Title: 1 Month PM of CTMW Pump
Equipment
Type Model
Serial Manufacturer
Parts and consumables
Part Name Part Number Qty Part Name Part Number Qty
Cotton rags
WD 40
GLAND PACKING
Tools and gears
Item Qty Item Qty
Spanner Set 1
PM Checks
Sr. No. Preventive Maintenance Checks Remarks
1 Obtain the safety document before commencement of work.
2 Ensure use of correct PPE's and tools.
Visually Inspect the pump and associated piping for leakage,
3 looseness, damage etc.
4 Check gland leakage(10 to 120 drops/min)
coupling inspection
5 Observe for any abnormal sound/vibration.
6 Check grease level, makeup if necessary
7 Check bearing housing breather, clean if necessary.
8 Clean the work area and remove all personnel, gears & tools
from job
Clear site.document.
safety
9
11 Update Check list/WI, if required.
12
13
14
15
Remarks/Notes