Work Inspection Request - WIR

The document is a Work Inspection Request (WIR) form used for project inspections, detailing information such as project name, contractor, inspection dates, and material codes. It includes sections for contractor and PMC comments, as well as approval statuses for various disciplines. The form also specifies the need for attached documents like drawings, test certificates, and checklists.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
176 views1 page

Work Inspection Request - WIR

The document is a Work Inspection Request (WIR) form used for project inspections, detailing information such as project name, contractor, inspection dates, and material codes. It includes sections for contractor and PMC comments, as well as approval statuses for various disciplines. The form also specifies the need for attached documents like drawings, test certificates, and checklists.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK INSPECTION REQUEST - (WIR)

Project Name WIR/ ITR Ref.No:


Project Code Rev. No:
Client/Employer WIR /ITR Submission
(Date & Time)

PMC/Engineer Inspection
(Date & Time )

Contractor WIR/ITR Submitted To: (Name of the organization)

Vendor Code WIR/ITR Submitted By: (Name of the organization)

Material code
Part A: By the Contractor:
Location Reference for the Inspection : Discipline:
Tower / Block Ref: Surveying Structural /Civil
Floor Level : Room/Area Ref: Mechanical Arch/ Finishing
Grid Reference : Electrical Landscape
Measurement Qty update (Unit: Cum/Sqm/Nos) : Plumbing Facade
Previous Qty : Current Qty: Cumulative Qty: Others(Specifiy) ID
Description of works / activity for which Inspection is requested for:

Drawing attached to show the location(s) Yes No N/A Method statement /ITP attd Yes No N/A

Attached Test Certificates / Reports Yes No N/A Checklist Sheet attached Yes No N/A
Specifiy Drawing Ref No: Yes No N/A Joint Measurement Sheet attd Yes No N/A

Other Sections' Comments & Sign-off: ( Where ever applicable based on scope)
Section Name Date Designation Signature Comment's If Any
MEP Clearance

Surveyor Clearance

Interface Clearance
Contractor Manager / Engineer Comments:

Contractor Manager/Engineer: Ready for


Lodha inspection and/or testing on:
Date: Time: Signed by:
Part B: Lodha/PMC
Received by Lodha/PMC on: Date: Time: Signed by:
Option- A (if Civil / Architectural / Landscaping Inspection) Option- B (if MEP Inspection)

A1) MEP Manager (First Level Approver) For MEP Clearence (B) MEP Manager Comments :

MEP Manager Comments :

A2) Tower /Building In-Charge (Second Level Approver) authorized to give approval status

Comments :

Code 2 Code 3 Code 4


Code 1 Conditionally approved. Work may proceed
Revise & Resubmit. Work may not For information and records only.
Work may proceed and resubmit incorporating comments
proceed. Work may proceed.
indicated

Name: Signature: Date: Time:

Name: Signature: Date: Time:

Template Ref: CO-LOD-GENE-QU-CN-TMT-001, Rev- 01, Date: 04-10-2023