0% found this document useful (0 votes)
13 views1 page

Perodical Checks For AHS Handling System: Equipment AHS Type Model Serial Manufacturer

The document outlines the preventive maintenance checks for the AHS handling system, detailing required parts, tools, and specific maintenance tasks. Key checks include inspecting bolts, lubricating bearings, and ensuring safety guards are in place. It also emphasizes the importance of addressing any leaks and maintaining proper equipment positioning.

Uploaded by

Roman Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Perodical Checks For AHS Handling System: Equipment AHS Type Model Serial Manufacturer

The document outlines the preventive maintenance checks for the AHS handling system, detailing required parts, tools, and specific maintenance tasks. Key checks include inspecting bolts, lubricating bearings, and ensuring safety guards are in place. It also emphasizes the importance of addressing any leaks and maintaining proper equipment positioning.

Uploaded by

Roman Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Mechanical Equipment Preventive Maintenance

Title: Perodical Checks for AHS handling system

Equipment AHS
Type Model
Serial Manufacturer

Parts and consumables


Part Name Part Number Qty Part Name Part Number Qty
Greese EP 2
Cotton rags
OIL OMALA 320
OIL TELLUS 46

Tools and gears


Item Qty Item Qty
Spanner Set 1
ALIGNMENT TOOL
Oil can and Keef 1
VIBRO PEN

PM Checks
Sr. No. Preventive Maintenance Checks Remarks
Ash conditioner & RVF
1 Check the tightness of all bolts
Check plumber blocks and bearings for any sound and vibration
2

3 Lubricate the bearings perodically


4 Check inside blades for any abnormility
check water spray nozzels clean if necessary
5

5 Check oil leakge/seepage from spur gearbox


6 All saftey gaurds shall be fixed as specified
ESP & APH Area
1 Check for any water leakage/seepage from aph dome valves
2 Grease the dome valves
3 Check seal pressure for all fields

4 check for any leakage of ash plus air from conveying pipes

5 If necessary adjust the skirt boards for proper positioning


6 Check all saftey gaurds

Remarks/Notes

You might also like