0% found this document useful (0 votes)
433 views2 pages

ECDIS Management Card

The ECDIS Management Card outlines navigational conditions and settings for a voyage from Antwerp to Lagos. It includes details on primary and secondary ECDIS operation settings, alarm configurations, and position sources. Any changes to the ECDIS safety settings must be approved by the Master, and the card should be reissued and signed accordingly.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
433 views2 pages

ECDIS Management Card

The ECDIS Management Card outlines navigational conditions and settings for a voyage from Antwerp to Lagos. It includes details on primary and secondary ECDIS operation settings, alarm configurations, and position sources. Any changes to the ECDIS safety settings must be approved by the Master, and the card should be reissued and signed accordingly.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ECDIS Management Card

Voyage: 04-22L (From – to) Antwerp - Lagos


Route Name: see next (route name as saved)
Passage Segment: 08 (WPT No. – WP No)
The ECDIS Management Card should be aligned with the ECDIS Check off cards

Select the applicable navigational conditions:


Coastal/Open Sea Day
Confined Waters Night

Primary and secondary ECDIS


Operation Settings System Settings
Scamin On/Off Shallow Contour m

CATZOC (M-Quality) Safety Depth m

Safety Contour m

Deep Contour m

LDL m
Alarm Buzzer Always On
Vectors mins

Anti Grounding Cone Always On


Route XTD Port
Ahead (mins)
Starboard
Starboard
nm
Port
nm
Starboard

Layers All / Custom Latest NTM Installed Date:

Primary ECDIS Wk I

Secondary ECDIS Wk I
Position Source DGPS #1, #2 Configuration Restricted Waters (2 Colour)
Deep Waters (4 Colour)

ECDIS Alarm disabled Reason Handed-out to next watch Approved by Master

OOW – 2nd Officer (Name /Signature) Chief Officer


OOW – 3rd Officer (Name /Signature)
OOW – Junior Officer (Name /Signature)
Master (approval) (Name /Signature)
Any changes to the initially approved ECDIS Safety Settings, through the passage plan approval process, must be
authorized by the Master. The ECDIS management card should be reissued and signed.

1|Page
ECDIS Management Card

2|Page

You might also like