YQ2000-10t-22m Hydraulic Crane
Service Manual
                                                                           Drw. No.:1YQ2000-001-00SM
                                                                           FILE:    mcm\..\1YQ2000-001-00SM
                                                                           英.doc
                                                                           DESIGN               SCALE m2
         No.     Q'ty   Revision No.       By   Date
                                                          Service Manual
         Designed by             Verified by
         Checked by              Appr. by                                    PAGE        1    OF      24
         Signed by               Traced by
         Std. checker            Checked by                                  SCMMP, CHINA
        Translator:
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP                   Service Manual                         1YQ2000-001-00SM                        Page 2 of 24
                                                              Content
             Main Technical Data···············································································3
             Ordering Spare Parts ··············································································4
             Usage, Construction and Performance Features···································5
             Safety System ·························································································6
             Mounting Guidance ······················································································7
             Initial Start·······························································································8
             Adjustment for Working Pressure ·························································9
             Adjustment for Load Holding Valve of Jib Cylinder ···························10
             Adjustment for Winch Counter Valve ···················································11
             Adjustment of the Slew Movement-Stop Length ·································12
             Slew Gear Brake Setting ········································································13
             Securing Wire to Winch ··················································· 14
             Filtration - General ·················································································15
             Lubricating Positions and Time ·····························································16
             Hydraulic Oil List···················································································17
             Maintenance····························································································18
             Re-tightening of Bolts in Slew Bearing ···································································19
             Wear Measurement for Slew Bearing ·······················································20
             Slew Bearing Wear Measurement Table ·········································································21
             Hydraulic System failures and Trouble Shooting·································22
             Surface Treatment···················································································24
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP           Service Manual           1YQ2000-001-00SM         Page 3 of 24
                                    Main Technical Data
           General:
           Model YQ2000-10t-22m hydraulic crane is one kind of our YQ series
           cylinder-luffing, box-type jib electric-hydraulic crane, which incorporates
           our more than ten-year experience of introducing foreign crane and absorbs
           foreign advanced technology. It is of a new generation marine lifting
           appliance Chinese-designed and developed with high starting points. This
           crane is suitable for various vessels, dock or platform to lift hose, cargo,
           provision, spare parts and other goods. The crane has a novel construction,
           beautiful appearance and reliable quality. Its main technical data are as
           follows:
               Crane model:                              YQ2000-10t-22m
               Rated safety working load:                SWL 10t
               Max. working radius:                      Rmax = 22 m
               Min. working radius:                       Rmin = 4.5m
               Lifting speed at SWL :                    0~18 m/min
               Slewing speed at noload:                   0~0.7 r/min
               Luffing time at noload:                    ~110 s
               Hoisting height:                           30m
               Slewing sector:                            360°(without limit)
               Max. allowable list/trim:                  5°/2°
               El. motor model:                           Y225M-4-H
               Power/voltage:                             65kW/380V/50Hz/3ph
               Insulation class:                          B
               Enclosure:                                 IP44
               Rated current:                             121.4A
               Duty :                                     S6-40%
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP          Service Manual         1YQ2000-001-00SM      Page 4 of 24
                                 Ordering Spare Parts
           When ordering spare parts, quote crane type and machine number. Order
           parts from:
                           South China Marine Machinery Plant
                    Add: 73 Qian Jian Road, Wuzhou, Guangxi, China
                    Telephone: (0774) 5845600
                    Telefax: 0774 - 5827016
                    Cable: 4767
                    Post code: 543004
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual            1YQ2000-001-00SM          Page 5 of 24
                     Usage, Construction and Performance Features
           YQ1400-4t-14m hydraulic crane is of a lifting appliance absorbed foreign
           advanced technology as well as Chinese-designed and developed with high
           starting points. It can be selected by various of ships for lifting goods.
           There are four parts for crane's integral construction including base, king, jib
           and control console.
           Base is of a circular column. It is necessary to mount this part to the deck
           counter foundation when using the crane.
           The inside of king is equipped with oil tank, oil pump and electric motor
           unit, slewing reduction unit and hydraulic system.
           Jib adopts a box-type construction welded with steel plates. No maintenance
           is needed inside the box.
           Control console is securely mounted to the side of the king. The operation of
           crane can be controlled on control cabin.
           This crane's actions are performed by the three power systems of lifting,
           slewing and luffing. Three power systems are full hydraulic type which the
           power is supplied by one set of electric motor drives one set of oil pump.
           The central slip ring is mounted in the middle between base and king to
           provide the power supply for crane.
           Lifting winch is mounted on the jib and is driven by axial piston motor with
           good quality. The winch lifts goods through the planetary gear reduction-box
           with high strength drives the drum to wind wire rope.
           Slewing unit is mounted on the king and is driven by axial piston motor with
           good quality. King's slewing motion is realized through the planetary gear
           reduction-box with high strength meshes directly with the inner-tooth ring of
           slew bearing.
           Luffing motion is realized by one hydraulic cylinder.
           Hand emergency oil pump is arranged outside the control cabin for
           emergency releasing under the condition of power is cut off.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual           1YQ2000-001-00SM            Page 6 of 24
                                        Safety System
           All lifting, luffing and slewing are equipped with automatic protection which
           has nothing to do with the control oil line of main power system. All motions
           can be automatically stopped at the event of cutting-off power or pressure for
           making sure the crane is safe.
           There is a safety valve mounted inside the main control valve .
           Winch and slewing unit are equipped with automatic brakes.
           Luffing cylinder is arranged with automatic load protective valve.
           Overload protection on all motions.
           Automatic stop is arranged in upper/lower hook position.
           Luffing limitation is determined by cylinder's own stroke.
           Hand emergency releasing gear is arranged on control table..
           Electric motor is equipped with short circuit protection and overheat
           protection.
           Note: The crane has been adjusted and tested before delivering. Each
           hydraulic component, safety valve, limit valve has been adjusted already.
           Please don't turn them at will for avoiding the safe accident.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP             Service Manual            1YQ2000-001-00SM           Page 7 of 24
                                      Mounting Guidance
           This crane is normally designed to be welded directly to the deck or some
           other type of support. If the User had a special requirement, the crane can be
           designed to be bolted to the flange of deck foundation by using bolts.
           As the minimum requirement of the various classifications, the deck must be
           designed to withstand the cranes max. bending moment with a 25 %
           overload.
           Due to the reason of transportation, the crane can be delivered by
           dismounting several parts, i.e. jib (including winch, wire rope and hook),
           base and king (including electric motor, oil pump, slew gear box, control
           valve, slew bearing etc.), control console, luffing cylinder, starter cabinet and
           other accessories.
           The following procedures should be complied with when mounting the crane
           components onboard ship:
           1. Weld the crane base (including king) to the deck, check butt welding
           grooves to obtain an even gap through the circumference. Also an evenly
           distributed heat input is required to avoid distortion. In case the flange bolt is
           adopted to connect, it should check if the dimensions and strength of bolt,
           nut and washer are in compliance with the requirements shown on the
           drawings. The tension /torque of holding bolt should be in compliance with
           the values stated on the drawings.
           2. Mount the jib and luffing cylinder on the king according to General
           Arrangement. It should be very careful when lifting cylinder for preventing
           the important parts from being damaged. Please note that don't mistake the
           direction of cylinder. The pin shaft for jib and cylinder should be locked with
           bolts and press cover and be greased.
           3. Connect the hoses between king, jib and cylinder according to the
           hydraulic flow diagram. Before delivery the dismantled hoses and
           connections should be marked. Please note that connect the hose to the
           connection which mark is matchable and then tighten up.
           4. Connect the cables between electric motor, starter cabinet against the
           electric principle drawing and wiring drawing, then check the wiring for
           correction again and again.
           After finishing the above mentioned installation, then carry out the check
           prior to start-up.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual           1YQ2000-001-00SM           Page 8 of 24
                                          Initial   Start
           Fill the hydraulic system oil tank with the correct amount of an approved oil
           (see lubrication chart). The oil level is to be in the middle of level glass.
           It is of the upmost important that only pure clean oil be used. Under no
           conditions must water, dirt and other foreign matters enter the tank.
           Impurities and moisture will drastically reduce the efficiency and life span of
           the hydraulic system. As a result, oil tank cavity can not be connected with
           air directly.
           The crane has been operated and tested at our works prior to delivery.
           However, improper storage and handling during transport may result in oil
           leakage.
           Therefore, check the oil level in the slew gear box and winch and top up if
           necessary, making sure to use only those oils recommended in this manual.
           All pressure control valves have been adjusted by the maker and must not be
           altered.
           As a final check before starting, check the rotation of the el. motor. The
           motor must rotate in a clockwise direction (subject to the rotation of oil
           pump) as seen from the fan end. If the motor is rotating in the wrong
           direction interchange 2 phases and check again for clockwise rotation.
           The pump must not be allowed to run in the wrong direction for an exceeded
           period of time, as this will adversely affect the life span of the pump.
           Upon completion of initial test run, check the oil level in the system oil tank
           top up if necessary.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP           Service Manual           1YQ2000-001-00SM         Page 9 of 24
                            Adjustment for Working Pressure
           Connect a manometer to the pressure-measuring point on the main control
           valve then start el. motor.
           Raise the jib to its uppermost position and hold the control valve handle in
           the jib up position, take the pressure indicated on the manometer. This
           pressure should be the same as the pressure shown on the hydraulic flow
           diagram. If the pressure differs more than 10% the following adjustment
           should be made.
           Remove the cover and the seal ring from the main relief valve C. Loosen the
           locking nut with the jib in its uppermost position continue holding the
           control valve handle in the jib up position.
           The operating pressure may now be adjusted using a screw driver on the
           adjusting screw. Turning the screw clockwise will increase the pressure.
           When the desired pressure is reached hold the adjusting screw in place with
           the screwdriver while tightening the locking nut. Take a final pressure
           reading before replacing the seal ring and cover.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual           1YQ2000-001-00SM         Page 10 of 24
                    Adjustment of Jib Cylinder Load Holding Valve
           Lift full load with jib to a position of approximately 15°over horizontal.
           Stop the electric motor leaving the load hanging on the hook. Move the
           operating handle for jib down to its maximum position and hold it there.
           Screw off the locking nut on the load holding valve, located near the bottom
           of the cylinder, loosen the adjusting screw just enough to allow the load to
           sink slightly. Then tighten the locking nut and return the operating handle to
           its neutral position.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP           Service Manual          1YQ2000-001-00SM        Page 11 of 24
                    Adjustment For Winch Counter Balance Valve
           The winch counter balance valve insures a smooth and safe winch down
           movement. In the event the winch operates in a jerky manner, the following
           adjustments are to be made:
           Loosen the locking nut and adjust the adjusting screw until a smooth winch
           down movement is achieved.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual           1YQ2000-001-00SM         Page 12 of 24
                   Adjustment of The Slew Movement - Stop Length
           Operate the crane with no load. Lower the jib to its horizontal position.
           Operate the slewing movement at max. speed. Release the operating handle.
           The crane should now stop via relatively smooth movement. If adjustments
           are necessary procedures as follows:
           Remove plug H. To increase stop length turn adjusting screw J in. To
           decrease stop length turn screw out.
           In the event the restriction valve is completely out of adjustment, turn the
           adjusting screw in until it stops, then turn out 1.5 turns. Replace plug H and
           check for proper operation.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP           Service Manual          1YQ2000-001-00SM           Page 13 of 24
                                 Slew Gear Brake Setting
           Brake friction piece in the slew gear will be worn as a result of use. When
           adjustments become necessary proceed as follows.
           Loosen plug H2. Measure dimension X.
           Using a 10mm square wrench in a clockwise direction will increase
           dimension X, turning in anticlockwise will decrease dimension X.
                     Fig. 3   Local Sectional View of Slew Unit Adjustment
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP          Service Manual         1YQ2000-001-00SM       Page 14 of 24
                                Securing Wire To Winch
           Thread end of wire through slotted hole in wire drum and then under the
           square clamps.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual           1YQ2000-001-00SM         Page 15 of 24
                                     Filtration - General
           The operation and lifespan of hydraulic system is greatly dependent upon the
           quality of the hydraulic oil.
           The lubrication schedule in the service manual indicates the type of oil to be
           used and frequency of oil change.
           A hydraulic system when in use will always produce particles. The amount
           and hardness of the particles varies dependent upon how well the system
           functions and where in the system the particles are produced.
           Each type of pollutant entering the oil will reduce the quality. In order to
           avoid reducing the oil quality or in the worst case damaging important and
           costly components it is of the utmost importance that the oil quality be
           maintained as close to that of new oil for the systems entire lifespan.
           Therefore are the built-in filters which function continuously while the
           system is in use an important part of the hydraulic system.
           The filter element must be changed during each oil change. Cleaning and
           reusing the filter element is not acceptable.
           In many cases the filters are equipped with indicators that reveal the
           condition of the filter. As soon as the indicator signals a dirty or
           contaminated filter, the filter element is to be replaced immediately.
           Under no circumstances shall a filter operates more than one year without
           changing the filter element. A clogged filter element causes a “BY-PASS”
           through the filter which results in the system operating with unfiltered oil.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
           SCMMP        Service Manual        1YQ2000-001-00SM     Page 16 of 24
                            Lubricating Positions and Time
          Hour     1    2     3     4     5     6    7
           50           C     A
           100    C     C     A     A                C
           150          C     A
           200    C     C     B     A                C   First 200 hours running
           200    C     C     A                      C
           250          C     A
           300    C     C     A     A                C
           350          C     A
           400    C     C     A     A                C
           450          C     A
           500    C     C     A     A    D           C
           550          C     A
           600    C     C     A     A                C
           650          C     A
           700    C     C     A     A                C
           750          C     A
           800    C     C     A     A                C
           850          C     A
           900    C     C     A     A                C
           950          C     A
          1000    C     C     B     B    D      C    C
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP           Service Manual            1YQ2000-001-00SM      Page 17 of 24
                                      Hydraulic Oil List
             Hydraulic system: 1000 liter wear-proof hydraulic oil (Trade mark YB-N68)
             Lifting winch: 15 liter Middle load gear oil 220
             Slew gearbox: 30 liter Middle load gear oil 220
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP           Service Manual          1YQ2000-001-00SM          Page 18 of 24
                                         Maintenance
           The use check and regular maintenance check for the crane should be carried
           out in compliance with the rules of marine lifting appliances.
           The loose parts (hook, shackle, shrink ring, sheave) should be external
           checked regularly (not more than 3 months) by the responsible person
           working onboard ship. The annual inspection should be carried out at least
           every 12 months.
           Wire rope should be external checked regularly (not more than 3 months).
           Any wire ropes which are found to be over worn and be seriously corroded
           or be broken by more than 5% within the length of 10 times diameter
           should be replaced.
           The crane should be annually checked every year and the lifting test should
           be carried out according to the Rules' requirements every 4 years.
           The methods for removing the hydraulic cylinder from crane are that lay the
           jib on the rigid support surface of about 5°over horizontal and fix it, then
           remove the hoses, the cylinder is now ready for removing. For the detailed
           maintenance methods, please refer to 《Service Manual For REXROYH CD
           Series Hydraulic Cylinder》.
           Check or adjust the mounting dimensions for lifting winch and the brake
           piston of slew gearbox every 1000 hours. We recommend to change brake
           piece every 3000 hours.
           Check bolt and nut tightening torque for lifting winch and slew gearbox
           every 500 hours.
           For the thread tightening torque, the following data should be used (Lightly
           grease the thread and support surface):
                                          Tightening Torque    (N·m)
               Thread Spec.
                                      8.8              10.9              12.9
                    M10               50                80
                    M12               80                120
                    M14              120                170
                    M16              190                265              320
                    M18              260                365              435
                    M20              370                560              620
                    M24              640                950              1080
                    M27              950               1350              1620
                    M30              1300              1800              2200
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual          1YQ2000-001-00SM         Page 19 of 24
                        Re - Tightening of Bolts in Slew Bearing
           The safe operation of slew bearing is dependent upon proper tightening of
           the bolts. It is very important that the bolts be regularly checked and
           re-tightened if necessary.
           The necessary bolt tension/torque indicated is based upon lightly oil bolt
           threads and nut/bolt head bearing surfaces.
           For re-tightening of bolts (type 10.9) use the following bolt tension/torque
           moment:
                      Bolt Size                     Torque Moment
                        M16                            265 N·m
                        M20                            560 N·m
                        M24                            950 N·m
                        M27                            1350 N·m
                        M30                            1800 N·m
           The first bolt check is to be made after 100 running hours. The second bolt
           check is to be made after 400 running hours. The interval between following
           bolt checks is about every 300 running hours, depending upon how much
           and at what loads the crane is being used.
           In the event that the bolts are loosing up between checking intervals,
           increase the frequency of bolt check.
           It is very important that mounting bolts have the correct pre-tightening
           torque.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP            Service Manual            1YQ2000-001-00SM          Page 20 of 24
                           Wear Measurement For Slew Bearing
           Wear on the slew bearing will result in a height difference between the
           crane's base and the rotating part of the slew ring.
           In order to perform an exact check on the possibility of this condition
           existing a measuring plate (ca. 25mm×25mm) is welded to the upper flange
           of the crane base. All measurements are made from the upper surface of this
           plate to the lower edge of the outer slew ring.
           Measurements are taken with no load on the hook and the boom in
           horizontal position.
           The first measurement is taken at position 1 with the boom on center directly
           over the measuring plate at position 1. The next measurement is made by
           rotating the boom 45°in a clockwise direction, and so on until all 8
           measurements have been made. The measuring positions are numbered in a
           clockwise sequence as shown in the sketch.
           In order to obtain accurate measuring data, it is very important that all future
           measurements are made with the boom in the same positions each time. The
           enclosed table is to be filled out as each measurement is taken, also sort out
           and store these measurements carefully. Measuring instruments with an
           exactness of at least 1/10mm are to be used. The first set of measurement are
           to be taken after installation onboard and are to be recorded in the table as
           the basic measurements.
           The maximum allowable deviation between the basic measurement and all
           future measurements is indicated on the table. If the difference is noticed to
           deviate more than expected, the intervals between making sets of
           measurements must be increased. The safe functioning of the slew ring is
           dangerously reduced if the maximum allowable deviation is exceeded.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP               Service Manual         1YQ2000-001-00SM        Page 21 of 24
                            Slew Bearing Wear Measurement Table
                                 (Max. Allowable Deviation = 1.9 mm)
           Measurements to be made every                 Boom Position
           6 months from the date of basic
           measurements                      1   2   3      4    5       6     7     8
           Basic             Measurement
           Measure-ment
           Date               Deviation      0   0   0      0    0       0     0     0
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
                             Measurement
                Date
                              Deviation
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP             Service Manual            1YQ2000-001-00SM             Page 22 of 24
                     Hydraulic System Failures And Trouble Shooting
            Failures              Reason Analysis                 Trouble Shooting
           No action      1. Electric connection failure.  1. Check electric circuit if
                                                           there is connection mistake
                                                           or joint is bad.
                          2. There isn't enough oil in oil 2. Check oil level height, add
                          tank.                            oil up to the specified value.
                         3. There isn't enough oil             3. Adjust main control valve
                         pre-ssure                             to raise oil pressure.
                         4. Oil filter is stopped up.          4. Check, clean or replace.
           Operating     1. Valve core of main control         1. Check, clean, repair or
           main control valve       produces       hydraulic   replace valve core, remove
           valve,        blockage or dirty.                    the blocked dirty.
           perfor-ming 2. Main control valve pressure          2. Adjust main control valve
           unit have no is too low.                            pressure.
           action
                         3. Oil filter is blocked or           3. Clean or replace.
                         damaged.
                         4. Breaking or loosening of           4. Check, tighten or replace.
                         hose.
           Control lever 1. Control valve spring is damaged.   1. Check, clean or replace spring.
           can't return
                          2. Sliding valve of control valve    2. Repair or replace valve core.
                          produces blockage.
                          3. Control connecting valve has      3. Check, adjust or replace.
                          failure.
           Breaking and 1. Adjusting pressure is too           1. Readjust and lower
           oil leakage of high.                                pro-perly.
           hose           2. Hose mounting isn't correct.      2. Remove then remount,
                                                               re-place.
                          3. Hose is loose                     3. Tighten hose connection.
           Oil            1. Operating oil capacity, heat      1. Replenish proper operating
           temper-atur exchange aren't enough.                 oil.
           e rise, oil 2. Continuous working time is           2. Stop operating to lower
           motor       is too long.                            te-mperature.
           over heated 3. Wear inside the oil motor.           3. Check, repair.
           Lifting     is 1. Safety valve adjusting            1. Check and raise pressure
           powerless      pre-ssure in main control valve      properly, but the specified
           or can't up. isn't enough                           value can't be exceeded.
                          2. Failure inside the oil motor.     2. Repair or replace.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP             Service Manual            1YQ2000-001-00SM       Page 23 of 24
           Continuation:
             Failures            Reason Analysis               Trouble Shooting
           Hook doesn't 1. The action of counter balance 1. Check, clean, repair.
           get down     valve isn't normal.
                        2. Failure inside the oil motor. 2. Repair or replace.
           Jib can't up   1. Pressure isn't enough.        1. Check and adjust, but the
                                                           specified value can't be
                                                           ex-ceeded.
                          2. Cylinder seal is damaged.     2. Repair cylinder.
           Jib can not 1. Counter balance valve is 1. Check, clean, repair blocked
           lower        blocked (hydraulic blockage).    position or replace the related
                                                         elements.
                        2. Leakage of pressure relief 2. Raise the pressure suitably.
                        valve is too much.
                        3. Restriction valve opening is 3. Close restriction opening a
                        too big.                         little.
           Slew doesn't 1. Oil motor has failure.        1. Check, replace the related
           move or is                                    element or motor.
           powerless
                        2. Slewing unit has failure.     2. Check, clean or replace.
                        3. The adjustment of check 3.            Readjust    restriction
                        re-striction valve isn't proper. open-ing.
           Emergency 1. Emergency valve doesn't 1. Remove emergency valve
           lower has change.                             handle to emergency lower
           no action                                     position.
                        2. Counter balance valve is 2. Repair or replace.
                        blocked.
                        3. There is no pressure through 3. Repair hand pump.
                        hand pump.
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
          SCMMP               Service Manual               1YQ2000-001-00SM              Page 24 of 24
                                         Surface        Treatment
         Surface treatment: sandblasted to Sa2.5.
             Primer/workshop primer:
            Epoxy zinc-phosphate primer or zinc-rich epoxy primer, 30~50μm;
             Intermediate paint::
            Epoxy zinc-phosphate paint or epoxy thick-liquid paint, 100~125μm;
              Top coat:
            Epoxy thick-liquid paint, epoxy enamel or epoxy polyester paint.Top coat
            colour will be grey, yellow or orange 100~150μm;
           ※ The painting can be done as per-customer’s requirement, but should be defined
           in approved document. Should customer has no confirmation in writing, we would consider the
           customer agrees our standards, i.e. the painting colour would be grey. ※