The document outlines general notes for construction, emphasizing that all dimensions are in millimeters and must be verified on-site before work begins. It specifies that electrical and plumbing installations must comply with requirements and be performed by qualified professionals, who must provide test certificates upon completion. Additionally, it highlights that works should adhere to approved codes and practices.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

Elevation 3

The document outlines general notes for construction, emphasizing that all dimensions are in millimeters and must be verified on-site before work begins. It specifies that electrical and plumbing installations must comply with requirements and be performed by qualified professionals, who must provide test certificates upon completion. Additionally, it highlights that works should adhere to approved codes and practices.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

General Notes .

All dimensions are in mm


unless otherwise
specified.
Drawings are not to be
scaled-only figured
dimensions are to be used.
Contractor must verify all
dimensions on site
before commencement of
works .
Electrical Installation.
All electrical works are to
comply with the
specified requirements and
should be done by
a qualified Electrician
providing requisite test
certificates upon
3 No. coats of Silk emulsion
0.700

completion and installation .


Works should be carried
paint to specification. out in accordance
to approved code and
practices .
Vertical Timber strip cladding
2.000

Plumping Works.
All Plumbing works are to
Company Logo comply with the
specified requirements and
2000mm by 1200mm should be done by
a qualified Plumber
Waiting Chair
1.000

providing pressure test


certificates upon
completion and installation .
Works should be carried
out in accordance
to approved code and
practices
E-03 Elevation 1:50 REVISION.