0% found this document useful (0 votes)
42 views9 pages

Isolator Calculation

The document outlines the plumbing system calculations for the Supreme Court Phase 2 project, detailing water consumption estimates, tank sizing, and pump head requirements. It includes data on various storeys and fittings, as well as calculations for potable and flush water systems. Overall, it provides a comprehensive overview of the plumbing design specifications and requirements for the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views9 pages

Isolator Calculation

The document outlines the plumbing system calculations for the Supreme Court Phase 2 project, detailing water consumption estimates, tank sizing, and pump head requirements. It includes data on various storeys and fittings, as well as calculations for potable and flush water systems. Overall, it provides a comprehensive overview of the plumbing design specifications and requirements for the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

P000093-Supreme Court Phase 2 05/06/2025

Storey Location Fittings


B4 Gravity Feed 0 0 0 0 10 0
B3 Gravity Feed 0 0 0 0 6 0
B2 Gravity Feed 39 10 38 6 7 0
B1 Gravity Feed 13 13 14 4 22 4
1st Gravity Feed 14 8 13 0 18 2
2nd Gravity Feed 13 11 12 0 19 3

Page 1 of 9 881412467.xls
P000093-Supreme Court Phase 2 05/06/2025

Storey Location Fittings


2And Gravity Feed 10 10 10 0 15 3
3rd Gravity Feed 0 0 0 0 8 0
3And Gravity Feed 18 10 18 0 14 2
4th Gravity Feed 25 9 24 0 17 3
4Ath Gravity Feed 2 2 2 0 3 0
5th Pump Feed 0 0 0 0 8 0
6th Pump Feed 7 5 6 0 13 0
Pump Feed 7 5 6 0 21 0
Gravity Feed 134 73 131 10 139 17
Total 141 78 137 10 160 17

Page 2 of 9 881412467.xls
SAP No. - Project Title 05/06/2025
Calculation Sheet for Plumbing System [(CP 48):1989]
ESTIMATED USAGE OF WATER CONSUMPTION
SIZING - Potable & Flush Water Tank
INDIRECT FEED
Population
Estimated Number of Units = 0
Estimated number of visitors = 0 10m2/ pax
Water consumption rate per unit per day = 0 l/head
Water consumption rate for visitors = 10 l/head
Total water consumption per day = 0 m3/day

DIRECT FEED
Toilet cleaning
Toilet cleaning rate (assumed) = 120 l/toilet/day
Number of toilets in building = 0
Total cleaning water consumption per day = 0 m3/day

Total Potable Water Consumption = 0.00 m3/day


= 0.00 m3/mth

Page 3 of 9 881412467.xls
SAP No. - Project Title 05/06/2025
Calculation Sheet for Plumbing System [(CP 48):1989]
WATER TANK SIZING
SUMMARY
Low Level Transfer Tank = 1 x 0 x 3
High Level PW Tank = 1 x 0 x 3
High Level HR Water Tank = 1 x 1 x 2
Cooling Tower Make-up Tank = 1 x 0 x 3
Irrigation Tank = 1 x 1 x 2
POTABLE SYSTEM
SIZING OF HIGH LEVEL PW TANK (Min 24 hrs storage CP48)
Storage capacity (assumed) = 24 hrs
Effective storage volume = 0 m3
Effective factor = 75%
Gross storage volume = 0 m3
Recommended tank size = 1 x 0 x 3
(Length) (Breadth) (Height)
TRANSFER TANK
low level tanks should be 1/3 capacity of high level tanks.
Storage capacity (assumed) = 8 hrs
Transfer Tank Capacity = 0.00 m3
Effective factor = 75%
Gross storage volume = 0 m3
Recommended tank size = 1 x 0 x 3
(Length) (Breadth) (Height)

HOSEREEL SYSTEM
SIZING OF HIGH LEVEL TANK (Min 24 hrs storage CP48)
Storage capacity (assumed) = 24 hrs
Effective storage volume = 1.1 m3
Effective factor = 75%
Gross storage volume = 2 m3
Recommended tank size = 1 x 1 x 2
(Length) (Breadth) (Height)

COOLING TOWER SYSTEM


Effective storage volume = 0 m3
Effective factor = 75%
Gross storage volume = 0 m3
Recommended tank size = 1 x 0 x 3
(Length) (Breadth) (Height)
IRRIGATION SYSTEM
Storage capacity (assumed) = 24 hrs
Effective storage volume = 0.33 m3
Effective factor = 75%
Gross storage volume = 1 m3
Recommended tank size = 1 x 1 x 2
(Length) (Breadth) (Height)

Page 4 of 9 881412467.xls
05/06/2025

Transfer Pump Head Sizing Calculation


Potable & Flush System
FITTINGS
SECTION Q C D ACTUAL TYPE EQV. PL PER NO. OF TOTAL HL PER M OF ACTUAL
OF PIPE (l/s) (mm) PL (m) FITTING (m) FITTINGS EQV. PL(m) PIPE (m/m) HL (m)
Between Furthest 0.00 140 0 - 0 0 0.00 #DIV/0! #DIV/0!
Tank to Transfer - 0 0
Pump - 0 0
- 0 0
- 0 0
- 0 0
Total head loss #DIV/0!
Minimum dynamic pressure = 0.0 m = 0.0 Bar
Static loss = 0 m Cut-in pressure = #DIV/0! kPa
Total friction loss = ### m = #DIV/0! kPa (approx.)
Safety Factor = 15% Cut-out pressure = #DIV/0! kPa
Pump Head Required = ### m = #DIV/0! kPa (approx.)

Page 5 of 9 881412467.xls
P000093-Supreme Court Phase 2 05/06/2025
Calculation Sheet for Plumbing System [(CP 48):1989]
Flow Rate Calculation
System Involve: (Tick the Box for Potable System ONLY)

Potable System Only

For Potable System


Fitting Qty Loading Unit Total
- - 0 x 0 = 0
Sub Total Loading Unit = 0
Total Floor Serving = 1
Total Loading Unit = 0

Design Flowrate for number of fittings Qp = 0.00 lit / sec

For Flush System


Fitting Qty
- - 0
- - 0
- - 0
- - 0
Total 0

Nature of Occupancy: (Select one group)

Group A: Offices, Hotels & Hospitals.

Group B: Schools & Other Premises where Rest Periods Create Extraordinary Demands.

Design Flowrate for number of FV Qf 0 x 1.5 = 0

Design Flowrate for number of FV Qf = 0.00 lit / sec

Design Flowrate of Pump Flowrate QT = Qp + Q f lit / sec


= 0.00 lit / sec

Page 6 of 9 881412467.xls
05/06/2025

Pump Head Sizing Calculation


Flush System - Block K
FITTINGS
SECTION LU Q C D ACTUAL TYPE EQV. PL PER NO. OF TOTAL HL PER M OF ACTUAL
OF PIPE (l/s) (mm) PL (m) FITTING (m) FITTINGS EQV. PL(m) PIPE (m/m) HL (m)
Between Furthest - 6.00 140 80 13 Tee 5.8 2 77.50 0.01873 1.6950
Fitting to Pump Elbow 3.4 6
Check Valve 11.5 1
Strainer 34 1
- 0 4
- 0 0
Total head loss 1.6950
Minimum dynamic pressure = 10.2 m = 1.0 Bar
Static loss = 15 m Cut-in pressure = 309.2 kPa
Total friction loss = 1.70 m = 310 kPa (approx.)
Safety Factor = 15% Cut-out pressure = 409.2 kPa
Pump Head Required = 30.92 m = 410 kPa (approx.)

Page 7 of 9 881412467.xls
05/06/2025

SIZING - Potable & Flush Water Pressure Vessel


Flush System - Block K

Maximum Flowrate (Design), Q = 6.00 l/s

Minimum Flowrate (assume 1/4 of Max.) = 1.50 l/s

Flowrate Average Pump Output (APO) = 3.75 l/s

Head Required = 16.10 m

Cut-in Pressure (P1) = 16.10 m

Cut-out Pressure (P2) = 26.10 m

Pressure Factor (PF) = 1 - (P1 + 10.33)/(P2 + 10.33)


= 0.2745

Pumping Time (t) = 3 min

No of pump cycle/hr (i) = 20 times per pump

Effective Volume of Pressure Vessel Output (PVO) = 1/2 APO x t


= 340 litres

Actual Volume of Pressure Vesssel (V1) = (PVO)/(PF)


= 1239 litres

Capacity of Pressure Vessel Tank = 750 litres

No. of Pressure Vessel Required (n) = 3 nos.

No of PV for 2 pump system, n = 2 nos.

Page 8 of 9 881412467.xls
05/06/2025

Isolator Sizing Calculation


Flush System - Block K
Flow rate = 6.00 l/s
= cmh
= 95.10 gpm

Head required = 16.1 m


= 52.8 ft

Take: Pump efficiency, Effp = 45.0%

Motor H.P., MHP = (Q x H) / (3960 x Effp)


= 2.81898 H.P.
= 2.07336 kW

Take: Motor efficiency, Effm = 75.0%


Power factor, PFm = 75.0%

Motor Power Intake, MPI = MHP / Effm


= 2.76448 kW

Rating required, IR = MPI / (PFm x 1.732 x 0.4)


= 5.32024 A

With 20% SF, IR = 6.38429 A


(Take IR = 6.5 A)

Page 9 of 9 881412467.xls