0% found this document useful (0 votes)
8 views3 pages

Specification

t

Uploaded by

v.naveen20102627
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views3 pages

Specification

t

Uploaded by

v.naveen20102627
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

FROM: DATE:25-02-2024

V.V.NAVEEN BUILDERS

PLOT NO:56, SRI RAGAVENDIRA NAGAR,

1st ROAD, (NEAR BY VGP BUS STOP)

RAJAKILPAKKAM, CHENNAI-600073

TO:

Mr. KOWSHIK

MADAMBAKKAM SITE

SPECIFICATION

1) ROOF HEIGHT - FROM SECOND FLOOR TO THE THIRD FLOOR IS 10-’0”.


AND RCC RATIO IS 1:6:6 WITH 5” THICKNESS.
2) STAIR CASE - 10 NOS OF TREAD & 7 NOS OF RISER WITH SS RAILINGS.
3) TOILET - SECOND FLOOR WATER PROOFING WITH FORSOC CHEMICAL.
4) SECOND FLOOR TILE - 2x2 CERAMIC TILE AMOUNT-70/-
BATHROOM TILE AMOUNT-40/-
5) PARAPET WALL - 3.5 HEIGHT WALL FROM THE TERRACE.

MATERIALS:

1) STEEL - ARS TMD BARS


2) CEMENT - CHITTINADU (53 GRADE)
3) BRICKS - QUALITY CHAMBER BURNT BRICKS SHALL
BE SOAKED WALL BEFORE USE.
4) M SAND - BRICK WORK & PLASTERING
5) RCC DESINGN MIX - 1:6:6
6) WATER PROOFING - DR. FIXIT
7) BATHROOM AND KITCHEN FITTINGS - PARRYWARE
8) WINDOWS - UPVC
9) TOILET DOORS - PVC DOOR
10) ROOF THICKNESS - 5’’THIICKNESS.
11) SWITCH - GM
12) PAINT - ASIAN PAINT
13) WIRE - ORBIT
RENOVATION WORK

1) THIRD FLOOR COOLING TILES (NEW INSTALLATION)

-AREA 1600SQ.FT=RS.3,71,250/-

2) THIRD FLOOR AND SECOND FLOOR (REMOVE THE OLD TILES)

-AREA 1600SQ.FT =RS.82,500/-

3)GROUND FLOOR (GAS)ROOM=3x4=RS.12,000/-

4)UPVC WINDOWS=3x5~ (2) NOS=RS.20,000/-

5)CAR PARKING OLD TILES REMOVE AND NEW CONCRETE FLOOR


LAYING=RS.63,000

6)WATER TANK MANUAL=2x2 (1) NOS=RS.1500/-

7)SECOND FLOOR ALL OPENING=RS.7000/-

8)LIFT ROOM-4 (NOS)=5x5=RS.6,00,000

9)LIFT SERVICE ROOM=RS.2,00,000/-

10)CAR PARKING MAIN GATE=5”x10’=RS.18,000/-

11)FIRST FLOOR SAFETY GATE=RS.3,000/-

12)THIRD FLOOR WALL BROKEN=77SQ.FT=RS.12,000/-

13)FRONT ELVATION=RS.20,000

14)FOR CLEAR THE WASTAGES=RS.10,000/-

15)ALL PLUMBING LINE AND TEMPORARY CONNECTION AND AN OUTER


LINE=RS.20,000/-
ESTIMATION:

S NO PATTICULARS AMOUNT INR

1 SECOND FLOOR 2,184,000 RS


780 SQFT x 2800/- PER SQFT

2 RENOVATION WORK 1,440,250 RS

3 TOTAL 3,644,250 RS

PROPRIETOR:

Mr. NAVEEN VADIVELU

THANK YOU…