0% found this document useful (0 votes)
20 views2 pages

HPCL Letter 25.07.

The document is a formal request from K&K Minerals Pvt. Ltd. to HPCL regarding the track linking work at Kamardanga POL Depot in Assam. It highlights the partial handover of the BLT site and requests the complete handover to avoid delays and additional costs. Additionally, it asks for a revised BOQ quantity for the supply of P. Way materials.

Uploaded by

soumodip Saha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views2 pages

HPCL Letter 25.07.

The document is a formal request from K&K Minerals Pvt. Ltd. to HPCL regarding the track linking work at Kamardanga POL Depot in Assam. It highlights the partial handover of the BLT site and requests the complete handover to avoid delays and additional costs. Additionally, it asks for a revised BOQ quantity for the supply of P. Way materials.

Uploaded by

soumodip Saha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

No. KKMPL/HPCL-Kamsardanga/P..

Way works/2025-26/63
Dated 25.07.2025

To
Deputy General Manager (Projects)
HPCL,
Khagrabari POL Depot Project Site,
Near No. 1 Amraguri School,
Dangtal Basugaon Road,
Dist. Chirang, Assam – 783372.

Kind Attn : Sri Akash Kumar Minj/ Manager (E & P)

Dear Sir,

Name of work : Track Linking work for railway siding at Kamardanga POL Depot at Assam for M/s
HPCL with Take Off at mid section between Basugaon & Dangtal Railway station under
Rangia Divn. of N. F. Railway. Reg: Handing over of balance BLT site for concreting work.

Ref: 1. PO No. 5200090992, dated, 08.04.2025,

Partial site of BLT track has been handed over to us for a length of 377mtr from starting chainage of
BLT.

In this stretch PCC & RCC completed for a length of 325 and ch 0/325 to Ch o/377 ( handed over )
PCC completed and RCC work is in progress, which will be completed within two days time.
Remanning portion of BLT site, blanketing and two nos culvert yet to be done by your other agency.

Hence, you are requested, kindly look into the matter and arrange to hand over the balance site so
that our machinery and man power is engaged for concreting work, otherwise they will be sitting
idle, which will not only cause delay in completion of work also attract additional cost burden on us.

At the same time we request, kindly arrange to provide us the revised BOQ quantity for supply of all
the P. Way materials item, which is repeatedly requested to your good offices.

Your early action in this regard will be highly solicited.

Thanking you,

Your sincerely,

Authorised Signatory
For K&K Minerals Pvt. Ltd.