The document contains a series of questions and answers related to Manufacturing Cloud functionalities, including work definitions, scheduling work orders, receipt accounting, project-driven supply chain setups, and operational checks for compliance. It addresses various scenarios and configurations necessary for effective manufacturing operations and reporting. The content is structured as a quiz format, testing knowledge on specific manufacturing processes and system setups.

Uploaded by

Parshuram Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views3 pages

Manufacturing Cloud

The document contains a series of questions and answers related to Manufacturing Cloud functionalities, including work definitions, scheduling work orders, receipt accounting, project-driven supply chain setups, and operational checks for compliance. It addresses various scenarios and configurations necessary for effective manufacturing operations and reporting. The content is structured as a quiz format, testing knowledge on specific manufacturing processes and system setups.

Uploaded by

Parshuram Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Manufacturing Cloud

1. Which two fields are updatable for alternate resources in work definition?
A. Basis
B. Charge type
C. Usage
D. Unit assigned
2. Which statement is false regarding scheduling work orders
A. Forward scheduling considers work order start date as anchor point
B. Midpoint scheduling usage work order start date or completion date as anchor point
C. Work order is rescheduled if work order quantity is updated
D. Backward scheduling considers work order completion date as anchor point.
3. Which statement is not true regarding receipt accounting?
A. Receipt accounting cannot be implemented separately from cost accounting.
B. On accrue at receipt, accrued liability account is credited when the goods are received.
C. Accrual accounting can be performed for services and supplies.
D. On accrue at receipt end, accounts payable accounts are credited when the supplier invoice is processed in
accounts payables.
4. Which three setups are required to enable project-driven supply chain?
A. Enable inventory organization for project.
B. Create project specific transaction types
C. Classify inventory organization as project expenditure organization.
D. Setup default expenditure type for transactions.
5. Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional
Operation.
A. There are no components attached to it.
B. The Automatically Transact check box is deselected.
C. The Automatically Transact check box is selected.
D. The Count Point check is selected.
E. The Count Point check box is deselected.
6. Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources
available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop
Integration)?
A. Create Work Definitions
B. Update Work Definitions
C. Create and update ATO (Assemble to Order) model work definitions
D. Populate Descriptive flexfields
7. A Work Center created a month ago is no longer in use now. You want to remove the Work Center; however, the
system is no allowing you to delete it.
Identify three reasons for this.
A. There are resources associated with the Work Center.
B. The Work Center is being referenced in the Closed Work Order.
C. The Work Center is being referenced in the Open Work Order.
D. The work center is being references in the work definition operation.
E. The work center is being referenced in the Work Area.
8. You are setting up Fusion Manufacturing to support Back-to-Back Fulfillment. Identify an option that needs to be set
for oracle Fusion Planning Central to plan back-to-back item components and resources.
A. Select the Used in Planning check box in the new Work Definition.
B. Select the Used in Planning check box in the Work Definition Names.
C. Select the Used in Planning check box in the Work Structure.
D. Select the Used in Planning check box in the item definition.
9. The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting
transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.
A. The Manage Item Rules setup is not complete.
B. The Costing Interfaced Attribute is enabled in the resource definition.
C. The item was made inactive after the Work Order transaction.
D. The Costing Interfaced Attribute is not enabled in the resource definition.
10. Identify two reports that provide work order cost-related information to the costing user.
A. Work order Operational Analysis
B. WIP Balance by Plant
C. Purchase Variance Summary
D. Cost Accounting Dashboard
11. Your customer has completed the required setup steps for automatic work definition. Identify the option that shows
the navigation steps needed to create an automatic work definition.
A. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition
B. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work
definition
C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions>
Create automatic work definition
D. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
12. The production user wants to report Work Order completion. Identify two ways of reporting the progress of work
order at work order operation level.
A. Change Move status to Ready.
B. Complete using quantity completion
C. Complete with Details
D. Quick Complete
E. Change status of Operation to completed
13. A Production Operator needs to load Work Order Transactions from an external system into Manufacturing Cloud.
Identify the correct sequence of tasks to be performed.
A. Load Data to Fusion repository> Export File to UCM server > Process Import Operations Transactions> Load file
from UCM to Interface table.
B. Export File to UCM server> Load Data to Fusion repository> Process Import Operations Transactions> Load file
from UCM to Interface table.
C. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to Interface table >Process Import
Operations Transactions.
D. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to UCM server> Process Import
Operations Transactions.
14. Which entity should you use to configure the manufacturing plant in Functional Manager?
A. Organization
B. Plant
C. Legal Entity
D. Business Unit
15. A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page. On the Entering Edit
Work Order: WO-1025 page, the supervisor finds a General Information, Operations, and History tab, but no
Reservations tab.
What are two reasons for the Reservations tab not being displayed for WO-1025?
A. It is not a Configured Item work order.
B. It Is not a Drop-Ship work order.
C. It is not a Pick-to-Order work order.
D. It is not a Back-to-Back work order.
E. It is not a Plan-to-Produce work order.
16. Production operations need operators to execute the right steps to produce quality products, so want to use "View
Document Items on a Dispatch List." Which statement is NOT true?
A. You can add attachments to the document item and invoke the engineering change order to release the latest
revision of the document item and attachment.
B. You cannot view the document item attachment on the Manage Supplier Operations page.
C. You can view the document item attachment in the dispatch list and on the Manage Supplier Operations page by
using the attachment icon.
D. You will always see the active revision of the attachment from currently effective revision of the document from
Master Organization.
17. Which statement is NOT true about cumulative lead time?
A. It calculates cumulative manufacturing lead times by rolling up manufacturing lead times of make Items.
B. It calculates cumulative total lead times by rolling up lead times of make items and adding up lead time values of
buy items.
C. It updates the item's lead time attributes at the end of the calculation process: cumulative manufacturing and
cumulative total lead times.
D. It updates lead time percent at the operation level in the work definition.
18. A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You
associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2
available for day and night shift.
What is the correct sequence of steps to achieve this?
A. Associate R2 with WCI > Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter
2 In the Day Shift column > Enter 2 In the Night Shift column.
B. Associate R2 with WC1> Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter
4 in the Day Shift column > Enter 4 In the Night Shift column.
C. Associate R2 with WCI > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 2
in the Day Shift column > Enter 2 in the Night Shift column.
D. Associate R2 with WC1 > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter
4 in the Day Shift column > Enter 4 In the Night Shift column.
19. Your client needs to implement operational checks for compliance with training and job requirements. Which four
statements are true about this functionality?
A. You do not have the ability to associate a Job profile with a Work order operation resource.
B. You have the ability to associate a Job profile with a Standard operation resource.
C. The qualification Is enforced during reporting of labor usage.
D. A qualified operator need not be specified to report resource transactions.
E. The qualification Is used to warn a production supervisor If they assign operators that don't meet the skill
requirements against the resource.
F. You have the ability to associate a Job profile with a Work definition operation resource.
20. Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?
A. Enable IoT Fleet Monitoring and enable synchronization to IoT Production Monitoring in Plant Parameters.
B. Enable IoT Asset Monitoring and turn on 'Enable synchronization to IoT Asset Monitoring' In Plant Parameters.
C. Enable IoT Production Monitoring and turn on 'Enable synchronization to IoT Production Monitoring' In
Inventory Organization.
D. Enable IoT Asset Monitoring and turn on 'Enable synchronization to IoT Asset Monitoring' in Resources.
E. Enable IoT Production Monitoring and turn on 'Enable synchronization to IoT Production
21. Your customer has multiple distribution centers and a few manufacturing plants. The plants manufacture different
items with some overlap between them. The distribution centers stock parts from all plants.
Corporate Engineering team is responsible for centrally defining items and catalogs. This team defines the items and
sets the attributes for most parameters. The respective distribution centers and manufacturing plants must be allowed
to change some attributes locally.
What is the best way to achieve this?
A. Set up plants, distribution centers, and the Corporate Engineering organization as inventory organizations.
B. Set up plants and distribution centers as inventory organizations, and the Corporate Engineering organization as
an Item organization.
C. Set up plants and the Corporate Engineering organization as item organizations, and distribution centers as
inventory organizations.
D. Set up plants and the Corporate Engineering organization as Inventory organizations, and distribution centers as
item organizations.
22. Set up plants as inventory organizations, and distribution centers and the corporate Engineering organization as item