Plot No. A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 60% 100% 100% 100% 100% 100% 60% 60% 60% 60% 60% 60% 100% 100% 60% 60% 60% 60% 60% 60% 60% 100% 100%
Sand Filling In Lift Pit 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
RCC &Pcc In Lift Pit 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Water Proofing Lift pit 100% 100% 100% 100%
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_GF ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st FSlab/BeamShuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Col. Shuttering (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 1%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. F Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C
R/F& Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
D
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. F Slab/Beam & S/C
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Col. Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th F Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
Col. R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (4th-terrace 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100% 100% 100%
Terrace F Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace F Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation
Col.&Beam Steel
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%###100%
Parapet & Elevation
Col.&Beam RCC
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%###100%
Parapet & Elevation Col/. &
Beam Shuttering
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%###100%
Mumty Coln 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation
Col.&Beam Steel
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 100%
Parapet & Elevation
Col.&Beam RCC
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 100%
Parapet & Elevation Col/. &
Beam Shuttering
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 100%
Status Month of May -2025
Plot No. B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60%
Sand Filling In Lift Pit
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Lift Pit Brick Work
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% ### 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering (1st_2nd F 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 1 100% 1 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering
Terrace Floor (4th-terrace F )
Slab/Beam 100% 100% 100
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100% 90% 90% 100% 100% 90% 90% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100% 90% 90% 100% 100% 90% 90% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100% 90% 90% 100% 100% 90% 90% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC
Parapet & Elevation Col. & Beam
Shuttering
Mumty Coln 100% 100% 100% 100% 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC
Parapet & Elevation Col. & Beam
Shuttering
Status Month of May -2025
Plot No. B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28 B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41
Excavation 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Back Filling 100% 100% 100% 100% 100% 100% 100% 60% 60% 60% 60% 60% 100% 100% 100% 100% 100% 100% 60% 60% 60% 60% 60% 60%
Sand Filling In Lift Pit 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Lift Pit RCC Work 100% 100% 100% 100% 100% 100% 100%
Water Proofing Lift pit 100% 100% 100% 100%
Plots PCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column Shuttering R/F&(1st_2nd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam R/F& Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F &Shuttering (3rd_4th F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Column R/F &Shuttering (4th-terrace F ) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Parapet & Elevation Col. & Beam Steel
Parapet & Elevation Col. & Beam RCC
Plot No. C1 C2 C3 C4 C5
Excavation 100% 100% 100% 100% 100%
Back Filling 100% 100% 100% 100% 100%
Sand Filling In Lift Pit 100% 100% 100% 100% 100%
Lift Pit PCC & RCC 100% 100% 100% 100% 100%
Water Proofing Lift pit 100% 100% 100% 100% 100%
Plots PCC 100% 100% 100% 100% 100%
Raft RCC 100% 100% 100% 100% 100%
Raft Shuttering 100% 100% 100% 100% 100%
Coln R/f (Fdn_G. F ) 100% 100% 100% 100% 100%
Column RCC (Fdn_G. F ) 100% 100% 100% 100% 100%
Coln Shuttering (Fdn_G. F ) 100% 100% 100% 100% 100%
Plinth Beam Reinforecment 100% 100% 100% 100% 100%
Plinth Beam RCC 100% 100% 100% 100% 100%
Plinth Beam Shuttering 100% 100% 100% 100% 100%
Coln R/f (G.F_1st F ) 100% 100% 100% 100% 100%
Column RCC (G.f_1st F ) 100% 100% 100% 100% 100%
Coln Shuttering(G.F_1st F ) 100% 100% 100% 100% 100%
1st. Floor Slab & Beam R/f 100% 100% 100% 100% 100%
1st. Floor Slab/Beam RCC 100% 100% 100% 100% 100%
1st. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100%
Column RCC (1st_2nd F ) 100% 100% 100% 100% 100%
Coln R/f (1st_2nd F ) 100% 100% 100% 100% 100%
Column Shuttering R/F&(1st_2nd F ) 100% 100% 100% 100% 100%
2nd. Floor Slab& Beam R/f. 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam & S/C RCC 100% 100% 100% 100% 100%
2nd. Floor Slab/Beam 100% 100% 100% 100% 100%
Reinforcement (2nd_3rd F ) 100% 100% 100% 100% 100%
Column RCC (2nd_3rd ) 100% 100% 100% 100% 100%
ColnShuttering (2nd_3rd F ) 100% 100% 100% 100% 100%
3rd. Floor Slab&Beam Re/f 100% 100% 100% 100% 100%
3rd. FloorSlab/Beam RCC 100% 100% 100% 100% 100%
3rd. Floor Slab/Beam & S/C Shuttering 100% 100% 100% 100% 100%
Reinforcement (3rd_4th F ) 100% 100% 100% 100% 100%
Column RCC (3rd_4th ) 100% 100% 100% 100% 100%
Column R/F &Shuttering (3rd_4th F ) 100% 100% 100% 100% 100%
4th Floor Slab/Beam R/f 100% 100% 100% 100% 100%
4th Floor Slab/Beam RCC 100% 100% 100% 100% 100%
4th Floor Slab/Beam Shuttering 100% 100% 100% 100% 100%
Column R/F (4th_TerraceF) 100% 100% 100% 100% 100%
Column RCC (4th_Terrace F ) 100% 100% 100% 100% 100%
Column R/F &Shuttering (4th-terrace F ) 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam R/f 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam Shuttering 100% 100% 100% 100% 100%
Terrace Floor Slab/Beam RCC 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam Steel 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam RCC 100% 100% 100% 100% 100%
Parapet & Elevation Col/. & Beam 100% 100% 100% 100% 100%
Shuttering
Mumty Coln 100% 100% 100% 100% 100%
Mumty Slab & Beam 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam Steel 100% 100% 100% 100% 100%
Parapet & Elevation Col.&Beam RCC 100% 100% 100% 100% 100%
Parapet & Elevation Col/. & Beam 100% 100% 100% 100% 100%
Shuttering
Status Month of May -2025
ESS/Lt Room Ess / LT Panel HT Meter Transformer Room
Excavation 100% 100% 100%
Back Filling 100% 100% 100%
Plots PCC 100% 100% 100%
Raft RCC 100% 100% 100%
Raft Shuttering 100% 100% 100%
GSB for Transformer
Column RCC (Base.To Plinth Beam ) 100% 100% 100%
Column Shuttering (Base.ToG. F ) 100% 100% 100%
Plinth Beam RCC/Shuttering 100% 100% 100%
Column RCC (G.F. To 1st F ) 100% 100% 100%
Column Shuttering (G.F. To 1st F ) 100% 100% 100%
Slab/Beam & S/C RCC (1st. Floor) 100% 100% N/A
Slab/Beam & S/C Shuttering (1st. Floor) 100% 100% N/A
Block Work Parapet Wall 100% 80% N/A
Tranch Footing 100% 100%
Tranch RCC Wall 100% 100%
Brick/Block Work 100% 100% 100%
Internal Plaster 100% 100% N/A
External Plaster 90% 100% 80%
Shuttering
100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100%
1st floor
Bands RCC 100% 100% 100% 100%
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3rd Floor
Bands RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor
Bands RCC 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
terrace Level
Bands RCC 100% 100% 100% 100%
Mumty Slab
Bands RCC
Shuttering
Reinforecment
Status Month of May -2025
Plot No. B28 B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41 B42 B43 B44 B45 B46 B47 B48 B49 B50 B51 B52 B53 B54 B55
Stilt
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2nd Floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A N/A N/A
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
N/A
3rd Floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4th Floor
Bands RCC
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Shuttering
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
terrace Level
Bands RCC
Shuttering
Reinforecment
Mumty
Bands RCC
Shuttering
Reinforecment
Mumty Slab
Bands RCC
Shuttering
Reinforecment
Status Month of May -2025
Plot No. A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23
Stilt
Bands RCC
Shuttering
Reinforecment
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1st floor
Bands RCC 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
N/A
Shuttering 100% 100% 100% 100% 100% 100%
100% 100% 100% 100% 100% 100%
Shuttering
100% 100% 100% 100% 100% 100%
Reinforecment
100% 100% 100% 100% 100% 100%
Plot No. C1 C2 C3 C4 C5
Stilt
Bands RCC
Shuttering
Reinforecment
1st floor 100% 100% 100% 100% 100%
Bands RCC 100% 100% 100% 100% 100%
Shuttering 100% 100% 100% 100% 100%
Reinforecment 100% 100% 100% 100% 100%
DWS FWS
B1 Rmt 5.85 6
B2 Rmt 5.25 5.5 25.2
B3 Rmt 5.45 5.8
B4 Rmt 5.24 5.66
B5 Rmt 5.19 5.78
B6 Rmt 5.15 5.75
B7 Rmt 5.45 5.75 121.5
B8 Rmt 5.35 5.82 95.85
B9 Rmt 5.35 5.95
B10 Rmt 5.5 5.55
B11 Rmt 5.4 5.87
B12 Rmt 5.4 5.8
B13 Rmt 5.5
Road Crossing Rmt 11.77 11.77 11.2
A1 Rmt
A2 Rmt
A3 Rmt
A4 Rmt
A5 Rmt
A6 Rmt
A7 Rmt 5.6
A8 Rmt 5.83
37.8
A9 Rmt 5.94
61
A10 Rmt 5.89
A11 Rmt 5.46 20
A12 Rmt 5.25
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A1Stilt (Gf-1st) 100% 100% 50%
100% 100%
1stF(1st-2nd) 90% 100% 95% 100% 85% 100% 95% 80% 100% 90% 90%
100%
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 80% 100% 95% 95%
100%
3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 95% 100% 100% 95% 100% 90% 90% 90% 90%
100%
4thF(4th-Terr.) 95% 100% 95% 100% 85% 100% 100% 50% 100%
100%
Terrace 100% 100% 100%
100%
Mumty 100% 100%
Above mumty
Above mumty
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 100% 100% 100% 100%
3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 95% 100% 100% 100% 100% 90% 90% 90% 90%
Mumty 100%
Above mumty
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 100% 70% 100% 100%
3rdF(3rd-4th) 95% 100% 95% 100% 85% 100% 100% 100% 70% 100% 100% 90% 90% 90% 90%
Mumty 100%
Above mumty
1stF(1st-2nd) 95% 100% 95% 100% 90% 100% 95% 50% 100% 100% 100%
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 100% 95% 100% 100% 100% 90% 90% 90% 90%
Mumty 100%
Above mumty
Finishing Status Month of May-2025
Stair case Stair Kot Internal Door Plumbing Shaft External Gypsum
Internal Stair
Balcony Water
Floor Tile Skirting
Plot No. Block Work Lift Block work front B/W kasta Granite Stair case steps Frame Plaster Plaster Plaster
cement cement
Plaster proofing Kitchen wall
Plaster Plaster Toilet Wall Toilet Balcony living Dining Bedroom Balcony living Dining Bedroom 1 & 2 Kitchen wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A6Stilt (Gf-1st) 100% 100% 85% 70% 85% 80%
1stF(1st-2nd) 95% 100% 95% 100% 90% 95% 50% 100% 100% 100%
2ndF(2nd-3rd) 95% 100% 95% 100% 85% 95% 100% 100% 100% 90% 90% 90% 90%
Terrace 100%
Mumty 100%
Above mumty
Finishing Status Month of May-2025
Stair Kot Stair Waterpro Wall Tile Floor Tile
Lift wall Stair Brick Internal Gypsum Shaft Lift wall Balcony External
Plot No. Brick Work Block Work
Block Work steps Door frame
kasta Lift Cladding
Plaster Plaster
cement
plaster Plaster Plaster
ofing(Toile IPS
Granite Plaster ts) Toilet Kitchen Toilet Balcony Kitchen living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A7Stilt (Gf-1st) 95% 100% 85% 90% 75% 90% 40% 90%
1stF(1st-2nd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 50% 90% 95% 85% 85% 85%
2ndF(2nd-3rd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 75% 90% 95% 100% 85% 90% 90% 85% 85% 85%
N/A
3rdF(3rd-4th) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 75% 90% 95% 85% 90% 90% 85% 85% 85%
4thF(4th-Terr.) 95% 100% 100% 85% 90% 95% 80% 75% 90% 75% 90% 95% 85% 90% 90% 85% 85% 85%
Terrace 100%
Mumty 100%
1stF(1st-2nd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 80% 95% 100% 85% 85% 85% 85% 85% 85%
2ndF(2nd-3rd) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 80% 95% 100% 85% 85% 85% 85% 85% 85%
N/A
3rdF(3rd-4th) 95% 95% 100% 100% 85% 90% 95% 80% 75% 90% 80% 95% 85% 85% 85% 85% 85% 85%
4thF(4th-Terr.) 95% 100% 50% 85% 90% 95% 80% 75% 90% 80% 95% 85% 85% 85% 85% 85% 85%
Terrace 100%
1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 85% 85% 85%
2ndF(2nd-3rd) 95% N/A 95% 100% 100% 95% 80% 85% 90% 80% 95% 100% 85% 90% 85% 85% 85% 85%
3rdF(3rd-4th) 95% 95% 100% 100% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%
4thF(4th-Terr.) 45% 55% 100% 100% 95% 80% 85% 90% 80% 95% 85% 85% 85%
Terrace 100%
1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 90% 85% 95% 95% 50%
2ndF(2nd-3rd) 95% N/A 95% 100% 100% 90% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%
3rdF(3rd-4th) 95% 95% 100% 100% 90% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%
Finishing Status Month of May-2025
Stair Kot Stair Waterpro Wall Tile Floor Tile
Lift wall Stair Brick Internal Gypsum Shaft Lift wall Balcony External
Plot No. Brick Work Block Work
Block Work steps Door frame
kasta Lift Cladding
Plaster Plaster
cement
plaster Plaster Plaster
ofing(Toile IPS
Granite Plaster ts) Toilet Kitchen Toilet Balcony Kitchen living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4thF(4th-Terr.) 90% 95% 100% 100% 90% 95% 80% 85% 90% 80% 95% 85% 90% 85% 85% 85% 85%
Terrace 100%
N/A
Mumty 100%
1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%
2ndF(2nd-3rd) 95% N/A 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%
3rdF(3rd-4th) 95% 95% 100% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%
4thF(4th-Terr.) 90% 95% 70% 100% 80% 95% 80% 85% 90% 80% 95% 85% 85% 85% 85% 85% 85%
Terrace 100%
N/A
Mumty 100%
1stF(1st-2nd) 95% 95% 100% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%
2ndF(2nd-3rd) 95% N/A 95% 100% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%
3rdF(3rd-4th) 95% 95% 100% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%
4thF(4th-Terr.) 90% 95% 70% 100% 80% 95% 80% 85% 70% 95% 85% 85% 85% 85% 85% 85%
Terrace 100%
N/A
Mumty 100%
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A13Stilt (Gf-1st) 95% 95% 90% 100% 100% 95% 90% 95%
1st F(1st-2nd) 95% 95% 90% 100% 100% 100% 95% 95% 80% 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
N/A
2nd F(2nd-3rd) 95% 95% 90% 100% 100% 100% 95% 95% 85% 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3rd F(3rd-4th) 95% 95% 90% 100% 100% 100% 95% 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
4th F(4th-Terr.) 95% 95% 90% 100% 100% 100% 90% N/A 95% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
1st F(1st-2nd) 95% 95% 95% 100% 100% 90% 90% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
2nd F(2nd-3rd) 95% 95% 95% 100% 100% N/A 80% 90% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
3rd F(3rd-4th) 95% 95% 95% 100% 100% 80% 90% 95% 90% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95%
4th F(4th-Terr.) 95% 95% 95% 100% 100% 90% N/A 90% 95% 95% 100% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95%
Terrace
Mumty
1st F(1st-2nd) 95% 95% 95% 100% 100% 90% 90% 70% 100% 85% 85%
2nd F(2nd-3rd) 95% 95% 95% 100% 100% 80% 90% 70% 100% 85% 85% 85%
Terrace
N/A
Mumty
Above mumty
1st F(1st-2nd) 95% 100% 100% 90% 70% 85% 85% 85%
2nd F(2nd-3rd) 95% 100% 100% 80% 70% 100% 85% 85% 85%
Terrace N/A
Mumty
Above mumty
N/A
Finishing Status Month of May-2025
External Wall Tile Floor Tile
Lift Pit Block Stair case Internal Door Gypsum Internal cement POP Double Coat Stair Balcony Shaft BalconyTop
Plot No. Brick Work Block Work Work(150m steps Kot Stair case steps Frame LIFT Plaster Plaster cement Plaster Punning Putty False Ceiling cement Plaster IPS Plaster Waterproofing Granite(Back
m) Kasta Plaster (Front+Back) Plaster +Front)
Toilet Wall Kitchen Wall Toilet Balcony kitchen living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4th F(4th-Terr.) 60% 100% 100%
N/A
Terrace
Mumty
Above mumty
Terrace
Mumty
Above mumty
Terrace
Mumty
Above mumty
Terrace
Mumty
Above mumty
Terrace
Mumty
Above mumty
Finishing Status Month of May-2025
External Wall Tile Floor Tile
Lift Pit Block Stair case Internal Door Gypsum Internal cement POP Double Coat Stair Balcony Shaft BalconyTop
Plot No. Brick Work Block Work Work(150m steps Kot Stair case steps Frame LIFT Plaster Plaster cement Plaster Punning Putty False Ceiling cement Plaster IPS Plaster Waterproofing Granite(Back
m) Kasta Plaster (Front+Back) Plaster +Front)
Toilet Wall Kitchen Wall Toilet Balcony kitchen living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A22Stilt (Gf-1st)
Mumty
Above mumty
Mumty
Above mumty
Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B1Stilt (Gf-1st) 90% 100%
1st F(1st-2nd)
2nd F(2nd-3rd) 60%
3rdF(3rd-4th)
4thF(4th-Terr.
1st F(1st-2nd)
3rdF(3rd-4th)
4thF(4th-Terr.
3rdF(3rd-4th)
4thF(4th-Terr.
3rdF(3rd-4th)
4thF(4th-Terr.
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
3rdF(3rd-4th)
4thF(4th-Terr.
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
3rdF(3rd-4th) 100%
4thF(4th-Terr. 100%
3rdF(3rd-4th) 100%
4thF(4th-Terr. 100%
Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B10Stilt (Gf-1st)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
B11Stilt (Gf-1st)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
B12Stilt (Gf-1st)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
B13Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
B14Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
Finishing Status Month of May-2025
Internal Stair Plumbing
Stair case Internal Stair Case Gypsum Balcony Shaft Water Wall Tile Floor Tile
Plot No. Block Work
steps Door frame Kot Kasta Plaster
cement cement
Plaster cement IPS
prooing
Plaster Plaster Plaster Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
3rdF(3rd-4th)
4thF(4th-Terr.
B15Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
B16Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
B17Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Finishing Status Month of May-2025
Internal Stair Plumbing Water Wall Tile Floor Tile
Stair case Internal Door Stair Case Gypsum Balcony Shaft
Plot No. Brick Work Block Work
Lift wall Block steps frame Kot Kasta Plaster
cement cement
Lift wall Plaster cement IPS prooing
Plaster Plaster (Toilets) Toilet Wall Kitchen
work Plaster Plaster Wall Toilet Balcony Kitchen living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B18Stilt (Gf-1st) 100% 95%
100% 85%
1st F(1st-2nd) 95% 100% 100% 95% 90% N/A 95% 95% 95% 95% 30% 95% 90% 95% 95% 95%
100% 85%
N/A
2nd F(2nd-3rd) 95% 100% 100% 95% 90% N/A 95% 95% 95% 95% 95% 95% 90% 95% 95% 50%
100% 85%
3rdF(3rd-4th) 95% 100% 100% 95% 90% 95% 95% 95% 95% 95% 95% 90% 95% 95% 95%
100% 85%
4thF(4th-Terr. 95% 100% 100% 95% 90% 95% 95% 95% 95% 95% 90% 90% 95% 95% 95%
100% 85%
Ter.Parapet Wal 95%
Mumty 95%
Mumty 95%
Mumty 95%
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4thF(4th-Terr. 95% 100% 100% 80% 95% 95% 95% 95% 90%
100%
Ter.Parapet Wal N/A 95%
Mumty 95%
1st F(1st-2nd) 90% RCC 100% 80% 95% 90% 90% 90%
1st F(1st-2nd) 95% RCC 100% 85% 85% 95% 95% 95%
Mumty
Finishing Status Month of May-2025
Internal Stair Plumbing Water Wall Tile Floor Tile
Stair case Internal Door Stair Case Gypsum Balcony Shaft
Plot No. Brick Work Block Work
Lift wall Block steps frame Kot Kasta Plaster
cement cement
Lift wall Plaster cement IPS prooing
Plaster Plaster (Toilets) Toilet Wall Kitchen
work Plaster Plaster Wall Toilet Balcony Kitchen living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B26Stilt (Gf-1st) 85%
Mumty
B27Stilt (Gf-1st)
1st F(1st-2nd) 90% 100% 100% 85% 85% 95% 95% 95%
Mumty
3rdF(3rd-4th) 80%
4thF(4th-Terr. 80%
Mumty
3rdF(3rd-4th) 80%
4thF(4th-Terr.
Mumty
2ndfloor(2nd-3rd) 80% N/A 100% 100% 90% ###95% 90% 90% 85% 75% ###85%
3rd floor(3rd-4th) 85% 100% 100% 90% ###95% 90% 90% 85% 85% 85%
4th floor(4th-Terr. 95% 100% 100% 90% 95% 90% 80% 85% 85%
Mumty
1st floor(1st-2nd) 85% 100% 100% 90% 90% 90% 90% 85% 85% 85%
2ndfloor(2nd-3rd) 80% N/A 100% 100% 90% 90% 90% 90% 85% 85% 85%
3rd floor(3rd-4th) 85% 100% 100% 90% 90% 90% 90% 85% 85% 85%
4th floor(4th-Terr. 95% 100% 100% 90% 90% 90% 85% 85%
Mumty
B32Stilt (Gf-1st)
1st floor(1st-2nd) 80% 100% 100% 85% 90% 90% 90% 80% 85% 85%
2ndfloor(2nd-3rd) 80% N/A 100% 100% 85% 90% 90% 90% 80% 85% 85%
B33Stilt (Gf-1st)
1st floor(1st-2nd) 80% 100% 100% 85% 90% 90% ###90% 80% 85% 85%
2ndfloor(2nd-3rd) 80% 100% 100% 85% 90% 90% 90% 80% 85% 85%
N/A
3rd floor(3rd-4th) 80% 100% 100% 85% 90% 90%
B34Stilt (Gf-1st)
1st floor(1st-2nd) 80% 100% 85% 85% 90% 90% 85% 90% 90%
Mumty
B35Stilt (Gf-1st)
1st floor(1st-2nd) 80% 100% 85% 85% 90% 90% 85% 90% 90%
Mumty
1st floor(1st-2nd) 95% 100% 85% 85% 90% 95% 95% 95%
Mumty
Finishing Status Month of May-2025
Plumbing
Stair case Internal Kot Kasta Gypsum Shaft Balcony Water Wall Tile Floor Tile
Plot No. Brick Work Block Work
steps Door frame On Stair Plaster cement Plaster prooing Toilet Wall Kitchen Toilet Balcony Kitchen living Dining Bedroom
Plaster Wall
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B37Stilt (Gf-1st) 100% 90%
2ndfloor(2nd-3rd) 95%
Mumty
B38Stilt (Gf-1st)
2ndfloor(2nd-3rd) 95%
B39Stilt (Gf-1st)
2ndfloor(2nd-3rd) 95%
Mumty
B40Stilt (Gf-1st)
2ndfloor(2nd-3rd) 95%
B41Stilt (Gf-1st)
2ndfloor(2nd-3rd) 95%
Mumty
Finishing Status Month of May-2025
Internal cement Stair cement Wall Tile Floor Tile
Plot No. Block Work Stair case steps Internal Door Main Door Gypsum Plaster
Plaster Plaster
Balcony Plaster Water prooing
Toilet Wall Kitchen Wall Toilet Balcony living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B42Stilt (Gf-1st) 100%
AboveTerrace
Mumty
Mumty
Mumty
AboveTerrace
Mumty
B46Stilt (Gf-1st)
Finishing Status Month of May-2025
Internal cement Stair cement Wall Tile Floor Tile
Plot No. Block Work Stair case steps Internal Door Main Door Gypsum Plaster
Plaster Plaster
Balcony Plaster Water prooing
Toilet Wall Kitchen Wall Toilet Balcony living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
1st floor(1st-2nd) 80% 100% 100% 95%
AboveTerrace
Mumty
B47Stilt (Gf-1st)
AboveTerrace
Mumty
AboveTerrace
Mumty
AboveTerrace
Mumty
Finishing Status Month of May-2025
Internal cement Stair cement Wall Tile Floor Tile
Plot No. Block Work Stair case steps Internal Door Main Door Gypsum Plaster
Plaster Plaster
Balcony Plaster Water prooing
Toilet Wall Kitchen Wall Toilet Balcony living Dining Bedroom
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B42-B43 Stair case Block Complete Gf-4th Floor
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
C1Stilt (Gf-1st) 100% 100% 100%
95% 85%
1st floor(1st-2nd) 90% 100% 100% 90% 100% 100% 100% 50% 100%
95%
2ndfloor(2nd-3rd) 95% 100% 100% 90% 100% 100% 100% 50% 100%
95%
3rd floor(3rd-4th) 95% 100% 100% 90% 100% 100% 100% 50% 100%
95%
4th floor(4th-Terr. 95% 100% 90% 100% 100% 100% 50% 100%
50%
1st floor(1st-2nd) 95% 100% 85% 90% 100% 100% 100% 50% 100% 100% 100%
100%
2ndfloor(2nd-3rd) 95% 100% ###85% 85% 100% 95% 100% 50% 100% 100% 90% 90% 90%
100%
3rd floor(3rd-4th) 95% 100% ###85% 100% 85% 100% 95% 100% 50% 100% 100% 100% 90% 90% 90%
4th floor(4th-Terr. 95% 100% ###85% 50% 85% 100% 100% 100% 50% 100% 100% 100% 100% 100%
1st floor(1st-2nd) 95% 100% 85% 85% 100% 100% 100% 90% 50% 100% 100% 100%
100%
2ndfloor(2nd-3rd) 95% 100% 85% 85% 100% 95% 100% 90% 50% 100% 100% 90% 90% 100%
100%
3rd floor(3rd-4th) 95% 100% 85% 100% 85% 100% 95% 100% 90% 50% 100% 100% 90% 90% 90%
4th floor(4th-Terr. 95% 100% 85% 50% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100%
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
C4Stilt (Gf-1st) 100% 100% 100%
95% 100%
1st floor(1st-2nd) 95% 100% 100% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100% 100%
95%
2ndfloor(2nd-3rd) 95% 100% 100% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100%
95%
3rd floor(3rd-4th) 95% 100% 100% 85% 100% 95% 100% 90% 50% 100% 100% 100% 100% 100% 100%
95%
4th floor(4th-Terr. 95% 100% 85% 100% 100% 90% 50% 100%
95% 50%
1st floor(1st-2nd) 95% 100% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100% 100%
95%
2ndfloor(2nd-3rd) 95% 100% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100%
95%
3rd floor(3rd-4th) 95% 100% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100% 100%
95%
4th floor(4th-Terr. 95% 100% 85% 100% 95% 100% 50% 100% 100% 100% 100% 100% 100%
95% 50%
(10) - - - 7 - - - - 8 - 8 - 5 5 5
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A1Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A2Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A3Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A4Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A5Stilt (Gf-1st)
37 of 37
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Ceiling Inner Wall Outer Wall Inner Wall Outer Wall
Plot No. white wash Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A6Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A7Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A8Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A9Stilt (Gf-1st)
1stF(1st-2nd)
38 of 38
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Ceiling Inner Wall Outer Wall Inner Wall Outer Wall
Plot No. white wash Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A10Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A11Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A12Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
39 of 39
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
A13Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A14Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A15Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A16Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
Mumty
Above mumty
A17Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A18Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A19Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A20Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A21Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A22Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
A23Stilt (Gf-1st)
1stF(1st-2nd)
2ndF(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.)
Terrace
Mumty
Above mumty
Finishing Status Month of May-2025
Inner Wall Outer Wall Lift wall & Ceiling Ceiling Inner Wall Outer Wall Ceiling Putty Inner Wall Outer Wall Ceiling Paint
Plot No. Primer Primer White wash Primer Putty Putty Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Inner Wall outer Wall Ceiling Inner Wall Outer Ceiling
Plot No. Plaster Primer Primer
Ceiling Primer
Putty Putty Putty Paint Wall Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B18Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.
Ter.Parapet Wal
Mumty
Mumty Parapet
B19Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.
Ter.Parapet Wal
Mumty
Mumty Parapet
B20Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.
Ter.Parapet Wal
Mumty
Mumty Parapet
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Inner Wall outer Wall Ceiling Inner Wall Outer Ceiling
Plot No. Plaster Primer Primer
Ceiling Primer
Putty Putty Putty Paint Wall Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B21Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
100%
4thF(4th-Terr.
Ter.Parapet Wal
Mumty
Mumty Parapet
B22Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
B23Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
B24Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
Finishing Status Month of May-2025
Lift wall & Ceiling OuterWall Inner Wall Inner Wall outer Wall Ceiling Inner Wall Outer Ceiling
Plot No. Plaster Primer Primer
Ceiling Primer
Putty Putty Putty Paint Wall Paint Paint
Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This Pre This
B25Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
B26Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
B27Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
B28Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
B29Stilt (Gf-1st)
1st F(1st-2nd)
2nd F(2nd-3rd)
3rdF(3rd-4th)
4thF(4th-Terr.
Mumty
Finishing Status Month of May-2025
Lift wall &
OuterWall Inner Wall Ceiling Inner Wall OuterWall Inner Wall Outer Wall
Plot No. Ceiling
Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint
Plaster
Pre This Pre This Pre This Pre This This This Pre This Pre This Pre This Pre This
C1Stilt (Gf-1st)
1st floor(1st-2nd)
2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.
Terrace
Mumty
Mumty Parapet
C2Stilt (Gf-1st)
1st floor(1st-2nd)
2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.
Terrace
Mumty
Mumty Parapet
C3Stilt (Gf-1st)
1st floor(1st-2nd)
2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.
Terrace
Mumty
Mumty Parapet
Finishing Status Month of May-2025
Lift wall &
OuterWall Inner Wall Ceiling Inner Wall OuterWall Inner Wall Outer Wall
Plot No. Ceiling
Primer Primer Primer Putty Putty
Ceiling Putty
Paint Paint
Ceiling Paint
Plaster
Pre This Pre This Pre This Pre This This This Pre This Pre This Pre This Pre This
C4Stilt (Gf-1st)
1st floor(1st-2nd)
2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.
Terrace
Mumty
Mumty Parapet
C5Stilt (Gf-1st)
1st floor(1st-2nd)
2ndfloor(2nd-3rd)
100%
3rd floor(3rd-4th)
100%
4th floor(4th-Terr.
Terrace
Mumty
Mumty Parapet
Mumty W/P
(5) 5 - - - - - -