0% found this document useful (0 votes)
13 views1 page

Flood Wall 2

The document outlines the design specifications for a flood wall along the right bank of the Karnafuli and Halda Rivers in Chittagong, Bangladesh, covering a total length of 6.500 km. It includes detailed measurements and reinforcement details for the construction, such as the use of various diameters of steel bars at specified intervals. The document is prepared by the Bangladesh Water Development Board's Design Circle IV and includes design, recommendation, and approval sections.

Uploaded by

safiqul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Flood Wall 2

The document outlines the design specifications for a flood wall along the right bank of the Karnafuli and Halda Rivers in Chittagong, Bangladesh, covering a total length of 6.500 km. It includes detailed measurements and reinforcement details for the construction, such as the use of various diameters of steel bars at specified intervals. The document is prepared by the Bangladesh Water Development Board's Design Circle IV and includes design, recommendation, and approval sections.

Uploaded by

safiqul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

300

(+)6.60m (PWD)
C/S R/S
D-20mm@125 C/C
2500 600 1700
D-25 mm@250 C/C
D-16mm@150 C/C Stem Toe 1650
600
2500 600
2500 1250
1650
(+)3.50m (PWD) Heel 2000
D-25 mm@125 C/C
600
D-16mm@200 C/C
Plan of Pile
2500 FILLET 150X150
D12 @ 125mm C/C
D-16mm@150 C/C D12 @ 250mm C/C
D-16mm@100 C/C D-25mm@125 C/C
2000 1700 (+)1.50m (PWD)
600 300mm(min) to be
750 impregated into the
base.
200 200
D12@250mm C/C
2-D12 2-D12
BANGLADESH WATER DEVELOPMENT BOARD
OFFICE OF THE SUPERINTENDING ENGINEER
DESIGN CIRCLE - IV
FLOOD CONTROL, DRAINAGE IMPROVEMENT AND WATER LOGGING MITIGATION OF
CHITTAGONG CITY
DESIGN OF FLOOD WALL FROM Km. 27.817 TO Km 34.042=6.225 Km & FROM Km
34.452 TO Km 34.727=0.275 Km; TOTAL =6.500 Km. ALONG THE RIGHT BANK OF
KARNAFULI RIVER AND HALDA RIVER FROM KALURGHAT BRIDGE KATA KHAL,
DIST: CHATTOGRAM, UNDER RANGAMATI O & M DIVISION, BWDB, KAPTAI.
DRAWN BY: RECOMMENED BY:
Detail of Flood Wall DESIGNED BY:
APPROVED BY:
(APPLICABLE FROM Km. 27.817 TO Km. 30.352=2.535Km.) CHECKED BY:
NO DATE DESIGNED CHECKED RECOM. APP.
R E V I S I O N S DATE: 21.03.2021 DRG. NO. DC - IV / 3954 / 08 / 18