JSA
- Job Safety Analysis -
JSA No.: LIL/SAM/JSA- Page 1 of 1
A. Activity
Lifting by Crane activities & material lifting and shifting by pick& carry crane
Activity titel:
Sam Engineering Construction
Contractor's name:
Prepared by: Date: 3/24/2025 Signature:
B. Hazard Factors (Please select one or several hazard factor numbers)
MECHANICAL BIOLOGICAL MATERIAL VIBRATION & OSCILLATION
1 Unprotected moving parts 16 Infection Hazards thru work with biological material 32 Hand and Arm vibration
2 Uncontrolled moving parts 17 Work with genetically modified organisms 33 All body vibration
3 Movement of machine and vehicle 18 Allergenic and toxicological effect from micro-organisms 34 Noise
4 Hazardous surfaces and forms PHYSICAL BURDEN / WORK INTENSITY 35 Infra and Ultra sound
5 Stumble, Slip and Fall 19 Intense and dynamic working position AMBIANT CONDITIONS
6 Falling from heights 20 Unilateral dynamic working position 36 Climate
ELECTRICAL 21 Constraining working posture and gesture 37 Lighting
7 Hazardous conductivity thru body 22 Combination of static and dynamic working position 38 Colour
8 Electric Arc HAZARDOUS SUBSTANCES 39 Working in humide conditions
9 Electrostatic Processes 23 Hazardous Substances (Liquids) 40 Working in high/low pressure
FIRE / EXPLOSIONS 24 Hazardous Substances (Gases) PSYCHIC BURDENS
10 Fire hazard (Solids, Liquids, Gases) 25 Hazardous Substances (Mist, Vapours) 41 Psychic Burden (Work Task)
11 Explosive Atmosphere 26 Hazardous Substances (Solids) 42 Psychic Burden (Work Organisation)
12 Explosives 27 Hazardous Substances (Aerosols) 43 Psychic Burden (Social Relationships)
RADIATION 28 Hazardous Substances (Dusts) 44 Psychic Burden (Work Environment)
13 Electromagnetic field 29 Hazardous Substances (Uncontrolled Reactions) MISC.
14 Ionising radiation THERMIC 45 Persons
15 Non ionising radiation 30 Hot media or surface 46 Plants and vegetal products
31 Cold media or surface 47 Animals
C. Risk Matrix
Potential personal injury
Light injury or occupational illness Moderate injury or occupational illness Possible death, disaster
Severe injury or occupational illness (C3)
(C1) (C2) (C4)
e.g. Bone fracture (arm, leg, etc.), bruise
(body, upper body), dislocation of body parts,
e.g. Contusion, abrasion, bruise (finger, hand, e.g. Bone fracture (finger, hand, toe, foot),
impalement, severe chemical burn, poisoning,
toe, foot), slight stitch cut or injury, streching, bruise (arm, leg), moderate stitch cut or injury, e.g. Fatal injury or illness
severe stitch cut or injuries, internal injuries,
strain, irritation, cold light chemical burn, allergy, infectious disease
occupational disease (noise induced hearing
loss, severe allergies, asbestosis, etc.)
occurrence of damage
high Occurance of an injury or illness is very
medium high high high
(L4) likely.
Probability of
medium
Occurance of an injury or illness is likely. medium medium high high
(L3)
low Occurance of an injury or illness is
low medium medium high
(L2) unlikely.
very low Occurance of an injury or illness is
low low medium medium
(L1) hardly likely.
D Risk Assessment by Work Steps
low Risk Level
Hazard Preventive Actions
No. Work Step Description (Low / Medium / High) Responsible
Factors No. to be implemented
(See section C)
1. Pre inspection of tools & tackles prior to start the job.
2. Ensure the tools tackles tobe colour coded.
high
1 Material Handling Setup 2,3 &5 MEDIUM 3. Material should be properly stacked. Supervisor/Engineer
4. Ensured to mandatory ppe's ( shoes, gloves,
helmet, googles, cover all).
1. Proper road survey must be done before positioning the crane.
2.
Area should be visually inspected before positioning the crane.
3.
Flag man should be ensured. 4.
No timper or wooden pack use for out riggers. 5.
The work should be conducted as per lifting plan. 6.
2 Positioning of Crane 2,3 &5 MEDIUM Safe distance should mantained while marching of crane nearby Supervisor/Engineer
foundations, underground utilities and existing building.
7.Ensure the signal
man only gives the signal to the operators
8.Ensure no one enter the marching area.
9. Ground condition must be chcked before
crane merching.
1. Only competent rigger allowed to performed the job.
2. Only qualified crane operator can performed the job.
3. Foreman must be present during lifting & shifting.
4. Ensure clear visibility between foreman
and crane operator. 5. Ensure proper sling
position. 6. Lifting tools &
tackles should be checked before start the activities.
3 Material lifting & shifting by Crane 2,3 &5 MEDIUM 7. Don't put hands in Supervisor/Engineer
between two materials. 8. Use two
tag lines during the lifting. 9. No
people should stand beneath the lifted objects.
10. Maintain safe distance from lifted objects.
11. Never sit,stand,walk under the suspended load.
1.Remove all unwanted material from site .
2.Only trained person are allowed to work.
3.TPI certificates and good
condition lifting and shifting tools and tackles must be used for
lifting and shifting of material.
4.Must use mandatory PPE's( shoes, gloves, helmet, googles,
cover all) while working at site.
4 Shifting & lifting by pick and carry crane 2,3 &5 MEDIUM 5.Bank's man must be depute with pick and carry crane. Supervisor/Engineer
6. Proper packing or
edge protection to be provided to avoid the damage of web belt or
sling during lifting and shifting.
7.Ensure only skilled person should be signal during
shifting and lifing of work.
8.Guide rope to be used during lifting
and shifting work.
9.Supervisor must be present during working at site.
1.Proper cleanup and ensure nothing is left behind .
5 Post Activity /House Keeping 28&45 LOW 2.provide appropriate trash been to collect Supervisor/Engineer
all wastage/garbage.
7
PREPARED BY REVIEW BY APPROVED BY