0% found this document useful (0 votes)
35 views4 pages

Final Layout Letter

The Hyderabad Metropolitan Development Authority has approved the final residential layout for open plots in Sy.No. 286p of Singapur village, covering an area of 13,758.69 Sqm, for M/s. HareeniHomes represented by VarthyaDevulank. The approval is subject to various conditions including compliance with local regulations and maintenance of civic amenities. The Executive Authority is requested to release the final layout plan within seven days after collecting the layout fee.

Uploaded by

Surabhi Rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views4 pages

Final Layout Letter

The Hyderabad Metropolitan Development Authority has approved the final residential layout for open plots in Sy.No. 286p of Singapur village, covering an area of 13,758.69 Sqm, for M/s. HareeniHomes represented by VarthyaDevulank. The approval is subject to various conditions including compliance with local regulations and maintenance of civic amenities. The Executive Authority is requested to release the final layout plan within seven days after collecting the layout fee.

Uploaded by

Surabhi Rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

HYDERABAD METROPOLITAN DEVELOPMENT AUTHORITY

District Commercial Complex, Administrative ‘L’ - Block,


Tarnaka, Hyderabad – 500 007.
Planning Department [Unit-II]

File No : 019812/LT/SKP/FLT/U6/HMDA/31012019 Date : 23 April, 2019

To,
HAREENIHOMES REPBYMANAGINGPARTNER
VARTHYADEVULANAIK
H. No. 6-109, MOKILA VILLAGE,
SHANKARPALLY MANDAL, RANGA REDDY
DISTRICT., HYDERABAD, Telangana
Pin Code - 501203

Sir,
Sub:- HMDA- Plg.Dept.- Issue of Final Residential Layout with open plots in Sy.No. 286p of Singapur village, Shankarpalle
Mandal, Ranga Reddy Dist. to an extent of 13,758.69 Sqm, M/s. HAREENIHOMES REPBYMANAGINGPARTNER
VARTHYADEVULANAIK Approval Accorded - Reg.

Ref:- 1. Application of HAREENIHOMES REPBYMANAGINGPARTNER VARTHYADEVULANAIK. 23 April, 2019.


2. This office letter No. 019812/LT/SKP/FLT/U6/HMDA/31012019, 26 March, 2019 intimating the DC.
3. This Office Letter No. 013022/SKP/LT/U6/HMDA/25062018, 01 September, 2018 issue of Draft Layout
4.Relinquishment Deed doc.No. 4082/2019 Dt 04/09/2019 executed in HMDA, Shankarpalle
***
Kind attention is invited to the subject and references cited above.

With reference, your request with open plots in Sy.No. 286p of Singapur village, Shankarpalle Mandal, Ranga Reddy Dist. to

an extent of 13,758.69 Sqm for Residential Purpose has been examined, it is to inform that the proposals have been technically

approved and forwarded to the Executive Authority, Singapur, Shankarpalle Mandal, Ranga Reddy District vide this office Letter No.

019812/LT/SKP/FLT/U6/HMDA/31012019 & Final Layout Permit No. 000177/LO/Plg/HMDA/2018 dt. 23 April, 2019 for

taking further necessary action as per the powers delegated to the Local Authority.

Yours faithfully,

For Metropolitan Commissioner

Director Planning - I

Application No.: 019812/LT/SKP/FLT/U6/HMDA/31012019 Dated: 23 April, 2019 Page 1 of 4


Copy
1. HAREENIHOMES REPBYMANAGINGPARTNER VARTHYADEVULANAIK
H. No. 6-109, MOKILA VILLAGE, SHANKARPALLY MANDAL, RANGA REDDY DISTRICT.
HYDERABAD
501203

2. The Sub-Registrar,
Shankerpalle SRO,
Ranga Reddy District.
3. The District Registrar, Ranga Reddy District.
4. The Collector, Ranga Reddy District.
5. The Special Officer & Comp. Authority, Urban Land Ceilings,
3rd Floor, Chandra Vihar Complex, M.J.Road, Hyderabad. - for information.

C.C. to:
1. The Executive authority,
Singapur Gram panchayath/ Nagarapanchayath,
Shankarpalle Mandal,
Ranga Reddy District.
2. The District Registrar, Ranga Reddy District - for information.

Application No.: 019812/LT/SKP/FLT/U6/HMDA/31012019 Dated: 23 April, 2019 Page 2 of 4


HYDERABAD METROPOLITAN DEVELOPMENT AUTHORITY
District Commercial Complex, Administrative ‘L’ - Block,
Tarnaka, Hyderabad – 500 007.
Final Layout Letter

File No. 019812/LT/SKP/FLT/U6/HMDA/31012019 Date : 23 April, 2019

To,
The Executive authority,
Singapur Gram panchayath/
Nagarapanchayath,
Shankarpalle Mandal,
Ranga Reddy District.
Sir,
Sub:- HMDA- Plg.Dept.- Issue of Final Residential Layout with open plots in Sy.No. 286p of Singapur village, Shankarpalle
Mandal, Ranga Reddy Dist. to an extent of 13,758.69 Sqm, M/s. HAREENIHOMES REPBYMANAGINGPARTNER
VARTHYADEVULANAIK Approval Accorded - Reg.

Ref:- 1. Application of HAREENIHOMES REPBYMANAGINGPARTNER VARTHYADEVULANAIK. 02 January, 2019.


2. This office letter No. 019812/LT/SKP/FLT/U6/HMDA/31012019, 26 March, 2019 intimating the DC.
3. This Office Letter No. 013022/SKP/LT/U6/HMDA/25062018, 01 September, 2018 issue of Draft Layout
4.Relinquishment Deed doc.No. 4082/2019 Dt 04/09/2019 executed in HMDA, Shankarpalle

***

M/s. HAREENIHOMES REPBYMANAGINGPARTNER VARTHYADEVULANAIK has applied for final Residential Layout with

open plots in Sy.No. 286p of Singapur village, Shankarpalle Mandal, Ranga Reddy Dist. to an extent of 13,758.69. The matter has

been examined and this office hereby approved the Final Layout under Section-14 of A.P. Urban Areas (Dev) Act, 1975, and Section-

19 of HMDA Act 2008 subject to the following conditions:

Conditions for Proceeding Letter:

1. That the layout now issued does not exempt the lands under reference from the purview of the A.P. Agricultural Land Ceiling
Act, 1973.
2. The roads, open spaces etc., have been taken over by the Local Authority with registered gift deed vide doc. No.10762/2018,
dt.27-10-2018 and also confirmed by the Local Authority .
3. After handing over of the open spaces etc., to the local body, deed of relinquishment with reference to mortgaged plots was
executed vide reference 4th cited.
4. Every building site shown in the sanctioned plan Layout Permit No 000177/LO/Plg/HMDA/2018,Date:01September,2018 shall
be utilized for the construction of any Residential dwelling house and no shop, godown / industry, or any other building which is
not ordinarily connected with dwelling shall be constructed in the site. No building shall be converted to any other than to which
it has been permitted for.
5. The individual building permission shall be considered for approval as per A.P. Building Rules – 2012 and the amended rules
issued by the Government from time to time.
6. In this layout which has been provided with water supply, sewerage and drainage disposal systems, street lighting rain water
harvesting structure and other civic amenities, the local body shall ensure proper and effective maintenance of the said services
and impose any further conditions for their usage and maintenance.
7. The Local Authority shall ensure that the roads and open spaces which are provided with necessary plantation and greenery
shall be maintained by the Local Authority.
8. There will not be any revision of this Final Layout. If revised, the same will be communicated to the Executive Authority.
9. This permission does not bar any public agency including HMDA to acquire the lands for any public purpose as per law.
10. If any dispute litigation arises in future, regarding the ownership of the land, site boundary etc., the applicant shall responsible
for the settlement of the same. HMDA or its employees shall not be a party to any such dispute litigation.
11. The HMDA reserve the right to cancel the permission if it is falls that permission obtained by framed misrepresentation or by
mistake of facts.
12. The applicant is solely responsible for ownership land disputes / boundary dispute / discrepancy / encroachments / litigations
arise in future and HMDA shall not responsible at any cost.
13. The applicant shall comply the terms and conditions and to adhere as imposed in the final layout proceedings of this office and
layout rules and regulations.
14. The other general conditions are applicable.
15. Any conditions laid by the authority are applicable.
16. The applicant shall keep all the roads open for free access to the general public and lands in the interior and no compound wall
is permitted.
17. The executive authority shall ensure that a minimum safety distance (both vertical & horizontal) of 3m (10’0”) shall be
maintained between the building and the high tension electricity lines while approving the individual residential building in the
Application No.: 019812/LT/SKP/FLT/U6/HMDA/31012019 Dated: 23 April, 2019
layout. Page 3 of 4
maintained between the building and the high tension electricity lines while approving the individual residential building in the
layout.

You are therefore requested to release the said Final Layout plan approved by HMDA to the applicant within (7) seven
days, with the above conditions and after collecting the layout fee.

You are requested to scrupulously follow the above and Final Layout Permit No. 000177/LO/Plg/HMDA/2018 dt.23

April, 2019 while according individual building permissions.


NameYours faithfully,
: YASWANTHA RAO
KOTTALA
Designation : Planning Officer
Date : 23-Apr-2019 19: 50:48

For Metropolitan Commissioner,HMDA


Planning Officer
Copy to:
1. HAREENIHOMES REPBYMANAGINGPARTNER VARTHYADEVULANAIK
H. No. 6-109, MOKILA VILLAGE, SHANKARPALLY MANDAL, RANGA REDDY DISTRICT.
HYDERABAD
501203

2. The Sub-Registrar,
Shankerpalle SRO,
Ranga Reddy District.
3. The District Registrar, Ranga Reddy District.
4. The Collector, Ranga Reddy District.
5. The Special Officer & Comp. Authority, Urban Land Ceilings,
3rd Floor, Chandra Vihar Complex, M.J.Road, Hyderabad. - for information.

C.C. to:
1. The Executive authority,
Singapur Gram panchayath/ Nagarapanchayath,
Shankarpalle Mandal,
Ranga Reddy District.
2. The District Registrar, Ranga Reddy District - for information.

Application No.: 019812/LT/SKP/FLT/U6/HMDA/31012019 Dated: 23 April, 2019 Page 4 of 4

You might also like