0% found this document useful (0 votes)
16 views3 pages

Le23m934 e LW DG 502 4009

The document outlines the electrical equipment layout for the SANA ROHILA Pump House, detailing the arrangement of various components including switchgear rooms and control rooms. It includes specifications for dimensions, levels, and references to civil drawings, as well as notes on installation and safety requirements. Additionally, it provides a key plan and a legend for abbreviations and door details relevant to the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

Le23m934 e LW DG 502 4009

The document outlines the electrical equipment layout for the SANA ROHILA Pump House, detailing the arrangement of various components including switchgear rooms and control rooms. It includes specifications for dimensions, levels, and references to civil drawings, as well as notes on installation and safety requirements. Additionally, it provides a key plan and a legend for abbreviations and door details relevant to the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TRUE NORTH

7 6 5 4 3 2 1
B

MA
IN
GA
TE
4M

FEN
WID

11KV FOUR POLE STRUCTURE EF E A

(TY G
W1 EF PPR

CIN

N:2 33258
OA

E:2
S1
CH

P)
D RO

312
AD

346 28
(CHARGED AT 6.6kV)

blo ust

.8
.79
thr
ck

4
(OUTDOOR AREA) 23 24 25

900IPE
(ty b
(REFER SHEET - 03) 19 20

DJ
BFV
P
p)
n

SS-2
4M RS
5M WIDT

SS-2

PT
SAN
HEIG H x

FIT
TO

EB
HT MA
INT

SS-2
BFV
EN

EB
PRESSURE FILTER

ARO
BA ANCE

BFV
Y

as-1
21

DJ BF

DPCV
HIL

as-1
DJ

900 E
(ty b
DPCV

as-1
V
A

BFV

PIP

VALAIR
p ) BO
n
SS-1

500 E

VE
(ty b
SS-1

PIP

600 E
p)

(ty b
n

OS
PUM R PRES
nrv SS-1

PIP
p)
DJ

n
FIL ARY

TE
PRIM
BFV nrv
EB DJ

P
SS-1

TER
BFV nrv
EB DJ
SS-1 BFV
EB
SS-1

FIL URE

VT-1
S
T ER

VT-2
11KV

VT-3
PLC
RO FO
BOOSTER PUMP 2Nos OF 40NB GI PIPE O M S UR
(CH TRUC POLE

SEC
AR T
GE URE
D
CONCEALED IN SLAB 6.6 AT

CA Y
VT-03 VT-02 VT-01

URIT
ELE KV)
CT

BIN
RIC
AL
RO
OM

THIS AREA

PIP INT

1.5
RC
N:2 33270

M X GATE
E 12 AKE
E:2

C
CABLE CELLAR ROOM TA

312

SLU
NS

00N

1.5
FO
RM

348.678

WIT EVEL
ER

ICE
M
B

L
.65

H 10 TRA
P.F.L

CLA NB ANSMIT
3

0
SS
150 I B16.5R

N
FLA CED

S
FA
W1

NG

TE
E
BFV BFV BFV
A
13
27
C PRIMARY FILTRATION

1:100
0
SLOP
D1 EF EF 28 SYSTEM

E
29

N:2 33415
E:2
22

312
295 79
.5
UP

.913
18
KEY PLAN

UP
NOTES:
14 PUMP HOUSE 1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METER UNLESS OTHERWISE SPECIFIED.
B
P.F.L
B 26
2. ALL PANELS SHOWN IN THE DRAWING WILL HAVE BOTTOM CABLE ENTRY.
3. FOR DIMENSIONS OF COLUMN, WALLS, SLABS & BEAMS REFER CIVIL DRAWING.
4. LEVELS AND OTHER SECTIONAL ELEVATIONS SHALL BE AS PER CIVIL DRAWING.
A 5. FOR EXACT LOCATION OF DOORS, WINDOWS, VENTILATIONS & CUTOUTS REFER CIVIL DRAWING.
6. CABLE TRAYS AND CABLE TRENCH SHOWN ARE INDICATIVE ONLY. CABLE ROUTING LAYOUT SHALL BE SUBMITTED SEPARATELY.
7. INDIVIDUAL EQUIPMENT DIMENSION INDICATED ARE TENTATIVE ONLY. HOWEVER ACTUAL DIMENSION SHALL BE UPDATED ON
A
RECEIPT OF VENDOR DRAWINGS.
8. OPEN VENTILATION IS NOT CONSIDERED IN ELECTRICAL ROOM.
9. PANEL BOTTOM FRAME SHALL BE MATCHED WITH THE ELECTRICAL ROOM FINISHED FLOOR LEVEL AND THERE SHALL NOT BE
ANY GAP EITHER IN VERTICAL OR HORIZONTAL FACES OF THE BOTTOM OF THE PANEL.
9. ALL THE OPEN FLOOR CUTOUTS SHALL BE COVERED BY CHEQUERED PLATE AFTER PLACEMENT OF PANELS.
10. EARTHING AND LIGHTNING PROTECTION LAYOUT SHALL BE SUBMITTED SEPARATELY.
11. RUBBER MAT SHALL BE PROVIDED IN FRONT OF PANELS AS PER IS-15652 (2006).
12. CONTROL ROOM LAYOUT FOR PUMPING STATION DETAILS SHALL BE SUBMITTED SEPARATELY VIA DOCUMENT NO.
LE23M934-I-LW-WS-502-CR-5006.
13. ROOF TOP SOLAR PANEL ARRANGEMENT SHALL BE AS PER VENDOR DOCUMENT.
14. REFER SHEET 2 FOR SWITCHGEAR ROOM EQUIPMENT LAYOUT PLAN, SECTION, CUTOUT DETAILS & EQUIPMENT DIMENSION.
15. REFER SHEET 3 FOR DSS DETAIL DRAWINGS.

LEGEND: ABBREVIATION: DOOR DETAILS:


HT - HIGH TENSION DD1 - 2500Wx3000H
APPROACH ROAD APPROACH ROAD - REMOVABLE CHEQURED PLATE
LT - LOW TENSION DD2 - 2100Wx2500H
DD3 - 2100Wx2100H
FGrL - FINISHED GRAVEL LEVEL
- REMOVABLE PRECAST SLAB SD1 - 1000Wx2100H
HFL - HIGH FLOOD LEVEL
- 230mm THK. BRICK WALL PFL - PUMP FLOOR LEVEL
EFL - ELECTRICAL ROOM FLOOR LEVEL
- CONCRETE WALL /COLUMN BOB - BOTTOM OF BEAM
BOC - BOTTOM OF CUTOUT
- FLOOR CUTOUT DD - DOUBLE DOOR
SD - SINGLE DOOR
EQUIPMENT LAYOUT PLAN - WALL MOUNTED PANEL
SS CUM FC - SOFT STARTER CUM FIXED CAPACITOR
PUMP HOUSE AND CABLE CELLAR ROOM - WELDING RECEPTACLE DCDB - DIRECT CURRENT DISTRIBUTION BOARD
W - WINDOW
- FRONT

REFERENCE DRAWINGS:-
3 2 1
S.NO. DESCRIPTION DOCUMENT NO.
SOLAR PANEL
OVERALL SINGLE LINE DIAGRAM FOR SANA ROHILA
01. LE23M934-E-LW-1L-502-4001
(ID NO-502) PUMP HOUSE
GENERAL ARRANGEMENT OF PUMP HOUSE
02. LE23M934-M-LW-WS-GA-2003
7 6 5 4 FOR SANA ROHILA
11KV FOUR POLE
STRUCTURE
(REFER SHEET-03)

PUMP HOUSE

WF WF
12.5T EOT CRANE
ELECTRICAL SWITCHGEAR ROOM PLC CONTROL
ROOM A FOR APPROVAL
NK/RP 22.08.24 NGP 22.08.24 AKKS 22.08.24 GK 22.08.24
16
10 REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED

01
VT-03 VT-02 VT-01
02 03 04 REVISIONS
E.F.L PRIMARY FILTRATION
P.F.L+3.000 SYSTEM CLIENT : DEPARTMENT OF WATER RESOURCES, ODISHA
B.O.B
PROJECT DIRECTOR-CUM-CHIEF ENGINEER, PMU, MEGALIFT PROJECTS

27
PROJECT : MEGA LIFT IRRIGATION PROJECT - CLUSTER XXII
EL(+)121.550
F.Gr.L
EL(+)121.500
QR CODE
EL(+)121.450
T.O.C P.F.L
CONTRACTOR:
L&T Construction
Water & Effluent Treatment IC

ELECTRICAL EQUIPMENT LAYOUT FOR


TITLE :
SANA ROHILA (ID NO-502) PUMP HOUSE

NAME SIGN DATE SCALE : 1 : 100 SIZE : A1 REV : A


SECTION A-A CHECKED BY SIGN DATE
LEVELS: GEOTECHNICAL - - DSGN NK/RP 22.08.24
PROJECT CODE DRAWING NO.
CIVIL & STRUCTURAL
P.F.L (PUMP FLOOR LEVEL) EL(+)121.500 DRWN NGP 22.08.24
PROCESS - -
B.O.B (BOTTOM OF BEAM) EL(+)124.500
MECHANICAL & PIPING CHKD AKKS 22.08.24
ELECTRICAL - -
LE23M934 LE23M934-E-LW-DG-502-4009
APPD GK 22.08.24 SHEET 01 OF 03
INSTRUMENTATION
TRUE NORTH

7 6 5 4 3 7 6 5 4 3
100(L)x100(W)
B B FLOOR OPENING
(TYP)

W1/V1 W1/EF W1/EF W1 W1/V1 W1/EF W1/EF W1


D D
16 17 16
V1

V1
W3

W3
01 02 03 04

12
PLC CONTROL ELECTRICAL SWITCHGEAR ROOM PLC CONTROL
ELECTRICAL SWITCHGEAR ROOM DD2
10 ROOM E.F.L DD2 ROOM
E.F.L
A A A EDGE ANGLE ISA 100X100X8 AROUND FLOOR CUTOUT A
11 CORNERS OF CUTOUT(TYP) (TYP)

W3

W3
05 06 08 07 09 100(L)x100(W)
W1/V1

W1/V1
FLOOR OPENING

15
DD1 DD3 DD1 DD3
SD1 C SD1 C
W1/EF W1/V1 W1/EF W1/V1

CAGE CAGE
LADDER LADDER
LANDING LANDING
HAND RAIL HAND RAIL
PLATFORM UP PLATFORM UP

UP UP
REMOVABLE REMOVABLE
HAND RAIL HAND RAIL
B B
3 TON MONO RAIL 3 TON MONO RAIL
FOR CHAIN FOR CHAIN
PULLEY BLOCK B PULLEY BLOCK B

EQUIPMENT LAYOUT PLAN A CUTOUT DETAILS PLAN A


ELECTRICAL SWITCHGEAR ROOM ELECTRICAL SWITCHGEAR ROOM

EQUIPMENT DIMENSION DETAILS:-


DIMENSIONS FINAL/
S.No. EQUIPMENT DESCRIPTION LOCATION
(L x W x H) IN MM TENTATIVE
01 6.6kV HT SWITCHGEAR PANEL SWITCHGEAR ROOM 3200x2200x2400 T

02 6.6kV HT SS CUM FC PANEL-1 SWITCHGEAR ROOM 2200x1700x2100 T

03 6.6kV HT SS CUM FC PANEL-2 SWITCHGEAR ROOM 2200x1700x2100 T

C 04 6.6kV HT SS CUM FC PANEL-3 SWITCHGEAR ROOM 2200x1700x2100 T


D
05 415V LT SWITCHGEAR PANEL SWITCHGEAR ROOM 3200x1000x2300 T

06 BATTERY CHARGER CUM DCDB SWITCHGEAR ROOM 1000x800x1800 T

07 110V VRLA BATTERY SWITCHGEAR ROOM 600x800x1500 T

08 SOLAR HYBRID PANEL SWITCHGEAR ROOM 800x800x1500 T

09 SOLAR BATTERY SWITCHGEAR ROOM 600x800x1500 T


3 TON MONO RAIL
FOR CHAIN
PULLEY BLOCK
ELECTRICAL SWITCHGEAR ROOM 10 LIGHTING DISTRIBUTION BOARD-1 SWITCHGEAR ROOM 800x250x700 T

11 EMERGENCY LIGHTING DISTRIBUTION BOARD-1 SWITCHGEAR ROOM 800x250x700 T


11 10
15 16 12 WELDING RECEPTACLE-1 SWITCHGEAR ROOM 300X200X500 T
REMOVABLE 12
HAND RAIL
EDGE ANGLE 13 WELDING RECEPTACLE-2 CABLE CELLAR ROOM 300X200X500 T
01
05 ISA 100X100X8 ON
E.F.L LANDING BOTH SIDE (TYP) 14 WELDING RECEPTACLE-3 PUMP HOUSE 300X200X500 T
PLATFORM
P.F.L+3.000 15 ELECTRICAL SWITCHGEAR ROOM VENTILATION FAN STARTER PANEL-1 SWITCHGEAR ROOM 400x200x400 T
B.O.B
16 ELECTRICAL SWITCHGEAR ROOM VENTILATION FAN STARTER PANEL-2 SWITCHGEAR ROOM 400x200x400 T

17 ELECTRICAL SWITCHGEAR ROOM VENTILATION FAN STARTER PANEL-3 SWITCHGEAR ROOM 400x200x400 T
13
18 PUMP HOUSE VENTILATION FAN STARTER PANEL-1 PUMP HOUSE 400x200x400 T
CABLE CELLAR
A FOR APPROVAL
EL(+)121.500
ROOM 19 PUMP HOUSE VENTILATION FAN STARTER PANEL-2 PUMP HOUSE 400x200x400 T NK/RP 22.08.24 NGP 22.08.24 AKKS 22.08.24 GK 22.08.24
P.F.L
20 PUMP HOUSE VENTILATION FAN STARTER PANEL-3 PUMP HOUSE 400x200x400 T REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED

21 PUMP HOUSE VENTILATION FAN STARTER PANEL-4 PUMP HOUSE 400x200x400 T REVISIONS
22 PUMP HOUSE VENTILATION FAN STARTER PANEL-5 PUMP HOUSE 400x200x400 T
CLIENT : DEPARTMENT OF WATER RESOURCES, ODISHA
23 DESILTING PUMP MOTOR ISOLATOR BOX-01 PUMP HOUSE 600x300x600 T
PROJECT DIRECTOR-CUM-CHIEF ENGINEER, PMU, MEGALIFT PROJECTS
24 FORCED WATER LUBRICATION BOOSTER PUMP-1 LOCAL CONTROL PANEL PUMP HOUSE 600x300x600 T
SECTION B-B
25 FORCED WATER LUBRICATION BOOSTER PUMP-2 LOCAL CONTROL PANEL PUMP HOUSE 600x300x600 T
PROJECT : MEGA LIFT IRRIGATION PROJECT - CLUSTER XXII
26 EOT CRANE ISOLATOR BOX PUMP HOUSE 300x250x400 T
QR CODE
27 LOCAL PUSH BUTTON STATION FOR VT PUMP MOTOR-1 PUMP HOUSE 250x200x350 T
CONTRACTOR:
L&T Construction
28 LOCAL PUSH BUTTON STATION FOR VT PUMP MOTOR-2 PUMP HOUSE 250x200x350 T
Water & Effluent Treatment IC
29 LOCAL PUSH BUTTON STATION FOR VT PUMP MOTOR-3 PUMP HOUSE 250x200x350 T

ELECTRICAL EQUIPMENT LAYOUT FOR


TITLE :
SANA ROHILA (ID NO-502) PUMP HOUSE

NAME SIGN DATE SCALE : 1 : 100 SIZE : A1 REV : A


CHECKED BY SIGN DATE
GEOTECHNICAL - - DSGN NK/RP 22.08.24
PROJECT CODE DRAWING NO.
CIVIL & STRUCTURAL
DRWN NGP 22.08.24
PROCESS - -
MECHANICAL & PIPING CHKD AKKS 22.08.24
ELECTRICAL - -
LE23M934 LE23M934-E-LW-DG-502-4009
APPD GK 22.08.24 SHEET 02 OF 03
INSTRUMENTATION
TRUE NORTH
NOTES:
7 BILL OF MATERIALS: 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. THE ORIENTATION OF THE DSS SHALL BE AS PER SITE SURVEY, ROAD APPROACH AND
S.No. SYMBOLS DESCRIPTION QTY
SITE CONDITION.

℄ OF LA, AB SWITCH &

℄ OF LA, AB SWITCH &


3. THE LOCATION OF THE DSS IS ABOVE THE HIGHEST WATER LEVEL OF THAT AREA.

TRANSFORMER & DO
D 01 6kV, 10kA LIGHTING ARRESTER

℄ OF LA, AB SWITCH
3 Nos
4. CABLE ROUTING LAYOUT, EARTHING LAYOUT & DETAILS, LIGHTING & LIGHTNING

℄ OF STRUCTURE

℄ OF STRUCTURE
AIR BREAK SWITCH WITH EARTH SWITCH. PROTECTION LAYOUT SHALL BE SUBMITTED IN SEPARATE DRAWING.
02 1 Set
(DOUBLE BREAK) 7.2kV, 400A, 25kA FOR 3 SEC. 5. FOUNDATION LAYOUT WITH DETAILS OF CIVIL COMPONENTS FOR MAJOR EQUIPMENTS &

AUXILIARY
DO FUSE

DO FUSE
AIR BREAK SWITCH (DOUBLE BREAK) 7.2kV, STRUCTURES, FENCE DETAILS SHALL BE SUBMITTED IN SEPARATE DRAWING.
D 03

FUSE
400A, 25kA FOR 3 SEC. 2 Set
6. THE LAYOUT HAS BEEN PREPARED AS PER COMPATIBLE REC STANDARDS.
7. GALVANIZED STRUCTURES ARE OF 7.5M HEIGHT FROM PLINTH LEVEL.
04 100kVA, 6.6/0.433kV, AUXILIARY TRANSFORMER 1 No
8. AUXILIARY TRANSFORMER HAS BEEN SIZED BASED ON ACTUAL CALCULATED LOAD FOR
THE PUMP HOUSE.
05 7.2kV DROP OUT FUSE, 200A. (VERTICAL TYPE) 1 Set
9. TOP OF PLINTH SHALL BE 325MM ABOVE THE FGL.
CHAIN LINK FENCE (TYP) 11kV DISC POLYMER INSULATOR SET WITH GALVANIZED 10. THERE MAY BE RE-ORIENTATION OF LAYOUT BASED SITE CONDITION.
3 Nos
HARDWARE TO SUIT INCOMING OVERHEAD CONDUCTOR.
11. DUE CARE SHALL BE TAKEN TO ENSURE THAT THE CABLE TAKEN FROM DSS IS
06

ELECTRICAL SWITCHGEAR ROOM


11kV DISC POLYMER INSULATOR SET WITH GALVANIZED PROTECTED ADEQUATELY AGAINST THE RAIN WATER.
6 Nos
HARDWARE TO SUIT ACSR PANTHER CONDUCTOR (200 SQ.MM).
12. A CLEARANCE OF MORE THAN 200mm SHALL BE MAINTAINED BETWEEN THE M.S. PARTS
AND LIVE JUMPER IN ALL THE PLACES.
℄ OF STRUCTURE, LA & 07 2.5M LIGHTNING SPIKE 25mm DIA G.I. PIPE 4 Nos
AB SWITCH
ABBREVIATION:
08 LT POWER CABLE AS REQD HT - HIGH TENSION
LT - LOW TENSION
09 HT POWER CABLE AS REQD DSS - DISTRIBUTION SUBSTATION
11KV FOUR POLE
FFL - FINISHED FLOOR LEVEL
STRUCTURE 10 T-CONNECTOR SD-SP FGrL - FINISHED GRAVEL LEVEL
3 Nos
(CHARGED AT 6.6kV) BOB - BOTTOM OF BEAM
(OUTDOOR AREA) 11 T-CONNECTOR SP-SP EFL - ELECTRICAL FLOOR LEVEL
12 Nos
SD - SINGLE DOG CONDUCTOR
40 Mtrs
12 - ACSR PANTHER CONDUCTOR (200 SQ.MM). SP - SINGLE PANTHER CONDUCTOR

W1
(Approx.)
℄ - CENTER LINE
℄ OF STRUCTURE & AB
SWITCH & AUX. B.O - BOTTOM OF
TRANSFORMER C.O - CENTER OF

SYSTEM CLEARANCES:
LEVELS:
MIN. CLEARANCE 11kV
C B Y R C F.F.L (FINISHED FLOOR LEVEL) EL(+)121.500
6.6kV INCOMING LINE 01 PHASE-PHASE CLEARANCE 200 mm
F.Gr.L (FINISHED GRAVEL LEVEL) EL(+)121.550
02 PHASE-EARTH CLEARANCE 180 mm

03 GROUND CLEARANCE (GC) 2750 mm


C 2M WIDE GATE
04 SAFETY CLEARANCE (SC) 2600 mm

D 05 CREEPAGE DISTANCE 25mm/kV

ADOPTED DISTANCE 11kV

06 PHASE-PHASE 760 mm

07 PHASE-EARTH 740 mm

08 DESIGN TEMPERATURE 50°C

EQUIPMENT LAYOUT PLAN 09 VOLTAGE VARIATION ±10%

10 FREQUENCY VARIATION +3% TO -5%

LIGHTNING SPIKE
G.I. PIPE 2.5M LONG
(TYP)
LIGHTNING
ARRESTOR
T-CONNECTOR
AB SWITCH WITH (SP-SP)(TYP)
EARTH SWITCH
ACSR PANTHER
T-CONNECTOR CONDUCTOR
B.O AB SWITCH WITH (SD-SP)
EARTH SWITCH LEVEL
C.O DISC INSULATOR 6.6kV INCOMING LINE
LEVEL FROM MSDSS

AAAC DOG CONDUCTOR

B.O AB SWITCH LEVEL AB SWITCH

DO FUSE
C.O DO FUSE LEVEL PIPE CLAMPING
(TYP)

100kVA, 6.6/0.433kV
AUXILIARY TRANSFORMER
TRANSFORMER
BELT 100MM DIA
PIPE
P.F.L+3.000
B.O.B

C.O TRANSFORMER
LEVEL A FOR APPROVAL
NK/RP 22.08.24 NGP 22.08.24 AKKS 22.08.24 GK 22.08.24

REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED


TO 415V LT TO 6.6kV HT
SWITCHGEAR PANEL REVISIONS
PANEL
FENCE
(TYP)
CLIENT : DEPARTMENT OF WATER RESOURCES, ODISHA
EL(+)121.550 EL(+)121.550
100MM DIA
F.Gr.L 100NB F.Gr.L PIPE
PROJECT DIRECTOR-CUM-CHIEF ENGINEER, PMU, MEGALIFT PROJECTS
DIA PIPE

EL(+)121.450 FGrL EL(+)121.500 EL(+)121.450 FGrL


T.O.C P.F.L T.O.C
PROJECT : MEGA LIFT IRRIGATION PROJECT - CLUSTER XXII
QR CODE

CONTRACTOR:
L&T Construction
Water & Effluent Treatment IC

ELECTRICAL EQUIPMENT LAYOUT FOR


TITLE :
SANA ROHILA (ID NO-502) PUMP HOUSE
℄ OF STRUCTURE, LA &
℄ OF AB SWITCH & DO

℄ OF AB SWITCH & DO
℄ OF AB SWITCH, DO

℄ OF STRUCTURE &
AB SWITCH & AUX.
℄ OF STRUCTURE

℄ OF STRUCTURE

NAME SIGN DATE SCALE : 1 : 50 SIZE : A1 REV : A


TRANSFORMER

CHECKED BY SIGN DATE


AUX. TRAFO.

NK/RP
AB SWITCH

GEOTECHNICAL - - DSGN 22.08.24


PROJECT CODE DRAWING NO.
FUSE &

CIVIL & STRUCTURAL


FUSE

FUSE

DRWN NGP 22.08.24


PROCESS - -
MECHANICAL & PIPING CHKD AKKS 22.08.24
SECTION C-C SECTION D-D ELECTRICAL - -
LE23M934 LE23M934-E-LW-DG-502-4009
APPD GK 22.08.24 SHEET 03 OF 03
INSTRUMENTATION