Manual No. Issued in Description of the report
TI/MM/0001 1994 Indian Railways Manual of AC Traction
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 6 of 7
ISO9001:2008 Document No. TI-M-4.2.3-11 version No. 3.0 Date Effective 03/04/2013
Document title Master List of Maintenance Instructions, Instructions, report and Maintenance
Manuals for Traction Installation Directorate
Maintenance & operation volume-II
(Part-I)
TI/MM/0001 1994 Indian Railways Manual of AC Traction
Maintenance & operation volume-II
(Part-II)
TI/MM/0001 1994 Indian Railways Manual of AC Traction
Maintenance & operation volume-
I(general)
Note: The master list is valid for two year from the date of issue. Thereafter, its
validity ceases to exist. Any updating/ correction in between shall be advised to the
customer separately in the form of a correction slip.
6.0 Referenced Documents
Nil
7.0 Referenced Documents of External Origin
Nil
8.0 Associated Records
Nil
9.0 Responsibility and Authority
Activity Responsible Approver Supporting Consulted Informed
Creation, DD/TI HOD/TI SE/JE/ISO MR/ISO- All groups
maintenance Cell through
of this Intranet
document
Cpmpliance of All groups HOD/TI SE/JE concerned
directives in charges
contained in
this document
10.0 Abbreviations
JE/TI DDTI EDTI Printed 2013/04/03
Prepared By Checked by Issued By Page 7 of 7