0% found this document useful (0 votes)
93 views1 page

Tarrif Charges EB

The TNERC Order No: SMT.No.6 of 2023, effective from July 1, 2023, outlines the revised tariff rates for various consumer categories, including high tension and low tension supply. The document specifies energy and demand charges for industries, educational institutions, and other categories, with some consumers receiving government subsidies. Tariffs vary based on consumption levels, with specific rates for public EV charging stations and temporary construction activities.

Uploaded by

matsajee2195.am
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views1 page

Tarrif Charges EB

The TNERC Order No: SMT.No.6 of 2023, effective from July 1, 2023, outlines the revised tariff rates for various consumer categories, including high tension and low tension supply. The document specifies energy and demand charges for industries, educational institutions, and other categories, with some consumers receiving government subsidies. Tariffs vary based on consumption levels, with specific rates for public EV charging stations and temporary construction activities.

Uploaded by

matsajee2195.am
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ONE PAGE STATEMENT ON TARIFF RATES AS IN THE TNERC ORDER NO :SMT.No.6 of 2023 DT:30.06.

2023
Revised Tariff rates with effect from 01.07.2023 Approved rate and payable by the Consumer
(Category of Consumers Fully / # Partly subsidised by the Government)
I- High Tension supply
Tariff Payable by the
Tariff Fixed by the TNERC Conssumer
rAfter Govt's subsldy ]
Tariff Category of Consumers Energy Demand Energy Demand
Charges Charges Charges Charges
(RS/Unit s/KVA/MOnt
[Rs/ (Rs/Unit) | (Rs/KVA/Month)
Industries, factories, Information Technology services 6.90 562 6.90 562

Govt. Educational Institutions, Govt. Hospitals,Railway Traction, CMRL etc., 7.15 562 7.15 562
IIA
Lift Irrigation Co-op Societies 7.15 562 0.00
Private Educational Institutions & its 562 7.65 562
IIB 7.65
|hostels, segregated Medical colleges)
Miscellaneous categories 8.70 562 8.70 562
III
IV Construction activities and other temporary purposes 12.25 562 12.25 562
06:00 to 9:00 Hours & 18:00 9.00
9.00
to 22:00 Hours
Public EV Charging Stations 138 6.00 138
9:00 to 16:00 Hours 6.00
16.00 to18:00 Hours & 22:00 7.50
7.50
to 06:00 Hours
II - Low Tension Supply
Fixed Fixed Charges
Tariff Category of Consumers & slabs
Energy Energy
Charges (Ps Charges olol"ololo|
TRs for bwo
Charges for two months]
,Mutitenements,
Domestic [Rs/Unit] months] (Rs/Unit)

0-100 units 4.60


age
old
homes, Consumption upto 500 units 101-200 units 4.60 2.25
Handloom, bi-monthly 201-400 unitsl 4.60 0 4.50
401-500 units 6.15 6.00
0-100 units 4.60
I -A 101-400 units 4.60 4.50
401-500 units 6.15 6.00 pey•
Consumption above 500 501-600 units 8.15 8.00
units bi-monthly
601-800 units 9.20 9.00
801-1000 units] 10.20 10.00
Above 1000 units 11.25 0 11.00
For Handlooms in residence, 0 to 300 units bimonthly is free.
Huts :- Till installion of meters (Fl!y subsidised by the 614/Sc 0
*I-B |Govt.)
On installation of meters i by the Govt.) 9.35 0
I-C |Bulk supply with single point meteri 8.15 204/SC 8.15 204/SC
I-D Common facilities in Multi-tenements 8.15 204/kW 8.15 204/kW
II-A Public Lighting, Water supply provices 'LOcal bodies 8.15 204/kW 8.15 204/kW
Government Educational Institutions its 0-50 KW 8.15 204/KW 8.15 204/KW
II-B(1) Hostel, Govt. Hospital, Other hospitais Above 5u KW- 112Kw 8.15 664/KW 8.15 664/KW
rendering totally free service Above 112 KW (CT Service) 8.15 562/KW/M 8.15 562/KW/M
Private Educational 0-50 KW 8.70 204/KW 8.70 204/KW
II-B(2) Institutions/Hostel,Segregated Privat Medical Above 50 KW- 112KWl 8.70 664/KW 8.70 664/KW
college Above 112 KW (CT Service) 8.70 562/KW/M 8.70 562/KW/M
0-120 units 5.90 204/Kw 2.90 204/Kw
#II-C Actual Places of Public worship
Above 120 units 7.15 204/Kw 7.15 204/Kw
upto 500 units 4.60 4.60
III-A(1)lCottage and Micro Industries above 500 units 6.65 144/kW 144kW
6.65
0- 500 units 6.65

#III
501-750 units 7.65 0
Power LOoms 751-10000 units 7.65 204/kW
A(2) 1001-1500 units 7.65 4.25
102/kw
above 1500 units 7.65 5.40
0-50 KW 7.65 154/KW 7.65 154/KW
III-B
Industries, Information Technology Above 50 KW- 112KW 7.65 306/KW 265 306/KW
services
Above 112 KW (CT Service) 7.65 562/KW/M 7.65 562/KW/M
|Agriculture and Allied activities - Till installation of meters (Fully Rs.3630/
*IV subsidised by the Govt.) HP/annu
On installation of meters (Fully subsidised bythe Govt.) 4.60
Miscellaneous Upto 100 units Bi-Monthly 0- 100 units 6.15 204/kW 6.15 204/KW
0-50 KW 9.70 204/kW 9.70 204/kW
/General |Above 100 units Bi Monthly
Above 50 KW- 112KW 9.70 614/kW 9.70 614/kW
purpose (for all units) Above 112 KW (CT Service) 9.70 562/KW/M 9.70 562/KW/M
VI Construction activities and Temporary purposes 12.25 562/KW/M 12.25 562/KW/M
|06:00 to 9:00 Hours &18:00 9.00 9.00
to 22:00 Hours
9:00 to 16:00 Hours 6.00 6.00
VII
Public EV Charging Stations 16.00 to18:00 Hours & 22:00
7.50 7.50
to 06:00 Hours
0-50 KW 25/kW 25/kW
Above 50 KW- 112KW 75/kW 75/kw
Above 112 KW(CT Service) 138/KW/M 138/KW/M

You might also like