0% found this document useful (0 votes)
190 views1 page

Empire State Building: LEED O+M: Existing Buildings (v2008)

Vote for the USGBC Board of Directors slate from June 17-July 16. Learn more about the candidates and cast your vote.

Uploaded by

Sagar Gheewala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views1 page

Empire State Building: LEED O+M: Existing Buildings (v2008)

Vote for the USGBC Board of Directors slate from June 17-July 16. Learn more about the candidates and cast your vote.

Uploaded by

Sagar Gheewala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

USGBC members: Vote for the USGBC Board of Directors slate for 2019 from June 17-July 16.

Learn more and vote

0010422392, New York, NY

Empire State Building


LEED O+M: Existing Buildings (v2008) GOLD, AWARDED JUL 2011

SUSTAINABLE SITES AWARDED: 6 / 12 MATERIAL & RESOURCES CONTINUED


SSc1 LEED certified design and construction 0/1 MRc4.2 Sustainable purchasing - reduced mercury in lamps 1/1
SSc2 Building exterior and hardscape Mgmt plan 1/1 MRc5 Sustainable purchasing - food 0/1
SSc3 Integrated pest Mgmt, erosion control and landscape Mgmt plan 1/1 MRc6 Solid waste Mgmt - waste stream audit 1/1
SSc4 Alternative commuting transportation 4/4 MRc7.1 Solid waste Mgmt - ongoing consumables 1/1
SSc5 Reduced site disturbance - protect or restore open space 0/1 MRc7.2 Solid waste Mgmt - ongoing consumables 0/1
SSc6 Stormwater Mgmt 0/1 MRc8 Solid waste Mgmt - durable goods 1/1
SSc7.1 Heat island reduction - non-roof 0/1 MRc9 Solid waste Mgmt - facility alterations and additions 1/1
SSc7.2 Heat island reduction - roof 0/1
SSc8 Light pollution reduction 0/1 INDOOR ENVIRONMENTAL QUALITY AWARDED: 7 / 19
EQp1 Outdoor air introduction and exhaust systems REQUIRED
WATER EFFICIENCY AWARDED: 4 / 10 EQp2 Environmental Tobacco Smoke (ETS) control REQUIRED
WEp1 Minimum indoor plumbing fixture and fitting efficiency REQUIRED EQp3 Green cleaning policy REQUIRED
WEc1.1 Water performance measurement 0/1 EQc1.1 IAQ best Mgmt practices - IAQ Mgmt program 0/1
WEc1.2 Water performance measurement 0/1 EQc1.2 IAQ best Mgmt practices - outdoor air delivery monitoring 0/1
WEc2.1 Additional indoor plumbing fixture and fitting efficiency 1/1 EQc1.3 IAQ best Mgmt practices - increased ventilation 0/1
WEc2.2 Additional indoor plumbing fixture and fitting efficiency 1/1 EQc1.4 IAQ best Mgmt practices - reduce particulates in air distribution 0/1
WEc2.3 Additional indoor plumbing fixture and fitting efficiency 1/1 EQc1.5 IAQ best Mgmt practices - Mgmt for facility alterations and additions 0/1
WEc3.1 Water efficient landscaping 0/1 EQc2.1 Occupant comfort - occupant survey 0/1
WEc3.2 Water efficient landscaping 0/1 EQc2.2 Occupant comfort - occupant-controlled lighting 0/1
WEc3.3 Water efficient landscaping 0/1 EQc2.3 Occupant comfort - thermal comfort monitoring 0/1
WEc4.1 Cooling tower water Mgmt 1/1 EQc2.4 Occupant comfort - daylight and views 0/1
WEc4.2 Cooling tower water Mgmt 0/1 EQc2.5 Occupant comfort - daylight and views 0/1
EQc3.1 Green cleaning - high-performance cleaning program 1/1
ENERGY & ATMOSPHERE AWARDED: 25 / 30 EQc3.2 Green cleaning - custodial effectiveness assessment 1/1
EQc3.3 Green cleaning - custodial effectiveness assessment 1/1
EAp1 Energy efficiency best Mgmt practices - REQUIRED
EQc3.4 Green cleaning - purchase of sustainable cleaning products and materials 1/1
EAp2 Minimum energy efficiency performance REQUIRED
EQc3.5 Green cleaning - purchase of sustainable cleaning products and materials 1/1
EAp3 Refrigerant Mgmt - ozone protection REQUIRED
EQc3.6 Green cleaning - purchase of sustainable cleaning products and materials 0/1
EAc1 Optimize energy efficiency performance 12 / 15
EQc3.7 Green cleaning - sustainable cleaning equipment 1/1
EAc2.1 Existing building commissioning - investigation and analysis 2/2
EQc3.8 Green cleaning - entryway systems 1/1
EAc2.2 Existing building commissioning - implementation 2/2
EQc3.9 Green cleaning - indoor integrated pest Mgmt 0/1
EAc2.3 Existing building commissioning - ongoing commissioning 2/2
EAc3.1 Performance measurement - building automation system 0/1
EAc3.2 Performance measurement - system-level metering 1/1 INNOVATION AWARDED: 5 / 6
EAc3.3 Performance measurement - system-level metering 1/1 IOc1 Innovation in operations 4/4
EAc4.1 On-site and off-site renewable energy 1/1 IOc2 LEED Accredited Professional 1/1
EAc4.2 On-site and off-site renewable energy 1/1 IOc3 Documenting sustainable building cost impacts 0/1
EAc4.3 On-site and off-site renewable energy 1/1
EAc4.4 On-site and off-site renewable energy 1/1 TOTAL 54 / 91
EAc5 Refrigerant Mgmt 0/1
EAc6 Emissions reduction reporting 1/1

MATERIAL & RESOURCES AWARDED: 7 / 14


MRp1 Sustainable purchasing policy REQUIRED
MRp2 Solid waste Mgmt policy REQUIRED
MRc1.1 Sustainable purchasing - ongoing consumables 0/1
MRc1.2 Sustainable purchasing - ongoing consumables 0/1
MRc1.3 Sustainable purchasing - ongoing consumables 0/1
MRc2.1 Sustainable purchasing - durable goods 0/1
MRc2.2 Sustainable purchasing - durable goods 0/1
MRc3 Sustainable purchasing - facility alterations and additions 1/1
MRc4.1 Sustainable purchasing - reduced mercury in lamps 1/1

You might also like