FROM:                                                                    DATE:25-02-2024
V.V.NAVEEN BUILDERS
       PLOT NO:56, SRI RAGAVENDIRA NAGAR,
       1st ROAD, (NEAR BY VGP BUS STOP)
       RAJAKILPAKKAM, CHENNAI-600073
TO:
      Mr. KOWSHIK
      MADAMBAKKAM SITE
SPECIFICATION
                1) ROOF HEIGHT - FROM SECOND FLOOR TO THE THIRD FLOOR IS 10-’0”.
                   AND RCC RATIO IS 1:6:6 WITH 5” THICKNESS.
                2) STAIR CASE - 10 NOS OF TREAD & 7 NOS OF RISER WITH SS RAILINGS.
                3) TOILET - SECOND FLOOR WATER PROOFING WITH FORSOC CHEMICAL.
                4) SECOND FLOOR TILE - 2x2 CERAMIC TILE AMOUNT-70/-
                                          BATHROOM TILE AMOUNT-40/-
                5) PARAPET WALL - 3.5 HEIGHT WALL FROM THE TERRACE.
MATERIALS:
              1) STEEL - ARS TMD BARS
              2) CEMENT - CHITTINADU (53 GRADE)
              3) BRICKS - QUALITY CHAMBER BURNT BRICKS SHALL
                  BE SOAKED WALL BEFORE USE.
              4) M SAND - BRICK WORK & PLASTERING
              5) RCC DESINGN MIX - 1:6:6
              6) WATER PROOFING - DR. FIXIT
              7) BATHROOM AND KITCHEN FITTINGS - PARRYWARE
              8) WINDOWS - UPVC
              9) TOILET DOORS - PVC DOOR
              10) ROOF THICKNESS - 5’’THIICKNESS.
              11) SWITCH - GM
              12) PAINT - ASIAN PAINT
              13) WIRE - ORBIT
RENOVATION WORK
             1) THIRD FLOOR COOLING TILES (NEW INSTALLATION)
-AREA 1600SQ.FT=RS.3,71,250/-
             2) THIRD FLOOR AND SECOND FLOOR (REMOVE THE OLD TILES)
-AREA 1600SQ.FT =RS.82,500/-
             3)GROUND FLOOR (GAS)ROOM=3x4=RS.12,000/-
             4)UPVC WINDOWS=3x5~ (2) NOS=RS.20,000/-
             5)CAR PARKING OLD TILES REMOVE AND NEW CONCRETE FLOOR
LAYING=RS.63,000
             6)WATER TANK MANUAL=2x2 (1) NOS=RS.1500/-
             7)SECOND FLOOR ALL OPENING=RS.7000/-
             8)LIFT ROOM-4 (NOS)=5x5=RS.6,00,000
             9)LIFT SERVICE ROOM=RS.2,00,000/-
             10)CAR PARKING MAIN GATE=5”x10’=RS.18,000/-
             11)FIRST FLOOR SAFETY GATE=RS.3,000/-
             12)THIRD FLOOR WALL BROKEN=77SQ.FT=RS.12,000/-
             13)FRONT ELVATION=RS.20,000
             14)FOR CLEAR THE WASTAGES=RS.10,000/-
              15)ALL PLUMBING LINE AND TEMPORARY CONNECTION AND AN OUTER
LINE=RS.20,000/-
ESTIMATION:
              S NO             PATTICULARS            AMOUNT INR
               1               SECOND FLOOR           2,184,000 RS
                         780 SQFT x 2800/- PER SQFT
               2             RENOVATION WORK          1,440,250 RS
               3                   TOTAL              3,644,250 RS
PROPRIETOR:
                     Mr. NAVEEN VADIVELU
                                       THANK YOU…