0% found this document useful (0 votes)
129 views8 pages

Dhige Sir 100kw

Pawar Solar and Services has submitted a proposal for a 100 KW solar on-grid setup, detailing energy generation estimates and financial offers totaling ₹24,00,000. The proposal includes a scope of work, client responsibilities, payment terms, and warranty information. Confidentiality is emphasized, and the document outlines the terms for installation and maintenance of the solar system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views8 pages

Dhige Sir 100kw

Pawar Solar and Services has submitted a proposal for a 100 KW solar on-grid setup, detailing energy generation estimates and financial offers totaling ₹24,00,000. The proposal includes a scope of work, client responsibilities, payment terms, and warranty information. Confidentiality is emphasized, and the document outlines the terms for installation and maintenance of the solar system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

joo

Proposal

PAWAR SOLAR AND SERVICES,


CIDCO MIDC NANDED ,
GSTIN/UIN:-27FTWPP1098B1Z4
CONTACT :-9022758085
EMAIL:-pawarsolar05@gmail.com

TO:- DHIGHE SIR (LOHA)

Project : 100 KW Solar On-Grids Setup

Statement of Confidentiality

These documents contain propriety trade secret and confidential information to be used solely for
evaluating Pawar solar. The information contained herein is to be considered confidential. Customer, by
receiving these documents agrees that neither this documents nor the information is disclosed herein.
Nor any part thereof shall be reproduced or transferred to other documents or used or disclosed to others
for any purpose except as specifically authorized in writing by Pawar solar.

Document Information

Project On Grid Solar

Prepared By: P SOLAR – Software Preparation Date 2702/2025

Reviewed By: Venkatesh Pawar Review Date 27/02/2025


To, Respected sir

We are delighted to present to you the quotation/proposal for Net Metering based Rooftop PV Solar
Power Plant.

Energy Generation Details:

Avg. Estimated Production (kWh / Annually)


Project Size

100 kw 500 units day /15,000 units month/1,80,000 year

Bank Name:- Bank Of Baroda


Branch :-Cidco Nanded
Account No :-42140200000367
Name Of :-Pawar Solar And Services
Ifsc Bank :- BARB0CIDNAN
Financial offer

Sr. Item Specification Make Qty.


No.

1 Solar PV Modules
530-585 (Bfical) WAAREE 100kw

3 -phase
2 Solar Inverter SOFAR/GROWATT/VSOLE 1

3 Solar structure Ms /GI structure TUV Approved Set

4 DC cable UV protected Cu flexible POLYCAB APR


4sq .mm

IP65 enclosure with DC


5 ACDB fuse,DC SPD's and Misc items HAVELLS APR

6 IP65 enclosure with DC APR


DCDB Fuses, DC SPD's and Misc HAVELLS
items

7 25 * 3 GI strip for
Structure Earthing
Earthing pits, 10 Sq mm Cable for APR.
Strips or Cable Inverter Earthing COPPER
Earthing Rod: Depth - 3
MTR * 48 mm

8 AC Cable Armoured 16 Core AL POLYCAB APR

9 Installation All fitting Experts APR

10 METERS 40-200 2 NOS 2


Sr.No Item Description Rate/PKW Project
Cost
Supply of solar TOPCONBIFICAL
1 monocrystalline PV module (MNRE
Approved) 16 busbar
Supply of Metal Flexi Conducts, GI Tray,
2 PVC Conducts, etc.
Supply of Array junction Boxes, DCDB
3 with MOV/SPD, etc.
Supply of AC Distribution board with
4 SPD, etc.
Supply of copper lightning arrester & GI
5 earthing system 24,000/- 24,00,000/-

Packing, unpacking, loading & unloading,


6 installation services, ETC
7 Transportation

Gst amount :-

8
Total GST INCLUDING /-- +

10 Total amount 24,00,000/-


Amount in words: TWENTY FOUR LAKH ONLY

Note*: GST Rate on :


* Panels and inverter 12% + 18% BOS ,Structure ,Installation services
* MSCB CHARGES EXTRA AS PER RECUIRED

*This is an important documents reproduction is strictly prohibited*


material is MNRE approved with complete guidelines and completely authorizes material which is required for proper
generation of units.
Scope of work:-

• Prepare full system design to include civil, structural, electrical and mechanical components,
with construction drawings and specifications.

• Perform complete system installation.

• Procure equipment and materials and deliver to site.

• Test all electrical components in accordance with manufacturer instructions.

Client Scope:-

• Provide shadow free open space, with clear roof, free of any encumbrances like
trees/plants or equipment or dummy pillars etc.
• In case of Projects with net-metering, Customer should additionally pay for the
cost of changes required in distribution system i.e. Bi-directional meters/ CTPT Sets
and connected load or contracted demand increase, as per the actual estimate
provided by DISCOM.
• Provide safe and secure storage area for the project components, upon receipt at
site.
• Provide necessary spare feeder within Customer’s HT/LT Network for
interconnection of the system.
• Provide necessary internet connectivity to the inverter for remote monitoring of
energy generation.
• Provide power and water required for civil construction and erection works.

Terms & Conditions.


• Under standard conditions, we will install the system within 4 5 - 75 days upon receipt of 65%
advance and clearance, if needed, from appropriate agencies.
• The price mentioned in the proposal is valid for 15 days.
• The price mentioned above is applicable for a structure height up to 1m. In case, elevated
structure is required based on site survey inputs, an additional cost of Rs. 2,500/ m/ kWp will be
added to the final price.
• The above-mentioned price includes Maintenance of the rooftop solar system for the first one
(1) years.

• Annual Maintenance will be provided at Rs. 1000/ kWp/ year ( 2nd year onwards) (if opted).
• The price quoted is subjected to change in case, there is any addition or alteration to bill of
materials. The customer will be informed on prior basis.
• We will ensure that installation and commissioning of system fulfill regulatory guidelines and are
up to best accepted standards.

All govt. documentation, permits and approvals will be taken care by us.

The cost of net meter/ bi-directional meter will be borne by the customer.

Solar panels and inverters are manufactured as per Pawar Solar specifications by a global leader.

Payment Terms:

• 40% advance along with work order


• 40% advance before dispatched of Material
• 10% before Installation
• 10% after completion

Warranty:

• Performance warranty 90% for 10 Years &80% for 15 Years for PV Modules warranty is in the
scope of manufacturer.
• Back to back Inverter warranty of 5 Years form manufacturer. (Pl refer warranty terms)
• 1 Years free Operation & Maintenance of the Plant.
• AMC will be charge extra after 1 years, AMC after 1 year will be signed separately.
This Standard Warranty or Relevant Warranty does not cover following eventualities

• Damage, fault, failure or malfunction due to external causes, including accident, abuse, misuse,
problems with electrical power, servicing not authorised by Pawar
Solar, usage and/or storage and/or installation not in accordance with Product instructions, failure to
perform required maintenance, normal wear and tear, act of
God, fire, flood, war, act of violence or any similar occurrence; products with missing or altered
Service Tags or serial numbers

Regards,
Pawar Solar & Services
HO- Nanded…

You might also like