Lagat
Company Name: Engr. Santos and Engr. Garcia
Description QTY.
Item
1 PRE-CONSTRUCTION
1.1 Project planning and design preparation
1.2 Bidding and Awarding of Contracts 1.00
1.3 Building Permits and Licenses 1.00
1.4 Notice to proceed 1.00
1.5 Mobilization 1.00
1.6 Site Clearing and Lay-outing 1.00
1.7 Temporary Facilities and Board-Ups 1.00
TOTAL ITEM FOR I. PRELIMINARIES
2 II. STRUCTURAL - CIVIL WORKS
2.1 1. EARTH / SITE WORKS
1.1 Excavation
1.1.1 Footing and Footing Tie Beam 151.38
1.2 Dewatering Works 1.00
1.3 Backfilling and Levelling
1.3.1 Footings 94.06
1.3.2 Footing Tie Beam 163
1.4 Gravel Bedding
1.4.1 Slab-on-grade and Footing 46.06
1.5 Soil Poisoning Treatment 155.89
1. SUB-TOTAL FOR FOR ITEM 1, EARTH AND SITE WORKS
2. STRUCTURAL WORKS
2.1 CONCRETING WORKS
2.1.1 Footings 34.53
2.1.2 Columns 34.27
2.1.3 Beams 34.27
2.1.3.1 Footing Tie beams 23.58
a. 2F Beams 20.57
d. TORBeams 3.13
2.1.5 Slab 25.68
2.1.5.2 Suspended Slab 25.68
a. 2nd Floor 25.68
2.1.6 Stairs 4.94
2.1.8 Septic Tank 12.810
UB-TOTAL FOR FOR ITEM 2.1, CONCRETING WORKS
2.2 REBARWORKS
2.2.1 Footings 2,663.45
2.2.2 Columns 2,663.45
2.2.3 Beams 2,663.45
2.2.3.1 Footing Tie beams 4470.74
2.2.3.2 Suspended Beams 2663.45
a. 2F Beams 5009.43
d. TORB Beams 310.73
2.2.5 Slab 25.68
2.2.5.2 Suspended Slab 25.68
a. 2nd Floor 3154.37
2.2.6 Stairs 924.61
2.2.7 Septic Tank 1299.62
SUB-TOTAL FOR FOR ITEM 2.2, REBARWORKS
2.3 FORMWORKS
2.3.1 Footings 64.96
2.3.2 Columns 5.36
a. Foundation to GF 82.87
b. GF to 2F 135.48
c. 2F to TORB 135.48
2.3.3 Beams 135.48
2.3.3.1 Footing Tie beams 7200
2.3.3.2 Suspended Beams 135.48
a. 2F Beams 136.05
d. TORB Beams 136.05
2.3.4 Girders 136.05
a. GF 233.6
b. 2F 228.875
e. TORB 18.9
2.3.5 Suspended Slab 874.73
a. 2nd Floor 874.73
b. 3rd Floor 874.73
c. 4th Floor 874.73
2.3.6 Stairs 874.73
a. GF to 2F 17.02
b. 2F to TORB 17.02
2.3.7 Septic Tank 117.10
SUB-TOTAL FOR FOR ITEM 2.3, FORMWORKS
2.4 MASONRY WORKS
2.4.1 C.H.B Laying 2020.36
2.4.1.1 C.H.B 1190.46
2.4.1.1.1 GF-2F 297.11
2.4.1.1.1.1 4" 1955.00
2.4.1.1.1.1 6" 1908.00
2.4.1.1.2 2F-TORB 861.63
2.4.1.1.2.1 4" 1905.00
2.4.1.1.2.2 6" 1829.00
2.4.1.2 Rebar 413.00
2.4.1.2.1 GF-2F 297.11
2.4.1.2.1.1 6m 273.00
2.4.1.2.2 2F-torb 861.63
2.4.1.2.2.1 6m 264.00
2.4.1.3.1 GF-2F 19.82
2.4.1.3.1.1 Cement 238.00
2.4.1.3.1.2 Sand 20.00
2.4.1.3.2 2F-TORB 19.10
2.4.1.3.2.1 Cement 230.00
2.4.1.3.2.2 Sand 20.00
SUB-TOTAL FOR MASONRY WORKS
2.5 ROOF STEEL TRUSS
Steel Trusses and Lateral Struts 3535.91
Purlins and Channel Beam 4180.68
Purlins (Ceiling Support) 989.93
Angular Base Plate 277.47
Sag rods 146.82
Crossingbracing 314.91
Turn Buckle 26
SUB-TOTAL FOR ROOF STEEL TRUSS
3. ARCHITECTURAL WORKS
3.1. Floor Finishes
3.1.1 Ground Floor
3.1.1.1 Classrooms - 45x45 Vinyl Grey (02) Tile Fl 189.00
3.1.1.2 CR - 60x60 Unglazed Ceramic Fantasy Ner 10.00
3.1.1.3 PWD CR - 60x60 Unglazed Ceramic Fantas 3.06
3.1.1.4 Corridor - 60x60 Glazed Ceramic Almon Gr 88.19
3.1.1.5 Cement Mortar 2.53
3.1.1.5.1 Cement 31.00
3.1.1.5.2 Sand 3.00
3.1.1.6 Tile Grout (2kg) 15.00
3.1.2 2nd Floor - 4th Floor
3.1.2.1 Classrooms - 45x45 Vinyl Grey (02) Tile Fl 567
3.1.2.2 CR - 60x60 Unglazed Ceramic Fantasy Ner 30.00
3.1.2.3 Storage - 60x60 Unglazed Ceramic Fluffy W 6.75
3.1.2.4 Corridor - 60x60 Glazed Ceramic Almon Gr 264.57
3.1.2.5 Cement Mortar 7.53
3.1.2.5.1 Cement 91.00
3.1.2.5.2 Sand 8.00
3.1.2.6 Tile Grout (2kg) 44.00
3.1.3 Roof Deck
3.1.3.1 60x60cm Cement Tiles 21.25
3.1.3.1.1 Cement 5
3.1.3.1.2 Sand 1
3.2. Wall Finishes
3.2.1 Ground Floor
3.2.1.1 Interior Walls
3.2.1.1.1 1st Coat
3.2.1.1.1.1 Classrooms - Glossy Latex Eggshell 245.34
3.2.1.1.1.2 Classrooms - Glossy Latex Eggshell 245.34
3.2.1.1.1.3 Classrooms - Glossy Latex Eggshell 245.34
3.2.1.1.1.4 CR - Semi-Gloss Latex Satin White ( 42.10
3.2.1.1.1.5 CR - Semi-Gloss Latex Satin White ( 42.10
3.2.1.1.1.6 Corridor - Glossy Latex Eggshell Be 173.08
3.2.1.1.1.7 Corridor - Glossy Latex Eggshell Bei 173.08
3.2.1.1.1.8 Corridor - Glossy Latex Eggshell Bei 173.08
3.2.1.1.2 2nd Coat
3.2.1.1.2.1 Classrooms - Glossy Latex Eggshell 245.34
3.2.1.1.2.2 Classrooms - Glossy Latex Eggshell 245.34
3.2.1.1.2.3 C.R - Semi-Gloss Latex Satin White 42.10
3.2.1.1.2.4 C.R - Semi-Gloss Latex Satin White 42.10
3.2.1.1.2.5 Corridor - Glossy Latex Eggshell Be 173.08
3.2.1.1.2.6 Corridor - Glossy Latex Eggshell Bei 173.08
3.2.1.1.2.7 Corridor - Glossy Latex Eggshell Bei 173.08
3.2.1.1.3 Flat Latex Primer (4L) 460.52
3.2.1.1.3.1 1st Coat 74.00
3.2.1.1.3.2 2nd Coat 62.00
3.2.1.2 Exterior Walls
3.2.1.2.1 1st Coat 304.77
3.2.1.2.1.1 Acrylic Semi Latex Gloss White (16L 304.77
3.2.1.2.1.2 Acrylic Semi Latex Gloss White (4L) 304.77
3.2.1.2.1.3 Acrylic Semi Latex Gloss White (1L) 304.77
3.2.1.2.2 2nd Coat
3.2.1.2.2.1 Acrylic Semi Latex Gloss White (16L 304.77
3.2.1.2.2.2 Acrylic Semi Latex Gloss White (4L) 304.77
3.2.1.2.2.2 Acrylic Semi Latex Gloss White (1L) 304.77
3.2.1.2.3 Acrytex Primer (4L) 304.77
3.2.1.3.1 1st Coat 49.00
3.2.1.3.2 2nd Coat 41.00
3.2.1.2.4 Acrytex Cast (4L) 49.00
3.2.1.2.5 Acrytex Reducer (4L) 101.00
3.2.2 2nd Floor - TORB
3.2.2.1 Interior Walls
3.2.2.1.1 1st Coat
3.2.2.1.1.1 Classrooms - Glossy Latex Eggshell 736.02
3.2.2.1.1.2 Classrooms - Glossy Latex Eggshell 736.02
3.2.2.1.1.3 CR - Semi-Gloss Latex Satin Off-Whi 85.47
3.2.2.1.1.4 CR - Semi-Gloss Latex Satin Off-Whi 85.47
3.2.2.1.1.5 Storage - Glossy Latex Eggshell Whi 41.31
3.2.2.1.1.6 Storage - Glossy Latex Eggshell Whi 41.31
3.2.2.1.1.7 Corridor - Glossy Latex Eggshell Be 519.24
3.2.2.1.2 2nd Coat
3.2.2.1.2.1 Classrooms - Glossy Latex Eggshell 736.02
3.2.2.1.2.2 Classrooms - Glossy Latex Eggshell 736.02
3.2.2.1.2.3 C.R - Semi-Gloss Latex Satin Off-Whi 85.47
3.2.2.1.2.4 Storage - Glossy Latex Eggshell Whi 41.31
3.2.2.1.2.5 Storage - Glossy Latex Eggshell Whi 41.31
3.2.2.1.2.6 Corridor - Glossy Latex Eggshell Be 519.24
3.2.2.1.2.7 Corridor - Glossy Latex Eggshell Bei 519.24
3.2.2.1.2.8 Corridor - Glossy Latex Eggshell Bei 519.24
3.2.2.1.3 Flat Latex Primer (4L) 1382.04
3.2.2.1.3.1 1st Coat 222.00
3.2.2.1.3.2 2nd Coat 185.00
3.2.2.2 Exterior Walls
3.2.2.2.1 1st Coat 778.47
3.2.2.2.1.1 Acrylic Semi Gloss Latex White (16L 778.47
3.2.2.2.1.2 Acrylic Semi Gloss Latex White (4L) 778.47
3.2.2.2.2 2nd Coat 778.47
3.2.2.2.2.1 Acrylic Semi Gloss Latex White (16L 778.47
3.2.2.2.2.2 Acrylic Semi Gloss Latex White (4L) 778.47
3.2.2.2.3 Acrytex Primer (4L) 778.47
3.2.2.2.3.1 1st Coat 125.00
3.2.2.2.3.2 2nd Coat 104.00
3.2.2.2.4 Acrytex Cast (4L) 125.00
3.2.2.2.5 Acrytex Reducer (4L) 258.00
3.2.3 Roof Deck 286.00
3.2.3.1 Interior Walls 25.90
3.2.3.1.1 Deck Roof - Flat Latex Acrylic Paint Bla 25.90
3.2.3.2 Exterior Walls 25.90
3.2.3.2.1 Deck Roof - Flat Latex Acrylic Paint Bla 12.95
3.2.4 Neutralizer (4L) 2964.65
3.2.4.1 1st Coat 10.00
3.2.5 Wall Cement Putty (5kg) - 2 Coats 2117.61
3.3. Ceiling Finishes
3.3.1 Ground Floor
3.3.1.1 Classrooms 189
3.3.1.1.1 4x8" Gypsum Board 189
3.3.1.1.2 Metal Furring (5m) 132
3.3.1.1.3 Carrying Channel (5m) 66
3.3.1.1.4 Wall Angle (3m) 6
3.3.1.1.5 Furring Wall Clip (100 pcs.) 792
3.3.1.1.6 Blind Rivets 1/8x1/2 (1box) 3
3.3.1.2 Toilet 12
3.3.1.2.1 1st Coat 13.06
3.3.1.2.1 Flat Latex White Acrylic Paint (1L) 13.06
3.3.1.2.2 2nd Coat 13.06
3.3.1.2.2.1 Flat Latex White Acrylic Paint (1L) 13.06
3.3.1.3 Corridor 13.06
3.3.1.3.1 1st Coat 13.06
3.3.1.3.1.1 Flat Latex White Acrylic Paint (4L) 88.19
3.3.1.3.1.2 Flat Latex White Acrylic Paint (1L) 88.19
3.3.1.3.2 2nd Coat 88.19
3.3.1.3.2.1 Flat Latex White Acrylic Paint (4L) 88.19
3.3.2 2nd Floor - TORB 88.19
3.3.2.1 Classrooms 88.19
3.3.2.1.1 4x8" Gypsum Board 567
3.3.2.1.2 Metal Furring (5m) 396
3.3.2.1.3 Carrying Channel (5m) 198
3.3.2.1.4 Wall Angle (3m) 18
3.3.2.1.5 Furring Wall Clip (100 pcs.) 2376
3.3.2.1.6 Blind Rivets 1/8x1/2 (1box) 9
3.3.2.2 Toilet 30
3.3.2.2.1 1st Coat 30
3.3.2.2.1.1 Flat Latex White Acrylic Paint (4L) 30
3.3.2.2.1.2 Flat Latex White Acrylic Paint (1L) 30
3.3.2.2.2 2nd Coat 30
3.3.2.2.2.1 Flat Latex White Acrylic Paint (4L) 30
3.3.2.3 Storage 30
3.3.2.3.1 1st Coat 30
3.3.2.3.1.1 Flat Latex White Acrylic Paint (1L) 6.75
3.3.2.3.2 2nd Coat 6.75
3.3.2.3.2.1 Flat Latex White Acrylic Paint (1L) 6.75
3.3.2.4 Corridor 264.57
3.3.2.4.1 1st Coat 264.57
3.3.2.4.1.1 Flat Latex White Acrylic Paint (4L) 264.57
3.3.2.4.1.2 Flat Latex White Acrylic Paint (1L) 264.57
3.3.2.4.2 2nd Coat 264.57
3.3.2.4.2.1 Flat Latex White Acrylic Paint (4L) 264.57
3.3.3 Flat Latex Primer (4L) 402.57
3.3.3.1 1st Coat 65.00
3.3.3.2 2nd Coat 54.00
3.3.4 Neutralizer (4L) 402.57
3.3.4.1 1st Coat 2.00
3.4. Doors
3.4.1 D1 - Mahogany Door Jamb with fixed clear glas 12
3.4.2 D2 - Mahogany Door Jamb (50x150mm thk.) 1
3.4.3 D3 - Concrete Door Jamb (50x150mm) 6
3.4.4 D4 - Concrete Door Jamb (50x100mm) 5
3.5. Windows
3.5.1 W1 - Casement Window on Steel Frame (3600 12
3.5.2 W2 - Casement Window on Steel Frame (2700 12
3.5.3 W3 - Jalouise Window on Steel Jambs Frame 9
3.6. Railings 57
3.6.1 Metal Railings (Front Railing) (0.7m High) 95.00
3.6.2 Metal Railings (Side Railing) (0.7m High) 13.00
3.7. Plastering
3.7.1 Rough Plastering 33.00
3.7.1.1 Cement 396.00
3.7.1.2 Fine Sand 44.00
3.7.1.2 Fine Plastering 33.00
3.7.1.2.1 Cement 75.00
SUB-TOTAL FOR ARCHITECTURAL - FINISHING WORKS
4. PLUMBING AND SANITARY WORKS
4.1 Pipings
4.1.1 Galvanized Iron SCH 40 (65mm) 26.9
4.1.2 Polypropylene Random Copolymer Cold Water 29
4.1.3 Polyvinyl Chloride Drain Pipe (100mm) 37.9
4.1.4 Polyvinyl Chloride Drain Pipe (150mm) 9.3
4.1.5 Polyvinyl Chloride Downspout (75mm) 8.91
4.1.6 Polyvinyl Chloride Downspout (100mm) 266.896
4.1.7 Polyvinyl Chloride Soil Pipe (100mm) 6.961
4.1.8 Polyvinyl Chloride Soil Pipe (150mm) 22.156
4.1.9 Polyvinyl Chloride Soil Stack (150mm) 20.7
4.1.10 Polyvinyl Chloride Vent Pipe (50mm) 12.36
4.1.11 Polyvinyl Chloride Vent Pipe (150mm) 20.7
4.1.12 Polyvinyl Chloride Vent Stack (50mm) 49.194
4.1.13 Polyvinyl Chloride Vent Stack (100mm) 10.387
4.1.14 Polyvinyl Chloride Vent through Roof (150mm 20.7
4.1.15 Polyvinyl Chloride Waste Pipe (100mm) 16.168
4.2 Fittings
4.2.1 Clean Out 12
4.3 Valves
4.3.1 Check Valve 2
4.3.2 Gate Valve 4
4.4 Fixtures
4.4.1 Corridor Drain 8
4.4.2 Floor Drain 12
4.4.4 Roof Drain 16
4.4.5 Floor Clean Out 6
4.4.7 Water Closet 6
4.4.8 Water Meter 1
4.4.9 Water Tank 1
4.4.10 Lavatory 5
4.4.13 Hose BIBB 6
4.4.14 Fire Hose Cabinet 2
4.4.15 Fire Department Connection 1
4.4.12 Manhole 2
4. SUBTOTAL FOR PLUMBING AND SANITARY WORKS
5. ELECTRICAL WORKS
5.1 Duplex Convenience Outlet, Grounding Type, 20A, 12
5.2 1 x 36 Watts Fluorescent Lighting Fixture, Box Typ 16
5.3 2 x 36 Watts Fluorescent Lighting Fixture, Box T 24
5.4 2 x 36 Watts Fluorescent Lighting Fixture, Box Typ 12
5.5 Single Pole Wall Switch 4
5.6 2 Single Pole Wall Switch in One Switch Plate 9
5.7 2 Three Way Wall Switch in One Switch Plate 4
5.8 Three Way Wall Switch 9
5.9 Weatherproof Duplex Convenience Outlet 2
5.10 Wall Fan Outlet 12
5.11 Ceiling Fan Control Switch 12
5. SUBTOTAL FOR ELECTRICAL WORKS 116
6. FIRE PROTECTION
6.1 Fire Alarm Control Panel 1
6.2 Manual Pull Station 4
6.3 Vibrating Bell Outlet 4
6.4 Pull Box 2
6.5 Fire Extinguisher 6
6. SUBTOTAL FOR FIRE PROTECTION
MATERIAL COST LABOR COST
UNIT
UNIT COST TOTAL COST UNIT COST
l.s. ₱ - ₱ -
l.s. ₱ - ₱ -
l.s. ₱ - ₱ -
l.s. ₱ 105,000.00
l.s. ₱ - ₱ - ₱ 231,000.00
l.s. ₱ - ₱ - ₱ 507,150.00
cu.m. ₱ - ₱ - ₱ 525.00
lot ₱ - ₱ - ₱ 105,000.00
cu.m. ₱ - ₱ - ₱ 350.00
cu.m. ₱ - ₱ - ₱ 350.00
cu.m. ₱ 114.94
bags ₱ 245.00 ₱ 97,020.00 ₱ 114.94
cu.m. ₱ 1,700.00 ₱ 74,800.00 ₱ 114.94
cu.m. ₱ - ₱ 114.94
bags ₱ 245.00 ₱ 18,375.00 ₱ 114.94
₱ - ₱ -
₱ 105,000.00 ₱ 105,000.00
₱ 231,000.00 ₱ 231,000.00
₱ 507,150.00 ₱ 507,150.00
₱ 843,150.00
₱ 79,474.50 ₱ 79,474.50
₱ 105,000.00 ₱ 105,000.00
₱ -
₱ 32,921.00 ₱ 32,921.00
₱ 57,050.00 ₱ 57,050.00
₱ -
₱ 16,121.00 ₱ 16,121.00
₱ 77,311,463.04 ₱ 77,545,298.04
₱ 77,835,864.54
₱ 25,142.16 ₱ 170,750.75
₱ 24,952.84 ₱ 169,465.05
₱ 24,952.84 ₱ 169,464.98
₱ 17,169.19 ₱ 116,603.03
₱ 14,977.53 ₱ 101,718.59
₱ 2,279.03 ₱ 15,477.84
₱ 18,698.25 ₱ 140,798.69
₱ 18,698.25 ₱ 140,798.69
₱ 18,698.25 ₱ 126,987.52
₱ 3,596.94 ₱ 24,428.28
₱ 9,327.28 ₱ 63,345.41
₱ 1,239,838.82
₱ 28,410.13 ₱ 148,265.38
₱ 28,410.13 ₱ 148,265.38
₱ 28,410.13 ₱ 148,265.38
₱ 47,687.89 ₱ 248,871.19
₱ 28,410.13 ₱ 148,265.38
₱ 53,433.92 ₱ 278,858.27
₱ 3,314.45 ₱ 17,297.30
₱ 274.01 ₱ 1,429.61
₱ 274.01 ₱ 1,429.61
₱ 33,646.61 ₱ 175,593.26
₱ 9,862.51 ₱ 51,469.96
₱ 13,862.57 ₱ 72,345.31
₱ 1,440,356.04
₱ 34,150.40 ₱ 43,500.17
₱ 2,817.83 ₱ 3,589.29
₱ 43,565.99 ₱ 83,888.35
₱ 71,224.70 ₱ 128,841.93
₱ 71,224.70 ₱ 128,841.93
₱ 71,223.77 ₱ 143,624.28
₱ 3,785,142.86 ₱ 7,632,816.98
₱ 71,223.77 ₱ 143,624.28
₱ 71,525.40 ₱ 144,232.41
₱ 71,523.43 ₱ 144,228.44
₱ 71,523.43 ₱ 144,228.55
₱ 122,806.86 ₱ 247,642.51
₱ 120,322.86 ₱ 242,633.47
₱ 9,936.00 ₱ 20,036.14
₱ 459,858.06 ₱ 927,313.77
₱ 459,859.70 ₱ 1,010,405.64
₱ 459,859.70 ₱ 1,010,405.64
₱ 459,859.70 ₱ 1,010,405.64
₱ 459,858.06 ₱ 1,010,404.37
₱ 8,947.75 ₱ 19,208.61
₱ 8,947.75 ₱ 19,208.61
₱ 61,561.14 ₱ 75,968.85
₱ 14,335,049.87
₱ 243,425.92 ₱ 312,118.33
₱ 143,433.90 ₱ 183,909.54
₱ 35,797.03 ₱ 45,898.60
₱ 235,550.35 ₱ 259,010.35
₱ 229,887.50 ₱ 264,231.50
₱ 103,814.45 ₱ 114,154.01
₱ 229,526.04 ₱ 252,386.04
₱ 220,369.10 ₱ 253,291.10
₱ 49,760.76 ₱ 122,035.76
₱ 35,797.03 ₱ 87,790.40
₱ 32,892.71 ₱ 80,667.71
₱ 103,814.45 ₱ 254,599.70
₱ 31,808.33 ₱ 78,008.33
₱ 2,387.66 ₱ 5,855.62
₱ 28,675.69 ₱ 86,985.69
₱ 2,409.72 ₱ 36,409.72
₱ 2,301.85 ₱ 5,645.17
₱ 27,711.81 ₱ 84,061.81
₱ 2,409.72 ₱ 36,409.72
₱ 2,251,350.77
₱ 24,279.92 ₱ 11,272,009.63
₱ 28,707.34 ₱ 13,327,450.42
₱ 6,797.52 ₱ 1,659,980.62
₱ 1,905.29 ₱ 465,280.19
₱ 1,008.16 ₱ 78,847.23
₱ 2,162.38 ₱ 89,812.33
₱ 178.53 ₱ 3,341.87
₱ 26,896,722.29
₱ 23,330.42 ₱ 55,219.42
₱ 1,234.57 ₱ 9,904.57
₱ 377.73 ₱ 2,978.73
₱ 10,886.30 ₱ 66,911.00
₱ 312.46 ₱ 2,049.66
₱ 3,826.68 ₱ 11,421.68
₱ 370.32 ₱ 5,470.32
₱ 1,851.62 ₱ 4,101.62
₱ - ₱ -
₱ 69,991.27 ₱ 166,351.27
₱ 3,703.24 ₱ 29,135.24
₱ 833.23 ₱ 5,553.23
₱ 32,658.89 ₱ 212,534.89
₱ 929.88 ₱ 6,055.88
₱ 11,233.17 ₱ 33,528.17
₱ 987.53 ₱ 14,587.53
₱ 5,431.42 ₱ 10,931.42
₱ - ₱ -
₱ 2,623.13 ₱ 7,829.38
₱ 617.21 ₱ 1,842.21
₱ 123.44 ₱ 1,823.44
₱ 108,526.87 ₱ 114,224.87
₱ 108,526.87 ₱ 109,266.87
₱ 108,526.87 ₱ 108,946.87
₱ 18,623.06 ₱ 19,372.06
₱ 18,623.06 ₱ 19,220.06
₱ 76,562.45 ₱ 79,411.45
₱ 76,562.45 ₱ 78,042.45
₱ 76,562.45 ₱ 77,192.45
₱ - ₱ -
₱ 108,526.87 ₱ 114,224.87
₱ 108,526.87 ₱ 108,736.87
₱ 18,623.06 ₱ 19,372.06
₱ 18,623.06 ₱ 19,021.06
₱ 76,562.45 ₱ 79,411.45
₱ 76,562.45 ₱ 77,302.45
₱ 76,562.45 ₱ 77,192.45
₱ 203,712.38 ₱ 205,392.38
₱ 32,734.12 ₱ 46,414.12
₱ 27,425.88 ₱ 38,945.88
₱ - ₱ -
₱ 134,815.91 ₱ 140,695.91
₱ 134,815.91 ₱ 140,695.91
₱ 134,815.91 ₱ 137,281.91
₱ 134,815.91 ₱ 135,490.91
₱ - ₱ -
₱ 134,815.91 ₱ 140,695.91
₱ 134,815.91 ₱ 136,459.91
₱ 134,815.91 ₱ 135,040.91
₱ 134,815.91 ₱ 135,040.91
₱ 21,675.29 ₱ 36,729.29
₱ 18,136.47 ₱ 30,874.47
₱ 21,675.29 ₱ 30,281.29
₱ 44,677.65 ₱ 60,121.65
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 325,580.61 ₱ 345,523.61
₱ 325,580.61 ₱ 326,000.61
₱ 37,807.91 ₱ 40,054.91
₱ 37,807.91 ₱ 38,217.91
₱ 18,273.60 ₱ 19,013.60
₱ 18,273.60 ₱ 18,903.60
₱ 229,687.34 ₱ 243,932.34
₱ - ₱ -
₱ 325,580.61 ₱ 342,674.61
₱ 325,580.61 ₱ 326,210.61
₱ 37,807.91 ₱ 40,054.91
₱ 18,273.60 ₱ 19,013.60
₱ 18,273.60 ₱ 18,693.60
₱ 229,687.34 ₱ 241,083.34
₱ 229,687.34 ₱ 230,427.34
₱ 229,687.34 ₱ 230,107.34
₱ 611,349.46 ₱ 612,609.46
₱ 98,202.35 ₱ 138,522.35
₱ 81,835.29 ₱ 115,675.29
₱ - ₱ -
₱ 344,358.49 ₱ 364,938.49
₱ 344,358.49 ₱ 364,938.49
₱ 344,358.49 ₱ 346,002.49
₱ 344,358.49 ₱ 344,808.49
₱ 344,358.49 ₱ 361,998.49
₱ 344,358.49 ₱ 346,002.49
₱ 344,358.49 ₱ 344,808.49
₱ 55,294.12 ₱ 92,350.12
₱ 46,004.71 ₱ 76,112.71
₱ 55,294.12 ₱ 76,478.12
₱ 114,127.06 ₱ 152,737.06
₱ 126,512.94 ₱ 169,280.94
₱ 11,456.94 ₱ 12,054.94
₱ 11,456.94 ₱ 12,054.94
₱ 11,456.94 ₱ 12,054.94
₱ 5,728.47 ₱ 6,178.47
₱ 1,311,421.65 ₱ 1,414,246.65
₱ 4,423.53 ₱ 13,223.53
₱ 936,729.75 ₱ 1,063,081.75
₱ 24,054.55 ₱ 58,374.55
₱ 24,054.55 ₱ 58,374.55
₱ 16,800.00 ₱ 26,304.00
₱ 8,400.00 ₱ 14,340.00
₱ 763.64 ₱ 967.64
₱ 100,800.00 ₱ 102,360.00
₱ 381.82 ₱ 641.44
₱ 1,527.27 ₱ 3,867.27
₱ 261.20 ₱ 560.76
₱ 1,662.18 ₱ 1,961.74
₱ 1,662.15 ₱ 3,618.27
₱ 1,662.15 ₱ 3,618.27
₱ 1,662.15 ₱ 3,618.27
₱ 1,662.15 ₱ 3,618.27
₱ 11,223.94 ₱ 82,657.84
₱ 11,223.94 ₱ 24,433.04
₱ 11,223.94 ₱ 24,433.04
₱ 11,223.94 ₱ 82,657.84
₱ 11,223.94 ₱ 24,433.04
₱ 11,223.94 ₱ 24,433.04
₱ 72,162.09 ₱ 174,602.09
₱ 50,398.92 ₱ 78,910.92
₱ 25,199.46 ₱ 43,019.46
₱ 2,290.91 ₱ 2,902.91
₱ 302,400.00 ₱ 307,080.00
₱ 1,145.45 ₱ 1,924.31
₱ 3,818.10 ₱ 6,414.30
₱ 3,818.10 ₱ 6,414.30
₱ 3,818.10 ₱ 28,118.10
₱ 3,818.10 ₱ 8,311.50
₱ 3,818.10 ₱ 8,311.50
₱ 3,818.10 ₱ 4,628.10
₱ 3,818.10 ₱ 8,311.50
₱ 3,818.10 ₱ 8,311.50
₱ 859.07 ₱ 1,870.09
₱ 859.07 ₱ 1,870.09
₱ 859.07 ₱ 1,008.85
₱ 33,671.82 ₱ 35,019.84
₱ 33,671.82 ₱ 35,019.84
₱ 33,671.82 ₱ 40,961.82
₱ 33,671.82 ₱ 35,019.84
₱ 33,671.82 ₱ 35,019.84
₱ 33,671.82 ₱ 40,961.82
₱ 51,235.08 ₱ 53,332.00
₱ 8,272.55 ₱ 20,512.55
₱ 6,872.58 ₱ 16,952.58
₱ 51,235.08 ₱ 123,955.08
₱ 254.54 ₱ 2,014.54
₱ 6,000.00 ₱ 72,000.00
₱ 500.00 ₱ 1,937.00
₱ 3,000.00 ₱ 14,400.00
₱ 2,500.00 ₱ 11,275.00
₱ 11,724.00 ₱ 256,968.24
₱ 7,815.96 ₱ 253,060.20
₱ 4,396.50 ₱ 46,696.50
₱ 35,936.46
₱ 9,012.65 ₱ 59,350.30
₱ 3,672.37 ₱ 10,560.68
₱ 3,793.02 ₱ 3,793.02
₱ 45,516.24 ₱ 142,536.24
₱ 5,057.36 ₱ 79,857.36
₱ 3,793.02 ₱ 3,793.02
₱ 8,620.50 ₱ 26,995.50
₱ 14,878,675.17
₱ 11,082.80 ₱ 127,193.96
₱ 11,948.00 ₱ 119,596.00
₱ 15,614.80 ₱ 20,289.13
₱ 3,831.60 ₱ 7,551.60
₱ 3,670.92 ₱ 5,601.42
₱ 109,961.15 ₱ 181,133.42
₱ 2,867.93 ₱ 4,724.20
₱ 9,128.27 ₱ 17,990.67
₱ 8,528.40 ₱ 16,808.40
₱ 5,092.32 ₱ 6,534.32
₱ 8,528.40 ₱ 16,808.40
₱ 20,267.93 ₱ 26,007.23
₱ 4,279.44 ₱ 7,049.31
₱ 8,528.40 ₱ 16,808.40
₱ 6,661.22 ₱ 10,972.68
₱ 7,500.00 ₱ 9,900.00
₱ 1,250.00 ₱ 2,530.00
₱ 2,500.00 ₱ 4,552.00
₱ 5,000.00 ₱ 6,720.00
₱ 7,500.00 ₱ 9,876.00
₱ 10,000.00 ₱ 15,760.00
₱ 3,750.00 ₱ 4,110.00
₱ 3,750.00 ₱ 39,750.00
₱ 625.00 ₱ 2,225.00
₱ 625.00 ₱ 31,125.00
₱ 3,125.00 ₱ 11,065.00
₱ 3,750.00 ₱ 4,650.00
₱ 1,250.00 ₱ 14,848.00
₱ 625.00 ₱ 7,623.00
₱ 1,250.00 ₱ 9,603.32
₱ 282,491.58 ₱ 759,406.46
₱ 6,990.00 ₱ 9,006.00
₱ 9,320.00 ₱ 18,120.00
₱ 13,980.00 ₱ 35,100.00
₱ 6,990.00 ₱ 9,378.00
₱ 2,330.00 ₱ 2,654.00
₱ 5,242.50 ₱ 6,502.50
₱ 2,330.00 ₱ 3,130.00
₱ 5,242.50 ₱ 8,392.50
₱ 1,165.00 ₱ 1,865.00
₱ 6,990.00 ₱ 11,190.00
₱ 6,990.00 ₱ 8,490.00
₱ 67,570.00 ₱ 113,828.00
₱ 388.33 ₱ 15,188.33
₱ 1,553.33 ₱ 3,693.33
₱ 1,553.33 ₱ 5,069.33
₱ 776.67 ₱ 2,350.67
₱ 2,330.00 ₱ 6,980.00
₱ 6,601.67 ₱ 33,281.67
₱ 140,627,523.62
₱ 140,627,523.62
₱ 25,312,954.25
₱ 4,218,825.71
₱ 4,218,825.71
₱ 2,812,550.47
₱ 14,062,752.36
₱ 7,031,376.18
₱ 172,971,854.05
total cost gravel bedding
44285.735
labor
total for chb works qty 5528.29 120094.54
materials unit price 442.00
total sqm for floor finishes 1179.82 ₱ 1,110.97
materials unit price ₱ 2,248.30
175,191 139,155
195,201 159,167
207,211
2894.1 ₱ 7,077.65
2438.16 ₱ 3,538.82
6824.73 ₱ 7,077.65
5449.29 ₱ 3,096.47
3055.30 ₱ 2,211.76
Total sqm for wall finishes 20661.58 ₱ 23,002.35
₱ 1,280,213.65
₱ 1,078,527.25
₱ 3,018,939.39
₱ 2,410,509.46
₱ 1,351,520.94
₱ 9,139,710.68
₱ 748,018.82
₱ 341,768.00
₱ 12,643.40
₱ 115,395.00
material total
total unit labor cost for floor finishes
total material price
₱ 16,562.00
₱ 11,139.00
₱ 16,579.00
₱ 10,914.00
₱ 2,244.00
₱ 57,438.00
Item Description
I Pre-Construction
1.1 Project planning and design preparation
1.2 Bidding and Awarding of Contracts
1.3 Building Permits and Licenses
1.4 Notice to proceed
1.5 Mobilization
1.6 Site Clearing and Lay-outing
1.7 Temporary Facilities and Board-Ups
2 Construction
2.1 Foundation
2.1.1 Excavation
2.1.2 Soil Poisoning
2.1.3 Soil Compaction Works and Lean Concrete Works
2.1.4 Dewatering Works
2.1.5 Footing Works
2.1.6 Column Works (substructure)
2.1.7 Footing Tie Beam Works
2.1.8 Wall Footing Works
2.1.9 Construction of septic tank
2.1.10 Damp proof works
2.1.11 Backfilling and Levelling
2.2 Ground Floor
2.2.1 Column Works
2.2.2 Slab Works
2.2.3 Beam Works
2.2.4 Stairs and Ramp
2.3 2nd floor
2.3.1 Column Works
2.3.2 Slab Works
2.3.3 Beam Works
2.3.4 Stairs and Ramp
2.4 Deck Roof
2.4.1 Slab Works
2.5 Roof
2.5.1 Truss/Roof Framing Works
2.5.2 Gutters & Downspouts
2.5.3 Sheeting Works
2.6 Masonry Works
2.6.1 CHB Installation
2.6.2 Plastering Works
2.7 Ceiling Works
2.7.1 Ceiling Frames
2.7.2 Ceiling Materials
2.8 Finishes
2.8.1 Windows and Doors Installation
2.8.2 Wall Finishes (Glazed Tiles, Plain Cemnt Plaster)
2.8.3 Painting Works (Masonry, Wooden, Metal)
Floor Finishes (Unglazed Tiles, Cement Floor
2.8.4
Finish)
2.9 MEPFS
2.9.1 Electrical Works
2.9.2 Plumbing and Sanitary Works
2.9.3 Fire Protection System
3 Post Construction
3.1 Final Inspection
3.2 Punch listing
3.3 Close-out Report
3.4 Turn-over
QTY. UNIT Labor Cost
Predecessor
Unit Cost
- 1 l.s.
1.1 1 l.s.
1.2 1 l.s.
1.3 1 l.s.
1.4 1 l.s. ₱ 105,000.00
1.5 1 l.s. ₱ 231,000.00
1.6 1 mo. ₱ 507,150.00
2.1.11 15 m3 ₱ 380.00
2.1.11, 2.9.1(overlap), 2.9.2(overlap) 40 m3 ₱ 400.00
2.2.1 25 m3 ₱ 420.00
2.2.2 12 m3 ₱ 450.00
2.2.3 15 m3 ₱ 380.00
2.2.3, 2.9.1(overlap), 2.9.2(overlap) 40 m3 ₱ 400.00
2.2.1 25 m3 ₱ 420.00
2.3.2 12 m3 ₱ 450.00
10
15
10
1
₱ 105,000.00 n/a n/a ₱ 105,000.00 2
₱ 231,000.00 n/a n/a ₱ 231,000.00 2
₱ 507,150.00 n/a n/a ₱ 507,150.00 3
06-Jan-25
12-Jan-25
Weight Factor
06-Jan-25 08-Sep-25
1
24-Jan-25
1
30-Jan-25
1
1 05-Feb-25
1
11-Feb-25
1
1
17-Feb-25
1
1
1
23-Feb-25
1
1
01-Mar-25
1
1
1
07-Mar-25
1
1
13-Mar-25
1
1
0.00% 0.00% 0.00% 0.00% 0.00% 1.99% 3.07% 0.24% 0.11% 0.18%
0.00% 0.00% 0.00% 0.00% 0.00% 1.99% 5.06% 5.30% 5.41% 5.59%
19-Mar-25
1
1
25-Mar-25
1
1
31-Mar-25
1
1
1
06-Apr-25
1
1
12-Apr-25
1
18-Apr-25
1
1
1
24-Apr-25
1
1
30-Apr-25
1
1
06-May-25
1
1
12-May-25
1
0.32% 0.32% 0.48% 0.34% 0.15% 0.37% 0.22% 0.35% 0.29% 0.18%
5.91% 6.24% 6.71% 7.06% 7.21% 7.58% 7.79% 8.15% 8.44% 8.61%
18-May-25
1
24-May-25
1
1
30-May-25
1
1
1
1
05-Jun-25
1
1
1
11-Jun-25
1
1
1
1
1
1
17-Jun-25
1
1
1
1
1
1
1
23-Jun-25
1
1
1
1
29-Jun-25
1
1
1
05-Jul-25
1
1
11-Jul-25
1
1
1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
0.18% 0.47% 1.59% 1.41% 1.95% 2.66% 2.01% 1.34% #DIV/0! #DIV/0!
8.79% 9.26% 10.84% 12.25% 14.20% 16.87% 18.88% 20.22% #DIV/0! #DIV/0!
17-Jul-25
1
1
23-Jul-25
1
1
1
29-Jul-25
1
1
04-Aug-25
1
10-Aug-25
16-Aug-25
22-Aug-25
28-Aug-25
03-Sep-25
1
1 1
1 1
1 1
1 1
1 1 1
1 1 1
1
1 1 1
1 1
1
#DIV/0! 2.89% 0.68% 6.34% 33.94% 28.87% 0.04% 0.06% 0.02%
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MATERIAL UNIT PRICE ANALYSIS 0.67
0.67
COLUMN FORMWORKS
F-GF
QTY MATERIALS Unit Total
4 4'x8' Phenolic board ₱ 960.00 ₱ 3,840.00
16 Shoring Jack ₱ 1,147.00 ₱ 18,352.00
20 Tie Rod ₱ 1,147.00 ₱ 22,940.00
40 Tie Nut ₱ 140.24 ₱ 5,609.60
40 1.2m-1" Diam- GI Pipe ₱ 160.00 ₱ 6,400.00
12 200mm Aluma Beams ₱ 3,225.00 ₱ 38,700.00
₱ 95,841.60
Accom= 5.36
₱ 17,880.90
0.6
0.6
for a 4.8m2 GF-2F
QTY MATERIALS Unit Total
3 4'x8' Phenolic board ₱ 960.00 ₱ 2,880.00
16 Shoring Jack ₱ 1,147.00 ₱ 18,352.00
20 Tie Rod ₱ 210.24 ₱ 4,204.80
40 Tie Nut ₱ 140.24 ₱ 5,609.60
40 1.2m-1" Diam- GI Pipe ₱ 160.00 ₱ 6,400.00
12 200mm Aluma Beams ₱ 3,225.00 ₱ 38,700.00
₱ 76,146.40
Accom= 4.8
₱ 15,863.83
BEAMS FORMWORKS
9.8 m2
QTY MATERIALS Unit Total
4 4'x8' Phenolic board ₱ 960.00 ₱ 3,840.00
5 Tie Rod ₱ 210.24 ₱ 1,051.20
10 Tie Nut ₱ 140.24 ₱ 1,402.40
10 1.2m-1" Diam- GI Pipe ₱ 160.00 ₱ 1,600.00
19 200mm Aluma Beams (6m) ₱ 3,400.00 ₱ 64,600.00
22 U-Head ₱ 226.00 ₱ 4,972.00
22 Base-Jack ₱ 265.00 ₱ 5,830.00
44 Vertical Post-EasyForms ₱ 1,100.00 ₱ 48,400.00
70 Horizontal Post-EasyForms ₱ 1,000.00 ₱ 70,000.00
₱ 201,695.60
Accom= 9.8
₱ 20,581.18
STAIRS FORMWORKS
12.05 m2 GF-4F
QTY MATERIALS Unit Total
19.00 1"x6" Lumber ₱ 486.86 ₱ 9,250.34
17.00 4"x4" Kiln Dry Wooden Batten ₱ 558.88 ₱ 9,500.96
8.00 2"x4" Kiln Dry Wooden Batten ₱ 280.00 ₱ 2,240.00
4.00 Nail for Wood 3" ₱ 100.00 ₱ 400.00
4.00 Nail for Wood 2" ₱ 100.00 ₱ 400.00
₱ 21,791.30
Accom= 12.05
₱ 1,808.59
Length 0.425
12.05 m2 4F-Roof Deck
QTY MATERIALS Unit Total
19.00 1"x6" Lumber ₱ 486.86 ₱ 9,250.34
16.00 4"x4" Kiln Dry Wooden Batten ₱ 558.88 ₱ 8,942.08
7.00 2"x4" Kiln Dry Wooden Batten ₱ 280.00 ₱ 1,960.00
4.00 Nail for Wood 3" ₱ 100.00 ₱ 400.00
4.00 Nail for Wood 2" ₱ 100.00 ₱ 400.00
₱ 20,952.42
Accom= 12.05
₱ 1,738.97
FOOTING FORMWORKS Perimeter 15.4
7.7 m2
QTY MATERIALS Unit Total
5 Steel Formwork 557.71 ₱ 2,788.55
24 Shoring Jack ₱ 1,147.00 ₱ 27,528.00
₱ 30,316.55
Accom= 7.7
₱ 3,937.21
Concrete Mix
1m 3
QTY MATERIALS Unit Total
8 Cement ₱ 232.00 ₱ 1,856.00
0.5 Sand ₱ 1,700.00 ₱ 850.00
1 Gravel ₱ 1,500.00 ₱ 1,500.00
0.3 Water ₱ 36.24 ₱ 10.87
₱ 4,216.87
1
₱ 4,216.87
Painting
1m 3 Plastering
QTY MATERIALS Unit Total
12 Cement ₱ 230.00 ₱ 2,760.00
1 Fine Sand ₱ 1,700.00 ₱ 1,700.00
0.3 Water ₱ 36.24 ₱ 10.87
₱ 4,470.87
1
₱ 4,470.87
Tileworks
1m3 Cement Mortar
QTY MATERIALS Unit Total
12 Cement ₱ 230.00 ₱ 2,760.00
1 Fine Sand ₱ 1,700.00 ₱ 1,700.00
0.3 Water ₱ 36.24 ₱ 10.87
₱ 4,470.87
1
₱ 4,470.87
SEPTIC FORMWORKS
42.56 m2
QTY MATERIALS Unit Total
20 4'x8' Phenolic board ₱ 960.00 ₱ 19,200.00
32 Shoring Jack ₱ 1,147.00 ₱ 36,704.00
32 1.2m-1" Diam- GI Pipe ₱ 160.00 ₱ 5,120.00
28 6m Tubular Steel ₱ 1,000.00 ₱ 28,000.00
₱ 89,024.00
Accom= 42.56
₱ 2,091.73
2.1
3.15
POST CONSTRUCTION
Reusable rating Total QTY
5 ₱ 576.00 3
50 ₱ 367.04 5
50 ₱ 84.10 1
50 ₱ 112.19 4
50 ₱ 128.00
50 ₱ 774.00
₱ 2,041.33
sq.m 4.8 sq.m
per sqm ₱ 425.28 per sqm
Length 2.9
m3
per cubic
#NAME? m2
m3
per cubic
m3
per cubic
Reusable rating Total
5 ₱ 3,840.00
50 ₱ 734.08
50 ₱ 102.40
50 ₱ 560.00
₱ 5,236.48
sq.m 42.56 sq.m
per sqm ₱ 123.04 per sqm
Item Qty (a) unitPrice*(b) Total Price (a*b)
ST CONSTRUCTION
MATERIALS Unit Total Reusable rating
Office Supplies Final Inspections ₱ 2,500.00 ₱ 7,500.00 5
Safety Gear Punchlisting ₱ 3,000.00 ₱ 15,000.00 50
PPEs Close out reports ₱ 2,500.00 ₱ 2,500.00 50
Document Printing Turn Over ₱ 3,000.00 ₱ 12,000.00 50
m
athing materials for waist slab 0.0254 thk. of wood
nclined length of waist slab) 2 pcs. waist slab
sheathing width for waist slab) 0.1524 (extension)
(area of sheathing)
(one waist slab)/ w thk.
(two waist slab)/ w thk. required wood
Joist
2.78 (Number of Joist)
0.175 7.99 Joist for waist slab (m)
0.25 15.99 2- joist for waist slab (m)
0.67 4.81 (Number of Joist)
18 6.02 Required Joist (m)
22.00 Total Required Joist (m)
Supports
say 3.00 pcs. 51.34 m
Stringer
1.75 m2 (area of stringers for a waist slab)
say 5.00 pcs. 3.50 m2 (both waist slab)
0.09 m3 / w thk. for stringer
Riser Face
18 number of risers say
5.0 m2 (area of risers)
0.13 m3 lumber qty. /w thk.
Joist
2.78 (Number of Joist) say 3.00 pcs.
7.10 Joist for waist slab (m)
14.20 2- joist for waist slab (m)
4.81 (Number of Joist) say 5.00 pcs.
6.02 Required Joist (m)
20.22 Total Required Joist (m)
Supports
47.18 m
Stringer
1.55 m2 (area of stringers for a waist slab)
3.11 m2 (both waist slab)
0.08 m3 / w thk. for stringer say
Riser Face
18 number of risers 1.00 m3
5.0 m2 (area of risers)
0.13 m3 lumber qty. /w thk. say
m3
1.00 m3
MATERIAL UNIT ANALYSIS
CONCRETING
Item Qty Unit Price Total Price
Cement 8 ₱ 232.00 ₱ 1,856.00
Sand 0.5 ₱ 1,700.00 ₱ 850.00
Gravel 1 ₱ 1,500.00 ₱ 1,500.00
Water 0.3 ₱ 36.24 ₱ 10.87
₱ 4,216.87
Product = 9.8
Material Unit Price = ₱ 430.29
FOOTING FORMWORKS
Item Qty Unit Price Total Price
Steel Formwork 5 ₱ 557.71 ₱ 2,788.55
Shoring Jack 24 ₱ 1,147.00 ₱ 27,528.00
Total = ₱ 30,316.55
Product = 29
Material Unit Price = ₱ 1,045.40
COLUMN FORMWORKS
Item Qty Unit Price Total Price
4'x8' Phenolic board 4 ₱ 960.00 ₱ 3,840.00
Shoring Jack 16 ₱ 1,147.00 ₱ 18,352.00
Tie Rod 20 ₱ 1,147.00 ₱ 22,940.00
Tie Nut 40 ₱ 140.24 ₱ 5,609.60
1.2m-1" Diam- GI Pipe 40 ₱ 160.00 ₱ 6,400.00
200mm Aluma Beams 12 ₱ 3,225.00 ₱ 38,700.00
Total = ₱ 95,841.60
Product = 132
Material Unit Price = ₱ 726.07
BEAMS FORMWORKS
Item Qty Unit Price Total Price
4'x8' Phenolic board 4 ₱ 960.00 ₱ 3,840.00
Tie Rod 5 ₱ 210.24 ₱ 1,051.20
Tie Nut 10 ₱ 140.24 ₱ 1,402.40
1.2m-1" Diam- GI Pipe 10 ₱ 160.00 ₱ 1,600.00
200mm Aluma Beams (6m) 19 ₱ 3,400.00 ₱ 64,600.00
U-Head 22 ₱ 226.00 ₱ 4,972.00
Base-Jack 22 ₱ 265.00 ₱ 5,830.00
Vertical Post-EasyForms 44 ₱ 1,100.00 ₱ 48,400.00
Horizontal Post-EasyForms 70 ₱ 1,000.00 ₱ 70,000.00
Total = ₱ 201,695.60
Product = 206
Material Unit Price = ₱ 979.10
SLAB FORMWORKS
Item Qty Unit Price Total Price
4'x8' Phenolic board 6 ₱ 960.00 ₱ 5,760.00
Shoring Jack 32 ₱ 1,147.00 ₱ 36,704.00
200mm Aluma Beams (3.6m) 5 ₱ 2,050.00 ₱ 10,250.00
U-Head 32 ₱ 226.00 ₱ 7,232.00
Base-Jack 32 ₱ 265.00 ₱ 8,480.00
Swivel Clamp 48 ₱ 45.00 ₱ 2,160.00
Shoring Jack Screw Set 32 ₱ 295.00 ₱ 9,440.00
1.2m-1" Diam- GI Pipe 64 ₱ 160.00 ₱ 10,240.00
Scaffolding Set 16 ₱ 2,290.00 ₱ 36,640.00
Total = ₱ 116,656.00
Product = 267
Material Unit Price = ₱ 436.91
STAIRS FORMWORKS
Item Qty Unit Price Total Price
1"x6" Lumber 19 ₱ 9,250.34 ₱ 175,756.46
4"x4" Kiln Dry Wooden Batten 17 ₱ 9,500.96 ₱ 161,516.32
2"x4" Kiln Dry Wooden Batten 8 ₱ 2,240.00 ₱ 10,250.00
Nail for Wood 3" 4 ₱ 400.00 ₱ 1,600.00
Nail for Wood 2" 4 ₱ 400.00 ₱ 1,600.00
Total = ₱ 340,472.78
Product = 52
Material Unit Price = ₱ 6,547.55
PAINTING
Item Qty Unit Price Total Price
Cement 12 ₱ 230.00 ₱ 2,760.00
Fine Sand 1 ₱ 1,700.00 ₱ 1,700.00
Water 0.3 ₱ 36.24 ₱ 10.87
Total = ₱ 4,470.87
Product = 13
Material Unit Price = ₱ 336.16
TILE WORKS
Item Qty Unit Price Total Price
Cement 12 ₱ 230.00 ₱ 2,760.00
Fine Sand 1 ₱ 1,700.00 ₱ 1,700.00
Water 0.3 ₱ 36.24 ₱ 10.87
Total = ₱ 4,470.87
Product = 13
Material Unit Price = ₱ 336.16
Material Unit Prices Referenc
STRUCTURAL WORKS
Item
Cement
Sand
Gravel
4'x8' Phenolic board
Tie Rod
Tie Nut
1.2m-1" Diam- GI Pipe
200mm Aluma Beams (3.6m)
Shoring Jack
U-Head
Base-Jack
Vertical Post-EasyForms
Horizontal Post-EasyForms
Swivel Clamp
Shoring Jack Screw Set
Scaffolding Set
1"x6" Lumber
4"x4" Kiln Dry Wooden Batten
2"x4" Kiln Dry Wooden Batten
Nail for Wood 3"
Nail for Wood 2"
CHB 4"
CHB 6"
Rebar 6m
Steel Formwork
3/8 x 3 x 3 Angle Bar
3/8 x 2 x2 Angle Bar
C-Purlins
12mm Sag rods
16mm Crossbracing
6m Tubular Steel
Turn Buckle
ELECTRICAL WORKS UPDATED
Item
5.1 Duplex Convenience Outlet, Grounding Type, 20A, 250Vo
5.2 1 x 36 Watts Fluorescent Lighting Fixture, Box Type
5.3 2 x 36 Watts Fluorescent Lighting Fixture, Box Type w
5.4 2 x 36 Watts Fluorescent Lighting Fixture, Box Type
5.5 Single Pole Wall Switch
5.6 2 Single Pole Wall Switch in One Switch Plate
5.7 2 Three Way Wall Switch in One Switch Plate
5.8 Three Way Wall Switch
5.9 Weatherproof Duplex Convenience Outlet
5.10 Wall Fan Outlet
5.11 Ceiling Fan Control Switch
Z
Brand Unit Cost Source/Reference
N/A ₱ 3,181.00 Local Hardware
N/A ₱ 3,181.00 Local Hardware
N/A ₱ 1,670.00 Local Hardware
N/A ₱ 1,670.00 Local Hardware
N/A ₱ 3,181.00 Local Hardware
N/A ₱ 1,670.00 Local Hardware
N/A ₱ 730.00 Local Hardware
STRUCTURAL LABOR COST
1
GRAVEL BEDDING
QTY WORKER DAILY RATE TOTAL
1 Foreman ₱850.00 850
8 Skilled Worker ₱750.00 6000
8 Unskilled Worker ₱600.00 4800
17 ₱ 11,650.00 per day
452.52 cu.m Productivity: 16 cu.m / day
29.00 days ₱ 728.13 cu.m
2 CONCRETING
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
8 Skilled Worker ₱ 750.00 ₱ 6,000.00
8 Unskilled Worker ₱ 600.00 ₱ 4,800.00
17 ₱ 11,650.00 per day
452.52 cu.m Productivity: 16.00 cu.m/day
28.28 days ₱ 728.13 /cu.m
3 REBAR WORKS
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00 71.428571 kg/man-day
9 Skilled Worker ₱ 750.00 ₱ 6,750.00 8.9285714 kg/mh
9 Unskilled Worker ₱ 600.00 ₱ 5,400.00 0.112 MH/kg
1 Bar Bender ₱ 1,500.00 ₱ 1,500.00 philconstruct
1 Bar Cutter ₱ 1,500.00 ₱ 1,500.00 7500 kg/day
21 ₱ 16,000.00 per day
452.52 cu.m Productivity: 1500 kg / day
0.30 days ₱ 10.67 /kg
4 FORM WORKS
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
13 Skilled Worker ₱ 750.00 ₱ 9,750.00
13 Unskilled Worker ₱ 600.00 ₱ 7,800.00
27 ₱ 18,400.00 per day
11621.48 sq.m Productivity: 35 sq.m / day
333.00 days ₱ 525.71 sq.m
5 ROOF STEEL TRUSS
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
7 Skilled Worker ₱ 750.00 ₱ 5,250.00
7 Unskilled Worker ₱ 600.00 ₱ 4,200.00
15 ₱ 10,300.00 per day
749.61 kg Productivity: 1500 m/day
0.49974 days ₱ 6.87 m
6 ROOF/INSULATION
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
9 Skilled Worker ₱ 750.00 ₱ 6,750.00
9 Unskilled Worker ₱ 600.00 ₱ 5,400.00
19 ₱ 13,000.00 per day
288.25 sq.m Productivity: 125 sq.m/day
2.306 days ₱ 104.00 sq.m
7 C.H.B Laying
QTY WORK DAILY RATE TOTAL 8 sq.m/per person
1 Foreman ₱ 850.00 ₱ 850.00 144 Total m2 per day
18 Skilled Worker ₱ 750.00 ₱ 13,500.00
5 Unskilled Worker ₱ 600.00 ₱ 3,000.00
1 Bar Cutter ₱ - ₱ -
1 Bar Bender ₱ - ₱ -
26 ₱ 17,350.00 per day
16.95 sq.m Productivity: 144 sq.m/day
1 days work ₱ 120.49 sq.m
10 Electrical Works
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
8 Skilled Worker ₱ 750.00 ₱ 6,000.00
8 Unskilled Worker ₱ 600.00 ₱ 4,800.00
16 ₱ 11,650.00 per day
178.00 pcs Productivity: 20 pcs / day
8.9 days ₱ 103,685.00 ₱ 582.50 pcs
11 Fire Protection
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
8 Skilled Worker ₱ 750.00 ₱ 6,000.00
8 Unskilled Worker ₱ 600.00 ₱ 4,800.00
16 ₱ 11,650.00 per day
93.00 pcs Productivity: 30 pcs / day
3.1 days ₱ 36,115.00 ₱ 388.33 pcs
12 Mechanical Works
QTY WORK DAILY RATE TOTAL
1 Foreman ₱ 850.00 ₱ 850.00
6 Skilled Worker ₱ 750.00 ₱ 4,500.00
6 Unskilled Worker ₱ 600.00 ₱ 3,600.00
12 ₱ 8,950.00 per day
12.00 pcs Productivity: 15 pcs / day
0.8 days ₱ 7,160.00 ₱ 596.67 pcs
ARCHITECTURAL LA
TILE WORKS
Floor Finishes
GF-2F
Classrooms
QTY WORK
1 Foreman
4 Skilled Worker
4 Unskilled Worker
9
C.R
QTY WORK
1 Foreman
3 Skilled Worker
3 Unskilled Worker
7
Corridor
QTY WORK
1 Foreman
2 Skilled Worker
2 Unskilled Worker
5
2F-RL
Classrooms
QTY WORK
1 Foreman
10 Skilled Worker
10 Unskilled Worker
21
C.R
QTY WORK
1 Foreman
1 Skilled Worker
1 Unskilled Worker
3
874.73 m2
WORK DAILY RATE TOTAL 20.00 m2/per day
Foreman ₱ 850.00 ₱ 850.00 80 Total m2/ per day
Skilled Worker ₱ 750.00 ₱ 3,000.00 11 days work
Unskilled Worker ₱ 600.00 ₱ 2,400.00
₱ 6,250.00 per day### 11 days of work
Productivity: 20.00 sq.m. / day
₱ 78.60 sq.m.
Roof Deck
QTY WORK
1 Foreman
1 Skilled Worker
1 Unskilled Worker
3
ARCHITECTURAL LABOR COST
45x45cm 160.40 m2
DAILY RATE TOTAL 20 m2 per person
₱ 1,000.00 ₱ 1,000.00 80 Total m2 per day
₱ 800.00 ₱ 3,200.00 3 days work
₱ 600.00 ₱ 2,400.00
₱ 6,600.00 per day ₱ 19,800.00 3 days of work
Productivity: 80 sq.m./ day
₱ 123.44 sq.m.
60x60cm 24.00 m2
DAILY RATE TOTAL 10 m2 per person
₱ 1,000.00 ₱ 1,000.00 30.00 Total m2 per day
₱ 800.00 ₱ 2,400.00 1 days work
₱ 600.00 ₱ 1,800.00
₱ 5,200.00 per day ₱ 5,200.00 1 days of work
Productivity: 30.00 sq.m. / day
216.6666666667 ₱ 104.76 sq.m.
60x60cm 0.00 m2
DAILY RATE TOTAL 20 m2 per person
₱ 1,000.00 ₱ 1,000.00 40 Total m2 per day
₱ 800.00 ₱ 1,600.00 0 days work
₱ 600.00 ₱ 1,200.00
₱ 3,800.00 per day ₱ - 0 days of work
Productivity: 40 sq.m./ day
#DIV/0! ₱ 104.76 sq.m.
60x60cm 3.06 m2
DAILY RATE TOTAL 20 m2 per person
₱ 1,000.00 ₱ 1,000.00 200 Total m2 per day
₱ 800.00 ₱ 8,000.00 1 days work
₱ 600.00 ₱ 6,000.00
₱ 15,000.00 per day ₱ 15,000.00 1 days of work
Productivity: 200 sq.m./ day
4901.960784314 ₱ 104.76 sq.m.
60x60cm 88.19 m2
DAILY RATE TOTAL 20 m2 per person
₱ 1,000.00 ₱ 1,000.00 20 Total m2 per day
₱ 800.00 ₱ 800.00 5 days work
₱ 600.00 ₱ 600.00
₱ 2,400.00 per day ₱ 12,000.00 5 days of work
Productivity: 20 sq.m./ day
136.0698491893 ₱ 136.07 sq.m.
60x60cm 31.00 m2
DAILY RATE TOTAL 20 m2 per person
₱ 1,000.00 ₱ 1,000.00 120 Total m2 per day
₱ 800.00 ₱ 4,800.00 1 days work
₱ 600.00 ₱ 3,600.00
₱ 9,400.00 per day ₱ 9,400.00 1 days of work
Productivity: 120 sq.m./ day
303.2258064516 ₱ 104.76 sq.m.
60x60cm 6.75 m2
DAILY RATE TOTAL 20 m2 per person
₱ 1,000.00 ₱ 1,000.00 20 Total m2 per day
₱ 800.00 ₱ 800.00 1 days work
₱ 600.00 ₱ 600.00
₱ 2,400.00 per day ₱ 2,400.00 1 days of work
Productivity: 20 sq.m./ day
355.5555555556 ₱ 104.76 sq.m.
PAINTING
Wall Finishes
GF-2F
Classrooms 21.25 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 120 Total m2 per day
6 Skilled Worker ₱ 800.00 ₱ 4,800.00 1 days work
6 Unskilled Worker ₱ 600.00 ₱ 3,600.00
13 ₱ 9,400.00 per day ₱ 9,400.00 1
Productivity: 120 sq.m./day
₱ 442.35
C.R 0.00 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 40 Total m2 per day
2 Skilled Worker ₱ 800.00 ₱ 1,600.00 0 days work
2 Unskilled Worker ₱ 600.00 ₱ 1,200.00
5 ₱ 3,800.00 per day ₱ - 0
Productivity: 40 sq.m./day
#DIV/0!
Corridor 0.00 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 80 Total m2 per day
4 Skilled Worker ₱ 800.00 ₱ 3,200.00 0 days work
4 Unskilled Worker ₱ 600.00 ₱ 2,400.00
9 ₱ 6,600.00 per day ₱ - 0
Productivity: 80 sq.m./day
#DIV/0! #DIV/0!
2F-RL
Classrooms 49 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 320 Total m2 per day
16 Skilled Worker ₱ 800.00 ₱ 12,800.00 1 days work
16 Unskilled Worker ₱ 600.00 ₱ 9,600.00
33 ₱ 23,400.00 per day ₱ 23,400.00 1
Productivity: 320 sq.m./day
477.55102041 ₱ 477.55
C.R 49 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 40 Total m2 per day
2 Skilled Worker ₱ 800.00 ₱ 1,600.00 2 days work
2 Unskilled Worker ₱ 600.00 ₱ 1,200.00
5 ₱ 3,800.00 per day ₱ 7,600.00 2
Productivity: 40 sq.m./day
155.10204082 ₱ 114.40
Corridor 0.00 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 200 Total m2 per day
10 Skilled Worker ₱ 800.00 ₱ 8,000.00 0 days work
10 Unskilled Worker ₱ 600.00 ₱ 6,000.00
21 ₱ 15,000.00 per day ₱ - 0
Productivity: 200 sq.m./day
#DIV/0! #DIV/0!
Roof Deck
R.D (Interior) 778.47 m2
QTY WORK DAILY RATE TOTAL 20 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 20 Total m2 per day
1 Skilled Worker ₱ 800.00 ₱ 800.00 39 days work
1 Unskilled Worker ₱ 600.00 ₱ 600.00
3 ₱ 2,400.00 per day ₱ 93,600.00 39
Productivity: 20 sq.m./day
120.23584724 ₱ 114.40
Neutralizer 125.00 m2
QTY WORK DAILY RATE TOTAL 30 m2 per person
1 Foreman ₱ 1,000.00 ₱ 1,000.00 480 Total m2 per day
16 Skilled Worker ₱ 800.00 ₱ 12,800.00 1 days work
16 Unskilled Worker ₱ 600.00 ₱ 9,600.00
33 ₱ 23,400.00 per day ₱ 23,400.00 1
Productivity: 480 sq.m./day
₱ 187.20 ₱ 187.20
Corridor
QTY WORK DAILY RATE
1 Foreman ₱ 1,000.00
3 Skilled Worker ₱ 800.00
3 Unskilled Worker ₱ 600.00
7
days of work Productivity:
2F-RL
Toilet
QTY WORK DAILY RATE
1 Foreman ₱ 1,000.00
1 Skilled Worker ₱ 800.00
1 Unskilled Worker ₱ 600.00
days of work 3
Productivity:
Primer (Interior)
QTY WORK DAILY RATE
1 Foreman ₱ 1,000.00
10 Skilled Worker ₱ 800.00
10 Unskilled Worker ₱ 600.00
days of work 21
Productivity:
Neutralizer
QTY WORK DAILY RATE
1 Foreman ₱ 1,000.00
10 Skilled Worker ₱ 800.00
10 Unskilled Worker ₱ 600.00
21
days of work Productivity:
days of work
days of work
days of work
days of work
days of work
days of work
days of work
days of work
days of work
PLASTERING
All Floors
132 m2 QTY WORK
TOTAL 20 m2 per person 1 Foreman
₱ 1,000.00 20 Total m2 per day 18 Skilled Worker
₱ 800.00 7 days work 18 Unskilled Worker
₱ 600.00 37
₱ 2,400.00 per day ₱ 16,800.00 7 days of work
20 sq.m.
₱ 127.27
0 m2
TOTAL 20 m2 per person
₱ 1,000.00 60 Total m2 per person
₱ 2,400.00 0 days work
₱ 1,800.00
₱ 5,200.00 per day ₱ - 0 days of work
60 sq.m.
#DIV/0!
396 m2
TOTAL 20 m2 per person
₱ 1,000.00 20 Total m2 per day
₱ 800.00 20 days work
₱ 600.00
₱ 2,400.00 per day ₱ 48,000.00 20 days of work
20 sq.m.
₱ 121.21
TOTAL
₱ 2,400.00
₱ 4,000.00
₱ 700.00
₱ 3,200.00
₱ 10,300.00
0 m2
TOTAL 20 m2 per person
₱ 1,000.00 120 Total m2 per day
₱ 4,800.00 0 days work
₱ 3,600.00
₱ 9,400.00 per day ₱ - 0 days of work
120 sq.m.
#DIV/0!
6.75 m2
TOTAL 20 m2 per person
₱ 1,000.00 200 Total m2 per day
₱ 8,000.00 1 days work
₱ 6,000.00
₱ 15,000.00 per day ₱ 15,000.00 1 days of work
200 sq.m.
₱ 2,222.22
264.57 m2
TOTAL 20 m2 per person
₱ 1,000.00 200 Total m2 per day
₱ 8,000.00 2 days work
₱ 6,000.00
₱ 15,000.00 per day ₱ 30,000.00 2 days of work
200 sq.m.
₱ 113.39
₱ 75.00
16.95 m2
DAILY RATE TOTAL 9 m2 per person
₱ 850.00 ₱ 850.00 162 Total m2 per day
₱ 750.00 ₱ 13,500.00 1 days work
₱ 600.00 ₱ 10,800.00
₱ 25,150.00 per day ₱ 25,150.00 1 days of work
Productivity: 162 sq.m./day
1483.77581121 ₱ 114.94
₱ 155.25
PHILIPPINE PRODUCTIVITY R
DESCRIPTION
1.STRUCTURAL EXCAVATION
Common excavation
Hand
Machine
Rock excavation
Hauling of spoils
2.STRUCTURAL BACKFILL
By hand
By machine
3.TRENCHING
By hand
By machine
EXCAVATION- MANUAL
Common earth
Loam of sand
Clay or heavy soil
Rock
EXCAVATION- MECHANICAL
Common earth
Rock with jack hammer
BACKFILLING
Common manual
Gravel fill manual
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS MANUAL FROM:
0 – 2m Depth
2 – 3m Depth
3 – 4m Depth
4 – 5m Depth
Placing binder gravel
Escombro backfilling
Spreading,tamping & grading
Mechanical compaction, plate compaction
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12″
Clearing under growth & shrubs
Disposal of soil
Hauling of soil
Gravel fill
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters
5.ROOFING AND SIDING
Roofing
Metallic
Non-Metallic
Siding
Metallic
4.CONCRETE WORKS
Grade members
Formworks
Concreting
Rebar
Finishing
Suspended members
Formworks
Concreting
Rebar
Finishing
Embeded metal
Water proofing
Joint filler
PLACING CONCRETE
Slab on Fill
Slip Form
Floor Finish Unhardened
Concrete finished hardened
REBAR WORKS
Ground floor installation
Upper floor installation
Fabrication
Mixing manual
Mixing machine
MORE THAN 1.8 M3 POUR
Chute from truck
Crane & bucket
Wheeling
Finishing
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground
Wall above ground
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming
Forming only
Forming & Shoring
Wood wall & Partition
FORM WORKS FABRICATION
Form works fabrication
STRIPPING OF FORMS
Wa
Wa
Su
Suspended
Suspended slab
Elevated & shored slab forming – s
Floor slab at grade – s
INSTALLATION OF CARPENTRY WORKS
Plywood partition
T & G Flooring and Siding
Ceiling & frame work
Siding frame work
Flooring framing
Wooden post errection
Truss Fabrication
Truss Installation
Girt Installation
Plates Installation
Purlins Installation
Fascia board Installation
1/4″ or 3/4″ thk. plywood
Cutting by manual
Assembly
ARCHITECTURAL SPECIALTIES
DOORS
Wooden
Steel
Aluminum
Cyclone wire
WINDOWS
Glass
Louver
Steel
PARTITIONS
single wall
Wooden wall
Wooden Louver
cyclone Louver
PAINTING ( 3 coats )
Equipment
Pipes
Miscillaneous
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light
Heavy
Errection
Light
Heavy
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total mh )
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight
Light weight
Grating 1 1/4″ x 3/16″
Star threat grating
Errection
Heavy Structural teel
Light Structural steel
Stacks ( Inc. full welding )
Tanks ( Inc. full welding )
FINISHING AND MASONRY WORKS
H. CHB
4” CHB
Laying
Tooling
Plastering
6” CHB
Laying
Tooling
Plastering
8” CHB
Laying
Tooling
Plastering
MANHOUR/UNIT UNIT
6 MH/M3
0.5 MH/M3
8 MH/M3
1 MH/M3
5 MH/M3
2 MH/M3
6 MH/M3
0.5 MH/M3
8 MH/M3
1.31 MH/M3
1.64 MH/M3
2.63 MH/M3
6.67 MH/M3
16.67 MH/M3
0.82 MH/M3
5 MH/M3
1.25 MH/LM
1.67 MH/LM
2.5 MH/LM
3.33 MH/LM
0.11 MH/M3
0.21 MH/M3
0.48 MH/M2
0.06 MH/M3
0.05 MH/M2
0.03 MH/M2
1.69 MH/M3
1 MH/M3
2.07 MH/M3
1.07 MH/M3
0.97 MH/m2
1.51 MH/m2
1.29 MH/m2
2.54 MH/M2
8.54 MH/M3
0.07 MH/kg
0.4 MH/M2
3.28 MH/M2
16.7 MH/M3
0.08 MH/kg
0.8 MH/M2
0.27 MH/kg
1.82 MH/M2
0.3 MH/lLm
5 MH/M3
25 MH/M3
1 MH/M3
1.43 MH/M3
0.07 MH/M3
0.08 MH/M3
0.1 MH/M3
16 MH/M3
1.8 MH/M3
7 MH/M3
14 MH/M3
27 MH/M3
2.8 MH/M3
2 MH/M2
2.35 MH/M2
3.08 MH/M2
2.35 MH/M2
1.67 MH/M2
3.33 MH/M2
8.6 MH/M2
11 MH/M2
0.5 MH/M2
1 MH/M2
0.25 MH/M2
1.29 MH/M2
1.03 MH/M2
0.85 MH/M2
0.83 MH/M2
1.08 MH/M2
3.5 MH/M2
2.8 MH/M2
1 MH/PC
0.14 MH/B.F.
0.36 MH/B.F.
0.27 MH/B.F.
0.97 MH/B.F.
0.43 MH/B.F.
0.35 MH/B.F.
0.8 MH/B.F.
0.21 MH/B.F.
0.13 MH/B.F.
0.27 MH/B.F.
0.46 MH/B.F.
1 MH/PC
0.42 MH/M2
2.37 MH/M2
7.64 MH/M2
8.07 MH/M2
7.64 MH/M2
3.23 MH/M2
4.63 MH/M2
32.29 MH/M2
2.48 MH/M2
3.44 MH/M2
3.44 MH/M2
5.38 MH/M2
0.24 MH/f2
0.3 MH/f2
0.24 MH/f2
110-130 MH/MT
60-90 MH/MT
70-100 MH/MT
40-60 MH/MT
40-50 Lf/day
50-90 MH/MT
100-125 MH/MT
3.0 – 3.5 MH/SF
4.0 – 5.0 MH/SF
30 – 60 MH/MT
60- 90 MH/MT
250 – 300 MH/MT
200 – 275 MH/MT
8.0 – 10 m2/day
11 – 14 m2/day
8.0 – 10 m2/day