UL 67 Compliant Load
Centers and Panelboards
Service entrance barrier changes to meet new enhanced safety requirements.
What is UL 67?
Beginning January 1, 2017, enhanced UL 67 safety
requirements will take effect, applying to all panelboards
and load centers with service equipment applications. To
comply, any single service disconnect panelboard or load
center must have provisions such that, when the service
disconnect is opened, no person in the field servicing the
equipment load side can make accidental contact to live
circuit parts. Barriers to protect against unintended
contact shall be constructed in such a way that they are
easily installable and removable without contacting or
damaging bare or insulated live parts.
In addition to meeting new UL 67 requirements, these
enhancements will meet the new requirements in Section
408.3(A)(2) of the 2017 National Electric Code. Although
these new service barrier requirements enhance the safety
of working on panelboards, Siemens recommends turning
off and locking all power supplying these panelboards
before working inside to avoid any potential hazards. Electrical
equipment should always be placed in an electrically safe
condition prior to working inside. Installation and maintenance
of this equipment should only be done by a qualified person.
Appropriate personal protective equipment (PPE) must be worn
and safe work practices must be followed. See NFPA 70E for
information on PPE and safe work practices.
Lighting panels and power panels
Panels are factory labeled suitable for use as service entrance equipment when NEC requirements are met. Factory installed and
field installable Service Entrance Barrier kits are now available as required by UL 67.
ND Main Breaker (With line side UL 67 barrier installed on the left side of the breaker)
Type P1 Service entrance barriers                                                  Type P4 Service entrance barriers
Field installable barriers to meet UL 67 service entrance requirements             Field installable barriers to meet UL 67 service entrance requirements
 Catalog                                                                            Catalog number                     Breaker type
 number              Description                                                    SEBP4V1                            (S)JD, (S)LD, MG
SEBKRP1V1           FD, QJ, QR Service Entrance Barrier Kit (Revised P1)            SEBP4V2                            CJD, CLD
SEBKRP1V2           ED Service Entrance Barrier Kit (Revised P1)                    SEBP4V3                            JG, LG
SEBKRP1V3           BQD Service Entrance Barrier Kit (Revised P1) back-fed
SEBKRP1V4           xGB Service Entrance Barrier Kit (Revised P1) back-fed         Type P5 Service entrance barriers
SEBKRP1P2P3V1 JD, LD Service Entrance Barrier Kit (RP1, P2, P3)                    Field installable barriers to meet UL 67 service entrance requirements
                                                                                    Catalog number                     Breaker type
Type P2 Service entrance barriers                                                   SEBP4V1                            (S)JD, (S)LD, MG
Field installable barriers to meet UL 67 service entrance requirements              SEBP4V2                            CJD, CLD
 Catalog                                                                            SEBP4V3                            JG, LG
 number              Description                                                    SEBP5V1                            (S)MD, (S)ND without shield
SEBKP2V1            BL, BQD Main Service Entrance Barrier (P2 only)                 SEBP5V2                            (S)MD, (S)ND without shield
SEBKP2V2            xGB Main Service Entrance Barrier (P2 only)                     SEBP5V3                            Vacu-Break Switches
                    FD, QJ, QR Horizontal Main Service Entrance Barrier             SEBP5V4                            HCP Switches
SEBKP2V3
                    (P2, P2 with SEM3, P3)
                    FD, QJ, QR Vertical Main Service Entrance Barrier
SEBKP2V4
                    (P2, P2 with SEM3)
                    ED Horizontal Main Service Entrance Barrier
SEBKP2V5
                    (P2, P2 with SEM3)
                    ED Vertical Main Service Entrance Barrier
SEBKP2V6
                    (P2, P2 with SEM3)
SEBKP1P2P3V1        D, LD Service Entrance Barrier Kit (RP1, P2, P3)
Type P3 Service entrance barriers
Field installable barriers to meet UL 67 service entrance requirements
 Catalog
 number              Description
SEBP3V1             Service Entrance Barrier Kit CFD, FD (P3 only)
SEBKP1P2P3V1        JD, LD Service Entrance Barrier Kit (RP1, P2, P3
Load centers and meter combos
Touchsafe barriers are required for any single main service
entrance application for a panel covered under UL 67. Line
Terminal Barriers will be included in Main Breaker Load
Centers and Single Main Meter Combos manufactured after
January 1, 2017.
Single phase and 3-phase main breaker kits will include a
barrier. Field installable kits are being created for replacements
if needed and line terminal barriers are being added to hold
down kits that can be used in back-fed applications. The
barriers are designed to have minimal interference during
load center installation, and can be removed and reattached
as necessary.
Service entrance barriers
                                           Catalog number    Description
                                           ECLTB1            For EQ Main Breakers / MBK kits 100A-125A
                                           ECLTB2            For EQ Main Breakers / MBK kits 150A-225A
                                           ECLTB3            For QN / QNR type breakers
                                           ECLTB4            For QR 3 phase breakers
                                                             For 2 Pole QP / MP-T type breakers for EQIII
                                           ECMBR1
                                                             (extruded basepan) and Line 5 Load Centers
                                                             For 2 Pole QP / MP-T type breakers to be used with Ultimate LCs (now ES / PL),
                                           ECMBR2
                                                             Murray or Rock Solid
                                           ECMBR3            For 3 Pole QP / MP-T type breakers to be used with PL, ES 3 phase load centers
                                           ECLX387HD         For 2 Pole MP-T type breakers in legacy Murray load centers
Questions and Clarifications Page
Q: When is the COMPAS launch?
A: COMPAS Launch is set for week of Oct. 24. Click the check 		
		 box to include a service entrance barrier kit in BOM.
Q. What if a job has already been ordered, but is			
		 shipping after Jan. 1, 2017?
A. Please contact the plant directly or customer service to 		
   coordinate a service entrance barrier kit to be shipped to 		
   the job site.
Q.   Does UL 67 apply to any other Siemens products?
A.   Switchboards, Motor Control Centers and Low Voltage
		   Switchgear are not affected by UL 67 because they already
		   have their own service entrance requirements.
Q.   What about panelboards and load centers already
		   installed in the field that do not have service entrance 		
		   barrier provisions?
A.   According to the standard, existing field sites/jobs do not 		
		   need to be retrofitted.
Q.   How do I work with and around the barrier when it is
		   installed?
A.   Instruction sheets will come with every kit. Sheets can also
		   be downloaded online in case they are lost.
                                       For more information, please contact   Subject to changes and errors. The information given
Published by                                                                  in this document only contains general descriptions and/or
                                       our Customer Support Center.
Siemens Industry, Inc. 2016.                                                  performance features which may not always specifically
                                       Phone:     1-800-241-4453
Siemens Industry, Inc.                 E-mail:    info.us@siemens.com         reflect those described, or which may undergo modification
5400 Triangle Parkway                                                         in the course of further development of the products. The
                                       usa.siemens.com/panelboards            requested performance features are binding only when they