JOB SAFETY ANALYSIS RECORD SHEET �w1son
SHAYBAH NGL RECOVERY PLANT DEPARTMENT
Shaybah N GL
JOB SAFETY ANALYSIS RECORD SHEET
PLANT/EQUIPMENT: DEPART MENT: Revised No./ Date: Rev. A/ 30-03-2024
- - - - :- - - - -: - ---------t
- G
r-=-Dl,.,...V,.,...,IS:-:-10-=---,--,-N/U-:-Nl-:-cc T-,-:-�----------+--S N L No S N G LO
...,..
SHAYBAH DPCU LAYDOWN SAGPD/ DPCU Shaybah JSA NO.: 19162 -HS0602 -JS A-134
DES CRIPTION OF JOB/TASK: IR Test/Megger test of cables (Instrument & Electrical)
LOCATIONS: LAYDOWN
PREPARED BY: Conta
r ctor Constructi REVIEWED BY: Contractor Sat� Re� £ REVIEWED BY: S NGL Complia nce Group
DAT�f {i)J DATE: ������{-
-3,o \ '3. \'2.PJ...l-,\
/('�.?(��
REVIEWED BY: Operation Forema n
""'"''\
DATE :
REFERENCES: OL & EQUIPMENT REQUIRED: PPE's:
Construction Safety Manual • Hand & Power Tools • Hard Hat
• Part I -01 Emergency Reporting and Response • Multimeter • Safety Glasses (dark & clear)
• Part I -03 Personal Protective Equipment PPE • Megger meter tool • Safety Shoes
• Part I - 04 Work Permit System and Stop Work Authority • Testing Tools Kit • Safety Gloves
• Part I - 07 Fire Prevention • Fire Extinguisher • Dust Mask/ Face mask.
• Part I -08 Traffic Vehicle Safety • Full Sleeve FRC Clothing
• Part 1-11 Hand Tools and Power Tools • Electrical hand gloves
• Part 1-12 Material Handling • Orange vest
• Pa rt I -13 Heat Stress
• Part Ill - 03 Electrical Equipment