On February 17, 2025, an aluminum scaffold ladder fell at the Amar Project site due to being left unsecured, posing a potential injury risk to workers. The incident highlighted system defects in training and material handling, leading to corrective actions such as securing the work area and conducting safety training. Key lessons emphasize the importance of regular inspections and securing ladders to prevent future accidents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Learn and Apply

On February 17, 2025, an aluminum scaffold ladder fell at the Amar Project site due to being left unsecured, posing a potential injury risk to workers. The incident highlighted system defects in training and material handling, leading to corrective actions such as securing the work area and conducting safety training. Key lessons emphasize the importance of regular inspections and securing ladders to prevent future accidents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Business Use

Date of accident:- 17-02-2025


Site: Amar Project
EUROPE IMEA ASIA Report #: 43

Learn and apply


Near miss

Near Miss – Aluminum scaffold ladder suddenely fellen on ground.

Description (what happened?) Photos / sketches

Location: Amar Building mezzanine floor (Leb room)


Decsription: An aluminum scaffold ladder fellen
from its position due to being left unsecured in a
vertical state. Additionally, neaeby materials became
entangled with the ladder, causing it to topple.

Consequences

(1) Worker might have got injuired (due to fall enjuiry).

Why the accident happened (THE MAIN SYSTEM DEFECTS)?

What did not work: (1) CMO/PMC was not aware of the task.
SYSTEM DEFECT
KE: Prevention & Improvement (KE 6) SYSTEM DEFECT
KE: Prevention & Improvement (KE 6)
SYSTEM: Training System
SYSTEM: Training System
SYSTEM DEFECT: Material Handling D&C requirements not in place
SYSTEM DEFECT:
Material Handling D&C requirements not in place

CAPA System

Corrective Action : 1. Secure the work area remove and inspected fellen ladder, and ensure no future risk.
2. Inspected all ladder and scaffolding, Check for proper stability, locking machanisms and positioning.
3. Conducd a toolbox talk with workers on the importance of securing ladder.
4. Assign a supervisor to oversee sfaffold- related activites for compliance.
Preventive Action : 1. Conduct daily and weekly checks on all scaffolding and ladder placement.
2. provide re-fresher training on ladder safety and fall prevention.
3. Ensure the ground is stable before setting up laddre and scaffold materails.

Key lessons learned / follow-up actions for All Sites (defined by Europe/IMEA/Asia HSE Lead Team)

Key learnings: 1. Regular check of scaffold and ladder can identify potential hazard before use.
2. Always secure ladder using locking mechanisms or tie-off point prevent fall .

Mandatory Actions: 1) Site safety procedure to be explained.


2) Trainig to be provided with all crew member and site supervisor.
3) Area should be clear for multiple activites.

Date: 19-02-2025 Issued by - CSL