Advanced Production Integration with EWM
Process Flow
Assign Bin to PSA/Product/PED
/SCWM/PSASTAGE
Configuration Setting
Create new Storage Location – PROD and assign to S4 Warehouse
Advanced Production Integration with EWM
GB20 we will use one storage location(0010) for staging
Map Storage locations from ERP System to EWM
Availability Group Setting
Availability Group
Non-Location Stock Type(S4/ECC)
Define Stock Type
Product Group Types and Product Groups
Spro->IMG–>SCM EWM–>SCM Basis–>master data–>product
Advanced Production Integration with EWM
Maintain Product Group Types for PSA Assignment
SPRO–>SCM Extended Warehouse Management–>EWM–>Master Data–>
Production Supply–> Maintain Product Group Type for PSA Assignment
Maintain Warehouse parameter for production
MAP SAP S4 Order Type to EWM Document Type
SPRO-IMG-SCM EWM-EWM-INTERFACES-ERP INTEGRATION-PRODUCTION-
Map SAP ERP Order Type to SAP EWM Document Type
Map Item Type Mapping
Warehouse Process Type
Determine WPT
Advanced Production Integration with EWM
WPT
WPT – P020
Advanced Production Integration with EWM
Picking and Put away Strategy
Advanced Production Integration with EWM
Storage Types
Advanced Production Integration with EWM
Advanced Production Integration with EWM
Queue
Master Data
Create Raw Material with MRP views– 4168
Create Finished Products with MRP & Work Scheduling
The storage location will be copied into Production Order
Advanced Production Integration with EWM
Production Scheduling Profile
WM Request 2 e.g once order is released PMR is automatically created
Bill of Material
Production supply Area(PK05)
Replicate PSA to EWM
/n /SCWM/PSA_REPLICATE – Replicate Production Supply Area (PSA)
Manual – Not Done
Work Centre(CR01)
Advanced Production Integration with EWM
Routing(CA01)
Advanced Production Integration with EWM
Control Cycle(LPK1)
Assign Bin to PSA/Product/PED
/SCWM/PSASTAGE
Advanced Production Integration with EWM
Advanced Production Integration with EWM
Single Order/Cross Order Staging –
- Quantity Based Calculation – WT will be created based on Replenishment Quantity
(It doesn’t check the current stock in PSA)
- Calculation based on PMR – WT will be created based on Minimum Production Qty
in PSA
Material Staging Process Execution
We already have 100 EA in PSA Bin
1. Create and Release Production Order
Required Quantity for Raw is 1000 EA
2. Review PMR
Advanced Production Integration with EWM
3. Stage Component (/SCWM/STAGE)
Advanced Production Integration with EWM
4. Review WT And WO
Resource Assigned
Advanced Production Integration with EWM
5. Confirm Warehouse Orde in RF
/SCWM/QSEQ – New Queue Production added
System Guided by Queue
WO is confirmed
6. Consumption
RF or Fiori App(Post Consumption)
04 Outbound Process 05 ConsumptionConsumption by Manufacturing Order
Advanced Production Integration with EWM
Consumption posted and 261 Movement Posted
Cross Order Staging Testing
Production Order Goods Receipt
EWM Specific Parameter(Integration with EWM)
1.Goods Receipt in S4 – Deflag GR from EWM(INBI)
2.Goods Receipt in EWM – Flag GR from EWM (INBM)
Notes
For Quantity Based Calculation
For Single Order Staging it always creates the WT based on Replenishment
Quantity and doesn’t check/validate min prod qty.
For Cross Order Staging if you have stock