PM Order Handling
                                     www.sap-topjobs.com
          Course Objective
¾Understand the concepts of
   9General Maintenance
   9Refurbishment Orders
   9Order confirmation
 Above tasks are divided in to two parts
      as Part 1 to Part 3
                                                  www.sap-topjobs.com
 Objectives – General maintenance
Understand
¾ Steps in maintenance processing and concept
  of maintenance order or different types and
  purpose.
¾ Planning of maintenance activities in the
  maintenance order.
¾ Integration with other SAP modules (i.e. material
  procurement).
¾ Equip to perform transactions to
   9 create,
   9 Change
   9 plan and complete maintenance orders.
                           www.sap-topjobs.com
General maintenance – Course title
PM Order Over View
Order Processing
Additional Functions
Processes in Maintenance
                                 www.sap-topjobs.com
        Maintenance Processes
¾ Following seven maintenance
  processes are standard SAP
  supported PM process.
   9 Corrective Maintenance
   9 Breakdown Maintenance
   9 Preventive Maintenance
   9 Turnaround Maintenance
   9 Project Maintenance
   9 Refurbishment
      Maintenance
   9 Special Event Maintenance
                              www.sap-topjobs.com
         Maintenance Order
9 A maintenance order is a
  tool to plan and manage
  the execution of
  maintenance work in SAP.
9 Entire data related to a
  maintenance process order
  is maintained in the PM
  order.
                                                       www.sap-topjobs.com
Maintenance Order Structure
                Contains :
 Order
 Header       Order type, dates, plant, reference object and Priority
  Object            Equipment (assembly), functional locations,
   List                    maintenance notifications
                                 Work center, control key, description
  Operation                      standard time, activity type
               Material list      For example: Material, quantity, storage location
           Production resources/tools
      Settlement
        Rule
           Costs
                                           www.sap-topjobs.com
Maintenance Order Types
There can be different order types according to the
  business requirements.
SAP standard PM order types are:
¾ PM01 – Corrective maintenance
¾ PM02 – Breakdown maintenance
¾ PM03 – Preventative maintenance
¾ PM04 – Refurbishment maintenance
¾ PM05 – Project related maintenance
¾ PM06 – Turnaround maintenance
¾ PM07 – Special Event maintenance
                           www.sap-topjobs.com
General maintenance – Course title
PM Order Over View
Order Processing
Additional Functions
Processes in Maintenance
                                         www.sap-topjobs.com
    Maintenance Order Creation
¾ The following are the essential to
  create maintenance order:
    9 Description of the work required
    9 Reference object (functional
      location or equipment)
    9 Maintenance Activity Type
    9 Basic dates
    9 Priority
¾ If the order is created from a
  notification many information from
  notification is copied.
                                   www.sap-topjobs.com
    Use of Maintenance Activity
¾ Ability to group maintenance
  orders performing similar type
  of work
¾ Used as selection criteria in
  reporting
¾ Limited by order type
   9 Example of Activity:
              -
       9 Repair
       9 Rework
       9 Replace
             -
       9 Overhaul
                                  www.sap-topjobs.com
            Order Basic Dates
¾ Indicates the time limits for
  the work is to be completed
  including:
   9 start date and time
   9 finish date and time
¾ Used to schedule the order.
                                                   www.sap-topjobs.com
 Maintenance Order Operations
¾ The operations detail the activities to be
  performed within the order.
¾ The order can contain multiple operations.
¾ There are two types of operations:
   9 Internal Processing Operations
        9 Operations that are performed
          internally.
    9 External Processing Operations
       9 Operations that are performed
          externally.
¾ Right control key to be maintained to indicate
  internal / External operation.
                                               www.sap-topjobs.com
 Internal Processing Operations
¾ To create an internal processing operation
  the following information is required:
   9 Work center
   9 Control key
   9 Operation description
   9 Work effort
   9 Number of people
   9 Duration
¾ An operation can only have one work
  center assigned.
¾ Additional work centers can be assigned
  through additional operations.
                                                www.sap-topjobs.com
         Maintenance Task Lists
¾ Used to plan maintenance order.
¾ Commonly task list used for
   9 Functional location
   9 Equipment
   9 General
¾ The task list is selected from within the
  maintenance order.
¾ Contains operations that defines the requirements
  to perform a particular activity:
   9 Labor
   9 Components
   9 Production Resource & Tools
   9 Relationships
                                                  www.sap-topjobs.com
  External Processing Operation
¾ Two ways of planning maintenance
  activities for external processing are:
        9 Agreement between company and
          vendor through Service master
          records. It contain a description for
          an agreed unit of work between the
          two parties.
        9 Contract (Lump sum) to perform
          defined work.
¾ Purchasing information will be defaulted
  through during the creation of external
  services
                                                 www.sap-topjobs.com
           Component Overview
¾ Components required to complete the
  operation are planned against the
  operation in the order.
¾ Two types of components are:
   9 Stock
       9 Material master record exists and
         quantity kept in warehouse
   9 Non stock
       9 Material master record exists but not
         kept in warehouse
       9 Purchased each time there is a
         requirement
       9 If a Material Master does not exist,
         then one must be created before
         procurement can commence.
                                  www.sap-topjobs.com
   Production Resource & Tools
¾ Production Resource Tool is
  planned against the operation
  if it is required.
¾ The relevant usage and PRT
  control key is maintained for
  each PRT assignment (in
  operation).
                                       www.sap-topjobs.com
   Schedule Maintenance Order
¾ Scheduling of the maintenance
  order is to determine the dates
  when the operations are to be
  performed.
¾ Performed once the order is
  planned.
¾ Uses the basic start date of the
  order and determines the basic
  finish date.
¾ Material availability check can be
  performed before or after
  scheduling of the order.
                           www.sap-topjobs.com
General maintenance – Course title
PM Order Over View
Order Processing
Additional Functions
Processes in Maintenance
                                        www.sap-topjobs.com
                 PM Order Permits
¾ Each order will be created with an
  initial permit.
¾ The initial permit is used as a
  reminder that physical permits
  must be obtained prior to work
  beginning.
¾ This permit must be issued prior to
  the order being released.
                                          www.sap-topjobs.com
           Release of PM Order
¾ After the order has been planned and
  scheduled, the order may be released.
¾ Releasing the order enables the
  following:
   9 Posting of time against that work
     order
   9 Posting of materials withdrawal
     against that work order
   9 Processing of Purchase
     Requisitions and creation of
     Purchase Orders
   9 Printing of PM Work Orders
¾ The system status REL for released is
  set.
                       www.sap-topjobs.com
General maintenance – Course title
PM Order Over View
Order Processing
Additional Functions
Processes in
Maintenance
                                    www.sap-topjobs.com
         PM Order Confirmation
¾ Process of recording the actual
  hours spent on performing
  work against a maintenance
  order.
¾ Confirmation can be done only
  after release of PM order.
¾ Labor cost and material used
  costs are recorded through
  confirmation.
                                   www.sap-topjobs.com
          Requisition Processing
¾ Non-stock Materials or
  External Services are planned
  in a Maintenance Order
¾ When Releasing the
  Maintenance Order, the
  system automatically creates a
  Purchase Requisition.
¾ The user can keep track of the
  status of the PR and PO from
  the Maintenance Order
                                        www.sap-topjobs.com
             PM Order Completion
¾ A maintenance order is technically
  completed after:
   9 All work has been completed
   9 Completion confirmations
     have been entered
¾ Order will be changed to display
  only and no further changes to the
  order can be made.
¾ It is possible to reverse technical
  completion of an order.
                                                  www.sap-topjobs.com
                  Order Settlement
¾ The order is used to collect actual cost of
  performing the maintenance activities.
¾ Cost are calculated against the
  maintenance order when:
   9 Time confirmations are entered
   9 Goods movements are performed
   9 Goods receipts are entered
   9 Service entry sheets are maintained and
     accepted
¾ The settlement rule is used to identify where
  the actual costs will be passed onto.
                                      www.sap-topjobs.com
                  Settlement Rule
¾ Actual cost can be settled to the
  following objects:
   9 Cost Center (maintenance for
       technical object)
   9 WBS Element (project related
       maintenance)
   9 Maintenance Order (sub
       orders)
¾ The settlement rule can be
  automatically generated from the
  reference object.
¾ The settlement rule may need to
  be changed.
                                                        www.sap-topjobs.com
        Order Business Complete
Following are the Final steps in PM order completion.
¾ Can be performed only after order is:
   9 Technically completed
   9 Settlement has been performed
¾ Orders will be completed after stipulated periods
  (e.g. 4 months) after they have been technically
  completed.
¾ This allows time for invoices to be processed and
  further settlements to occur.
                                       www.sap-topjobs.com
                  Warranty Claims
¾ Warranties can be assigned to
  individual technical objects.
¾ Upon creation of a maintenance
  notification or order a warranty
  information message is displayed.
¾ If maintenance is performed on a
  technical object whilst covered by
  a warranty the following steps
  need to occur:
    9 Change maintenance activity
      type
                                                     www.sap-topjobs.com
         Transaction code tips
IW32 –Maintain components
      Maintain PRT
      Schedule Maintenance Order
      Release Maintenance Order
      Display purchase requisition
      Maintain settlement Rule
IW28 – Create Warranty Claim Maintenance
       Order
IW38 – Change Maintenance Orders with List Editing
IW49 – Display Operations with List Editing
                    www.sap-topjobs.com
Part 2 – Refurbishment Order
                                                   www.sap-topjobs.com
    Module Objectives Refurbishment
Understand
¾ Corrective cycle of the refurbishment process.
¾ Process steps within refurbishment processing.
¾ concepts of refurbishment order.
¾ Integration of the refurbishment process with
  other modules.
¾ Perform transactions in SAP to
   9 Create
   9 Change
   9 Plan and complete refurbishment orders.
                       www.sap-topjobs.com
   Refurbishment – Course title
Replacement Cycle
Refurbishment Cycle
                                       www.sap-topjobs.com
     Refurbishment Process
Refurbishment is the process of repairing the
item and fixing it back to its position for
successful performance.
                                   www.sap-topjobs.com
            Equipment Records
¾ When removing the equipment,
  its record need to be updated:
   9 Dismantle equipment from
     functional location
   9 Remove ‘Tag Number’ from
     Equipment record
                       www.sap-topjobs.com
   Refurbishment – Course title
Replacement Cycle
Refurbishment Cycle
                                                  www.sap-topjobs.com
Refurbishment Maintenance Order
¾ Refurbishment is the repair of an item to its “as
  new” condition.
¾ Created to perform refurbishment of repairable
  items that are kept as a stock item in the
  warehouse.
¾ PM Order for refurbishment can be created
  without a notification.
¾ The maintenance planner creates and monitor the
  creation of Refurbishment maintenance process.
                                         www.sap-topjobs.com
      Refurbishment Order ..cont
¾ Different Order type used for
  ‘Refurbishment order’.
¾ If the material is handled in serial
  number, the serial number is also
  entered.
¾ The refurbishment order will follow
  the same order life cycle as an
  ordinary order.
¾ Different resources can be used
  for refurbishment order:
    9 Internal or External
    9 Materials
    9 Production Resource Tool
                                           www.sap-topjobs.com
  Refurbishment Order Process
¾ The Refurbishment Order is Technically
  Completed after the entire process is
  completed.
¾ Update the Equipment Master record
¾ The System Status will be ESTO (in the
  warehouse) on the Equipment record
                                              www.sap-topjobs.com
          Transaction code tips
IE02 – Maintain Equipment for refurbishment
IH08 – Display Equipment using List Editing
IW81 Create Refurbishment Order
IW32 Technical Completion of Refurbishment Order
IE02 Maintain Equipment Master User Status
                     www.sap-topjobs.com
Part 3 – PM Order confirmation
                         www.sap-topjobs.com
  Order confirmation – Course title
Confirmation
Measurement Document
Service Entry Sheet
                                           www.sap-topjobs.com
      Order confirmation
A time confirmation is the recording of actual
 hours spent during maintenance activities
performance against a maintenance order
operation
                                        www.sap-topjobs.com
Type of Order confirmation
 ¾There are two types of confirmation
    ¾Individual confirmation
       9PM order will be confirmed one by one
    ¾Collective confirmation
       9Multiple PM orders will be confirmed
                collectively
                                             www.sap-topjobs.com
    Confirmation over view
¾Used to record the actual hours of both
labor and operation spent for a PM order.
¾PM Order must be released before
confirmation.
¾This is the process of capturing the cost
of maintenance activities.
                                              www.sap-topjobs.com
       Collective Confirmation
¾Used to record the actual hours of both
labor and operation spent for many PM
order at a time.
¾PM Orders must be released before
confirmation.
¾This is the process of capturing the cost
of maintenance activities.
¾This will help to process the confirmation
quickly.
                                              www.sap-topjobs.com
         Cancel Confirmation
¾Confirmation performed on a PM order
can only be cancelled.
¾No Change of confirmation is possible.
¾Any wrong confirmation has to be
cancelled and reconfirmed again.
¾Reason for canceling confirmation has to
be entered wile canceling the confirmation.
                                    www.sap-topjobs.com
   Transaction code tips
IW41 – Enter PM Individual Time
       Confirmation
IW47 – Display Time Confirmation List
IW48 – Collective Time Confirmation with
Selection List
IW45 – Cancel confirmation
                                       www.sap-topjobs.com
   Measurement Document
¾ To record the reading at measuring
  point or at counter, measuring
  document is created.
¾ Shop-floor paper from PM order can
  be used to record the readings.
¾ Measurement document contains
   9 Measuring point number
   9 Reading date & time
   9 Reading and Text
                                            www.sap-topjobs.com
                     Measuring Point
¾ Measuring points and counters are
  created for technical objects for the
  purpose of recording a specific status
  for the object.
¾ It is possible to have more than one
  measuring point for a technical object.
                         www.sap-topjobs.com
  Order confirmation – Course title
Confirmation
Measurement Document
Service Entry Sheet
                                               www.sap-topjobs.com
              Service Entry sheet
¾ A Service entry sheet is created to confirm the
  receipt of a service that has been provided by an
  external vendor.
¾ It is created at the time of making PO against PM
  order
¾ When accepting the services, cost will be posted to
  PM order
                                                  www.sap-topjobs.com
   Service Entry sheet - Process
¾ A Service entry sheet is required for
  maintenance operation which are performed
  externally.
¾ On releasing PM order, Purchase Request is
  created for services.
¾ PR details are copied into the Purchase order
  at the time of crating PO with respect to PR.
¾ Multiple service entry sheet can be created
  for a PO.
¾ Service entry has to be accepted for the cost
  to flow into the PM order.
                                         www.sap-topjobs.com
          Transaction code tips
IK11 Create Measurement Document
IK14 Create Measurement Document for Object
IK34 Create Measurement Document with Entry List
IK31 Create Entry List
ML81N Create Service Entry Sheet
ML81N Release Service Entry Sheet
                              www.sap-topjobs.com
                Summary
¾Understood the concepts of
   9General Maintenance
   9Refurbishment Orders
   9PM Order Confirmation