0% found this document useful (0 votes)
10 views2 pages

Tec Mom

The minutes document the technical meeting held on December 10, 2024, regarding precast panels, post-tensioning (PT) submissions, soil improvement, and starter bars development length. Key actions include coordinating with the precast contractor for architectural submissions, expediting the review of soil improvement designs, and addressing concerns over starter bars development length. The document serves as a record of agreements and intended actions unless formally contested before the next meeting.

Uploaded by

Parth Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

Tec Mom

The minutes document the technical meeting held on December 10, 2024, regarding precast panels, post-tensioning (PT) submissions, soil improvement, and starter bars development length. Key actions include coordinating with the precast contractor for architectural submissions, expediting the review of soil improvement designs, and addressing concerns over starter bars development length. The document serves as a record of agreements and intended actions unless formally contested before the next meeting.

Uploaded by

Parth Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT NAME

Minutes of Technical Meeting for Precast, PT, Soil Improvement &


Rebars Development Length.
Date: 10th Dec 2024
Location Site Office Meeting Room
:

Attendance
S/N Name Designation Company
1 Mr. Moustafa Thabet Sr. Manager – Project Management ABC
2 Mr. Mohamed Al Bahij Sr. Project Manager ABC
3 Mr. Ahmed Elshoura Str Engineer ABC
4 Mr. Khalid Alqasem Sr. Mechanical Engineer ABC
5 Mr. Tamer Mahmoud Design Manager ABC
6 Mr. Abdullah Shboul Construction Manager ABC
7 Precast Representative Technical Engineer Precast Cont.

This minutes records ABC understanding of the meeting and intended action arising agreement, the
minute from a true record of the events of the project unless comments are received formally before the
meeting and/or by next scheduled meeting.

ABC= ABC International, LAC=ABC Architects and Engineering Consultants, FIB: ABC LLC Info=
Information,

Prepared by,

Mohamed Al Bahij
Sr. Project Manager

CC:
ABC
ABC
ABC

Page 1 of 2
PROJECT NAME

ITEM ACTION ACTION


DESCRIPTION
NO. BY DUE
1.0 Precast panels:
As confirmed by precast contractor that no need approval
from RAKM for external precast panels since it is not load
bearing panels but need to be submitted as part of
1.1 Note
architectural package – that external block is replaced with
precast panels – for highlighted area as not all external block
will replace with precast –
The U-value for the full section (precast details and Gypsum
details) to comply with Barajeel / project requirements and
FIB Urgent
1.2 the same will be coordinated by ABC with precast contractor
and submit soon – submission date will advise by ABC –

ABC will coordinate with precast contractor and to submit


architectural layout showing the location of precast panels to
FIB Urgent
1.3 enable ABC/Arjan to include the same and submit to RAKM –
submission date will be advised by ABC –

2.0 PT submission to RAKM:


Combined package comply with all raised comments for all
approved buildings will be submitted to ABC for review and
2.1 onward submission to RAKM. FIB/LAC Urgent

3.0 Soil improvement – stone columns –


3.1 Design & method statement under ABC review – ABC to
expedite the review – LAC Urgent

4.0 Starter bars development length:


4.1 ABC raise a concern for extra development length used in
starter bars from raft & pile caps and ABC stated that the
same already commented in steel SD for ABC necessary FIB
arrangement and to submit MS for fixing,
Respecting the standards and reinforcement general notes Note
for the specific development length of 50 times of the rebar
Día and as requested from ABC to submit MS/Action plan for
the same.