Concrete Pouring Checklist Form
Project Details
Project Name: ________________________________________
Location: ____________________________________________
Contractor: ___________________________________________
Engineer in Charge: ____________________________________
Date of Pour: __________________________________________
Concrete Strength (psi): _________________________________
Mix Design Reference No.: ______________________________
Batch Ticket No(s): ______________________________________
Weather Conditions: ____________________________________
Pre-Pour Checklist
- Formwork aligned, secured, and braced
- Formwork gaps sealed to prevent leakage
- Dimensions, slopes, and levels verified
- Formwork coated with release agent (if needed)
- Rebar size, spacing, and placement per drawings
- Adequate concrete cover maintained
- Spacers and chairs in place and secured
- Concrete mix verified with batch ticket
- Admixtures (if required) approved and ready
- Water source available (for curing)
During Pouring Checklist
- Concrete placement follows approved procedure
- Pouring starts from the lowest point
- No free fall greater than 5 feet (to avoid segregation)
- Concrete vibrated properly in layers
- Cold joints avoided or treated as per specification
Post-Pour Checklist
- Concrete surface properly screeded and leveled
- Control joints cut (if applicable)
Concrete Pouring Checklist Form
- Curing method applied (wet curing/compound)
- Protection from rain, wind, and sun ensured
Testing Requirements
- Slump Test (Target: ______ in) - Result: ______ in
- Temperature (Target: ______ °F) - Result: ______ °F
- Cylinder Samples Collected (Yes/No)
- Air Content Test (If required) - Result: ______ %
Signatures
Site Engineer/Inspector: ____________________ Date: ____________
Contractor Representative: _________________ Date: ____________
Supervisor/Foreman: _______________________ Date: ____________