5A. P.Bridge (STR) EA
5A. P.Bridge (STR) EA
                                                                                                               BOQ                         Qty
 Pay
Item                                       Item Description                                            Unit                            Claimed IPC- Accumulative   Remarks
                                                                                                                Qty       Upto IPC-010
 No                                                                                                                                        011        Claimed
       STEEL STRUCTURE (Excluding Chequered Plate & Corrugated Sheet)
       Providing, cutting, fabricating, erecting, placing and installing, fixing in position Steel
       Structure works having minimum yield strength of 36 ksi, all structural steel members
       consisting of (H, I or W sections, angles, tubes, beams, channels, base plate, MS sheets,
       stiffener plate, MS pipe, MS post, MS bar, anchors bolts, rawal bolts, J bolts, nuts, washer)
       or where required with (epoxy painted as per specification). and confirming to ASTM
       A36, ASTM A325 or equivalent, ASTM A307, ASTM A563, ASTM A570, jointing, welding
 14
       confirming to AWS (American welding society) specification. painting with 3 coats of
       approved make enamel paint over a one coat of primer in any floor, including the cost of
       scaffolding, platforms & winches etc. The contractor shall submit coordinated and
       checked shop drawings (without any additional cost) for approval prior to the start of the
       work etc. complete in all respects as per drawing, standard , specifications and as
       directed by the Engineer.
MS CHEQUERED PLATE
       Providing, cutting, fabricating, erecting, placing and installing, fixing in position M.S
       Chequered Plate from approved manufacture having minimum yield strength of 36 ksi, or
       where required and confirming to ASTM A36, ASTM A325 or equivalent, ASTM A307,
       ASTM A563, ASTM A570, jointing, welding confirming to AWS (American welding society)
 15    specification. painting with 3 coats of approved make enamel paint over a one coat of
       primer in any floor, including the cost of scaffolding, platforms & winches etc. The
       contractor shall submit coordinated and checked shop drawings (without any additional
       cost) for approval prior to the start of the work etc. complete in all respects as per
       drawing, standard , specifications and as directed by the Engineer.
       Providing, fabricating and fixing GI "C" channels 50mmx125mm for wall including
       required horizontal & vertical, inclined & cross bracing braising of approved design, size,
       gauge (thickness) with u-channels top & bottom including all required hardware for fixing
       (joints sheet, screws, rivets etc,) with galvanize coating as per manufacturer's
 9
       specification etc, complete in all respect as per drawing, standard, specifications and
       direction of the Engineer.
       The contractor shall submit shop drawings (without any additional cost) for approval prior
       to start of work.
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
Abstract
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 11)
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 11)
        MS CHEQUERED PLATE
        Providing, cutting, fabricating, erecting, placing and
        installing, fixing in position M.S Chequered Plate from
        approved manufacture having minimum yield strength
        of 36 ksi, or where required and confirming to ASTM
        A36, ASTM A325 or equivalent, ASTM A307, ASTM A563,
        ASTM A570,        jointing, welding confirming to AWS
        (American welding society) specification. painting with 3
  15    coats of approved make enamel paint over a one coat of
        primer in any floor, including the cost of scaffolding,
        platforms & winches etc. The contractor shall submit
        coordinated and checked shop drawings (without any
        additional cost) for approval prior to the start of the
        work etc. complete in all respects as per drawing,
        standard , specifications and as directed by the
        Engineer.
Type-B : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 11)
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 11)
MS CHEQUERED PLATE
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 11)
Type-E : 1) CIVIL WORK a) Structre Work (Pedetrian Bridge) GL-06 (IPC No - 11)
  Pay                                                                        VO # 5                    Qty
 Item                       Item Description                          Unit                                                         Remarks
  No                                                                          Qty       Previou.    Present         Total
d For Ticket Booth Security & Storage I.T Security kgs 6,000 - - -
        MS CHEQUERED PLATE
                                                                                                                                               Page 7 of 187
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 11)
GL-06 Type-A
1 Civil Work
a From NGL (±) 0.00 meter depth to -1.5 meter depth M3 500 2,600 1,300,000 5,450 2,725,000 2,850 1,425,000
b More than -1.5 meter depth to -3.0 meter depth M3 1,000 960 960,000 4,125 4,125,000 3,165 3,165,000
  2     Providing, spreading and compacting earth / engineered filling earth    M3       1,800      16           28,800         16        28,800          -           -
        under floor / foundation and where required etc
  a     Below foundation, equipment's pad, plinth beam, situ, sub flooring M3            7,500     200      1,500,000          400     3,000,000     200       1,500,000
        over stone soling etc
a Foundations (for any type & shape) M3 14,000 720 10,080,000 3,000 42,000,000 2,280 31,920,000
b Columns / Pedestal below plinth beam M3 17,000 200 3,400,000 350 5,950,000 150 2,550,000
c Retaining Wall / Ramp Wall/Shear / Core / lift Walls / RCC Wall M3 18,000 16 288,000 50 900,000 34 612,000
GL-06 Type-A
  7     Providing and fixing PVC ribbed water stops 12 inches wide x 1/2       M       1,200     160          192,000           -           -      (160)      (192,000)
        inches thick
8 Providing and applying industrial bitumen paint M2 175 4,240 742,000 5,300 927,500 1,060 185,500
9 Providing and applying termite control treatment of sub grade soil M2 100 144 14,400 144 14,400 - -
  10    Providing and laying solid block masonry in foundation and where M3            9,000      80          720,000         80       720,000          -           -
        required (800 Psi minimum)
b R.C.C Shear / Core / Lift / Parapet / Picked up / RCC Wall M3 18,500 160 2,960,000 425 7,862,500 265 4,902,500
GL-06 Type-A
a For Pedestrian bridge Kgs 240 1,268,160 304,358,400 1,644,000 394,560,000 375,840 90,201,600
b For Steel Staircase with canopy of steel structure for Escalator Kgs 250 144,200 36,050,000 372,000 93,000,000 227,800 56,950,000
a For Pedestrian bridge Kgs 240 200,800 48,192,000 246,000 59,040,000 45,200 10,848,000
b For Steel Staircase with canopy of steel structure for Escalator Kgs 265 22,000 5,830,000 78,000 20,670,000 56,000 14,840,000
a For Pedestrian bridge Kg 215 25,800 5,547,000 28,000 6,020,000 2,200 473,000
b For Steel Staircase with canopy of steel structure for Escalator Kg 215 10,800 2,322,000 11,400 2,451,000 600 129,000
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
Abstract
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 13)
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 500 2,600 1,300,000 5,450 2,725,000 6,804.038 5,450.000 1,354.038 3,402,019 2,725,000 677,019
b More than -1.5 meter depth to -3.0 meter depth Cum 1,000 960 960,000 4,125 4,125,000 5,725.413 4,125.000 1,600.413 5,725,413 4,125,000 1,600,413
b For Cast in situ or where required (15 Mpa 2200Psi) Cum 8,500 24 204,000 24 204,000 - - -
a Foundations (for any type & shape) (28 Mpa 4000 Psi) Cum 14,000 720 10,080,000 3,000 42,000,000 - - -
a Sub-Structure M.Ton 113,000 136 15,368,000 375 42,375,000 443.901 375.000 68.901 50,160,790 42,375,000 7,785,790
        BITUMEN COATING
                                                                                                                                                                                                              Page 12 of 187
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 13)
        TERMITE PROOFING
                                                                                                                                                                                                                      Page 13 of 187
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 13)
  10    Providing and laying solid block masonry in foundation and M3          9,000     80       720,000       80       720,000                                         -           -              -
        where required (800 Psi minimum)
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 17,000 8 136,000 8 136,000 - - -
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 17,500 8 140,000 40 700,000 - - -
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 30,500 8 244,000 40 1,220,000 - - -
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 36,500 16 584,000 425 15,512,500 - - -
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge) GL-06 (IPC No - 13)
        MS CHEQUERED PLATE
        Providing, cutting, fabricating, erecting, placing and
        installing, fixing in position M.S Chequered Plate from
        approved manufacture having minimum yield strength
  15    of 36 ksi, or where required and confirming to ASTM
        A36, ASTM A325 or equivalent, ASTM A307, ASTM A563,
        ASTM A570,        jointing, welding confirming to AWS
        (American welding society)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                                                                                                                                       Abstract
Type-A : 1) CIVIL WORK a) Structre Work (Pedestrian Bridge)
                                                                                                                                                                                                                                              Revised
                                                                                          Actual                         Executed                             Remaining                                                                      Contract
                                                                                                                                                                                                                                                                             Actual Total
 Item
                            Item Description                          Unit                                                                                                                      Remarks                    Rate
  No                                                                                                                                             Previous                          Current
                                                                              Qty           Amount       %     Qty        Amount          %                 Amount         %                                                          Qty         Amount          Qty            Amount            %
                                                                                                                                                 week Qty                         week Qty
        EXCAVATION, DEWATERING AND BACKFILLING
  a     From NGL (±) 0.00 meter depth to -1.5 meter depth             Cum     5,471.523      2,735,762       5,431.023     2,715,511    99.26%     40.500      20,250    0.74%      40.500      Remaining                    500    5,450.000       2,725,000     5,471.523        2,735,762    100.39%
                                                                                                                                                                                                Station 9-A      416.666
                                                                                                                                                                                               Footing CF-5
  b     More than -1.5 meter depth to -3.0 meter depth                Cum     3,474.018      3,474,018       3,457.818     3,457,818    99.53%     16.200      16,200    0.47%      16.200                                  1,000      4,125        4,125,000     3,474.018        3,474,018    84.22%
                                                                                                                                                                                                Right Side       119.541
        EARTH FILL / ENGINEERED FILL                                                                 -                              -                  -             -                  -
                                                                                                                                                                                                                      -
                                                                                                                                                                                                                 384.000
        STONE SOLING                                                                                 -                              -                  -             -                  -
                                                                                                                                                                                                                      -
                                                                                                                                                                                                                                                    Revised
                                                                                          Actual                            Executed                              Remaining                                                                        Contract
                                                                                                                                                                                                                                                                                    Actual Total
 Item
                           Item Description                          Unit                                                                                                                         Remarks                      Rate
  No                                                                                                                                                 Previous                         Current
                                                                              Qty           Amount         %      Qty        Amount          %                  Amount        %                                                          Qty            Amount           Qty            Amount            %
                                                                                                                                                     week Qty                        week Qty
        Providing and laying RCC cement concrete with
        Betocrete     G-2000 or approved equivalent (Super
        plasticizer concrete admixture / retarder mix according
        to supplier instruction) where required using OPC Type-
  5                                                                                  -                -                                -                   -             -                 -                                                                                    -
        I or C3 A ≤ 8% or OPC Type-II cement & approved
        quarry of crushed stone 25 mm (1 inch) and down
        gauge with approved quarry of sand having 28 days
        preliminary                                                                                                                                                                                                       -
                                                                                                                                                                                                  Remaining
        Foundations (for any type & shape) (28 Mpa 4000                                                                                                                                           Station 9-A
  a                                                                  Cum      2,739.391     38,351,474          2,726.913    38,176,782    99.54%      12.478     174,692    0.46%     12.478                                   14,000   3,000           42,000,000      2,739.391       38,351,474    91.31%
        Psi)                                                                                                                                                                                     Footing CF-5
                                                                                                                                                                                                  Right Side        244.813
                                                                                                                                                                                                  Remaining
        Columns / Pedestal below plinth beam (28 Mpa 4000                                                                                                                                         Station 9-A
  b                                                                  Cum       392.151       6,666,567           390.637      6,640,829    99.61%       1.514      25,738    0.39%      1.514                                   17,000     350            5,950,000       392.151         6,666,567    112.04%
        Psi)                                                                                                                                                                                     Column CF-5
                                                                                                                                                                                                  Right Side         57.315
                                                                                                                                                                                                  Remaining
        Retaining Wall / Ramp Wall/Shear / Core / lift Walls /                                                                                                                                  Station 9-A Lift
  c                                                                  Cum       436.103       7,849,854           432.339      7,782,102    99.14%       3.764      67,752    0.86%      3.764                                   18,000         50             900,000     436.103         7,849,854    872.21%
        RCC Wall (28 Mpa 4000 Psi)                                                                                                                                                              Wall CF-5 Right
                                                                                                                                                                                                     Side
                                                                                                                                                                                                                    386.103
        STEEL REINFORCEMENT BARS                                                                      -                                -                   -             -                 -
                                                                                                                                                                                                                          -
        Providing, supplying, straightening, cutting, bending,
        fabricating, placing and installing / binding in position
        etc., straight or curved deformed steel bar
        reinforcement having minimum yield strength 414 Mpa
  6                                                                                  -                -                                -                   -             -                 -                                                                                    -
        (60 ksi or 60,000 Psi), including cost of G.I binding wire
        18 SWG, chairs, wastages, precast c.c. spacers and
        welding where required to be followed ASTM A615
        standard                                                                                                                                                                                                          -
                                                                                                                                                                                                  Remaining
                                                                                                                                                                                                  Station 9-A
  a     Sub-Structure                                                M.Ton          475     53,675,000           472.000     53,336,000    99.37%       3.000     339,000    0.63%      3.000                                  113,000     375           42,375,000       475.000        53,675,000    126.67%
                                                                                                                                                                                                 Footing CF-5
                                                                                                                                                                                                  Right Side
                                                                                                                                                                                                                    100.000
        WATER STOPPER BAR                                                                             -                                -                   -             -                 -
                                                                                                                                                                                                                          -
                                                                                                                                                                                                  Remaining
        Providing and applying industrial bitumen paint (Coverage 7 Kg                                                                                                                            Station 9-A
  8     / 10 Sqm) mixed with water component 2 coats on all RCC / Sqm        10,233.882      1,790,929         10,183.882     1,782,179    99.51%      50.000       8,750    0.49%     50.000                                     175    5,300                927,500   10,233.882        1,790,929    193.09%
                                                                                                                                                                                                 Footing CF-5
        CC structural member surfaces up to plinth etc
                                                                                                                                                                                                  Right Side
                                                                                                                                                                                                                   4,933.882
        TERMITE PROOFING                                                                              -                                -                   -             -                 -                                                                                                       -
                                                                                                                                                                                                                          -
                                                                                                                                                                                                                          -
        SOLID BLOCK MASONRY IN SUB-STRUCTURE                                                          -                                -                   -             -                 -                                                                                                       -
                                                                                                                                                                                                                          -
  10    Providing and laying solid block masonry in foundation and M3           40.000        360,000             40.000        360,000    100.00%         -             -   0.00%         -                                     9,000         80             720,000      40.000          360,000     50.00%
        where required (800 Psi minimum)                                                                                                                                                                                  -
                                                                                     -    120,130,134                       119,043,454    99.10%               1,086,680    0.90%                                                                     103,001,700             -       120,130,134 116.63%
                                                                                                                                                                                                                          -
                                                                                     -                                                                                                                                    -                                                     -                  -
                                                                                                                                                                                                                                                          Revised
                                                                                            Actual                             Executed                                   Remaining                                                                      Contract
                                                                                                                                                                                                                                                                                               Actual Total
 Item
                           Item Description                         Unit                                                                                                                                      Remarks                 Rate
  No                                                                                                                                                    Previous                              Current
                                                                                Qty           Amount       %       Qty          Amount          %                      Amount         %                                                           Qty         Amount              Qty              Amount            %
                                                                                                                                                        week Qty                             week Qty
        Providing and laying RCC cement concrete with
        Betocrete     G-2000 or approved equivalent (Super
        plasticizer concrete admixture / retarder mix according
  11    to supplier instruction) where required using OPC                              -                                                                                                                                                                                                   -                  -
        cement & approved quarry of crushed stone 25 mm
        (1 inch) and down gauge with approved quarry of
        sand having 28 days preliminary                                                                                                                                                                                          -
a Columns (28 Mpa 4000 Psi) Cum 15.525 279,450 15.525 279,450 100.00% - - 0.00% - 18,000 82 1,476,000 15.525 279,450 18.93%
                                                                                                                                                                                                                                 -
        R.C.C Shear / Core / Lift / Parapet / Picked up / RCC
  b                                                                 Cum                -               -                  -               -                     -               -                    -                                 18,500        425        7,862,500                  -                  -   0.00%
        Wall (28 Mpa 4000 Psi)                                                                                                                                                                                                   -
                                                                                                                                                                                                             Remaining
  c     Beams / lintel with nibs / projection (21 Mpa 3000 Psi)     Cum           21.283        361,811             20.513         348,721    96.38%        0.770         13,090    3.62%        0.770      (Right Side.)              17,000           8           136,000         21.283            361,811     266.04%
                                                                                                                                                                                                               Lobby         13.283
                                                                                                                                                                                                             Remaining
  d     Slab i/c Projections (21 Mpa 3000 Psi)                      Cum          101.433       1,775,077            99.615        1,743,263   98.21%        1.818         31,815    1.79%        1.818      (Right Side.)              17,500           40          700,000        101.433           1,775,077    253.58%
                                                                                                                                                                                                               Lobby         63.033
        Providing, making and fixing RCC Pre-Cast members
        including reinforcement bars,      having preliminary
        cylindrical crushing strength as specified below (with
  12                                                                                   -               -                                  -                     -               -                    -                                                                                     -                  -
        water-tight Fair faced form work), fixing mortar 1:4,
        fixed on specified location, maintaining proper line &
        level etc                                                                                                                                                                                                                -
  a     Slab i/c Projections (21 Mpa 3000 Psi)                      Cum           47.174       1,438,807            45.208        1,378,856   95.83%        1.966         59,951    4.17%        1.966   Remaining                     30,500           40      1,220,000           47.174           1,438,807    117.93%
                                                                                                                                                                                                                              7.174
                                                                                                                                                                                                      Station 9-A Right
  b     RCC Pre-Cast Beams (21 Mpa 3000 Psi)                        Cum          359.874      13,135,412          343.838        12,550,103   95.54%      16.036         585,309    4.46%      16.036       Side                       36,500        425       15,512,500          359.874          13,135,412    84.68%
                                                                                                                                                                                                                                 -
        STEEL REINFORCEMENT BARS                                                                       -                                  -                     -               -                    -                                                                                                        -
                                                                                                                                                                                                                                 -
        Providing, supplying, straightening, cutting, bending,
        fabricating, placing and installing / binding in position
  13    etc., straight or curved deformed steel bar                                    -               -                                  -                     -               -                    -                                                                                     -                  -
        reinforcement having minimum yield strength 414 Mpa
        (60 ksi or 60,000 Psi)                                                                                                                                                                                                   -
                                                                                                                                                                                                              Remaining
  a     Super-Structure                                             M.Ton              8        904,000              7.500         847,500    93.75%        0.500         56,500    6.25%        0.500       (Right Side.)            113,000           62      7,006,000               8.000         904,000     12.90%
                                                                                                                                                                                                           Lobby 5-A & 9-A
                                                                                                                                                                                                                                 -
        STEEL STRUCTURE (Excluding Chequered Plate & Corrugated Sheet)                                 -                                  -                     -               -                    -                                                                                                        -
                                                                                                                                                                                                                                 -
        Providing, cutting, fabricating, erecting, placing and
        installing, fixing in position Steel Structure works
        having minimum yield strength of 36 ksi, all structural
        steel members consisting of (H, I or W sections, angles,
  14                                                                                   -               -                                  -                     -               -                    -                                                                                     -                  -
        tubes, beams, channels, base plate, MS sheets,
        stiffener plate, MS pipe, MS post, MS bar, anchors
        bolts, rawal bolts, J bolts, nuts, washer) or where
        required with (epoxy painted as per specification)                                                                                                                                                                       -
  a     For Pedestrian Bridge (Defication : 1,960,000 kg)            kgs    1,893,698.262    454,487,583       1,399,770.222    335,944,853   73.92%    493,928.039   118,542,729   26.08%   493,928.039                                 240    1,644,000     394,560,000     1,893,698.262        454,487,583    115.19%
                                                                                                                                                                                                                                 -
        For Steel Staircase with canopy of steel structure for
  b                                                                  kgs     217,228.016      54,307,004       83,320.741        20,830,185   38.36%    133,907.275    33,476,819   61.64%   133,907.275                                 250     372,000       93,000,000      217,228.016          54,307,004    58.39%
        Escalator                                                                                                                                                                                                                -
        MS CHEQUERED PLATE                                                                             -                                  -                     -               -                    -                                                                                                        -
                                                                                                                                                                                                                                 -
        Providing, cutting, fabricating, erecting, placing and
        installing, fixing in position M.S Chequered Plate from
        approved manufacture having minimum yield strength
  15                                                                                   -               -                                  -                     -               -                    -                                                                                     -                  -
        of 36 ksi, or where required and confirming to ASTM
        A36, ASTM A325 or equivalent, ASTM A307, ASTM
        A563, ASTM A570                                                                                                                                                                                                          -
  a     For Pedestrian Bridge                                        kgs     214,534.000      51,488,160       159,801.550       38,352,372   74.49%    54,732.450     13,135,788   25.51%   54,732.450                                  240     246,000       59,040,000      214,534.000          51,488,160    87.21%
                                                                                                                                                                                                                                 -
        For Steel Staircase with canopy of steel structure for
  c                                                                  kgs      33,875.000       8,976,875       12,628.950         3,346,672   37.28%    21,246.050      5,630,203   62.72%   21,246.050                                  265      78,000       20,670,000       33,875.000           8,976,875    43.43%
        Escalator                                                                                                                                                                                                                -
        G.I CORRUGATED SHEET                                                                           -                                  -                     -               -                    -                                                                                                        -
                                                                                                                                                                                                                                 -
        Providing, cutting, fabricating, erecting, placing and
        installing, fixing in position G.I Corrugated Sheet
        (Prepainted) having minimum yield strength of 36 ksi,
  16                                                                                   -               -                                  -                     -               -                    -                                                                                     -                  -
        or where required and confirming to ASTM A36, ASTM
        A325 or equivalent, ASTM A307, ASTM A563, ASTM
        A570                                                                                                                                                                                                                     -
  a     For Pedestrian Bridge                                        kgs      23,437.460       5,039,054       10,561.483         2,270,719   45.06%    12,875.977      2,768,335   54.94%   12,875.977                                  215      28,000        6,020,000       23,437.460           5,039,054    83.71%
                                                                                                                                                                                                                                 -
        For Steel Staircase with canopy of steel structure for
  c                                                                  kgs       6,455.376       1,387,906        1,703.435          366,239    26.39%    4,751.941       1,021,667   73.61%   4,751.941                                   215      11,400        2,451,000        6,455.376           1,387,906    56.63%
        Escalator                                                                                                                                                                                                                -
                                                                                                                                                                                                                               Page 18 of 187
                                                                                                                                                                                         Revised
                                                                     Actual                  Executed                               Remaining                                           Contract
                                                                                                                                                                                                                Actual Total
 Item
                       Item Description                 Unit                                                                                                     Remarks   Rate
  No                                                                                                                Previous                           Current
                                                               Qty     Amount      %   Qty    Amount         %                   Amount         %                                 Qty        Amount       Qty       Amount            %
                                                                                                                    week Qty                          week Qty
Total Pedestrian Bridge Work                                         593,581,139             418,258,932   70.46%              175,322,207   29.54%                                         609,654,000            593,581,139    97.36%
GE # KAR/BRTS/GL/06
stract
                                                                                                                      GL-06 (IPC No - 17)
                                                             Saving                             Increase
                                                                                                                           Remarks
                                                   Qty       Amount         %       Qty         Amount          %
- -
                                                                                                                           Remaining
                                                         -            -   0.00%     384.000        691,200   2400.00%   Station 5-A, 8-A
                                                                                                                          Ramp Filling
- -
- -
- -
                                                                                                                           Remaining
                                                                                                                           Station 9-A
                                                         -            -   0.00%     200.000      1,500,000   50.00%
                                                                                                                          Footing CF-5
                                                                                                                           Right Side
          Saving                              Increase
                                                                         Remarks
Qty       Amount         %        Qty          Amount        %
- -
                                                                         Remaining
                                                                         Station 9-A
505.422    7,075,908   16.85%           245    3,427,382   8.16%
                                                                        Footing CF-5
                                                                         Right Side
                                                                         Remaining
                                                                         Station 9-A
 15.164     257,788    4.33%      57.315         974,355   16.38%
                                                                        Column CF-5
                                                                         Right Side
                                                                         Remaining
                                                                       Station 9-A Lift
      -            -   0.00%     386.103       6,949,854   772.21%
                                                                       Wall CF-5 Right
                                                                            Side
- -
- -
                                                                         Remaining
                                                                         Station 9-A
      -            -   0.00%     100.000      11,300,000   26.67%
                                                                        Footing CF-5
                                                                         Right Side
- -
- - 0.00% -
- -
                                                                         Remaining
                                                                         Station 9-A
      -            -   0.00%    4,933.882        863,429   93.09%
                                                                        Footing CF-5
                                                                         Right Side
- -
- -
- -
      -                                  -
                                                                                           Page 21 of 187
              Saving                           Increase
                                                                          Remarks
   Qty        Amount         %       Qty       Amount         %
- -
                                                                          Remaining
    66.475     1,196,550   81.07%          -                              Station 9-A
                                                                          Right Side
                                                                          Remaining
         -             -   0.00%      13.283      225,811   166.04%       Station 9-A
                                                                          Right Side
                                                                          Remaining
     1.600       28,000    4.00%      63.033    1,103,078   157.58%       Station 9-A
                                                                          Right Side
- -
- -
- -
- -
- -
- -
- -
- -
- -
      Saving                      Increase
                                                             Remarks
Qty    Amount        %      Qty    Amount        %
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 767.769 383,884 767.769 383,884 100.00% - - 0.00% 500 681.250 340,625 767.769 383,884 112.700% - - 0.000% 86.519
b More than -1.5 meter depth to -3.0 meter depth Cum 395.788 395,788 395.788 395,788 100.00% - - 0.00% 1,000 515.625 515,625 395.788 395,788 76.759% 119.837 119,837 23.241%
STONE SOLING - - -
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000% 12.500
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3               5.000        45,000            5.000        45,000    100.00%          -           -    0.00%                            9,000     10.000             90,000       5.000           45,000   50.000%       5.000        45,000     50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 2.250 40,500 2.250 40,500 100.00% - - 0.00% 18,000 10.250 184,500 2.250 40,500 21.951% 8.000 144,000 78.049%
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 2.691 45,747 2.691 45,747 100.00% - 0.00% 17,000 1.000 17,000 2.691 45,747 269.100% - - 0.000% 1.691
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 4.200 73,500 4.200 73,500 100.00% - 0.00% 17,500 5.000 87,500 4.200 73,500 84.000% 0.800 14,000 16.000%
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000% 0.897
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 47.961 1,750,586 47.961 1,750,586 100.00% - 0.00% 36,500 53.125 1,939,063 47.961 1,750,586 90.280% 5.164 188,476 9.720%
a Super-Structure M.Ton 1 113,000 1.000 113,000 100.00% - - 0.00% 113,000 7.750 875,750 1 113,000 12.903% 6.750 762,750 87.097%
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 217,239.377 52,137,450 206,377.41 49,530,578 95.00% 10,861.97 2,606,873 5.00% 10,861.97 240 245,000.000 58,800,000 217,239.377 52,137,450 88.669% 27,760.623 6,662,550 11.331%
       MS CHEQUERED PLATE                                                                             -                             -                                 -
       Providing, cutting, fabricating, erecting, placing and
       installing, fixing in position M.S Chequered Plate from
       approved manufacture having minimum yield strength
  15                                                                                        -                        -                               -
       of 36 ksi, or where required and confirming to ASTM
       A36, ASTM A325 or equivalent, ASTM A307, ASTM
       A563, ASTM A570
a For Pedestrian Bridge kgs 20,174.000 4,841,760 19,165.30 4,599,672 95.00% 1,008.70 242,088 5.00% 1,008.70 240 30,750.000 7,380,000 20,174.000 4,841,760 65.607% 10,576.000 2,538,240 34.393%
a For Pedestrian Bridge kgs 2,122.000 456,230 1,909.80 410,607 90.00% 212.20 45,623 10.00% 212.20 215 3,500.000 752,500 2,122.000 456,230 60.629% 1,378.000 296,270 39.371%
Total Pedestrian Bridge Work 67,910,975 63,673,097 4,237,878 85,686,751 67,910,975 79.25% 17,831,873 20.81%
Increase
                            Remarks
 Amount        %
43,259 12.70%
74,581 2071.69%
80,475 21.46%
17,629 2.37%
709,992 631.10%
1,412,500 26.67%
60,865 52.50%
2,399,301 18.64%
28,747 169.10%
- 0.00%
   27,351    17.94%
  56,098    0.07%
2,455,399   2.49%
                                                                                                                                                                       BALANCE QUANTITY DETAILS
                                                                                                                                                                                 GREEN LINE BRTS - GL-06
                                                                                                                                                                     STATION # 3A (KARIMI CHOWRANGI)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                              Date: 04-08-2020
                                                                                                                                                                                                                                         Revised
                                                                                          Actual                             Executed                                 Remaining                                                         Contract
                                                                                                                                                                                                                                                                           Actual Total                            Saving
Item
                          Item Description                          Unit                                                                                                                               Remarks   Rate
 No                                                                                                                                                     Previous                            Current
                                                                               Qty          Amount          %      Qty        Amount            %       week Qty    Amount          %      week Qty                           Qty            Amount             Qty          Amount           %          Qty       Amount           %
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 816.907 408,453 816.907 408,453 100.00% - - 0.00% 500 681.250 340,625 816.907 408,453 119.913% - - 0.000%
b More than -1.5 meter depth to -3.0 meter depth Cum 518.126 518,126 518.126 518,126 100.00% - - 0.00% 1,000 515.625 515,625 518.126 518,126 100.485% - - 0.000%
STONE SOLING - - -
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000%
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3              5.000            45,000           5.000         45,000      100.00%          -             -     0.00%                          9,000       10.000                90,000       5.000            45,000    50.000%       5.000        45,000     50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 2.250 40,500 2.250 40,500 100.00% - 0.00% 18,000 10.250 184,500 2.250 40,500 21.951% 8.000 144,000 78.049%
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 2.691 45,747 2.691 45,747 100.00% - 0.00% 17,000 1.000 17,000 2.691 45,747 269.100% - - 0.000%
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 4.200 73,500 4.200 73,500 100.00% - 0.00% 17,500 5.000 87,500 4.200 73,500 84.000% 0.800 14,000 16.000%
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000%
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 47.812 1,745,128 47.812 1,745,128 100.00% - 0.00% 36,500 53.125 1,939,063 47.812 1,745,128 89.999% 5.313 193,934 10.001%
a Super-Structure M.Ton 1 113,000 1.000 113,000 100.00% - - 0.00% 113,000 7.750 875,750 1 113,000 12.903% 6.750 762,750 87.097%
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 216,771.467 52,025,152 179,920.32 43,180,876 83.00% 36,851.15 8,844,276 17.00% 36,851.15 240 245,000.000 58,800,000 216,771.467 52,025,152 88.478% 28,228.533 6,774,848 11.522%
MS CHEQUERED PLATE - - -
a For Pedestrian Bridge kgs 2,635.890 566,716 2,372.30 510,045 90.00% 263.59 56,672 10.00% 263.59 215 3,500.000 752,500 2,635.890 566,716 75.311% 864.110 185,784 24.689%
Total Pedestrian Bridge Work 70,270,123 58,931,047 11,339,076 85,686,751 70,270,123 82.01% 15,472,725 18.06%
          Increase
                                        Remarks
Qty       Amount            %
2,452,010 19.04%
- 0.00%
2,508,108   2.54%
                                                                                                                                                                BALANCE QUANTITY DETAILS
                                                                                                                                                                       GREEN LINE BRTS - GL-06
                                                                                                                                                               STATION # 4A (SURJANI CHOWRANGI)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                       Date: 04-08-2020
                                                                                                                                                                                                                              Revised
                                                                                           Actual                          Executed                                Remaining                                                 Contract                          Actual Total                          Saving                           Increase
Item
                           Item Description                          Unit                                                                                                                       Remarks   Rate
 No                                                                                                                                                Previous                          Current
                                                                                Qty          Amount       %      Qty        Amount         %                    Amount       %                                         Qty         Amount           Qty          Amount         %          Qty       Amount         %       Qty
                                                                                                                                                   week Qty                         week Qty
       EXCAVATION, DEWATERING AND BACKFILLING
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 527.328 263,664 527.328 263,664 100.00% - - 0.00% 500 681.250 340,625 527.328 263,664 77.406% 153.922 76,961 22.594% -
b More than -1.5 meter depth to -3.0 meter depth Cum 262.593 262,593 262.593 262,593 100.00% - - 0.00% 1,000 515.625 515,625 262.593 262,593 50.927% 253.032 253,032 49.073%
STONE SOLING - - -
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000% 12.500
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3               5.000        45,000            5.000        45,000    100.00%          -            -    0.00%                           9,000     10.000            90,000       5.000          45,000    50.000%       5.000      45,000     50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 1.688 30,375 1.688 30,375 100.00% - 0.00% 18,000 10.250 184,500 1.688 30,375 16.463% 8.563 154,125 83.537%
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 2.650 45,053 2.650 45,053 100.00% - 0.00% 17,000 1.000 17,000 2.650 45,053 265.017% - - 0.000% 1.650
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 6.306 110,346 6.306 110,346 100.00% - 0.00% 17,500 5.000 87,500 6.306 110,346 126.110% - - 0.000% 1.306
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000% 0.897
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 42.242 1,541,846 42.242 1,541,846 100.00% - 0.00% 36,500 53.125 1,939,063 42.242 1,541,846 79.515% 10.883 397,217 20.485%
a Super-Structure M.Ton 1 113,000 1.000 113,000 100.00% - - 0.00% 113,000 7.750 875,750 1 113,000 12.903% 6.750 762,750 87.097%
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 256,994.027 61,678,566 244,144.33 58,594,638 95.00% 12,849.70 3,083,928 5.00% 12,849.70 240 245,000.000 58,800,000 256,994.027 61,678,566 104.896% -11,994.027 - 2,878,566 -4.896%
       MS CHEQUERED PLATE                                                                             -                             -                                  -
       Providing, cutting, fabricating, erecting, placing and
       installing, fixing in position M.S Chequered Plate from
       approved manufacture having minimum yield strength
  15                                                                                        -                        -                               -
       of 36 ksi, or where required and confirming to ASTM
       A36, ASTM A325 or equivalent, ASTM A307, ASTM
       A563, ASTM A570
a For Pedestrian Bridge kgs 31,622.000 7,589,280 30,040.90 7,209,816 95.00% 1,581.10 379,464 5.00% 1,581.10 240 30,750.000 7,380,000 31,622.000 7,589,280 102.836% - 872.000 - 209,280 -2.836%
a For Pedestrian Bridge kgs 3,362.120 722,856 3,194.01 686,713 95.00% 168.11 36,143 5.00% 168.11 215 3,500.000 752,500 3,362.120 722,856 96.061% 137.880 29,644 3.939%
Total Pedestrian Bridge Work 79,496,905 75,769,662 3,727,243 85,686,751 79,496,905 92.78% 6,268,094 7.32%
Increase
                            Remarks
 Amount        %
- 0.00%
83,395 2316.52%
348,025 92.81%
1,113,070 21.20%
- 0.00%
699,228 621.54%
1,412,500 26.67%
125,499 108.25%
3,781,717 29.37%
28,053 165.02%
22,846 26.11%
   27,351    17.94%
  78,250    0.09%
3,859,967   3.92%
                                                                                                                                                                 BALANCE QUANTITY DETAILS
                                                                                                                                                                         GREEN LINE BRTS - GL-06
                                                                                                                                                               STATION # 5A (2 MINUTE CHOWRANGI)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                         Date: 04-08-2020
                                                                                                                                                                                                                                      Revised
                                                                                          Actual                          Executed                                 Remaining                                                         Contract
                                                                                                                                                                                                                                                                        Actual Total                          Saving                             Increase
Item
                          Item Description                          Unit                                                                                                                           Remarks        Rate
 No                                                                                                                                                Previous                            Current
                                                                               Qty          Amount       %      Qty        Amount          %       week Qty     Amount         %      week Qty                                 Qty        Amount             Qty          Amount         %          Qty       Amount           %       Qty
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 871.694 435,847 871.694 435,847 100.00% - - 0.00% - 500 681.250 340,625 871.694 435,847 127.955% - - 0.000% 190.444
b More than -1.5 meter depth to -3.0 meter depth Cum 441.348 441,348 441.348 441,348 100.00% - - 0.00% - 1,000 515.625 515,625 441.348 441,348 85.595% 74.277 74,277 14.405%
STONE SOLING - - -
                                                                                                                                                                                                   Remaining
       Below foundation, equipment's pad, plinth beam, situ,
  a                                                          Cum                 74.690       560,174           67.535        506,513    90.42%        7.155       53,661    9.58%        7.155   (Right Side.)    7,500       50.000           375,000      74.690          560,174 149.380%             -             -    0.000%     24.690
       sub flooring over stone soling etc (10 Mpa 1500Psi)
                                                                                                                                                                                                    Footpath
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% - 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000% 12.500
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3              5.000        45,000            5.000         45,000    100.00%          -              -   0.00%           -                     9,000       10.000           90,000        5.000           45,000   50.000%       5.000       45,000      50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 2.138 38,475 2.138 38,475 100.00% - 0.00% 18,000 10.250 184,500 2.138 38,475 20.854% 8.113 146,025 79.146%
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000% 0.897
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 41.227 1,504,801 41.227 1,504,801 100.00% - 0.00% 36,500 53.125 1,939,063 41.227 1,504,801 77.605% 11.898 434,262 22.395%
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 244,852.651 58,764,636 200,779.17 48,187,002 82.00% 44,073.48 10,577,635 18.00% 44,073.48 240 245,000.000 58,800,000 244,852.651 58,764,636 99.940% 147.349 35,364 0.060%
MS CHEQUERED PLATE - - -
a For Pedestrian Bridge kgs 3,856.710 829,193 3,085.37 663,354 80.00% 771.34 165,839 20.00% 771.34 215 3,500.000 752,500 3,856.710 829,193 110.192% - 356.710 - 76,693 -10.192%
Total Pedestrian Bridge Work 76,758,465 59,822,872 16,935,593 85,686,751 76,758,465 89.58% 9,473,435 11.06%
Increase
                            Remarks
Amount          %
95,222 27.96%
104,716 2908.77%
185,174 49.38%
455,124 61.19%
1,520,946 1351.95%
1,412,500 26.67%
135,914 117.23%
3,909,596 30.37%
28,053 165.02%
489,746 559.71%
   27,351    17.94%
 545,150    0.64%
4,454,746   4.52%
                                                                                                                                                              BALANCE QUANTITY DETAILS
                                                                                                                                                                  GREEN LINE BRTS - GL-06
                                                                                                                                                                 STATION # 6A (2400 ROAD)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                      Date: 04-08-2020
                                                                                                                                                                                                                                 Revised
                                                                                         Actual                         Executed                               Remaining                                                        Contract                        Actual Total                       Saving
Item
                           Item Description                          Unit                                                                                                                       Remarks        Rate
 No                                                                                                                                              Previous                           Current
                                                                             Qty           Amount       %     Qty        Amount          %                   Amount         %                                             Qty        Amount           Qty         Amount         %       Qty       Amount           %
                                                                                                                                                 week Qty                          week Qty
       EXCAVATION, DEWATERING AND BACKFILLING
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 685.297 342,648 685.297 342,648 100.00% - - 0.00% - 500 681.250 340,625 685.297 342,648 100.594% - - 0.000%
b More than -1.5 meter depth to -3.0 meter depth Cum 579.521 579,521 579.521 579,521 100.00% - - 0.00% - 1,000 515.625 515,625 579.521 579,521 112.392% - - 0.000%
STONE SOLING - - -
                                                                                                                                                                                                Remaining
       Below foundation, equipment's pad, plinth beam, situ,
  a                                                          Cum               67.246        504,344          60.091       450,683     89.36%        7.155     53,661     10.64%       7.155   (Right Side.)     7,500    50.000       375,000        67.246        504,344 134.492%           -             -    0.000%
       sub flooring over stone soling etc (10 Mpa 1500Psi)
                                                                                                                                                                                                 Footpath
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% - 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000%
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3            5.000         45,000           5.000        45,000     100.00%          -             -   0.00%           -                      9,000    10.000           90,000      5.000          45,000   50.000%     5.000      45,000      50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 2.138 38,475 2.138 38,475 100.00% - 0.00% 18,000 10.250 184,500 2.138 38,475 20.854% 8.113 146,025 79.146%
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 2.650 45,053 2.650 45,053 100.00% - 0.00% 17,000 1.000 17,000 2.650 45,053 265.017% - - 0.000%
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 34.826 609,446 34.826 609,446 100.00% - 0.00% 17,500 5.000 87,500 34.826 609,446 696.510% - - 0.000%
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000%
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 46.048 1,680,735 46.048 1,680,735 100.00% - 0.00% 36,500 53.125 1,939,063 46.048 1,680,735 86.678% 7.077 258,327 13.322%
a Super-Structure M.Ton 1 113,000 1.000 113,000 100.00% - - 0.00% - 113,000 7.750 875,750 1 113,000 12.903% 6.750 762,750 87.097%
MS CHEQUERED PLATE - - -
a For Pedestrian Bridge kgs 23,361.000 5,606,640 14,951.04 3,588,250 64.00% 8,409.96 2,018,390 36.00% 8,409.96 240 30,750.000 7,380,000 23,361.000 5,606,640 75.971% 7,389.000 1,773,360 24.029%
a For Pedestrian Bridge kgs 2,482.460 533,729 - - 0.00% 2,482.46 533,729 100.00% 2,482.46 215 3,500.000 752,500 2,482.460 533,729 70.927% 1,017.540 218,771 29.073%
Total Pedestrian Bridge Work 73,712,186 42,475,784 31,236,402 85,686,751 73,712,186 86.03% 12,551,914 14.65%
          Increase
                                     Remarks
Qty       Amount          %
3,523,340 27.37%
4,100,690   4.16%
                                                                                                                                                                          BALANCE QUANTITY DETAILS
                                                                                                                                                                                GREEN LINE BRTS - GL-06
                                                                                                                                                                     STATION # 7A (POWER HOUSE CHOWRANGI)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                                   Date: 04-08-2020
                                                                                                                                                                                                                                                    Revised
                                                                                          Actual                             Executed                                     Remaining                                                                Contract
                                                                                                                                                                                                                                                                                      Actual Total                            Saving                             Increase
Item
                          Item Description                          Unit                                                                                                                                     Remarks        Rate
 No                                                                                                                                                     Previous                                Current
                                                                               Qty          Amount          %      Qty        Amount            %       week Qty       Amount          %       week Qty                                  Qty            Amount             Qty          Amount           %          Qty       Amount           %       Qty
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 566.453 283,226 566.453 283,226 100.00% - - 0.00% - 500 681.250 340,625 566.453 283,226 83.149% 114.797 57,399 16.851%
b More than -1.5 meter depth to -3.0 meter depth Cum 568.769 568,769 568.769 568,769 100.00% - - 0.00% - 1,000 515.625 515,625 568.769 568,769 110.307% - 0.000% 53.144
STONE SOLING - - -
                                                                                                                                                                                                             Remaining
       Below foundation, equipment's pad, plinth beam, situ,
  a                                                          Cum                 90.774        680,808             83.620        627,147      92.12%        7.155          53,661     7.88%        7.155    (Right Side.)    7,500       50.000               375,000      90.774          680,808 181.549%               -             -    0.000%     40.774
       sub flooring over stone soling etc (10 Mpa 1500Psi)
                                                                                                                                                                                                              Footpath
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% - 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000% 12.500
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3              5.000            45,000           5.000         45,000      100.00%           -               -     0.00%            -                     9,000       10.000                90,000       5.000            45,000    50.000%       5.000        45,000     50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 1.688 30,375 1.688 30,375 100.00% - 0.00% 18,000 10.250 184,500 1.688 30,375 16.463% 8.563 154,125 83.537%
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 2.650 45,053 2.650 45,053 100.00% - 0.00% 17,000 1.000 17,000 2.650 45,053 265.017% - - 0.000% 1.650
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 6.306 110,346 6.306 110,346 100.00% - 0.00% 17,500 5.000 87,500 6.306 110,346 126.110% - - 0.000% 1.306
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000% 0.897
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 44.377 1,619,768 44.377 1,619,768 100.00% - 0.00% 36,500 53.125 1,939,063 44.377 1,619,768 83.534% 8.748 319,295 16.466%
a Super-Structure M.Ton 1 113,000 1.000 113,000 100.00% - - 0.00% - 113,000 7.750 875,750 1 113,000 12.903% 6.750 762,750 87.097%
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 238,622.684 57,269,444 121,697.57 29,207,416 51.00% 116,925.12 28,062,028 49.00% 116,925.12 240 245,000.000 58,800,000 238,622.684 57,269,444 97.397% 6,377.316 1,530,556 2.603%
MS CHEQUERED PLATE - - -
a For Pedestrian Bridge kgs 2,752.010 591,682 - - 0.00% 2,752.010 591,682 100.00% 2,752.010 215 3,500.000 752,500 2,752.010 591,682 78.629% 747.990 160,818 21.371%
Total Pedestrian Bridge Work 74,651,675 34,699,716 39,951,959 85,686,751 74,651,675 87.12% 11,113,325 12.97%
Increase
                              Remarks
Amount            %
- 0.00%
53,144 10.31%
81,514 2264.27%
305,808 81.55%
601,580 11.46%
- 0.00%
681,678 605.94%
1,412,500 26.67%
117,849 101.65%
3,254,072 25.27%
28,053 165.02%
22,846 26.11%
    27,351     17.94%
  78,250    0.09%
3,332,322   3.38%
                                                                                                                                                                    BALANCE QUANTITY DETAILS
                                                                                                                                                                           GREEN LINE BRTS - GL-06
                                                                                                                                                                        STATION # 8A (4200 ROAD)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                             Date: 04-08-2020
                                                                                                                                                                                                                                              Revised
                                                                                          Actual                            Executed                                Remaining                                                                Contract
                                                                                                                                                                                                                                                                                Actual Total                            Saving                             Increase
Item
                          Item Description                          Unit                                                                                                                               Remarks        Rate
 No                                                                                                                                                  Previous                             Current
                                                                               Qty          Amount          %     Qty        Amount          %       week Qty     Amount         %       week Qty                                  Qty            Amount             Qty          Amount           %          Qty       Amount           %       Qty
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 600.083 300,041 600.083 300,041 100.00% - - 0.00% - 500 681.250 340,625 600.083 300,041 88.086% 81.167 40,584 11.914% -
b More than -1.5 meter depth to -3.0 meter depth Cum 417.729 417,729 417.729 417,729 100.00% - - 0.00% - 1,000 515.625 515,625 417.729 417,729 81.014% 97.896 97,896 18.986%
STONE SOLING - - -
                                                                                                                                                                                                       Remaining
       Below foundation, equipment's pad, plinth beam, situ,
  a                                                          Cum                 90.251        676,885            83.097        623,224    92.07%        7.155       53,661    7.93%         7.155    (Right Side.)    7,500       50.000               375,000      90.251          676,885 180.503%               -             -    0.000%     40.251
       sub flooring over stone soling etc (10 Mpa 1500Psi)
                                                                                                                                                                                                        Footpath
b For Cast in situ or where required (15 Mpa 2200Psi) Cum - - - - 8,500 3.000 25,500 - 0.000% 3.000 25,500 100.000%
a Sub-Structure M.Ton 59.375 6,709,375 59.375 6,709,375 100.00% - - 0.00% - 113,000 46.875 5,296,875 59.375 6,709,375 126.667% - - 0.000% 12.500
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3              5.000            45,000          5.000         45,000    100.00%           -             -   0.00%             -                     9,000       10.000                90,000       5.000            45,000    50.000%       5.000       45,000      50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 1.688 30,375 1.688 30,375 100.00% - 0.00% 18,000 10.250 184,500 1.688 30,375 16.463% 8.563 154,125 83.537%
c Beams / lintel with nibs / projection (21 Mpa 3000 Psi) Cum 2.650 45,053 2.650 45,053 100.00% - 0.00% 17,000 1.000 17,000 2.650 45,053 265.017% - - 0.000% 1.650
d Slab i/c Projections (21 Mpa 3000 Psi) Cum 6.306 110,346 6.306 110,346 100.00% - 0.00% 17,500 5.000 87,500 6.306 110,346 126.110% - - 0.000% 1.306
a Slab i/c Projections (21 Mpa 3000 Psi) Cum 5.897 179,851 5.897 179,851 100.00% - 0.00% 30,500 5.000 152,500 5.897 179,851 117.935% - - 0.000% 0.897
b RCC Pre-Cast Beams (21 Mpa 3000 Psi) Cum 45.440 1,658,555 45.440 1,658,555 100.00% - 0.00% 36,500 53.125 1,939,063 45.440 1,658,555 85.534% 7.685 280,508 14.466%
a Super-Structure M.Ton 1 113,000 1.000 113,000 100.00% - - 0.00% - 113,000 7.750 875,750 1 113,000 12.903% 6.750 762,750 87.097%
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 248,452.279 59,628,547 84,473.77 20,273,706 34.00% 163,978.50 39,354,841 66.00% 163,978.50 240 245,000.000 58,800,000 248,452.279 59,628,547 101.409% - 3,452.279 - 828,547 -1.409%
MS CHEQUERED PLATE - - -
a For Pedestrian Bridge kgs 3,126.540 672,206 - - 0.00% 3,126.540 672,206 100.00% 3,126.540 215 3,500.000 752,500 3,126.540 672,206 89.330% 373.460 80,294 10.670%
Total Pedestrian Bridge Work 76,923,965 24,551,906 52,372,059 85,686,751 76,923,965 89.77% 8,841,035 10.32%
Increase
                              Remarks
Amount            %
- 0.00%
84,824 2356.22%
301,885 80.50%
559,748 10.66%
70,431 9.47%
708,642 629.90%
1,412,500 26.67%
123,210 106.27%
3,261,240 25.33%
28,053 165.02%
22,846 26.11%
    27,351     17.94%
  78,250    0.09%
3,339,490   3.39%
                                                                                                                                                                 BALANCE QUANTITY DETAILS
                                                                                                                                                                            GREEN LINE BRTS - GL-06
                                                                                                                                                                        STATION # 9A (UP MORE)
CIVIL WORK a) Structre Work (Pedestrian Bridge)                                                                                                                                          Date: 04-08-2020
                                                                                                                                                                                                                                           Revised
                                                                                          Actual                          Executed                               Remaining                                                                Contract
                                                                                                                                                                                                                                                                             Actual Total                            Saving                             Increase
Item
                          Item Description                          Unit                                                                                                                              Remarks          Rate
 No                                                                                                                                                Previous                             Current
                                                                               Qty          Amount       %      Qty        Amount          %       week Qty    Amount           %      week Qty                                     Qty         Amount            Qty            Amount         %          Qty       Amount           %       Qty
  a    From NGL (±) 0.00 meter depth to -1.5 meter depth            Cum        635.994        317,997          595.494       297,747     93.63%      40.500      20,250       6.37%      40.500       Remaining           500     681.250            340,625      635.994          317,997    93.357%      45.256       22,628      6.643%
                                                                                                                                                                                                      Station 9-A
                                                                                                                                                                                                     Footing CF-5
  b    More than -1.5 meter depth to -3.0 meter depth               Cum        290.144        290,144          273.944       273,944     94.42%      16.200      16,200       5.58%      16.200       Right Side        1,000     515.625            515,625      290.144          290,144    56.270%     225.481      225,481 43.730%
STONE SOLING - - -
       Foundations (for any type & shape) (28 Mpa 4000                                                                                                                                               Footing CF-5
  a                                                                 Cum        457.356      6,402,984          444.878      6,228,292    97.27%      12.478      174,692      2.73%      12.478                         14,000    375.000       5,250,000         457.356        6,402,984 121.962%              -             -    0.000%     82.356
       Psi)                                                                                                                                                                                           Right Side
       Columns / Pedestal below plinth beam (28 Mpa 4000                                                                                                                                            Columns CF-5
  b                                                                 Cum          37.376       635,392           35.862       609,654     95.95%        1.514     25,738       4.05%        1.514                        17,000      43.750           743,750       37.376          635,392    85.431%       6.374      108,358 14.569%              -
       Psi)                                                                                                                                                                                          Right Side
       Retaining Wall / Ramp Wall/Shear / Core / lift Walls /                                                                                                                                      Wall CF-5 Right
  c                                                                 Cum          43.180       777,240           39.416       709,488     91.28%        3.764     67,752       8.72%        3.764                        18,000       6.250           112,500       43.180          777,240 690.880%              -             -    0.000%     36.930
       RCC Wall (28 Mpa 4000 Psi)                                                                                                                                                                       Side
                                                                                                                                                                                                     Footing CF-5
  a    Sub-Structure                                                M.Ton        59.375     6,709,375           56.375      6,370,375    94.95%        3.000     339,000      5.05%        3.000                       113,000      46.875      5,296,875          59.375        6,709,375 126.667%              -             -    0.000%     12.500
                                                                                                                                                                                                     Right Side
BITUMEN COATING - - -
TERMITE PROOFING - - -
 10    Providing and laying solid block masonry in foundation and M3              5.000        45,000            5.000        45,000     100.00%          -             -     0.00%           -                         9,000       10.000           90,000         5.000           45,000    50.000%       5.000       45,000      50.000%
       where required (800 Psi minimum)
a Columns (28 Mpa 4000 Psi) Cum 1.688 30,375 1.688 30,375 100.00% - 0.00% 18,000 10.250 184,500 1.688 30,375 16.463% 8.563 154,125 83.537%
  a    Slab i/c Projections (21 Mpa 3000 Psi)                       Cum           5.897       179,851            3.931       119,900     66.67%        1.966     59,951       33.33%       1.966      Remaining         30,500       5.000           152,500        5.897          179,851 117.935%              -             -    0.000%      0.897
                                                                                                                                                                                                   Station 9-A Right
  b    RCC Pre-Cast Beams (21 Mpa 3000 Psi)                         Cum          44.767     1,633,993           28.731      1,048,684    64.18%      16.036      585,309      35.82%     16.036         Side Lift       36,500      53.125      1,939,063          44.767        1,633,993    84.267%       8.358      305,069 15.733%
                                                                                                                                                                                                      Remaining
  a    Super-Structure                                              M.Ton            1        113,000            0.750        84,750     75.00%         0.25     28,250       25.00%        0.25     (Right Side.)     113,000       7.750           875,750            1          113,000    12.903%       6.750      762,750 87.097%
                                                                                                                                                                                                        Lobby
a For Pedestrian Bridge (Defication : 1,960,000 kg) kgs 234,952.140 56,388,514 211,456.93 50,749,662 90.00% 23,495.21 5,638,851 10.00% 23,495.21 240 245,000.000 58,800,000 234,952.140 56,388,514 95.899% 10,047.860 2,411,486 4.101%
       MS CHEQUERED PLATE                                                                            -                               -                                  -
       Providing, cutting, fabricating, erecting, placing and
       installing, fixing in position M.S Chequered Plate from
       approved manufacture having minimum yield strength
  15                                                                                       -                        -                                 -
       of 36 ksi, or where required and confirming to ASTM
       A36, ASTM A325 or equivalent, ASTM A307, ASTM
       A563, ASTM A570
a For Pedestrian Bridge kgs 28,558.00 6,853,920 25,702.20 6,168,528 90.00% 2,855.80 685,392 10.00% 2,855.80 240 30,750.000 7,380,000 28,558.00 6,853,920 92.872% 2,192.000 526,080 7.128%
a For Pedestrian Bridge kgs 3,099.730 666,442 - - 0.00% 3,099.730 666,442 100.00% 3,099.730 215 3,500.000 752,500 3,099.730 666,442 88.564% 400.270 86,058 11.436%
Total Pedestrian Bridge Work 73,856,843 58,334,846 15,521,997 85,686,751 73,856,843 86.19% 11,908,157 13.90%
Increase
                           Remarks
 Amount        %
- 0.00%
73,415 2039.32%
31,870 8.50%
1,152,984 21.96%
- 0.00%
664,740 590.88%
1,412,500 26.67%
117,308 101.18%
3,452,818 26.82%
28,053 165.02%
22,846 26.11%
   27,351   17.94%
  78,250    0.09%
3,531,068   3.58%
    5,471.523       5,431.023
    3,474.018       3,457.818
           -               -
      400.000         319.031
           -               -
           -               -
           -               -
           -               -
      600.000         561.526
           -               -
           -               -
    2,739.391       2,726.913
      392.151         390.637
      436.103         432.339
           -               -
           -               -
      475.000         472.000
           -               -
           -               -
           -               -
   10,233.882      10,183.882
           -               -
       65.304          65.304
           -               -
       40.000          40.000
           -               -
           -               -
           -               -
           -               -
       15.525          15.525
           -               -
       21.283          20.513
      101.433          99.615
           -               -
       47.174          45.208
      359.874         343.838
           -               -
           -               -
        8.000           7.500
           -               -
           -               -
1,893,698.262   1,399,770.222
  217,228.016      83,320.741
         -             -
         -             -
214,534.000   159,801.550
 33,875.000    12,628.950
         -             -
         -             -
 23,437.460    10,561.483
  6,455.376     1,703.435
         -
         -
         -
         -
         -
         -
         -
         -
         -
    395.143   416.666
    770.523   119.541
         -          -
         -    384.000
         -          -
     16.000         -
         -          -
         -          -
         -    200.000
     24.000         -
         -          -
    505.422   244.813
     15.164    57.315
         -    386.103
         -          -
         -          -
         -    100.000
         -          -
         -          -
         -          -
         -         ###
         -          -
     78.696         -
         -          -
     40.000         -
         -          -
         -          -
         -          -
         -          -
     66.475         -
    425.000         -
         -     13.283
      1.600    63.033
         -          -
         -      7.174
     65.126         -
         -          -
         -          -
     54.000         -
         -          -
         -          -
 66,301.738         -
154,771.984         -
        -    -
        -    -
31,466.000   -
44,125.000   -
        -    -
        -    -
 4,562.540   -
 4,944.624   -
                                                                                                                                                                                    Page 59 of 187
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                                Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                           Measurement                    Qty.
 Item
                                   Item Description                                  Unit   B.O.Q    V.O-5   No.                                                                   Remarks
  No                                                                                                                                                      Area           Volume
                                                                                                                    L          W         H/D     no / m
                                                                                                                                                          (m2)            (m3)
a From NGL (±) 0.00 meter depth to -1.5 meter depth Cum 2,600 5,450
CF-6 Left Side (S.Raod) NGL 142.453 - Exc.L 139.984 1 9.200 7.695 1.500 - - 106.191
F-4 Left Side (S.Raod) NGL 142.453 - Exc.L 139.984 4 3.200 3.200 1.500 - - 61.440
Escalator Pit (S.Road) NGL 142.453 - Exc.L 140.454 1 6.800 0.640 1.500 - - 6.528
CF-4 Left Side (S.Raod) NGL 142.453 - Exc.L 139.782 2 2.265 5.550 1.500 - - 37.712
CF-7 Left Side (S.Raod) NGL 142.453 - Exc.L 139.782 1 4.397 6.345 1.500 - - 41.848
CF-5 Left Side (M.Raod) NGL 142.279 - Exc.L 139.984 1 4.500 5.025 1.500 - - 33.919
F-1A Left Side (M.Raod) NGL 142.279 - Exc.L 140.897 2 1.200 1.100 1.400 - - 3.696
        CF-2 Left Side (M.Raod) NGL 142.279 - Exc.L 139.984                                                   1    3.200      6.400      1.500        -          -        30.720
                                                                                                                                                                  Page 60 of 187
                                                                                                         Measurement                    Qty.
 Item
                                Item Description                    Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                    Area           Volume
                                                                                                   L         W         H/D     no / m
                                                                                                                                        (m2)            (m3)
F-4 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782 1 3.200 3.200 1.500 - - 15.360
F-4 & F-4A Left Side (M.Raod) NGL 142.279 - Exc.L 139.984 4 3.200 3.200 1.500 - - 61.440
Escalator Pit (M.Road) NGL 142.279 - Exc.L 140.893 1 6.800 0.640 1.386 - - 6.032
CF-4 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782 2 2.265 5.550 1.500 - - 37.712
CF-8 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782 1 6.400 3.200 1.500 - - 30.720
CF-8 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782 1 6.400 3.200 1.500 - - 30.720
CF-1 Median NGL 142.243 - Exc.L 140.137 1 9.175 7.020 1.500 - - 96.613
CF-3 Right Side NGL 141.972 - Exc.L 139.795 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 141.972 - Exc.L 139.795 2 2.000 2.000 1.500 - - 12.000
CF-5 Right Side NGL 141.972 - Exc.L 139.795 1 12.200 6.400 1.500 - - 117.120
Escalator Pit Right Side NGL 141.972 - Exc.L 141.047 1 6.800 2.230 0.925 - - 14.027
CF-6 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 9.200 7.695 1.500 - - 106.191
F-4 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 2 3.200 3.200 1.500 - - 30.720
Escalator Pit (S.Road) NGL 140.425 - Exc.L 139.443 1 6.800 2.230 0.982 - - 14.891
CF-8 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 3.200 4.445 1.500 - - 21.336
        CF-4 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625                                 2    2.265      5.550      1.500        -          -        37.712
                                                                                                                                                             Page 61 of 187
                                                                                                    Measurement                    Qty.
 Item
                                Item Description               Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                               Area           Volume
                                                                                              L         W         H/D     no / m
                                                                                                                                   (m2)            (m3)
CF-7 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 4.397 6.345 1.500 - - 41.848
CF-10 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 4.900 8.300 1.500 - - 61.005
F-1A Left Side (M.Raod) NGL 140.218 - Exc.L 138.818 1 1.200 1.000 1.400 - - 1.680
F-4 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 4 3.200 3.200 1.500 - - 61.440
CF-9 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 3.200 6.350 1.500 - - 30.480
Escalator Pit (M.Road) NGL 140.218 - Exc.L 139.708 1 6.800 2.230 0.510 - - 7.734
CF-11 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 3.200 9.275 1.500 - - 44.520
CF-4 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 2.265 5.550 1.500 - - 18.856
CF-12 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 3.200 9.383 1.500 - - 45.038
CF-13 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 6.395 6.400 1.500 - - 61.392
CF-1 Median NGL 140.352 - Exc.L 138.252 1 9.175 7.020 1.500 - - 96.613
CF-3 Right Side NGL 140.411 - Exc.L 138.311 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 140.411 - Exc.L 138.311 2 2.000 2.000 1.500 - - 12.000
CF-5 Right Side NGL 140.411 - Exc.L 138.311 1 12.200 6.400 1.500 - - 117.120
        Escalator Pit Right Side NGL 140.411 - Exc.L 139.486                           1    6.800      2.230      0.925        -          -        14.027
                                                                                                                                                               Page 62 of 187
                                                                                                      Measurement                    Qty.
 Item
                                Item Description                 Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                 Area           Volume
                                                                                                L          W        H/D     no / m
                                                                                                                                     (m2)            (m3)
CF-6 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 1 8.900 7.695 1.500 - - 102.728
F-4 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 3 3.200 3.200 1.500 - - 46.080
Escalator Pit (S.Road) NGL 141.826 - Exc.L 140.755 1 6.800 2.230 1.071 - - 16.241
CF-7 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 1 3.200 4.438 1.500 - - 21.302
CF-4 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 2 2.265 5.550 1.500 - - 37.712
CF-3A Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 1 2.745 2.000 1.500 - - 8.235
F-1A Left Side (S.Raod) NGL 141.826 - Exc.L 140.425 3 1.200 1.200 1.400 - - 6.048
PileCap Left Side (M.Raod) NGL 141.509 - Exc.L 141.605 1 71.200 8.200 0.161 - -
CF-1 Median NGL 141.717 - Exc.L 139.617 1 9.180 11.040 1.500 - - 152.021
CF-3 Right Side NGL 141.511 - Exc.L 139.411 1 2.000 3.700 1.500 - - 11.100
        F-1 Right Side NGL 141.511 - Exc.L 139.411                                       2    2.000      2.000      1.500        -          -        12.000
                                                                                                                                                                         Page 63 of 187
                                                                                                               Measurement                    Qty.
 Item
                                   Item Description                       Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                          Area           Volume
                                                                                                         L         W         H/D     no / m
                                                                                                                                              (m2)            (m3)
CF-2 Right Side NGL 141.511 - Exc.L 139.411 1 13.850 5.600 1.500 - - 116.340
Escalator Pit Right Side NGL 141.511 - Exc.L 140.608 1 6.800 2.230 0.903 - - 13.693
CF-6 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 9.200 7.695 1.500 - - 106.191
F-4 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 2 3.200 3.700 1.500 - - 35.520
F-4 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 2 3.200 3.200 1.500 - - 30.720
CF-7 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 3.200 4.445 1.500 - - 21.336
CF-4 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 2 2.265 5.550 1.500 - - 37.712
CF-3 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 2.000 4.200 1.500 - - 12.600
F-1A Left Side (S.Raod) NGL 137.819 - Exc.L 136.419 3 1.200 1.100 1.400 - - 5.544
CF-12 Left Side (M.Raod) NGL 138.584 - Exc.L 136.484 1 8.600 5.315 1.500 - - 68.564
F-1A Left Side (M.Raod) NGL 138.584 - Exc.L 137.184 3 1.200 1.100 1.400 - - 5.544
                                                                                                    Measurement                    Qty.
 Item
                                Item Description               Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                               Area           Volume
                                                                                              L          W        H/D     no / m
                                                                                                                                   (m2)            (m3)
CF-8 Left Side (M.Raod)) NGL 138.584 - Exc.L 136.484 1 3.200 4.770 1.500 - - 22.896
CF-10 Left Side (M.Raod) NGL 138.584 - Exc.L 136.484 4 3.200 5.400 1.500 - - 103.680
CF-1 Median NGL 138.677- Exc.L 136.577 1 9.175 11.815 1.500 - - 162.604
CF-3 Right Side NGL 138.207- Exc.L 136.107 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 138.207- Exc.L 136.107 2 2.000 2.000 1.500 - - 12.000
CF-2A Right Side NGL 138.207- Exc.L 136.107 1 13.350 5.700 1.500 - - 114.143
Escalator Pit Right Side NGL 138.207- Exc.L 136.763 1 6.800 2.230 1.444 - - 21.897
CF-6 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 9.200 7.700 1.500 - - 106.260
F-1A Left Side (S.Raod) NGL 135.587 - Exc.L 134.187 3 1.200 1.100 1.400 - - 5.544
F-4 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 2 3.200 3.200 1.500 - - 30.720
Escalator Pit (S.Road) NGL 135.587- Exc.L 135.493 1 6.800 2.230 0.094 - - 1.425
CF-7 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 3.200 4.445 1.500 - - 21.336
        CF-4 Left Side (S.Raod) NGL 135.587- Exc.L 132.489                             1    2.265      5.550      1.500        -          -        18.856
                                                                                                                                                             Page 65 of 187
                                                                                                   Measurement                    Qty.
 Item
                                Item Description              Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                              Area           Volume
                                                                                             L         W         H/D     no / m
                                                                                                                                  (m2)            (m3)
CF-4 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 2.265 6.050 1.500 - - 20.555
CF-9 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 4.400 6.450 1.500 - - 42.570
                                                                                                                                                           1/2 footing
        CF-11 Left Side (M.Raod) NGL 136.000- Exc.L 132.882                           1    9.200      4.200      1.500        -          -        57.960
                                                                                                                                                             In Nala
                                                                                                                                                           2 footing In
        F-4 Left Side (M.Raod) NGL 136.000- Exc.L 133.900                             2    3.200      3.200      1.500        -          -        30.720
                                                                                                                                                               Nala
Escalator Pit (M.Road) NGL 136.000- Exc.L 135.917 1 6.800 2.230 0.083 - - 1.259
                                                                                                                                                           1/2 footing
        CF-8 Left Side (M.Raod) NGL 136.000- Exc.L 132.882                            1    3.200      1.620      1.500        -          -         7.776
                                                                                                                                                             In Nala
                                                                                                                                                           1/2 footing
        CF-4 Left Side (M.Raod) NGL 136.000- Exc.L 132.882                            1    2.265      2.700      1.500        -          -         9.173
                                                                                                                                                             In Nala
                                                                                                                                                           1/2 footing
        CF-10 Left Side (S.Raod) NGL 136.000- Exc.L 132.882                           1    6.400      3.200      1.500        -          -        30.720
                                                                                                                                                             In Nala
CF-1 Median NGL 136.173- Exc.L 133.343 1 9.175 7.020 1.500 - - 96.613
CF-2 Median NGL 136.173- Exc.L 133.343 2 6.400 3.200 1.500 - - 61.440
CF-3 Right Side NGL 135.908- Exc.L 133.708 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 135.908- Exc.L 133.708 2 2.000 2.000 1.500 - - 12.000
CF-2A Right Side NGL 135.908- Exc.L 133.708 1 13.350 5.700 1.500 - - 114.143
Escalator Pit Right Side NGL 135.908- Exc.L 135.177 1 6.800 2.230 0.731 - - 11.085
CF-6 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 9.200 7.695 1.500 - - 106.191
        F-1A Left Side (S.Raod) NGL 133.006 - Exc.L 131.606                           3    1.200      1.100      1.400        -          -         5.544
                                                                                                                                                            Page 66 of 187
                                                                                                   Measurement                    Qty.
 Item
                                  Item Description            Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                              Area           Volume
                                                                                             L         W         H/D     no / m
                                                                                                                                  (m2)            (m3)
F-4 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 2 3.200 3.200 1.500 - - 30.720
Escalator Pit (S.Road) NGL 133.006- Exc.L 131.955 1 6.800 2.230 1.051 - - 15.937
CF-7 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 3.200 4.450 1.500 - - 21.360
CF-4 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 2 2.265 5.550 1.500 - - 37.712
CF-3A Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 4.400 6.250 1.500 - - 41.250
CF-1 Median NGL 133.199- Exc.L 130.299 1 9.175 7.025 1.500 - - 96.682
CF-2 Median NGL 133.199- Exc.L 130.299 2 6.400 3.200 1.500 - - 61.440
CF-3 Right Side NGL 134.270- Exc.L 130.988 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 134.270- Exc.L 130.988 2 2.000 2.000 1.500 - - 12.000
CF-2A Right Side NGL 134.270- Exc.L 130.988 1 13.350 5.700 1.500 - - 114.143
Escalator Pit Right Side NGL 134.270- Exc.L 132.495 1 6.800 2.230 1.500 - - 22.746
CF-6 Left Side (S.Raod) NGL 132.538- Exc.L 129.625 1 9.200 7.700 1.500 - - 106.260
F-1A Left Side (S.Raod) NGL 132.538 - Exc.L 131.136 3 1.200 1.000 1.400 - - 5.040
F-4 Left Side (S.Raod) NGL 132.538- Exc.L 130.438 1 3.200 3.200 1.500 - - 15.360
F-4 Left Side (S.Raod) NGL 132.538- Exc.L 129.625 1 3.200 3.200 1.500 - - 15.360
        Escalator Pit (S.Road) NGL 132.538- Exc.L 132.113                             1    6.800      2.230      0.425        -          -         6.445
                                                                                                                                                             Page 67 of 187
                                                                                                    Measurement                    Qty.
 Item
                               Item Description                Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                               Area           Volume
                                                                                              L          W        H/D     no / m
                                                                                                                                   (m2)            (m3)
CF-7 Left Side (S.Raod) NGL 132.538- Exc.L 130.438 1 3.200 4.450 1.500 - - 21.360
CF-4 Left Side (S.Raod) NGL 132.538- Exc.L 129.625 2 2.265 5.550 1.500 - - 37.712
CF-3A Left Side (S.Raod) NGL 132.538- Exc.L 129.625 1 4.390 6.200 1.500 - - 40.827
PileCap Left Side (M.Raod) NGL 133.051 Exc.L 132.911 1 47.700 10.163 0.140 - - 67.869
                                                                                                   Measurement                    Qty.
 Item
                                Item Description              Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                              Area           Volume
                                                                                             L         W         H/D     no / m
                                                                                                                                  (m2)            (m3)
CF-1 Median NGL 133.081- Exc.L 129.981 1 9.175 7.025 1.500 - - 96.682
CF-2 Median NGL 133.081- Exc.L 129.981 2 6.400 3.200 1.500 - - 61.440
CF-3 Right Side NGL 132.766- Exc.L 130.666 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 132.766- Exc.L 130.666 2 2.000 2.000 1.500 - - 12.000
CF-5 Right Side NGL 132.766- Exc.L 130.666 1 13.350 5.700 1.500 - - 114.143
Escalator Pit Right Side NGL 132.766- Exc.L 132.342 1 6.800 2.230 0.425 - - 6.445
CF-6 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 1 9.200 7.695 1.500 - - 106.191
F-1A Left Side (S.Raod) NGL 130.259 - Exc.L 128.859 3 1.200 1.100 1.400 - - 5.544
F-4 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 2 3.200 3.200 1.500 - - 30.720
Escalator Pit (S.Road) NGL 130.259- Exc.L 129.834 1 6.800 2.230 0.425 - - 6.445
CF-7 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 1 3.200 4.450 1.500 - - 21.360
CF-4 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 2 2.265 5.550 1.500 - - 37.712
        CF-3A Left Side (S.Raod) NGL 130.259- Exc.L 128.159                           1    6.265      6.200      1.500        -          -        58.265
                                                                                                                                                               Page 69 of 187
                                                                                                     Measurement                     Qty.
 Item
                                 Item Description               Unit   B.O.Q   V.O-5   No.                                                                    Remarks
  No                                                                                                                                 Area           Volume
                                                                                               L          W        H/D      no / m
                                                                                                                                     (m2)            (m3)
PileCap Left Side (M.Raod) NGL 130.387- Exc.L 130.030 1 47.365 10.615 0.357 - - 179.492
Less Offset
CF-1 Median NGL 130.791- Exc.L 127.845 1 9.175 7.020 1.500 - - 96.613
CF-2 Median NGL 130.791- Exc.L 127.845 1 5.800 4.760 1.500 - - 41.412
CF-3 Right Side NGL 130.521- Exc.L 128.421 1 2.000 3.700 1.500 - - 11.100
F-1 Right Side NGL 130.521- Exc.L 128.421 2 2.000 2.000 1.500 - - 12.000
CF-2A Right Side NGL 130.521- Exc.L 128.421 2 4.200 6.700 1.500 - - 84.420
CF-5 Right Side NGL 130.521- Exc.L 128.421 1 4.800 5.625 1.500 - - 40.500
Escalator Pit Right Side NGL 130.521- Exc.L 130.030 1 6.800 2.230 0.491 - - 7.446
Lift Lobby Ramp (Right Side) (2 No x 8 Station) 16 3.150 0.550 0.350 9.702 -
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                                Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                          Measurement                    Qty.
 Item
                                   Item Description                                  Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                                     Area           Volume
                                                                                                                   L          W         H/D     no / m
                                                                                                                                                         (m2)            (m3)
CF-6 Left Side (S.Raod) NGL 142.453 - Exc.L 139.984 1 9.200 7.695 0.969 - - 68.599
F-4 Left Side (S.Raod) NGL 142.453 - Exc.L 139.984 4 3.200 3.200 0.969 - - 39.690
Escalator Pit (S.Road) NGL 142.453 - Exc.L 140.454 1 6.800 0.640 0.499 - - 2.172
CF-4 Left Side (S.Raod) NGL 142.453 - Exc.L 139.782 2 2.265 5.550 1.171 - - 29.441
CF-7 Left Side (S.Raod) NGL 142.453 - Exc.L 139.782 1 4.397 6.345 1.171 - - 32.670
CF-5 Left Side (M.Raod) NGL 142.279 - Exc.L 139.984 1 4.600 5.030 0.795 - - 18.395
CF-2 Left Side (M.Raod) NGL 142.279 - Exc.L 139.984 1 3.200 6.400 0.795 - - 16.282
        F-4 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782                                                   4    3.200      3.200      0.795        -          -        32.563
                                                                                                                                                                  Page 71 of 187
                                                                                                         Measurement                    Qty.
 Item
                                Item Description                    Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                    Area           Volume
                                                                                                   L         W         H/D     no / m
                                                                                                                                        (m2)            (m3)
F-4 & F-4A Left Side (M.Raod) NGL 142.279 - Exc.L 139.984 2 2.265 5.550 0.997 - - 25.066
CF-4 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782 1 6.400 3.200 0.997 - - 20.419
CF-8 Left Side (M.Raod) NGL 142.279 - Exc.L 139.782 1 9.175 7.020 0.606 - - 39.032
CF-1 Median NGL 142.243 - Exc.L 140.137 1 2.000 3.700 0.677 - - 5.010
CF-3 Right Side NGL 141.972 - Exc.L 139.795 2 2.000 2.000 0.677 - - 5.416
F-1 Right Side NGL 141.972 - Exc.L 139.795 1 12.200 6.400 0.677 - - 52.860
CF-6 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 2.136 1.295 1.300 - - - 3.596
F-4 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 3.200 4.445 1.300 - - 18.491
CF-8 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 2 2.265 5.550 1.300 - - 32.684
CF-4 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 4.397 6.345 1.300 - - 36.269
CF-7 Left Side (S.Raod) NGL 140.425 - Exc.L 137.625 1 1.197 3.147 1.300 - - - 4.897
CF-10 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 1.700 2.565 1.069 - - - 4.661
F-4 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 3.200 9.275 1.069 - - 31.728
CF-9 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 2.265 5.550 1.069 - - 13.438
CF-11 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 3.200 9.383 1.069 - - 32.097
        CF-4 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649                                 1    2.700      3.345      1.069        -          -         9.655
                                                                                                                                                             Page 72 of 187
                                                                                                    Measurement                    Qty.
 Item
                                Item Description               Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                               Area           Volume
                                                                                              L          W        H/D     no / m
                                                                                                                                   (m2)            (m3)
CF-12 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 6.395 6.400 1.069 - - 43.752
CF-13 Left Side (M.Raod) NGL 140.218 - Exc.L 137.649 1 9.175 7.020 0.600 - - 38.645
CF-1 Median NGL 140.352 - Exc.L 138.252 2 2.000 2.000 0.600 - - 4.800
CF-3 Right Side NGL 140.411 - Exc.L 138.311 1 12.200 6.400 0.600 - - 46.848
CF-5 Right Side NGL 140.411 - Exc.L 138.311 1 8.900 7.695 1.071 - - 73.348
CF-6 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 3 3.200 3.200 1.071 - - 32.901
F-4 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 2 2.265 5.550 1.071 - - 26.927
CF-7 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 1 2.745 2.000 1.071 - - 5.880
CF-4 Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 1 9.180 11.040 0.600 - - 60.808
CF-3A Left Side (S.Raod) NGL 141.826 - Exc.L 139.255 2 2.150 1.290 0.600 - - - 3.328
CF-1 Median NGL 141.717 - Exc.L 139.617 2 1.270 1.290 0.600 - - - 1.966
CF-3 Right Side NGL 141.511 - Exc.L 139.411 1 13.850 5.600 0.600 - - 46.536
CF-2 Right Side NGL 141.511 - Exc.L 139.411 1 9.200 7.695 1.200 - - 84.953
                                                                                                               Measurement                    Qty.
 Item
                                Item Description                          Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                          Area           Volume
                                                                                                         L          W        H/D     no / m
                                                                                                                                              (m2)            (m3)
CF-6 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 2 3.700 3.200 1.200 - - 28.416
F-4 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 3.200 4.445 1.200 - - 17.069
F-4 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 2 2.265 5.550 1.200 - - 30.170
CF-7 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 2.000 4.200 1.200 - - 10.080
CF-4 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 8.600 5.315 0.600 - - 27.425
CF-3 Left Side (S.Raod) NGL 137.819 - Exc.L 135.119 1 4.325 2.120 0.600 - - - 5.501
                                                                                                                                                                       2 footing In
        CF-12 Left Side (M.Raod) NGL 138.584 - Exc.L 136.484                                      4    3.200      3.200      0.600        -          -        24.576
                                                                                                                                                                           Nala
                                                                                                                                                                       1/2 footing
        F-4 / F-4A Left Side (M.Raod) (5+1) NGL 138.584 - Exc.L 136.484                           1    2.265      3.075      1.534        -          -        10.684
                                                                                                                                                                         In Nala
                                                                                                                                                                       1/2 footing
        CF-8 Left Side (M.Raod)) NGL 138.584 - Exc.L 136.484                                      1    3.200      5.475      1.534        -          -        26.876
                                                                                                                                                                         In Nala
CF-4 Left Side (M.Raod) NGL 138.584 - Exc.L 135.550 4 3.200 5.400 0.600 - - 41.472
CF-9 Left Side (M.Raod) NGL 138.584 - Exc.L 135.550 1 9.175 11.815 0.600 - - 65.042
CF-10 Left Side (M.Raod) NGL 138.584 - Exc.L 136.484 2 1.387 3.140 0.600 - - - 5.226
CF-1 Median NGL 138.677- Exc.L 136.577 1 2.000 3.700 0.600 - - 4.440
CF-3 Right Side NGL 138.207- Exc.L 136.107 1 13.350 5.700 0.600 - - 45.657
CF-2A Right Side NGL 138.207- Exc.L 136.107 1 9.200 7.700 1.598 - - 113.202
CF-6 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 2 3.200 3.200 1.598 - - 32.727
                                                                                                   Measurement                    Qty.
 Item
                                Item Description              Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                              Area           Volume
                                                                                             L         W         H/D     no / m
                                                                                                                                  (m2)            (m3)
F-4 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 2.265 5.550 1.598 - - 20.088
CF-7 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 2.265 6.050 1.598 - - 21.898
CF-4 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 4.400 6.450 1.598 - - 45.351
CF-4 Left Side (S.Raod) NGL 135.587- Exc.L 132.489 1 1.200 3.245 1.598 - - - 6.223
                                                                                                                                                           1/2 footing
        CF-9 Left Side (S.Raod) NGL 135.587- Exc.L 132.489                            1    9.200      4.200      1.618        -          -        62.520
                                                                                                                                                             In Nala
                                                                                                                                                           2 footing In
                                                                                      2    3.200      3.200      0.600        -          -        12.288
                                                                                                                                                               Nala
                                                                                                                                                           1/2 footing
        CF-11 Left Side (M.Raod) NGL 136.000- Exc.L 132.882                           1    3.200      1.620      1.618        -          -         8.388
                                                                                                                                                             In Nala
                                                                                                                                                           1/2 footing
        F-4 Left Side (M.Raod) NGL 136.000- Exc.L 133.900                             1    2.265      2.700      1.618        -          -         9.895
                                                                                                                                                             In Nala
                                                                                                                                                           1/2 footing
        CF-8 Left Side (M.Raod) NGL 136.000- Exc.L 132.882                            1    6.400      3.200      1.618        -          -        33.137
                                                                                                                                                             In Nala
CF-4 Left Side (M.Raod) NGL 136.000- Exc.L 132.882 1 3.200 0.725 1.618 - - 3.754
CF-10 Left Side (S.Raod) NGL 136.000- Exc.L 132.882 1 9.175 7.020 1.330 - - 85.663
CF-1 Median NGL 136.173- Exc.L 133.343 1 2.000 3.700 0.700 - - 5.180
CF-2 Median NGL 136.173- Exc.L 133.343 2 2.000 2.000 0.700 - - 5.600
CF-3 Right Side NGL 135.908- Exc.L 133.708 1 13.350 5.700 0.700 - - 53.266
CF-2A Right Side NGL 135.908- Exc.L 133.708 1 9.200 7.695 1.626 - - 115.111
CF-6 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 2.000 2.230 1.626 - - 7.252
Add- Wall Escalator Pit NGL 133.006- Exc.L 129.880 1 3.200 4.450 1.626 - - 23.154
        F-4 Left Side (S.Raod) NGL 133.006- Exc.L 129.880                             2    2.265      5.550      1.626        -          -        40.880
                                                                                                                                                            Page 75 of 187
                                                                                                   Measurement                    Qty.
 Item
                                Item Description              Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                              Area           Volume
                                                                                             L         W         H/D     no / m
                                                                                                                                  (m2)            (m3)
CF-7 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 4.400 6.250 1.626 - - 44.715
CF-4 Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 1.200 3.045 1.626 - - - 5.941
CF-3A Left Side (S.Raod) NGL 133.006- Exc.L 129.880 1 9.175 7.025 1.400 - - 90.236
CF-1 Median NGL 133.199- Exc.L 130.299 1 2.000 3.700 1.782 - - 13.187
CF-2 Median NGL 133.199- Exc.L 130.299 2 2.000 2.000 1.782 - - 14.256
CF-3 Right Side NGL 134.270- Exc.L 130.988 1 13.350 5.700 1.782 - - 135.601
F-1 Right Side NGL 134.270- Exc.L 130.988 1 6.800 2.230 0.275 - - 4.170
Escalator Pit Right Side NGL 134.270- Exc.L 132.495 1 9.200 7.700 1.413 - - 100.097
CF-6 Left Side (S.Raod) NGL 132.538- Exc.L 129.625 1 3.200 3.200 0.600 - - 6.144
F-4 Left Side (S.Raod) NGL 132.538- Exc.L 130.438 1 3.200 4.450 0.600 - - 8.544
F-4 Left Side (S.Raod) NGL 132.538- Exc.L 129.625 2 2.265 5.550 1.413 - - 35.525
CF-7 Left Side (S.Raod) NGL 132.538- Exc.L 130.438 1 4.390 6.200 1.413 - - 38.459
CF-4 Left Side (S.Raod) NGL 132.538- Exc.L 129.625 1 1.200 3.000 1.413 - - - 5.087
CF-3A Left Side (S.Raod) NGL 132.538- Exc.L 129.625 1 9.175 7.020 1.600 - - 103.054
CF-1 Median NGL 133.081- Exc.L 129.981 1 2.000 3.700 0.600 - - 4.440
CF-2 Median NGL 133.081- Exc.L 129.981 2 2.000 2.000 0.600 - - 4.800
        CF-3 Right Side NGL 132.766- Exc.L 130.666                                    1    13.350     5.700      0.600        -          -        45.657
                                                                                                                                                            Page 76 of 187
                                                                                                   Measurement                    Qty.
 Item
                                Item Description              Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                              Area           Volume
                                                                                            L          W         H/D     no / m
                                                                                                                                  (m2)            (m3)
CF-5 Right Side NGL 132.766- Exc.L 130.666 1 9.200 7.700 0.825 - - 58.443
CF-6 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 2 3.200 3.200 0.825 - - 16.896
F-4 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 1 2.265 5.550 0.825 - - 10.371
CF-7 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 1 2.265 5.670 0.825 - - 10.595
CF-4 Left Side (S.Raod) NGL 130.259- Exc.L 128.159 1 6.265 6.200 0.825 - - 32.045
CF-3A Left Side (S.Raod) NGL 130.259- Exc.L 128.159 1 1.200 3.000 0.825 - - - 2.970
CF-1 Median NGL 130.791- Exc.L 127.845 1 4.800 3.700 1.425 - - 25.308
CF-2 Median NGL 130.791- Exc.L 127.845 1 4.800 5.600 1.425 - - 38.304
CF-3 Right Side NGL 130.521- Exc.L 128.421 1 2.000 3.700 1.650 - - 12.210
F-1 Right Side NGL 130.521- Exc.L 128.421 2 2.000 2.000 1.650 - - 13.200
CF-2A Right Side NGL 130.521- Exc.L 128.421 2 4.200 6.700 1.650 - - 92.862
CF-5 Right Side NGL 130.521- Exc.L 128.421 1 4.800 5.625 1.650 - - 44.550
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                             Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
F-4 / F-4A Left Side (M.Raod) (5+1) 6 3.200 3.200 0.100 - - 6.144
Less Offset
Plinth beam
Under Floor
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                    Measurement                    Qty.
 Item
                                  Item Description                             Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                               Area           Volume
                                                                                                             L          W         H/D     no / m
                                                                                                                                                   (m2)            (m3)
a Foundations (for any type & shape) (28 Mpa 4000 Psi) Cum 720 3,000
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                      Area           Volume
                                                                                     L         W         H/D     no / m
                                                                                                                          (m2)            (m3)
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                      Area           Volume
                                                                                     L         W         H/D     no / m
                                                                                                                          (m2)            (m3)
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                      Area           Volume
                                                                                     L          W        H/D     no / m
                                                                                                                          (m2)            (m3)
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                      Area           Volume
                                                                                     L          W        H/D     no / m
                                                                                                                          (m2)            (m3)
F-4 / F-4A Left Side (M.Raod) (5+1) 6 3.000 3.000 0.450 - - 24.300
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                      Area           Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)            (m3)
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                      Area           Volume
                                                                                     L         W         H/D     no / m
                                                                                                                          (m2)            (m3)
                                                                                           Measurement                     Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                    Remarks
  No                                                                                                                       Area           Volume
                                                                                     L         W         H/D      no / m
                                                                                                                           (m2)            (m3)
                                                                                           Measurement                     Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                                    Remarks
  No                                                                                                                       Area           Volume
                                                                                     L         W         H/D      no / m
                                                                                                                           (m2)            (m3)
                                                                                                                     Measurement                    Qty.
 Item
                                   Item Description                             Unit   B.O.Q   V.O-5   No.                                                                   Remarks
  No                                                                                                                                                Area           Volume
                                                                                                               L          W        H/D     no / m
                                                                                                                                                    (m2)            (m3)
PileCap Left Side (M.Raod) T.O.Pile Cap 131.040 B.O. Pile Cap 130.130 1 47.165 10.410 0.910 - - 446.799
Less Offset
                                                                                          Measurement                    Qty.
 Item
                                  Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                     Area       Volume
                                                                                   L          W         H/D     no / m
                                                                                                                         (m2)        (m3)
                                                                                         Measurement                    Qty.
 Item
                                 Item Description   Unit   B.O.Q   V.O-5   No.                                                                 Remarks
  No                                                                                                                    Area       Volume
                                                                                  L          W         H/D     no / m
                                                                                                                        (m2)        (m3)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                     Measurement                    Qty.
 Item
                                  Item Description                              Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                                                Area       Volume
                                                                                                              L          W         H/D     no / m
                                                                                                                                                    (m2)        (m3)
b Columns / Pedestal below plinth beam (28 Mpa 4000 Psi) Cum 200 350
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
F-4 / F4A Left Side (M.Raod) (PDC-1) 5 0.600 0.600 2.588 - - 4.658
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
CF-12 Left Side (M.Raod) (PDC-1) Over Beam 1 0.600 0.600 1.085 - - 0.391
CF-13 Left Side (M.Raod) (PDC-1) Over Beam 2 0.600 0.600 1.085 - - 0.781
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
CF-6 Left Side (S.Raod) (C-1)Over Beam 1 0.300 0.150 1.723 - - 0.078
F-4 Left Side (S.Raod) (PDC-1) Over Beam 3 0.600 0.600 1.416 - - 1.529
CF-4 Left Side (S.Raod) (PDC-1) Over Beam 2 0.600 0.600 1.416 - - 1.020
CF-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 1.100 - - 0.792
                                                                                             Measurement                    Qty.
 Item
                                   Item Description     Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                        Area       Volume
                                                                                      L          W         H/D     no / m
                                                                                                                            (m2)        (m3)
CF-3A Left Side (S.Raod) (PDC-2A) Over Beam 2 0.800 0.300 1.116 - - 0.536
CF-3A Left Side (S.Raod) (PDC-2A) Underr Beam 2 0.800 0.300 1.100 - - 0.528
CF-6 Left Side (S.Raod) (C-1)Over Beam 1 0.300 0.150 2.768 - - 0.125
                                                                                            Measurement                    Qty.
 Item
                                 Item Description      Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                       Area       Volume
                                                                                     L          W         H/D     no / m
                                                                                                                           (m2)        (m3)
CF-3 Left Side (S.Raod) (PDC-2A) Over Beam 2 0.800 0.300 2.251 - - 1.080
CF-3 Left Side (S.Raod) (PDC-2A) Underr Beam 2 0.800 0.300 1.200 - - 0.576
F-4 / F-4A Left Side (M.Raod) Over Beam 2 0.600 0.600 0.620 - - 0.446
F-4 / F-4A Left Side (M.Raod) Underr Beam 2 0.600 0.600 1.816 - - 1.308
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
CF-6 Left Side (S.Raod) (PDC-1) Over Beam 2 0.600 0.600 2.821 - - 2.031
CF-6 Left Side (S.Raod) (PDC-1) Underr Beam 4 0.600 0.600 1.000 - - 1.440
CF-6 Left Side (S.Raod) (C-1)Over Beam 1 0.300 0.150 2.116 - - 0.095
F-4 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 2.821 - - 1.016
F-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 1.050 - - 0.756
        CF-4 Left Side (S.Raod) (PDC-1) Over Beam                             1    0.600      0.600      2.821        -          -     1.016
                                                                                                                                               Page 108 of 187
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
CF-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 1.000 - - 0.720
CF-9 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 2.821 - - 1.016
CF-9 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 1.000 - - 0.720
                                                                                            Measurement                    Qty.
 Item
                                  Item Description     Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                       Area       Volume
                                                                                     L          W         H/D     no / m
                                                                                                                           (m2)        (m3)
CF-6 Left Side (S.Raod) (PDC-1) Over Beam 2 0.600 0.600 2.256 - - 1.624
CF-6 Left Side (S.Raod) (PDC-1) Underr Beam 4 0.600 0.600 1.096 - - 1.578
CF-6 Left Side (S.Raod) (C-1)Over Beam 1 0.300 0.150 2.055 - - 0.092
CF-4 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 2.256 - - 0.812
CF-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 1.096 - - 0.789
CF-3A Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 2.256 - - 0.812
        CF-3A Left Side (S.Raod) (PDC-1) Underr Beam                           2    0.600      0.600      1.096        -          -     0.789
                                                                                                                                               Page 110 of 187
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
CF-6 Left Side (S.Raod) (PDC-1) Over Beam 2 0.600 0.600 2.829 - - 2.037
CF-6 Left Side (S.Raod) (PDC-1) Underr Beam 4 0.600 0.600 0.900 - - 1.296
CF-6 Left Side (S.Raod) (C-1)Over Beam 1 0.300 0.150 2.599 - - 0.117
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
F-4 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 2.829 - - 1.018
F-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 0.900 - - 0.648
CF-4 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 2.829 - - 1.018
CF-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 0.900 0.648
                                                                                           Measurement                    Qty.
 Item
                                  Item Description    Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
F-4 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 1.718 - - 0.618
F-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 0.897 - - 0.646
CF-4 Left Side (S.Raod) (PDC-1) Over Beam 1 0.600 0.600 1.718 - - 0.618
CF-4 Left Side (S.Raod) (PDC-1) Underr Beam 2 0.600 0.600 0.847 - - 0.610
                                                                                           Measurement                    Qty.
 Item
                                   Item Description   Unit   B.O.Q   V.O-5   No.                                                               Remarks
  No                                                                                                                      Area       Volume
                                                                                    L          W         H/D     no / m
                                                                                                                          (m2)        (m3)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                              Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
a) Lift Pits
Wall 1 Lift Pits-2 (Left Side.) S.Raod 2 2.500 0.250 2.443 3.054
Wall 2 Lift Pits-2 (Left Side.) S.Raod 2 1.900 0.250 2.443 2.321
Wall 1 Lift Pits-2 (Right Side.) M.Raod 2 2.500 0.250 2.443 3.054
Wall 2 Lift Pits-2 (Right Side.) M.Raod 2 1.900 0.250 2.443 2.321
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
Wall 1 Lift Pits-2 (Left Side.) S.Raod 2 2.500 0.250 2.778 3.473
Wall 2 Lift Pits-2 (Left Side.) S.Raod 2 1.900 0.250 2.778 2.639
        Wall 1 Lift Pits-2 (Right Side.) M.Raod                                       2    2.500   0.250     2.754                         3.443
                                                                                                                                            Page 116 of 187
Wall 2 Lift Pits-2 (Right Side.) M.Raod 2 1.900 0.250 2.754 2.616
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
Wall 1 Lift Pits-2 (Left Side.) S.Raod 2 2.500 0.250 4.951 - - 6.189
Wall 2 Lift Pits-2 (Left Side.) S.Raod 2 1.900 0.250 4.951 4.703
Wall 1 Lift Pits-2 (Right Side.) M.Raod 2 2.500 0.250 3.586 4.483
Wall 2 Lift Pits-2 (Right Side.) M.Raod 2 1.900 0.250 3.586 3.407
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
a) Lift Pits
b) U.G.Tank
c) ESCALATOR PIT
(Right Side.)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                            Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
i) Reinforcement of Foundations
i) 2A 1 41.992 41.992
v) 6A 1 56.879 56.879
                                                                        Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
BITUMEN COATING
Column's Deduction -
Column's -
Column's Decution -
Column's -
Column's Deduction -
Column's -
Bridge Beam -
Column Deduction -
Column's -
Column Deduction -
Column's -
Bridge Beam -
Column's Deduction -
Column's -
Bridge Beam -
Column's Deduction -
Column's - -
Column Deduction -
Column's -
Bridge Beam -
                                                                            Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
TERMITE PROOFING
Total 197.892
Applied Total Station No. 3A, 4A, 5A, 6A, 7A, 8A & 9A (Allow 33%) Sqm
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                           Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                  Measurement                  Qty.
B.O.Q
                               Item Description                            Unit   B.O.Q    V.O-5   No.                                                             Remarks
 No
                                                                                                              L       W         H/D   no / m   Area       Volume
- -
- -
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                        Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                        Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                         Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
Lift-Pit 1, 2
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                         Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                    Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                                    Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                     Measurement                     Qty.
 Item
                                  Item Description                                  Unit    BOQ      No.                                                                  Remarks
  No                                                                                                                                                 Area    Volume
                                                                                                                 L        W        H/D    no / m
                                                                                                                                                     (m2)     (m3)
b For Steel Staircase with canopy of steel structure for Escalato Kg. 372,000
        vi) Anchor Bolts Hot Dip Galvanized 25 mm dia 1100 mm Length 100
                                                                                                     4,392      5.500                    24,156.00
        mm Thread, 150 mm L-with Two Nuts and Washer
                                                                                                                                                        Page 181 of 187
                                                                                                 Measurement                      Qty.
 Item
                              Item Description                          Unit   BOQ   No.                                                                Remarks
  No                                                                                                                              Area     Volume
                                                                                             L       W         H/D    no / m
                                                                                                                                  (m2)      (m3)
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
                                                                                                                  Measurement                  Qty.
 Item
                                  Item Description                                  Unit    BOQ      No.                                                            Remarks
  No                                                                                                                                           Area   Volume
                                                                                                              L        W        H/D   no / m
                                                                                                                                               (m2)    (m3)
MS CHEQUERED PLATE
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
MS CHEQUERED PLATE
b For Steel Staircase with canopy of steel structure for Escalator Kg. 78,000
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
MS CHEQUERED PLATE
GREEN LINE BUS RAPID TRANSIT SYSTEM FROM KESC POWER SURJANI TO MUNCIPAL PARK, SADDAR KARACHI
                                                                          Measurement Sheet
Type-A : a) Structre Work (Pedestrian Bridge)
MS CHEQUERED PLATE
b For Steel Staircase with canopy of steel structure for Escalator kgs 78,000