12 D/New folder 2023/Sales Circular 2023
UTTAR HARYANA BIJLI VITRAN NIGAM
Sales Circular No. U-04/2023
From
Superintending Engineer/ Commercial,
UHBVN, Panchkula
To
All CEs (OP), SEs(OP), XENs (OP), SDOs (OP),
JEs-I In-charge Sub-office in UHBVN
Memo No.Ch- 34/TR-72(90)/Tariff/ ARR/FY 2023-24/CE/C-I
Dated: 15 .05 .2023
Subject: Schedule of tariff for supply of energy.
Please refer to the sale circular no U-03/2023 dated 31.03.2023 vide
which tariff order for FY 2023-24 was issued in compliance to the HERC in its Order
dated 15.02.2023. Now Hon'ble commission has issued clarifications with regard to
Tariff Order dated 15.02.2023 vide memo no. 583-84/HERC/Tariff/No. 966/967 dated
02 .05.2023 .
Accordingly, Tariff for FY 2023-24 which shall be applicable with effect
from O1.04.2023 is as under: -
Sr. Tariff for 2022-23 (w.e.f. 01.04.2022) Tariff for 2023-24 (w.e.f. 01.04.2023)
No.
Category Energy Fixed MMC (Rs. Category Energy Fixed MMC (Rs.
of Charges Charge (Rs. per kW per of Charges Charge (Rs. per kW per
consum- (Paisa / per kW per month of consume (Paisa / per kW per month of
ers kWh or/ month of the rs kWh or/ month of the
kVAh) the connected kVAh) the connected
connected load or part connected load or part
load/ per thereof) load/ per thereof)
kVAof kVAof
sanctioned sanctioned
contract contract
demand (in demand (in
case supply case
is on HT) supply is
or as on HT) or
indicated as
indicated
1 Domestic Supply Domestic Sunnlv
Category I: (Total consumption up to 100 units Category I: (Total consumption up to 100 units
per month' per month)
0 - 50 200/ Nil Rs.115up 0 - 50 200/ Nil Rs. I 15 up to
units per kWh to 2 kW and units per kWh 2 kW a nd
month Rs. 70 mon th Rs. 70 a bove
51-100 250/ Nil above 2 kW 51-100 250/ Nil 2 kW
kWh kWh
Category 11: (Total consumption more than 100 Category II: (Total consumption more than 100
units/month and up to 800 units/monthll units/month and up to 800 units/month))
0-150 275/ Nil Rs 125 upto 0-150 275/ Nil Rs 125 Uplo
kWh 2 kW and kWh 2 kW a nd
Rs .75 above Rs .75 above
151-250 525/ Nil 2 kW 15 1-250 525 / Nil 2 kW
kWh kWh
2 5 1- 500 6 30/ Nil 251 -50 0 630/ Nil
kWh kWh
50 1-800 71 0/ Nil 50 1-8 00 7 10/ Nil
a n d abo ve kWh and kW h
abo ve
elescopic tariff shall be i
..
shall be Note: Benefit of t ·t /Months for category II .
Not e: Benefit of tele scopic tariff
restricted upto 800 uni s fl t rate of 710/kWh
restricted upto 800 units per months for the
only i .e. 801 and abov~ , \ire consumption.
category II only i.e. 801 & above, flat rate of s hall be applicable for t e en
7 10/kWh shall be applicable for the entire
consumption. d t Hoarding
Non Domestic (including Indepe~ en
2 Non Domestic (including Independent Hoarding
/ Decorative Lie:htine: and others 'ff
/ Decorative Li~htin~ and othersl Merged with LT supply tar~
Merged wit h LT supply tariff Merged with HT supply tar'.ff
Merged with HT supply tariff Merged with HT suoolv tanff .
Mern:ed with HT sunnlv ta riff b 50 kW) including Traction &
3 HT supply (above 50 kW) including Traction & HT supply (a ove
DMRC DMRC Nil
665 / 165/kVA
Su pply at 665/ 165/kVA Nil Supply at
11 KV kVAh , 11 KV kVAh
including 73 8 / including 738/
NOS kWh in NOS kWh in
ex isting case of existin g ca s e of
consu mer s u pply consumer s u pply
s above 50 con tinue s above con tinue
KW and s to be at 50 KW s to be
u pto 70 LT a nd upto at LT
KW (LT) 70 KW
(LT}
Supply a t 6 55 / 165 /kVA Nil Supply a t 65 5/ 165/ kVA Nil
33 KV kVAh 33 KV kVAh
Su pply a t 6 45 / 165/kVA Nil Supply at 645/ 165/ kVA Nil
66 kV or kVAh 66 kV or kVAh
high er higher
S u pply a t 63 5/ 165/kVA NIL Supply at 635 / 165/kVA NIL
22 0 kV kVAh 220 kV kVAh
S u p ply at 6 25 / 165 / kVA NIL Supply at 625/ 165 / kVA NIL
40 0 kV kVAh 400 kV kVAh
Arc 695 165 / kVA Nil Arc 695 165/kVA Nil
furnaces/ Paisa per furnaces / Paisa
Steel kVAh if Steel per
Ro lling su pply is Rolling kVAh if
Mills also a t 11 kV Mills supply
applicable is at 11
to Open kV
Acces s
4 LT sunnlv • upto 50 kW LT sunnly • upto 50 kW
Up to 10 63 5 / Nil Rs . 185/kW Upto 10 635/ Nil Rs. 185 /kW
KW kVAh or KW kVAh or
705/ 705 /
kWh kWh
Above 10 665 / Nil Rs. 185 /kW Above 10 665/ Nil Rs. 185 / kW
KW& kVAh or KW& kVAh or
up to 20 738 / upto 20 738/
kW kWh kW kWh
Above 20 640 / Rs 160/ KW Nil Above 20 64 0/ Rs 160/KW Nil
KW and kVAh of 80% of KW and kVAh of 80% of
u pto 50 Con nected upto 50 the
KW Load KW Connected
Load
Existing Merged wi th HT supply Existing Merged with HT supply
con s umer consumer
s above 50 s above
kW upto 50 kW
70 kW (LT) upto 70
kW(LT)
5 Agro-industries/FPO (upto 20 KW)
Pack House, Grading, Pack ing, Pre-Cooling and
Ripening Chamber, Honey B ee, Honey Processing, 4 75/kWh Nil Nil
Tissue culture, Zinga and Fish Farming, Pou ltry Farm,
Pig Farm, Milk Chilling Plant and Cold Storage,
Mushroom Farming up to 20 kW load.
(See note-17 below)
D/New folder 2023/Sales Circular 2023
14
Agriculture Tube-well Supply
6 Agriculture Tube-well Sunnlv
667 /unit - Rs. 200 / Metered: 662/
Metered:
BHP/year (i) with unit
(i) with
motor
motor
upto 15
upto 15
BHP BHP Rs. 200 /
BHP/year
(ii) with 667 /unit Nil Rs. 200 / (ii) with 662/
BHP/year motor unit
motor
above 15 above 15
BHP BHP
Nil Un- Nil Rs.15/BHP Nil
Un- Nil Rs. 15 / Per
metered - BHP/ metered /Month
(Rs./ Per Month (Rs./
BHP/ Per BHP
Month): I
(i) with Month):
motor (i) with
upto 15 motor
BHP upto 15
BHP
(ii) with Nil Rs. 12 / Per Nil (ii) with Nil Rs.12/BHP Nil
motor BHP/ motor /Month
a bove 15 Month above 15
BHP BHP
7 Public 735/ 180/kW or MMC of Public 735/ 180/kW or MMC of
Water kWh BHP except Rs.165/KW Water kWh BHP except Rs.165/KW /
Works/ street light /month Works/ street light month only
Lift only for Lift for s t reet
Irrigation street light Irrigatio light
/ MITC n / MITC '
/Street /Street
Light Light
8 Railway Traction Railwav Traction
Supply at Merged with HT Supply Tariff at the Suppl_x at Merged with HT Supply Tariff a t th e
11 KV respective voltage of supply 11 KV respective voltage of supply
Supply at Supply at
33 KV 33 KV
Supply at Supply at
66 or 132 66 or 132
kV kV
Supply at Supply at
220 kV 220 kV
9 DMRC DMRC
Supply at Merged with HT Supply Tariff Supply at Merged with HT Supply Tariff
66 kV or 66 kV or
132 kV 132 kV
10 Bulk Sunni, Bulk Supply
Supply at 650/ 160/kW or Nil Supply at 650/ 160/kW or Nil
LT kVAh Rs. LT kVAh Rs.
Supply at 640/ 160/kVA as Supply 640/ 160 /kVA as Nil
11 kV kVAh applicable at 11 kV kVAh applicable
Supply at 630/ (see note 3) Supply at 630/ (see note 3) Nil
33 kV kVAh 33 kV kVAh
Supply at 620/ Supply at 620/ Nil
66 or 132 kVAh 66 or kVAh
kV 132 kV
Supply at 615/ Supply at 615/ Nil
220 kV kVAh 220 kV kVAh
11 Bulk Suppl, (Domestic! Bulk Suooly (Domestic!
For total 525 Rs. 80 /kW/ Nil For total 525 Rs. 80
consumpti /kWh month of consumpt /kWh /kW/
on in a the recorded ion in a month of
month not demand month the
exceeding not recorded
800 exceeding demand
units/ 800
0at/ dwelli unitsL
15 ---.
-ng unit flat/dwell
(DU). -ing unit --------
(DU).
For total 620 Rs. 80 Nil For total 620 Rs. 80 Nil -----
cons um pt- /kWh /kW/ consumpt /kWh /kW/
ion in a month of -ion in a month of
month the recorded month the
exceeding demand exceeding recorded
800 800 demand
units/ flat/ units/flat
DU. I DU .
Notes:
1. In case of Arc furnaces/ Steel Rolling Mills for supply at 33 kV and above, the HT Supply
tariff at the corresponding voltage level shall be applicable. The tariff determined in the
table above for Arc Furnace taking supply at 11 kV voltage, is inclusive of surcharge.
However, the open access consumers bringing in power under Open Access Mechanism
shall also pay a surcharge of 30 Paisa/unit.
2. Fixed charges for HT supply and Bulk Supply category are in Rs. / kVA ·of Contract
Demand.
3 . In case of Bulk Supply Consumers (other than Bulk Supply- OS), the fixed charges are
in Rs ./kW of the connected load where contract demand is not sanctioned and in
Rs./kVA of contract demand where contract demand is sanctioned.
4. Advocate's Chamber, shall be levied a single rate (tariff) equivalent to CoS of LT Supply
(i.e. Rs.6.62) as d e termined in the present order. There shall be no demand / fixed
charges.
5. The electricity crematorium shall be levied a concessional tariff of Rs . 2.75 / Unit (kVA
or kWh) . No demand charges shall be levied.
6. The schedule of tariff and charges does not include Electricity Duty, Municipal Tax,
Panchayat Tax (being levied as per the notifications issued by the State Government)
and FSA as per MYT Regulations in vogue . ·
7. Tariff for the eligible Gaushalas shall be Rs. 2.0 / kWh subject to payment of subsidy
by the State Government , in case of non-payment of subsidy a tariff equivalent to
Domestic Supply tariff, as determined in the present order shall be applicable .
8 . The tariff for electricity supply to 'the EV Charging station in Haryana shall be a single
part tariff equivalent to the CoS of HT Supply (i.e. Rs.6.22) and LT Supply (i.e. Rs.6.62) ,
as determined in the present order. The off peak / night time concession benefits shall
also be applicable. There shall be no fixed / demand charges.
9 . In the case of the existing consumers above SO kW upto 70 kW (LT) that has been merged
with HT Supply, the tariff shall be as per HT Supply. ln the absence of a compatible
meter standard power factor of 0.90 may be used . However, the Discerns shall ensure
that a compatible meter of requisite accuracy is installed either by the Discerns or by
the consumers themselves within six months from this order. It is clarified that
consumer will not have the option to pick and choose.
10. The tariff for places of worship shall be a single part tariff equivalent to the Domestic
Supply tariff(s).
11.The charges, other than energy and demand charges determined in the present order,
for NDS category merged with HT/ LT Supply shall be as per the charges applicable for
erstwhile HT/ LT Industry. The Discerns are directed to file a comprehensive proposal
for amendment in ge neral and miscellaneous charges as well as the relevant regulations
such as the Duty t o Supply Regula tions .
12 . The Temporary Supply Tariff shall remain unchanged i.e. as per the Commission 's tariff
order for the FY 2021-22 i. e .
"The tariff and charges for temporary supply shall be 1.2 times fixed charges
and 1.5 times the energy charges of the relevant category for which
temporary supply has been sought. While releasing electric supply on
temporary basis, the DISCOMs must mention the period for which temporary
supply has been sought and given. In case the said period gets extended for
16 D/New folder 2023/Sales Circular 2023
whatever reasons, the multiplication factor for both fixed charges and energy
charges shall be 2 times.
The Commission has also clarified in its order dated 31 .03.2022 in case No.
HERC/RA-OB of 2021 that 2 times charges are to be levied from the extension
of period of the said connection."
13. The AP Supply tariff shall be Rs . 6.62 / kWh for metered supply and BHP (in the case
of flat rate shall be converted to kW and units worked out by applying the average
running hours of the tube-wells . However, the State Govt. may continue with the
subsidized tariff provided advance subsidy, in the beginning of each quarter is paid by
the State Government to the Discoms, as per Section 65 of the Electricity Act, 2003 . It
is clarified that in the case of theft of electricity by AP Tube-Well consumer the tariff to
be reckoned with shall be as determined by the Commission i.e. Rs . 6.62/Unit.
The issue of AP su 1 tariff is under consideration of the State Government. The billin
of metered and un-metered AP connections will continue as per tariff for FY 2021 -22
(Sales Circular No. UT· 17 /2021) till subsidized tariff of AP category is decided by the
State Government and its commitment to provide subsidy in the beginning of each
quarter to DISCOMs is received.
14.It is clarified that the acceptance limit of cash will be Rs. 5000 (five thousand) . However,
the cash collection limit for theft penalty amount may be enhanced to Rs. 2 ,00,000 (two
lakhs); submission of PAN Card shall be mandatory for any transaction exceeding Rs.
50,000 (Fifty Thousand). It is further made clear that the AEE / SDO concerned shall
be fully responsible for cash collected and prompt remittance into the designated
bank(s).
15. The AP Tube-well tariff determined by the Commission u/s 62 of the Electricity Act,
2003 shall be levied by the Discoms in case the Government does not pay subsidy in
accordance with the provisions of Section 65 of the Electricity Act, 2003.
16.Green Energy premium shall be Rs. 2.30 / Unit for solar energy and Rs.I/unit for non-
solar energy over and above the normal tariff. Provided the option should be exercised
for the entire financial year for the total energy drawn from the Dscoms.
17. Fish farming units connected on AP feeders shall continue to be billed on AP subsidized
tariff. However, fish farming on other than AP feeders shall be included in the new tariff
category i.e. Agro Industries/FPO (New Category upto 20 kW) .
Wheeling Charges
• The wheeling charges payable by the 'open access consumers shall be as under:-
HT (Rs./kWh) Rs. 0.86
LT (Rs./kWh) Rs.1.21
• The embedded open access consumers of the Discom's drawing power at 66kV or
above imposes cost which is being borne by the Discoms. Hence, besides the intra
state transmission loss as determined by the Commission for FY 2023- 24 in the
ARR/Tariff order of HVPNL, such open access consumers shall also be liable to pay
the distribution system network cost as determined i.e . Rs. 0 .58 per unit, till such
time they are consumers of the Distribution Licensees.
Cross-Subsidy Surcharge fCSS)
Sr. Categories Cross Subsidy
No. Surcharge (Rs./kWh)
1 HT sunnlv 1.24
2 Bulk Sunnly (other than DSl 1.16
4 LT sunnlv 1.01
17 D/New folder 2023/Sales Circular 2023
Additional surcharge:
The additional surcharge payable by the open access consumers shall continue to be
levied@ 0.78/kWh (as notified vide Sales Circular No. UA.sR-13/2022 effective from
20 . 10.2022) .
Transmission charges
41 Paise/kWh to be applicable w .e .f.01.04.2023 (As approved by the HERC in its Order
dated 30 .0 1. 2023 for approval of ARR for Transmission Business & SLDC and
determination of Transmission Tariff and SLDC charges for the FY 2023-24) .
Sales Circular No . UT-3/2023 is hereby superseded.
The above instructions may be brought to the notice of all concerned for
strict and meticulous compliance.
.
Supennten d.~
1 .IJ-5·2.,3C ommerc1'al
n 1tieer/l
UHBVN, Panchkula
D/New folder 2020/Noting-2
UHBVN web site address·
E-mail address· cecom . ~-Uhbvn.org.in
End t N · mercial@uhbvn ·
s. o. Ch- 34/TR-72(90)/T ·rr .org.m, secommercial@uhbvn.org.in
Dated: .Os. 2023 an /ARR/FY 2023-24/CE/C-I
Copy of the above is forw
1. sps to Additional Ch~rded to the following:-
2. SPS to Chairman H~i Secretary (Energy), Govt. of Haryana.
3. SPS to MD UHBVN p . hk I
4. SPS to MD, DHBVN, H~c u a.
5 ' , 1sar.
. SPS to MD, HVPNL, Panchkula
6· S~S to MD, HPGCL, Panchkula.
7. Dir./Vigilance, HVPN, Panchkuia
8· ~PS to Director (Op)/Director (Proj)/Director (Fin.) in UHBVN & DHBVN.
9· Cecretary, HERC, Bays No.33-36, Sector-4, Panchkula - 134112 {Haryana)
l0. E/Comml., DHBVN, Hisar.
l l. CE/ PD&C UHBVN, Panchkula.
12 . CE/MM, UHBVN, Panchkula.
13. CE/HPPC, Panchkula.
14. CE/IT, UHBVN, Panchkula.
15. Company Secretary, UHBVN, Panchkula.
16. Chief Electrical Inspector, Govt. of Haryana Sector-17, Chandigarh.
17. SE/ Monitoring, UHBVN, Panchkuia.
18. SE/Commercial, DHBVN, Hisar: He is requested to maintain uniformity in Sales
Circular.
19. CE/Admn., UHBVN, Panchkula.
20. CE/SO, UHBVN, Panchkula
21. S .E /workshop and store UHBVN Dhulkote {Ambala)
22 . SE/RA, UHBVN, Panchkula.
23. SE/Const. Circle, UHBVN Panchkula.
24. SE {M&P), UHBVN Dhulkot ( Ambala)
25. SE/R-APDRP, UHBVN, Panchkula.
26. Legal Remembrance, HVPNL, Panchkula.
27. F.A/HQ, UHBVN, Panchkula.
28. Chief Auditor, UHBVN, Panchkula & Rohtak.
29. Chief Account Officer, UHBVN, Panchkula.
30. Chairman, CGRF, Kurukshetra.
31. XEN/IT, UHBVN, Panchkula.
32. Deputy Secy. (Technical), UHBVN, Panchkula.
33. Deputy Secy. (Project), UHBVN, Panchkula
34. Deputy Secy. (OP), HVPN, Panchkula. '
35. All XEN's (M&P) in UHBVN.
36. Principal Accountant General (Audit) Haryana (Report Section), Chandigarh (e-mail:
sraoca4@gmail.com ).
37. CPRO, UHBVN, Panchkula.
38. PHD Chamber of Commerce & Ind. PHD Khel Gaon Road, New Delhi-16.
39. Haryana Chamber of Commerce and Industries 0/0 VPS Agro Oil Ind.(P) Ltd., Dhanwanti
Bhawan Railway Road, Kurukshetra.
40. The Haryana Chamber of Commerce and Industry (Distt.Unit Panchkula), 239, Industrial
Area, Phase-I, Panchkula-134113
41. Chief Coordinator JAG & Director of Industries of Haryana, 30 Bays Building, Sector-17,
Chandigarh.
42 . Y.Nagar- Jagadhri Chamber of Commerce and Ind!. C/O the Oriental Engg. Works (P)
Ltd., Ind!. Area, Y.Nagar, Haryana- 136001.
43. General Secretary, Panchkula Residents Welfare Federation, H.No. 984, Sector-16,
Panchkula. ·
44. President Haryana Rice Millers & Dealers Association, Ladwa (Kurukshetra.)
45. Haryana Chamber of Commerce Ind. C/O M/s Liberty Enterprises Railway Road, Karna!.
46. Confederation of Indian Industries, Sector-31 , Chandigarh.
47. President Manufacturing Association, Sonepat.
48. Director, Industries Association, Yamunanagar
49. Citizen Welfare Association (UE) Regd. Kothi No.508, Sector-15, Panchkula.
50. Haryana Solvent Extractor's Association 0/0 Pee-Pee Agro Industry, Pvt. Ltd ., Dhurkhera
Hisar Road, Ambala.
51. President, Faridabad Industrial Association Bata Chowk Industrial Area,
Faridabad. 121001.
52. Secretary, Ambala Electrical Dealers & Manufacturers Associate, 872, URBAN ESTATE,
Sector -7, Ambala City.
53. The Engineers Club (Regd.), Haryana Zone, 260, Subhash Nagar, Rohtak-124001.
54. President Karna! Agricultural Implements Manufacturers Association, C/o Kamal
Agriculture Industries Ltd . Sham Nagar, GT Road, Karnal-132 00 I.
55. All Billing Agencies NIELIT centre, Hartron and HCL (T)
Supe rintendi ~~lr'.(c"omml.
UHBVN, Panchkula.