0% found this document useful (0 votes)
7 views1 page

Scorecard

The UC3M Edificio Carmen Martin Gaite achieved LEED BD+C: New Construction Platinum certification in October 2013, scoring a total of 53 out of 69 points. The building excelled in categories such as Water Efficiency and Indoor Environmental Quality, while facing challenges in Materials and Resources. Overall, it demonstrated strong sustainability practices across various environmental aspects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Scorecard

The UC3M Edificio Carmen Martin Gaite achieved LEED BD+C: New Construction Platinum certification in October 2013, scoring a total of 53 out of 69 points. The building excelled in categories such as Water Efficiency and Indoor Environmental Quality, while facing challenges in Materials and Resources. Overall, it demonstrated strong sustainability practices across various environmental aspects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

10496476, Calle Getafe

UC3M Edificio Carmen Martin Gaite


LEED BD+C: New Construction (v2.2) PLATINUM, AWARDED OCT 2013

SUSTAINABLE SITES AWARDED: 11 / 14 MATERIAL & RESOURCES CONTINUED


SSp1 Construction activity pollution prevention REQUIRED MRc3.1 Materials reuse - 5% 0/1
SSc1 Site selection 1/1 MRc3.2 Materials reuse - 10% 0/1
SSc2 Development density and community connectivity 1/1 MRc4.1 Recycled content - 10% (post-consumer + 1/2 pre-consumer) 2/1
SSc3 Brownfield redevelopment 0/1 MRc4.2 Recycled content - 20% (post-consumer + 1/2 pre-consumer) 0/1
SSc4.1 Alternative transportation - public transportation access 1/1 Regional materials - 10% extracted, processed and manufactured
MRc5.1 1/1
regiona...
SSc4.2 Alternative transportation - bicycle storage and changing rooms 1/1
Regional materials - 20% extracted, processed and manufactured
SSc4.3 Alternative transportation - low emitting and fuel efficient vehicles 1/1 MRc5.2 1/1
regiona...
SSc4.4 Alternative transportation - parking capacity 1/1
MRc6 Rapidly renewable materials 0/1
SSc5.1 Site development - protect or restore habitat 1/1
MRc7 Certified wood 0/1
SSc5.2 Site development - maximize open space 1/1
SSc6.1 Stormwater design - quantity control 1/1
SSc6.2 Stormwater design - quality control 0/1
INDOOR ENVIRONMENTAL QUALITY AWARDED: 14 / 15
SSc7.1 Heat island effect - non-roof 1/1
EQp1 Minimum IAQ performance REQUIRED
SSc7.2 Heat island effect - roof 1/1
EQp2 Environmental Tobacco Smoke (ETS) control REQUIRED
SSc8 Light pollution reduction 0/1
EQc1 Outdoor air delivery monitoring 1/1
EQc2 Increased ventilation 1/1
EQc3.1 Construction IAQ Mgmt plan - during construction 1/1
WATER EFFICIENCY AWARDED: 5 / 5
EQc3.2 Construction IAQ Mgmt plan - before occupancy 1/1
WEc1.1 Water efficient landscaping - reduce by 50% 1/1
EQc4.1 Low-emitting materials - adhesives and sealants 1/1
WEc1.2 Water efficient landscaping - no potable water use or no irrigation 1/1
EQc4.2 Low-emitting materials - paints and coatings 1/1
WEc2 Innovative wastewater technologies 1/1
EQc4.3 Low-emitting materials - carpet systems 1/1
WEc3.1 Water use reduction - 20% reduction 1/1
EQc4.4 Low-emitting materials - composite wood and agrifiber products 0/1
WEc3.2 Water use reduction - 30% reduction 1/1
EQc5 Indoor chemical and pollutant source control 1/1
EQc6.1 Controllability of systems - lighting 1/1
EQc6.2 Controllability of systems - thermal comfort 1/1
ENERGY & ATMOSPHERE AWARDED: 12 / 17
EQc7.1 Thermal comfort - design 1/1
EAp1 Fundamental commissioning of the building energy systems REQUIRED EQc7.2 Thermal comfort - verification 1/1
EAp2 Minimum energy performance REQUIRED EQc8.1 Daylight and views - daylight 75% of spaces 1/1
EAp3 Fundamental refrigerant Mgmt REQUIRED EQc8.2 Daylight and views - views for 90% of spaces 1/1
EAc1 Optimize energy performance 8 / 10
EAc2 On-site renewable energy 1/3
EAc3 Enhanced commissioning 1/1 INNOVATION AWARDED: 5 / 5
EAc4 Enhanced refrigerant Mgmt 1/1
IDc1 Innovation in design 1/1
EAc5 Measurement and verification 1/1
IDc2 LEED Accredited Professional 1/1
EAc6 Green power 0/1

TOTAL 53 / 69
MATERIAL & RESOURCES AWARDED: 6 / 13
MRp1 Storage and collection of recyclables REQUIRED
MRc1.1 Building reuse - maintain 75% of existing walls, floors & roof 0/1
MRc1.2 Building reuse - maintain 95% of existing walls, floors & roof 0/1
MRc1.3 Building reuse - maintain 50% of interior non-structural elements 0/1
MRc2.1 Construction waste Mgmt - divert 50% from disposal 1/1
MRc2.2 Construction waste Mgmt - divert 75% from disposal 1/1

You might also like