Sandvik Contents
Sandvik Contents
Sandvik DT1130-SC
Operator and Maintenance Manual
107D12735 -1
OPERATION MANUAL
B 00101--2 is 1007
3
1. INTRODUCTION TO THE MACHINE
2. SECURITY
3. OPERATING INSTRUCTIONS
4. OPERATIONAL FAULT LOCATOR
APPENDIX
TECHNICAL SPECIFICATIONS DT1130--SC 6--9280
MAINTENANCE MANUAL
B 00472--3 is 1007
4
1. INTRODUCTION TO THE MACHINE
2. SAFETY INSTRUCTIONS
3. IMPORTANCE OF PERIODIC MAINTENANCE
4. PERIODIC MAINTENANCE
APPENDIX
B 00525--7 is 0507 RECOMMENDATIONS FOR MACHINE LUBRICATION
DIESEL ENGINE OPERATION AND MAINTENANCE:
MB TIER 3
MEX 1007 / AR
Sandvik DT1130-SC
TECHNICAL MANUAL
107D12735 -1
INFORMATION 1
B 00112--3 ES 0507 Maintenance manual safety instructions
B 00300--2 is 0507 Technical tables; Conversion of measures and tightening pairs
HAMMER 2
C 00640--2 in 0607 Rock drill service card
D 20116--2 is 0607 Hydraulic hammer HFX5T; Lifting instructions
B 23700--6 is 0607 Hydraulic hammer HLX 5T, HFX 5T; Operation and maintenance
D 23700--6 is 0607 Hydraulic hammer HLX 5T, HFX 5T; Repair instructions
D 28160--9 is 0507 Accumulator of hydraulic hammers; Instructions for repair
RUNNER 3
C 31095--7 is 0607 Cylindrical slide TF 500 / TFX 500; Maintenance and repair
ARM 4
B 44900--10 is 0507 Hydraulic arm TB; Operation and maintenance
C 47150--4 is 0507 Hydraulic cylinders; Repair and adjustments
CARRIER 5
B 16200--10 in 0607 Steering and braking system; TC 7 / TC 8, TC 10--TC 12 carrier
B 00499--11 in 0507 Drill carrier TC 7--8, 10--12; Maintenance and lubrication manual
B 85000--2 is 0507 Tire change and inspection of the rim
C 16060--2 in 0607 Mercedes Benz--Engine fault codes
DRILLING HYDRAULICS 6
C 50700--9 is 0707 Drilling hydraulic system--TPC; Series DT1020--DT1240
B 57200--3 is 0507 Variable flow pump
B 58200--2 is 0507 Symbols used in diagrams for the hydraulic and pneumatic system
D 01301--2 is 0507 Joystick Protective Cover; Disassembly and Assembly
MEX 1007 / AR
Sandvik DT1130-SC
TECHNICAL MANUAL
107D12735 -1
WATER/AIR CIRCUIT 7
C 60299--4 is 0607 Water circuit; Series DT/DD/DB
B 61250--2 in 0607 Air circuit; DT/DD/DB series: Mining and tunneling jumbos
B 63250--10 is 0607 SLU 1/2/3; Operation and maintenance
V 64107--1 is 0201 CT10, CT16 screw compressor; Operation and maintenance
B 65500--6 is 0507 Water pressure lifting pump WBP; Operation and maintenance
ELECTRIC CIRCUIT 8
C 70780--7 is 0507 MSE electrical system; Maintenance and adjustments
B 75500--6 is 0507 Electrical diagrams; Interpretation and symbols
B 75700--3 is 0607 Electric motor; Maintenance
OTHER COMPONENTS 10
C 48260--3 is 0108 TBB 2i----5i Arm; Adjustment Instructions
C 48270--1 is 0108 BASKET ARM TBBi; Instructions for service tools
In 80200--2 it is 1201 Coiling drums for cables and tubes; Assembly instructions and man
entertainment
C 33850--3 is 0507 Rod holder Tamrock TRR--1; Maintenance and adjustment
B 85630--4 is 0607 Air conditioning unit; Operation and maintenance manual
it TBB5i 072; Operating and Maintenance Manual
VISUAL TUNNELING 11
B 78131--5 in 0507 Visual Tunneling Report; Operating instructions
B 78141--5 in 0507 Visual Tunneling Design; Users guide
B 78151--4 in 0507 Visual Tunneling Curve; Operating instructions
B 78160--2 in 0507 Visual Tunneling; Installation instructions
Visual Tunneling CD-ROM