0% found this document useful (0 votes)
22 views48 pages

Status May 2025

The document provides a detailed status report for construction activities across various plots for May 2025. Most tasks, including excavation, back filling, and concrete work, show high completion percentages, with many at 100%. However, back filling for certain plots is only at 60%, indicating some areas may require additional attention.

Uploaded by

Arpita Singal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views48 pages

Status May 2025

The document provides a detailed status report for construction activities across various plots for May 2025. Most tasks, including excavation, back filling, and concrete work, show high completion percentages, with many at 100%. However, back filling for certain plots is only at 60%, indicating some areas may require additional attention.

Uploaded by

Arpita Singal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 48

Status Month of May -2025

Plot No. A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 60% 100% 100% 100% 100% 100% 60% 60% 60% 60% 60% 60% 100% 100% 60% 60% 60% 60% 60% 60% 60% 100% 100%
Sand Filling In Lift Pit 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
RCC &Pcc In Lift Pit 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Water Proofing Lift pit 100% 100% 100% 100%
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_GF ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st FSlab/BeamShuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Col. Shuttering (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 1%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. F Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C
R/F& Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
D
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. F Slab/Beam & S/C
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Col. Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th F Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
Col. R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (4th-terrace 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100%
Terrace F Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace F Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation
Col.&Beam Steel
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%###100%
Parapet & Elevation
Col.&Beam RCC
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%###100%
Parapet & Elevation Col/. &
Beam Shuttering
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%###100%
Mumty Coln 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation
Col.&Beam Steel
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 100%
Parapet & Elevation
Col.&Beam RCC
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 100%
Parapet & Elevation Col/. &
Beam Shuttering
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 100%
Status Month of May -2025
Plot No. B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60%
Sand Filling In Lift Pit
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Lift Pit Brick Work
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering (1st_2nd F 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 1 100% 1 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering
Terrace Floor (4th-terrace F )
Slab/Beam 100% 100% 100
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100% 90% 90% 100% 100% 90% 90% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100% 90% 90% 100% 100% 90% 90% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100% 90% 90% 100% 100% 90% 90% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC
Parapet & Elevation Col. & Beam
Shuttering
Mumty Coln 100% 100% 100% 100% 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC
Parapet & Elevation Col. & Beam
Shuttering
Status Month of May -2025
Plot No. B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28 B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 100% 100% 100% 100% 100% 100% 100% 60% 60% 60% 60% 60% 100% 100% 100% 100% 100% 100% 60% 60% 60% 60% 60% 60%
Sand Filling In Lift Pit 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Lift Pit RCC Work 100% 100% 100% 100% 100% 100% 100%
Water Proofing Lift pit 100% 100% 100% 100%
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering R/F&(1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam R/F& Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F &Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F &Shuttering (4th-terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC

Parapet & Elevation Col. & Beam Shuttering


Mumty Coln 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC
Parapet & Elevation Col. & Beam Shuttering
Status Month of May -2025
Plot No. B42 B43 B44 B45 B46 B47 B48 B49 B50 B51 B52 B53 B54 B55 M1
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60%
Sand Filling In Lift Pit
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Lift Pit Brick Work
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam PCC 100% 100% 100% 100% 100% 100% 100% 100% N/A N/A N/A N/A N/A N/A N/A
Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering R/F&(1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam R/F& Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F &Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F &Shuttering (4th-terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
Mumty Coln 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Mumty Slab 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Status Month of May -2025

Plot No. C1 C2 C3 C4 C5
Excavation 100% 100% 100% 100% 100%
Back Filling 100% 100% 100% 100% 100%
Sand Filling In Lift Pit 100% 100% 100% 100% 100%
Lift Pit PCC & RCC 100% 100% 100% 100% 100%
Water Proofing Lift pit 100% 100% 100% 100% 100%
Plots PCC 100% 100% 100% 100% 100%
Raft RCC 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100%
1st. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100%
Column Shuttering R/F&(1st_2nd F ) 100% 100% 100% 100% 100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100%
Column R/F &Shuttering (3rd_4th F ) 100% 100% 100% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100%
Column R/F &Shuttering (4th-terrace F ) 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam Shuttering 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam Steel 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam RCC 100% 100% 100% 100% 100%

Parapet & Elevation Col/. & Beam 100% 100% 100% 100% 100%
Shuttering
Mumty Coln 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam Steel 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam RCC 100% 100% 100% 100% 100%
Parapet & Elevation Col/. & Beam 100% 100% 100% 100% 100%
Shuttering
Status Month of May -2025
ESS/Lt Room Ess / LT Panel HT Meter Transformer Room
Excavation 100% 100% 100%
Back Filling 100% 100% 100%
Plots PCC 100% 100% 100%
Raft RCC 100% 100% 100%
Raft Shuttering 100% 100% 100%
GSB for Transformer
Column RCC (Base.To Plinth Beam ) 100% 100% 100%
Column Shuttering (Base.ToG. F ) 100% 100% 100%
Plinth Beam RCC/Shuttering 100% 100% 100%
Column RCC (G.F. To 1st F ) 100% 100% 100%
Column Shuttering (G.F. To 1st F ) 100% 100% 100%
Slab/Beam & S/C RCC (1st. Floor) 100% 100% N/A
Slab/Beam & S/C Shuttering (1st. Floor) 100% 100% N/A
Block Work Parapet Wall 100% 80% N/A
Tranch Footing 100% 100%
Tranch RCC Wall 100% 100%
Brick/Block Work 100% 100% 100%
Internal Plaster 100% 100% N/A
External Plaster 90% 100% 80%

Grade Slab PCC 100% 100%


Grade Slab 100% 100%
Tranch MS Work 100% 50%
Kotastone flooring 100% 85%
Internal paint 85%
WATER PROOFING OF ROOF
Status Month of May -2025
Plot No. B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 B27
Stilt
Bands RCC
100% 100% 100% 100% 100%

Shuttering
100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100%

1st floor
Bands RCC 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering 100% 100% 100% 100%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A N/A N/A N/A N/A N/A
2nd Floor
Bands RCC 100% 100% 100% 100%
100% 100% 100% 100%

Shuttering 100% 100% 100% 100%


100% 100% 100% 100%

Reinforecment 100% 100% 100% 100%


100% 100% 100% 100%

3rd Floor
Bands RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

4th Floor
Bands RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

terrace Level
Bands RCC 100% 100% 100% 100%

Shuttering 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100%

100% 100% 100% 100%


Mumty
Bands RCC 100% 100% 100% 100%

Shuttering 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100%

Mumty Slab
Bands RCC

Shuttering

Reinforecment
Status Month of May -2025

Plot No. B28 B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41 B42 B43 B44 B45 B46 B47 B48 B49 B50 B51 B52 B53 B54 B55
Stilt
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

1st floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

2nd Floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A N/A N/A
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A

3rd Floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

4th Floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

terrace Level
Bands RCC

Shuttering

Reinforecment

Mumty
Bands RCC

Shuttering

Reinforecment

Mumty Slab
Bands RCC

Shuttering

Reinforecment
Status Month of May -2025

Plot No. A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23
Stilt
Bands RCC

Shuttering

Reinforecment

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st floor
Bands RCC 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
N/A
Shuttering 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100%
N/A
2nd Floor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Bands RCC 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100%
N/A N/A N/A N/A N/A
Shuttering 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100%
N/A N/A N/A N/A
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd Floor
Bands RCC 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%

Shuttering 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100%


100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100%


4th Floor
Bands RCC 80% 60% 50%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Shuttering 80% 60% 50%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Reinforecment 80% 60% 50%


100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100%


terrace Level
Bands RCC
100% 100% 100% 100% 100% 100%

Shuttering
100% 100% 100% 100% 100% 100%

Reinforecment
100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100%


Mumty
Bands RCC 100% 100% 100% 100% 100% 100% 100%

Shuttering 100% 100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100%


Mumty Slab
Bands RCC 100% 100% 100% 100% 100% 100% 100%

Shuttering 100% 100% 100% 100% 100% 100% 100%

Reinforecment 100% 100% 100% 100% 100% 100% 100%


Status Month of May -2025

Plot No. C1 C2 C3 C4 C5
Stilt
Bands RCC
Shuttering
Reinforecment
1st floor 100% 100% 100% 100% 100%
Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%

2nd Floor 100% 100% 100% 100% 100%


Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%

3rd Floor 100% 100% 100% 100% 100%


Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%

4th Floor 100% 100% 100% 100% 100%


Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%

terrace Level 100% 100% 100% 100% 100%


Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%
Mumty 100% 100% 100% 100% 100%
Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%
Mumty Slab 100% 100% 100% 100% 100%
Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%
DRINKING WATER PIPELINE STATUS-MAY2025

DWS FWS

GI PIPE 100MM DIA


PLOT UOM GI PIPE 25MM DIA LAYING PVC pipe 20mm dia PVC pipe 90mm dia PVC pipe 75mm dia PVC pipe 50mm dia DI pipe 110mm dia REMARKS
LAYING

B1 Rmt 5.85 6
B2 Rmt 5.25 5.5 25.2
B3 Rmt 5.45 5.8
B4 Rmt 5.24 5.66
B5 Rmt 5.19 5.78
B6 Rmt 5.15 5.75
B7 Rmt 5.45 5.75 121.5
B8 Rmt 5.35 5.82 95.85
B9 Rmt 5.35 5.95
B10 Rmt 5.5 5.55
B11 Rmt 5.4 5.87
B12 Rmt 5.4 5.8
B13 Rmt 5.5
Road Crossing Rmt 11.77 11.77 11.2
A1 Rmt
A2 Rmt
A3 Rmt
A4 Rmt
A5 Rmt
A6 Rmt
A7 Rmt 5.6
A8 Rmt 5.83
37.8
A9 Rmt 5.94
61
A10 Rmt 5.89
A11 Rmt 5.46 20
A12 Rmt 5.25

TOTAL 11.77 64.58 108.7 107.62 63 20 193.7


Finishing Status Month of May-2025
Stair case Stair Kot Internal Door Plumbing Shaft External Gypsum
Internal Stair
Balcony Water
Floor Tile Skirting
Plot No. Block Work Lift Block work front B/W kasta Granite Stair case steps Frame Plaster Plaster Plaster
cement cement
Plaster proofing Kitchen wall
Plaster Plaster Toilet Wall Toilet Balcony living Dining Bedroom Balcony living Dining Bedroom 1 & 2 Kitchen wall

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A1Stilt (Gf-1st) 100% 100% 50%
100% 100%
1stF(1st-2nd) 90% 100% 95% 100% 85% 100% 95% 80% 100% 90% 90%
100%
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 80% 100% 95% 95%
100%
3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 95% 100% 100% 95% 100% 90% 90% 90% 90%
100%
4thF(4th-Terr.) 95% 100% 95% 100% 85% 100% 100% 50% 100%
100%
Terrace 100% 100% 100%
100%
Mumty 100% 100%

Above mumty

A2Stilt (Gf-1st) 100% 100% 100% 50%


100%
1stF(1st-2nd) 90% 100% 95% 100% 90% 100% 95% 80% 100% 90% 90%
100%
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 80% 100% 95% 95%
100%
3rdF(3rd-4th) 90% 100% 95% 100% 85% 100% 95% 100% 100% 100% 100% 90% 90% 90% 90%
100%
4thF(4th-Terr.) 95% 100% 95% 100% 85% 100% 100% 50% 30%
100%
Terrace 100% 100% 100%
100%
Mumty 100% 100%

Above mumty

A3Stilt (Gf-1st) 100% 100% 100% 85% 70% 85% 80%


100%
1stF(1st-2nd) 95% 100% 95% 100% 90% 100% 95% 100% 65% 95% 95%

2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 100% 100% 100% 100%

3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 95% 100% 100% 100% 100% 90% 90% 90% 90%

4thF(4th-Terr.) 95% 100% 95% 100% 85% 100%

Terrace 100% 100%

Mumty 100%

Above mumty

A4Stilt (Gf-1st) 100% 100% 100% 85% 70% 85% 80%


100%
1stF(1st-2nd) 95% 100% 95% 100% 90% 100% 95% 100% 100% 95% 95%

2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 100% 70% 100% 100%

3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 100% 100% 70% 100% 100% 90% 90% 90% 90%

4thF(4th-Terr.) 90% 100% 95% 100% 85% 100% 100%

Terrace 100% 100%

Mumty 100%

Above mumty

A5Stilt (Gf-1st) 100% 100% 100% 85% 70% 85% 80%

1stF(1st-2nd) 95% 100% 95% 100% 90% 100% 95% 50% 100% 100% 100%

2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 100% 100% 100% 90% 90% 90% 90%

3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 100% 100%

4thF(4th-Terr.) 95% 100% 95% 100% 85% 100% 100%

Terrace 100% 100%

Mumty 100%

Above mumty
Finishing Status Month of May-2025
Stair case Stair Kot Internal Door Plumbing Shaft External Gypsum
Internal Stair
Balcony Water
Floor Tile Skirting
Plot No. Block Work Lift Block work front B/W kasta Granite Stair case steps Frame Plaster Plaster Plaster
cement cement
Plaster proofing Kitchen wall
Plaster Plaster Toilet Wall Toilet Balcony living Dining Bedroom Balcony living Dining Bedroom 1 & 2 Kitchen wall

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A6Stilt (Gf-1st) 100% 100% 85% 70% 85% 80%

1stF(1st-2nd) 95% 100% 95% 100% 90% 95% 50% 100% 100% 100%

2ndF(2nd-3rd) 95% 100% 95% 100% 85% 95% 100% 100% 100% 90% 90% 90% 90%

3rdF(3rd-4th) 95% 100% 95% 100% 85% 95% 100%

4thF(4th-Terr.) 95% 100% 95% 100% 85% 100%

Terrace 100%

Mumty 100%

Above mumty
Finishing Status Month of May-2025
Stair Kot Stair Waterpro Wall Tile Floor Tile
Lift wall Stair Brick Internal Gypsum Shaft Lift wall Balcony External
Plot No. Brick Work Block Work
Block Work steps Door frame
kasta Lift Cladding
Plaster Plaster
cement
plaster Plaster Plaster
ofing(Toile IPS
Granite Plaster ts) Toilet Kitchen Toilet Balcony Kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A7Stilt (Gf-1st) 95% 100% 85% 90% 75% 90% 40% 90%

1stF(1st-2nd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 50% 90% 95% 85% 85% 85%

2ndF(2nd-3rd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 75% 90% 95% 100% 85% 90% 90% 85% 85% 85%
N/A
3rdF(3rd-4th) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 75% 90% 95% 85% 90% 90% 85% 85% 85%

4thF(4th-Terr.) 95% 100% 100% 85% 90% 95% 80% 75% 90% 75% 90% 95% 85% 90% 90% 85% 85% 85%

Terrace 100%

Mumty 100%

Above mumty 100%

A8Stilt (Gf-1st) 95% 100% 85% 90% 75% 90% 40%

1stF(1st-2nd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 80% 95% 100% 85% 85% 85% 85% 85% 85%

2ndF(2nd-3rd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 80% 95% 100% 85% 85% 85% 85% 85% 85%
N/A
3rdF(3rd-4th) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 80% 95% 85% 85% 85% 85% 85% 85%

4thF(4th-Terr.) 95% 100% 50% 85% 90% 95% 80% 75% 90% 80% 95% 85% 85% 85% 85% 85% 85%

Terrace 100%

Mumty N/A 100%

Above mumty 100%

A9Stilt (Gf-1st) 95% 100% 80% 85% 90% 40%

1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 85% 85% 85%

2ndF(2nd-3rd) 95% N/A 95% 100% 100% 95% 80% 85% 90% 80% 95% 100% 85% 90% 85% 85% 85% 85%

3rdF(3rd-4th) 95% 95% 100% 100% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%

4thF(4th-Terr.) 45% 55% 100% 100% 95% 80% 85% 90% 80% 95% 85% 85% 85%

Terrace 100%

Mumty N/A 100%

Above mumty 100%

A10Stilt (Gf-1st) 100% 80% 85% 90% 40%

1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 90% 85% 95% 95% 50%

2ndF(2nd-3rd) 95% N/A 95% 100% 100% 90% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%

3rdF(3rd-4th) 95% 95% 100% 100% 90% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%
Finishing Status Month of May-2025
Stair Kot Stair Waterpro Wall Tile Floor Tile
Lift wall Stair Brick Internal Gypsum Shaft Lift wall Balcony External
Plot No. Brick Work Block Work
Block Work steps Door frame
kasta Lift Cladding
Plaster Plaster
cement
plaster Plaster Plaster
ofing(Toile IPS
Granite Plaster ts) Toilet Kitchen Toilet Balcony Kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4thF(4th-Terr.) 90% 95% 100% 100% 90% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%

Terrace 100%
N/A
Mumty 100%

Above mumty 100%

A11Stilt (Gf-1st) 100% 80% 85% 90% 40%

1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%

2ndF(2nd-3rd) 95% N/A 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%

3rdF(3rd-4th) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%

4thF(4th-Terr.) 90% 95% 70% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%

Terrace 100%
N/A
Mumty 100%

Above mumty 100%

A12Stilt (Gf-1st) 100% 50% 85% 40%

1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%

2ndF(2nd-3rd) 95% N/A 95% 100% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%

3rdF(3rd-4th) 95% 95% 100% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%

4thF(4th-Terr.) 90% 95% 70% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%

Terrace 100%
N/A
Mumty 100%

Above mumty 100%

A7 Outer Side Plaster Gf- Terrrace Floor 95%

A7-A8 Stair case Block Complete Gf-Mumty parapet

A9-A10 Stair case Block Complete Gf-Mumty parapet

A10-A11 Stair case Block Complete Gf-Mumty parapet


Finishing Status Month of May-2025
External Wall Tile Floor Tile
Lift Pit Block Stair case Internal Door Gypsum Internal cement POP Double Coat Stair Balcony Shaft BalconyTop
Plot No. Brick Work Block Work Work(150m steps Kot Stair case steps Frame LIFT Plaster Plaster cement Plaster Punning Putty False Ceiling cement Plaster IPS Plaster Waterproofing Granite(Back
m) Kasta Plaster (Front+Back) Plaster +Front)
Toilet Wall Kitchen Wall Toilet Balcony kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A13Stilt (Gf-1st) 95% 95% 90% 100% 100% 95% 90% 95%

1st F(1st-2nd) 95% 95% 90% 100% 100% 100% 95% 95% 80% 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
N/A
2nd F(2nd-3rd) 95% 95% 90% 100% 100% 100% 95% 95% 85% 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%

3rd F(3rd-4th) 95% 95% 90% 100% 100% 100% 95% 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%

4th F(4th-Terr.) 95% 95% 90% 100% 100% 100% 90% N/A 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%

Terrace 0% 95% 95% Terrace floor Tile 90%

Mumty 95% 95% 95%

Above mumty 95% 95%

A14Stilt (Gf-1st) 95% 95% 100% 90% 95%

1st F(1st-2nd) 95% 95% 95% 100% 100% 90% 90% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%

2nd F(2nd-3rd) 95% 95% 95% 100% 100% N/A 80% 90% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%

3rd F(3rd-4th) 95% 95% 95% 100% 100% 80% 90% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95%

4th F(4th-Terr.) 95% 95% 95% 100% 100% 90% N/A 90% 95% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%

Terrace

Mumty

Above mumty 95%

A15Stilt (Gf-1st) 95% 95% 100%

1st F(1st-2nd) 95% 95% 95% 100% 100% 90% 90% 70% 100% 85% 85%

2nd F(2nd-3rd) 95% 95% 95% 100% 100% 80% 90% 70% 100% 85% 85% 85%

3rd F(3rd-4th) 95% 90% 95% 95% 100% 90% 70%

4th F(4th-Terr.) 60% 100% 95% 100%

Terrace
N/A
Mumty

Above mumty

A16Stilt (Gf-1st) 100%

1st F(1st-2nd) 95% 100% 100% 90% 70% 85% 85% 85%

2nd F(2nd-3rd) 95% 100% 100% 80% 70% 100% 85% 85% 85%

3rd F(3rd-4th) 85% 100%

4th F(4th-Terr.) 60% 100% 100%

Terrace N/A

Mumty

Above mumty

A17Stilt (Gf-1st) 100%

1st F(1st-2nd) 80% 100% 100%

2nd F(2nd-3rd) 90% 100%

3rd F(3rd-4th) 85% 100%

N/A
Finishing Status Month of May-2025
External Wall Tile Floor Tile
Lift Pit Block Stair case Internal Door Gypsum Internal cement POP Double Coat Stair Balcony Shaft BalconyTop
Plot No. Brick Work Block Work Work(150m steps Kot Stair case steps Frame LIFT Plaster Plaster cement Plaster Punning Putty False Ceiling cement Plaster IPS Plaster Waterproofing Granite(Back
m) Kasta Plaster (Front+Back) Plaster +Front)
Toilet Wall Kitchen Wall Toilet Balcony kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4th F(4th-Terr.) 60% 100% 100%
N/A
Terrace

Mumty

Above mumty

A18Stilt (Gf-1st) 100%

1st F(1st-2nd) 90% 100%

2nd F(2nd-3rd) 90%

3rd F(3rd-4th) 80%

4th F(4th-Terr.) 60% 100%

Terrace

Mumty

Above mumty

A19Stilt (Gf-1st) 100%

1st F(1st-2nd) 90% 100%

2nd F(2nd-3rd) 90%

3rd F(3rd-4th) 85%

4th F(4th-Terr.) 100%

Terrace

Mumty

Above mumty

A20Stilt (Gf-1st) 100%

1st F(1st-2nd) 90% 100%

2nd F(2nd-3rd) 50%

3rd F(3rd-4th) 85%

4th F(4th-Terr.) 100%

Terrace

Mumty

Above mumty

A21Stilt (Gf-1st) 100%

1st F(1st-2nd) 100%

2nd F(2nd-3rd) 30%

3rd F(3rd-4th) 80%

4th F(4th-Terr.) 80%

Terrace

Mumty

Above mumty
Finishing Status Month of May-2025
External Wall Tile Floor Tile
Lift Pit Block Stair case Internal Door Gypsum Internal cement POP Double Coat Stair Balcony Shaft BalconyTop
Plot No. Brick Work Block Work Work(150m steps Kot Stair case steps Frame LIFT Plaster Plaster cement Plaster Punning Putty False Ceiling cement Plaster IPS Plaster Waterproofing Granite(Back
m) Kasta Plaster (Front+Back) Plaster +Front)
Toilet Wall Kitchen Wall Toilet Balcony kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A22Stilt (Gf-1st)

1st F(1st-2nd) 50%


2nd F(2nd-3rd) 20% 50%
3rd F(3rd-4th) 90%

4th F(4th-Terr.) 60%


Terrace

Mumty

Above mumty

A23Stilt (Gf-1st) 50%


1st F(1st-2nd) 50%
2nd F(2nd-3rd)

3rd F(3rd-4th) 85%

4th F(4th-Terr.) 50%


Terrace

Mumty

Above mumty
Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B1Stilt (Gf-1st) 90% 100%

1st F(1st-2nd)
2nd F(2nd-3rd) 60%

3rdF(3rd-4th)

4thF(4th-Terr.

B2Stilt (Gf-1st) 90% 100%

1st F(1st-2nd)

2nd F(2nd-3rd) 60%

3rdF(3rd-4th)

4thF(4th-Terr.

B3Stilt (Gf-1st) 90% 100%

1st F(1st-2nd) 85%

2nd F(2nd-3rd) 60%

3rdF(3rd-4th)

4thF(4th-Terr.

B4Stilt (Gf-1st) 90% 100%

1st F(1st-2nd) 85%

2nd F(2nd-3rd) 60%

3rdF(3rd-4th)

4thF(4th-Terr.

B5Stilt (Gf-1st) 90% 100%

1st F(1st-2nd) 75%

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B6Stilt (Gf-1st) 50%

1st F(1st-2nd) 80% 100%


Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B7Stilt (Gf-1st) 50%

1st F(1st-2nd) 80% 100%

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B8Stilt (Gf-1st) 100%

1st F(1st-2nd) 85% 100%

2nd F(2nd-3rd) 100%

3rdF(3rd-4th) 100%

4thF(4th-Terr. 100%

B9Stilt (Gf-1st) 100%

1st F(1st-2nd) 75% 100%

2nd F(2nd-3rd) 100%

3rdF(3rd-4th) 100%

4thF(4th-Terr. 100%
Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B10Stilt (Gf-1st)

1st F(1st-2nd) 90%

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B11Stilt (Gf-1st)

1st F(1st-2nd) 90%

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B12Stilt (Gf-1st)

1st F(1st-2nd) 90%

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B13Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B14Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)
Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
3rdF(3rd-4th)

4thF(4th-Terr.

B15Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B16Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

B17Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.
Finishing Status Month of May-2025
Internal Stair Plumbing Water Wall Tile Floor Tile
Stair case Internal Door Stair Case Gypsum Balcony Shaft
Plot No. Brick Work Block Work
Lift wall Block steps frame Kot Kasta Plaster
cement cement
Lift wall Plaster cement IPS prooing
Plaster Plaster (Toilets) Toilet Wall Kitchen
work Plaster Plaster Wall Toilet Balcony Kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B18Stilt (Gf-1st) 100% 95%
100% 85%
1st F(1st-2nd) 95% 100% 100% 95% 90% N/A 95% 95% 95% 95% 30% 95% 90% 95% 95% 95%
100% 85%
N/A
2nd F(2nd-3rd) 95% 100% 100% 95% 90% N/A 95% 95% 95% 95% 95% 95% 90% 95% 95% 50%
100% 85%
3rdF(3rd-4th) 95% 100% 100% 95% 90% 95% 95% 95% 95% 95% 95% 90% 95% 95% 95%
100% 85%
4thF(4th-Terr. 95% 100% 100% 95% 90% 95% 95% 95% 95% 95% 90% 90% 95% 95% 95%
100% 85%
Ter.Parapet Wal 95%

Mumty 95%

Mumty Parapet 95%

B19Stilt (Gf-1st) 100% 95% 90% ### 95%


100% 85%
1st F(1st-2nd) 95% 100% 100% 95% N/A 90% ### 95% 95% 95% 95% 95% 90% 95% 90% ### 95% 95% 95%
100% 85%
N/A
2nd F(2nd-3rd) 95% 100% 100% 95% 95% 95% 95% 95% 95% 95% 90% 95% 90% 95% 95% 95%
100% 85%
3rdF(3rd-4th) 95% 100% 100% 95% 95% N/A 95% 95% 95% 95% 95% 90% 95% 90% 95% 95% 95%
100% 85%
4thF(4th-Terr. 95% 100% 100% 95% 95% 95% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95%
100% 85%
Ter.Parapet Wal 95%

Mumty 95%

Mumty Parapet 95%

B20Stilt (Gf-1st) 95% 85% 90% 95%


100%
1st F(1st-2nd) 95% 100% 100% 95% N/A 85% 90% 95% 95% 95% 95% 90% 90% 95% 95% 95%
100%
N/A
2nd F(2nd-3rd) 95% 100% 100% 95% 90% 95% 95% 95% 95% 95% 90% 95% 95% 95%
100%
3rdF(3rd-4th) 95% 100% 100% 95% 90% 95% 95% 95% 95% 95% 50% 90% 90%
100%
4thF(4th-Terr. 95% 100% 100% 95% 95% 95% 95% 95% 95% 50% 90% 90% 90%
100%
Ter.Parapet Wal 95%

Mumty 95%

Mumty Parapet 95%

B21Stilt (Gf-1st) 95% 85% ###90% 95%


100%
1st F(1st-2nd) 95% 100% 100% 95% N/A 85% 90% 95% 95% 95% 95% 95% 90% 90% 95% 95% 95%
100%
N/A
2nd F(2nd-3rd) 95% 100% 100% 75% 90% 95% 95% 95% 95% 90% 90% 95% 95% 95%
100%
3rdF(3rd-4th) 95% 100% 100% 95% 90% 95% 95% 95% 95% 90% 90% 90% 90% 50%
100%
Finishing Status Month of May-2025
Internal Stair Plumbing Water Wall Tile Floor Tile
Stair case Internal Door Stair Case Gypsum Balcony Shaft
Plot No. Brick Work Block Work
Lift wall Block steps frame Kot Kasta Plaster
cement cement
Lift wall Plaster cement IPS prooing
Plaster Plaster (Toilets) Toilet Wall Kitchen
work Plaster Plaster Wall Toilet Balcony Kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4thF(4th-Terr. 95% 100% 100% 80% 95% 95% 95% 95% 90%
100%
Ter.Parapet Wal N/A 95%

Mumty 95%

Mumty Parapet 95%

B22Stilt (Gf-1st) 85% 95%


100%
1st F(1st-2nd) 95% 100% 100% N/A 85% 95% 95% 95% 90% 90% 95% 95% 95%
100%
N/A
2nd F(2nd-3rd) 95% 100% 100% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95%
100%
3rdF(3rd-4th) 95% 100% 100% 95% 95% 95% 95% 90% 90% 90% 95% 90%
100%
4thF(4th-Terr. N/A 95% 100% 100% 80% 95% 95% 95% 90%
100%
Mumty

B23Stilt (Gf-1st) 85% 95%


100%
1st F(1st-2nd) 95% 100% 100% N/A 85% 95% 95% 95% 95% 95% 95%
100%
2nd F(2nd-3rd) 95% 100% 100% 95% 95% 95% 95% 60% 95% 95% 95%
100%
3rdF(3rd-4th) 95% 100% 100% 90% 95% 95% 95% 95% 95% 95%
100%
4thF(4th-Terr. N/A 95% 100% 100% 80% 95% 95% 95% 90% 90% 90%
100%
Mumty

B24Stilt (Gf-1st) N/A 100% 45%

1st F(1st-2nd) 90% RCC 100% 80% 95% 90% 90% 90%

2nd F(2nd-3rd) 90% 100% 50%


100%
3rdF(3rd-4th) 90% 100% 50%
100%
4thF(4th-Terr. 90% 100%
100%
Mumty

B25Stilt (Gf-1st) 100%

1st F(1st-2nd) 95% RCC 100% 85% 85% 95% 95% 95%

2nd F(2nd-3rd) 95% 100% 80% 50%

3rdF(3rd-4th) 95% 80% 50%

4thF(4th-Terr. 95% 80%

Mumty
Finishing Status Month of May-2025
Internal Stair Plumbing Water Wall Tile Floor Tile
Stair case Internal Door Stair Case Gypsum Balcony Shaft
Plot No. Brick Work Block Work
Lift wall Block steps frame Kot Kasta Plaster
cement cement
Lift wall Plaster cement IPS prooing
Plaster Plaster (Toilets) Toilet Wall Kitchen
work Plaster Plaster Wall Toilet Balcony Kitchen living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B26Stilt (Gf-1st) 85%

1st F(1st-2nd) 90% 100% 100% 50% 95% 95% 95%

2nd F(2nd-3rd) 90% 85% 50%

3rdF(3rd-4th) 95% 85% 50%

4thF(4th-Terr. 80% 85%

Mumty

B27Stilt (Gf-1st)

1st F(1st-2nd) 90% 100% 100% 85% 85% 95% 95% 95%

2nd F(2nd-3rd) 80%

3rdF(3rd-4th) 70% 85%

4thF(4th-Terr. 80% 85%

Mumty

B28Stilt (Gf-1st) 100%

1st F(1st-2nd) 90% 85% 85% 85% 95% 95% 95%

2nd F(2nd-3rd) 90%

3rdF(3rd-4th) 80%

4thF(4th-Terr. 80%

Mumty

B29Stilt (Gf-1st) 100%

1st F(1st-2nd) 85% 85% 95% 85% 95% 95% 95%

2nd F(2nd-3rd) 80%

3rdF(3rd-4th) 80%

4thF(4th-Terr.

Mumty

B18 Face External Plaster Complete Gf-parapet


95%
B18-B19 Stair case Block Complete Gf-parapet
95%
B20-B21 Stair case Block Complete Gf-parapet
95%
B22-B23 Stair case Block Complete Gf-parapet
95%
Finishing Status Month of May-2025
Plumbing
Stair case Internal Kot Kasta Gypsum Shaft Balcony Water Wall Tile Floor Tile
Plot No. Brick Work Block Work
steps Door frame On Stair Plaster cement Plaster prooing Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Plaster Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B30Stilt (Gf-1st) 100%

1st floor(1st-2nd) 85% 100% 100% 90% ###95% 90%

2ndfloor(2nd-3rd) 80% N/A 100% 100% 90% ###95% 90% 90% 85% 75% ###85%

3rd floor(3rd-4th) 85% 100% 100% 90% ###95% 90% 90% 85% 85% 85%

4th floor(4th-Terr. 95% 100% 100% 90% 95% 90% 80% 85% 85%

Mumty

B31Stilt (Gf-1st) 100%

1st floor(1st-2nd) 85% 100% 100% 90% 90% 90% 90% 85% 85% 85%

2ndfloor(2nd-3rd) 80% N/A 100% 100% 90% 90% 90% 90% 85% 85% 85%

3rd floor(3rd-4th) 85% 100% 100% 90% 90% 90% 90% 85% 85% 85%

4th floor(4th-Terr. 95% 100% 100% 90% 90% 90% 85% 85%

Mumty

B32Stilt (Gf-1st)

1st floor(1st-2nd) 80% 100% 100% 85% 90% 90% 90% 80% 85% 85%

2ndfloor(2nd-3rd) 80% N/A 100% 100% 85% 90% 90% 90% 80% 85% 85%

3rd floor(3rd-4th) 85% 100% 100% 85% 90% 90% 90%

4th floor(4th-Terr. 95% 100% 85% 90% 90% 90%


N/A
Mumty

B33Stilt (Gf-1st)

1st floor(1st-2nd) 80% 100% 100% 85% 90% 90% ###90% 80% 85% 85%

2ndfloor(2nd-3rd) 80% 100% 100% 85% 90% 90% 90% 80% 85% 85%
N/A
3rd floor(3rd-4th) 80% 100% 100% 85% 90% 90%

4th floor(4th-Terr. 85% 100% 85% 90% 90%


Finishing Status Month of May-2025
Plumbing
Stair case Internal Kot Kasta Gypsum Shaft Balcony Water Wall Tile Floor Tile
Plot No. Brick Work Block Work
steps Door frame On Stair Plaster cement Plaster prooing Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Plaster Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
Mumty

B34Stilt (Gf-1st)

1st floor(1st-2nd) 80% 100% 85% 85% 90% 90% 85% 90% 90%

2ndfloor(2nd-3rd) 85% 100% 85% 85% 90% 90%


N/A
3rd floor(3rd-4th) 85% 100% 85% 85% 90% 90%

4th floor(4th-Terr 85% 85% 85% 90%

Mumty

B35Stilt (Gf-1st)

1st floor(1st-2nd) 80% 100% 85% 85% 90% 90% 85% 90% 90%

2ndfloor(2nd-3rd) 90% 100% 90%

3rd floor(3rd-4th) 90% 100% 90%

4th floor(4th-Terr. 90% 85% 85% 90% 90%

Mumty

B36Stilt (Gf-1st) 100%

1st floor(1st-2nd) 95% 100% 85% 85% 90% 95% 95% 95%

2ndfloor(2nd-3rd) 95% 100%

3rd floor(3rd-4th) 95%

4th floor(4th-Terr. 95%

Mumty
Finishing Status Month of May-2025
Plumbing
Stair case Internal Kot Kasta Gypsum Shaft Balcony Water Wall Tile Floor Tile
Plot No. Brick Work Block Work
steps Door frame On Stair Plaster cement Plaster prooing Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Plaster Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B37Stilt (Gf-1st) 100% 90%

1st floor(1st-2nd) 95% 100% 95% 90% 95% 95% 95%

2ndfloor(2nd-3rd) 95%

3rd floor(3rd-4th) 95%

4th floor(4th-Terr. 95%

Mumty

B38Stilt (Gf-1st)

1st floor(1st-2nd) 95% 95% 85% 85% 95% 95% 95%

2ndfloor(2nd-3rd) 95%

3rd floor(3rd-4th) 95%

4th floor(4th-Terr. 95%


N/A
Mumty

B39Stilt (Gf-1st)

1st floor(1st-2nd) 95% 95% 90% 85% 95% 95% 95%

2ndfloor(2nd-3rd) 95%

3rd floor(3rd-4th) 95%

4th floor(4th-Terr. 95%

Mumty

B40Stilt (Gf-1st)

1st floor(1st-2nd) 95% 85%

2ndfloor(2nd-3rd) 95%

3rd floor(3rd-4th) 95%

4th floor(4th-Terr. 95%


Finishing Status Month of May-2025
Plumbing
Stair case Internal Kot Kasta Gypsum Shaft Balcony Water Wall Tile Floor Tile
Plot No. Brick Work Block Work
steps Door frame On Stair Plaster cement Plaster prooing Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Plaster Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
Mumty

B41Stilt (Gf-1st)

1st floor(1st-2nd) 95% 85%

2ndfloor(2nd-3rd) 95%

3rd floor(3rd-4th) 95%

4th floor(4th-Terr. 95%

Mumty
Finishing Status Month of May-2025
Internal cement Stair cement Wall Tile Floor Tile
Plot No. Block Work Stair case steps Internal Door Main Door Gypsum Plaster
Plaster Plaster
Balcony Plaster Water prooing
Toilet Wall Kitchen Wall Toilet Balcony living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B42Stilt (Gf-1st) 100%

1st floor(1st-2nd) 95% 100% 100% 90% 75%

2ndfloor(2nd-3rd) 95% 100% 90%

3rd floor(3rd-4th) 85% 100% 85%

4th floor(4th-Terr. 75% 100%

AboveTerrace

Mumty

B43Stilt (Gf-1st) 100%

1st floor(1st-2nd) 80% 100% 100% 90% 95%

2ndfloor(2nd-3rd) 85% 100% 90% 95%

3rd floor(3rd-4th) 85% 100% 85%

4th floor(4th-Terr. 100%

Mumty

B44Stilt (Gf-1st) 100%

1st floor(1st-2nd) 80% 100% 100% 90% 95%

2ndfloor(2nd-3rd) 85% 100% 85% 95%

3rd floor(3rd-4th) 85% 100% 85%

4th floor(4th-Terr. 90% 100%

Mumty

B45Stilt (Gf-1st) 100%

1st floor(1st-2nd) 80% 100% 100% 95%

2ndfloor(2nd-3rd) 85% 100% 85% 95%

3rd floor(3rd-4th) 75% 100%

4th floor(4th-Terr. 75% 100%

AboveTerrace

Mumty

B46Stilt (Gf-1st)
Finishing Status Month of May-2025
Internal cement Stair cement Wall Tile Floor Tile
Plot No. Block Work Stair case steps Internal Door Main Door Gypsum Plaster
Plaster Plaster
Balcony Plaster Water prooing
Toilet Wall Kitchen Wall Toilet Balcony living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
1st floor(1st-2nd) 80% 100% 100% 95%

2ndfloor(2nd-3rd) 85% 100% 85%

3rd floor(3rd-4th) 75%

4th floor(4th-Terr 75%

AboveTerrace

Mumty

B47Stilt (Gf-1st)

1st floor(1st-2nd) 80% 100% 100% 50%

2ndfloor(2nd-3rd) 90% 100% 85%

3rd floor(3rd-4th) 75%

4th floor(4th-Terr. 75%

AboveTerrace

Mumty

B48Stilt (Gf-1st) 100%

1st floor(1st-2nd) 80% 100% 85% 50%

2ndfloor(2nd-3rd) 85% 100% 85%

3rd floor(3rd-4th) 90% 100%

4th floor(4th-Terr. 80% 100%

AboveTerrace

Mumty

B49Stilt (Gf-1st) 100% 85%

1st floor(1st-2nd) 80% 100% 85%

2ndfloor(2nd-3rd) 85% 100% 85%

3rd floor(3rd-4th) 90% 100%

4th floor(4th-Terr. 75% 100%

AboveTerrace

Mumty
Finishing Status Month of May-2025
Internal cement Stair cement Wall Tile Floor Tile
Plot No. Block Work Stair case steps Internal Door Main Door Gypsum Plaster
Plaster Plaster
Balcony Plaster Water prooing
Toilet Wall Kitchen Wall Toilet Balcony living Dining Bedroom

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B42-B43 Stair case Block Complete Gf-4th Floor

B44-B45 Stair case Block Complete Gf-4th Floor

B46-B47 Stair case Block Complete Gf-4th Floor


Finishing Status Month of May-2025
Stair case Internal Stair Wall Tile Floor Tile
Internal Gypsum Balcony Water
Plot No. Block Work steps Brick
Door
Main Door
Plaster
cement cement
Plaster prooing
Work Plaster Plaster Toilet Wall Kitchen Toilet Balcony living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B50Stilt (Gf-1st) 100%
1st floor(1st-2nd) 95% 100% 85%
2ndfloor(2nd-3rd) 90% 100%
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
B51Stilt (Gf-1st) 100% 85%
1st floor(1st-2nd) 95% 100%
2ndfloor(2nd-3rd) 90% 100%
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
B52Stilt (Gf-1st) 100% 85%
1st floor(1st-2nd) 95% 100%
2ndfloor(2nd-3rd) 90% 100%
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
B53Stilt (Gf-1st) 100% 85%
1st floor(1st-2nd) 80% 100%
2ndfloor(2nd-3rd) 70% 100%
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
B54Stilt (Gf-1st) 100%
1st floor(1st-2nd) 90% 100%
2ndfloor(2nd-3rd) 80% 100%
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
B55Stilt (Gf-1st) 100%
1st floor(1st-2nd) 80% 100%
2ndfloor(2nd-3rd) 100%
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
Finishing Status Month of May-2025
Stair case Internal Stair Wall Tile Floor Tile
Internal Gypsum Balcony Water
Plot No. Block Work steps Brick
Door
Main Door
Plaster
cement cement
Plaster prooing
Work Plaster Plaster Toilet Wall Kitchen Toilet Balcony living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
M1Stilt (Gf-1st)
1st floor(1st-2nd) 50%
2ndfloor(2nd-3rd)
3rd floor(3rd-4th)
4th floor(4th-Terr.
Mumty
Finishing Status Month of May-2025
Stair case Stair Wall Tile Floor Tile & Skirting
Stair case Internal Lift Wall Gypsum Lift White Balcony
Plot No. Block Work
Brick steps
steps Kot Lift claddingg
Door Block Work Plaster Wash 3coat
cement
Plaster
Water prooing
Kasta Plaster
Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
C1Stilt (Gf-1st) 100% 100% 100%
95% 85%

1st floor(1st-2nd) 90% 100% 100% 90% 100% 100% 100% 50% 100%
95%

2ndfloor(2nd-3rd) 95% 100% 100% 90% 100% 100% 100% 50% 100%
95%

3rd floor(3rd-4th) 95% 100% 100% 90% 100% 100% 100% 50% 100%
95%

4th floor(4th-Terr. 95% 100% 90% 100% 100% 100% 50% 100%
50%

Terrace 80% 100%

Mumty 100% 100% 100% 100%

Mumty Parapet 80%

C2Stilt (Gf-1st) 100% 85% 100% 100%


100%

1st floor(1st-2nd) 95% 100% 85% 90% 100% 100% 100% 50% 100% 100% 100%
100%

2ndfloor(2nd-3rd) 95% 100% ###85% 85% 100% 95% 100% 50% 100% 100% 90% 90% 90%
100%

3rd floor(3rd-4th) 95% 100% ###85% 100% 85% 100% 95% 100% 50% 100% 100% 100% 90% 90% 90%

4th floor(4th-Terr. 95% 100% ###85% 50% 85% 100% 100% 100% 50% 100% 100% 100% 100% 100%

Terrace 80% 100%

Mumty 100% 100% 85% 100% 100%

Mumty Parapet 80%

C3Stilt (Gf-1st) 100% 85% 100% 100%


100%

1st floor(1st-2nd) 95% 100% 85% 85% 100% 100% 100% 90% 50% 100% 100% 100%
100%

2ndfloor(2nd-3rd) 95% 100% 85% 85% 100% 95% 100% 90% 50% 100% 100% 90% 90% 100%
100%

3rd floor(3rd-4th) 95% 100% 85% 100% 85% 100% 95% 100% 90% 50% 100% 100% 90% 90% 90%

4th floor(4th-Terr. 95% 100% 85% 50% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100%

Terrace 80% 100%

Mumty 100% 100% 85% 100% 100%

Mumty Parapet 80%


Finishing Status Month of May-2025
Stair case Stair Wall Tile Floor Tile & Skirting
Stair case Internal Lift Wall Gypsum Lift White Balcony
Plot No. Block Work
Brick steps
steps Kot Lift claddingg
Door Block Work Plaster Wash 3coat
cement
Plaster
Water prooing
Kasta Plaster
Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
C4Stilt (Gf-1st) 100% 100% 100%
95% 100%

1st floor(1st-2nd) 95% 100% 100% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100% 100%
95%

2ndfloor(2nd-3rd) 95% 100% 100% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100%
95%

3rd floor(3rd-4th) 95% 100% 100% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100% 100%
95%

4th floor(4th-Terr. 95% 100% 85% 100% 100% 90% 50% 100%
95% 50%

Terrace 80% 100%

Mumty 100% 100% 100% 100%

Mumty Parapet 80%

C5Stilt (Gf-1st) 100% 100% 100%


95% 100%

1st floor(1st-2nd) 95% 100% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100% 100%
95%

2ndfloor(2nd-3rd) 95% 100% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100%
95%

3rd floor(3rd-4th) 95% 100% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100% 100%
95%

4th floor(4th-Terr. 95% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100% 100%
95% 50%

Terrace 80% 100%

Mumty 100% 100% 100% 100%

Mumty Parapet 80%

Mumty W/P C1 to C5 95%

(10) - - - 7 - - - - 8 - 8 - 5 5 5

Note Terrace & Mumty PCC = 24.5cum


Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Ceiling Inner Wall Outer Wall Inner Wall Outer Wall
Plot No. white wash Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A1Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A2Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A3Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A4Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A5Stilt (Gf-1st)

37 of 37
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Ceiling Inner Wall Outer Wall Inner Wall Outer Wall
Plot No. white wash Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A6Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A7Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A8Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A9Stilt (Gf-1st)

1stF(1st-2nd)

38 of 38
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Ceiling Inner Wall Outer Wall Inner Wall Outer Wall
Plot No. white wash Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A10Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A11Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A12Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

39 of 39
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A13Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A14Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A15Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A16Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
Mumty

Above mumty

A17Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A18Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A19Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A20Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A21Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A22Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty

A23Stilt (Gf-1st)

1stF(1st-2nd)

2ndF(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.)

Terrace

Mumty

Above mumty
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Inner Wall outer Wall Ceiling Inner Wall Outer Ceiling
Plot No. Plaster Primer Primer
Ceiling Primer
Putty Putty Putty Paint Wall Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B18Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.

Ter.Parapet Wal

Mumty

Mumty Parapet

B19Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.

Ter.Parapet Wal

Mumty

Mumty Parapet

B20Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.

Ter.Parapet Wal

Mumty

Mumty Parapet
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Inner Wall outer Wall Ceiling Inner Wall Outer Ceiling
Plot No. Plaster Primer Primer
Ceiling Primer
Putty Putty Putty Paint Wall Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B21Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)
100%
4thF(4th-Terr.

Ter.Parapet Wal

Mumty

Mumty Parapet

B22Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty

B23Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty

B24Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Inner Wall outer Wall Ceiling Inner Wall Outer Ceiling
Plot No. Plaster Primer Primer
Ceiling Primer
Putty Putty Putty Paint Wall Paint Paint

Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B25Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty

B26Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty

B27Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty

B28Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty

B29Stilt (Gf-1st)

1st F(1st-2nd)

2nd F(2nd-3rd)

3rdF(3rd-4th)

4thF(4th-Terr.

Mumty
Finishing Status Month of May-2025
Lift wall &
OuterWall Inner Wall Ceiling Inner Wall OuterWall Inner Wall Outer Wall
Plot No. Ceiling
Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint
Plaster

Pre This Pre This Pre This Pre This This This Pre This Pre This Pre This Pre This
C1Stilt (Gf-1st)

1st floor(1st-2nd)

2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.

Terrace

Mumty

Mumty Parapet

C2Stilt (Gf-1st)

1st floor(1st-2nd)

2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.

Terrace

Mumty

Mumty Parapet

C3Stilt (Gf-1st)

1st floor(1st-2nd)

2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.

Terrace

Mumty

Mumty Parapet
Finishing Status Month of May-2025
Lift wall &
OuterWall Inner Wall Ceiling Inner Wall OuterWall Inner Wall Outer Wall
Plot No. Ceiling
Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint
Plaster

Pre This Pre This Pre This Pre This This This Pre This Pre This Pre This Pre This
C4Stilt (Gf-1st)

1st floor(1st-2nd)

2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.

Terrace

Mumty

Mumty Parapet

C5Stilt (Gf-1st)

1st floor(1st-2nd)

2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.

Terrace

Mumty

Mumty Parapet

Mumty W/P

(5) 5 - - - - - -