Mechanical Completion: Valves

Uploaded by

Aous H
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

Mechanical Completion: Valves

Uploaded by

Aous H
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Mechanical Completion:

Valves
M-31A Page 1 of 1

*50000037687* *50000037687*

Unique ID: 30-XY-8102B-M-31A_V1 Item/Tag No. 30-XY-8102B

Project Name: KU-TWK-026 CS Migration System No. 30-CSM-01

Tag Name: 30-XY-8102B

Sub-System No. CSM-07 Job Card: ~

Primary Drawing Ref: Date Printed: 30-Mar-18

Secondary Drawing Ref: Location:


Initial / Punch list
No. Description of Check / Action to be made Results
Signature item No.
Confirm that Valve nameplate complies with Data Sheet and nameplate
1
securely attached
2 Confirm valve location & orientation is correct to detail drawings
Check and confirm Installation and bolting arrangement is in accordance with
3
required specification drawing and manufacturers instructions.
Check access for operation is acceptable and there is sufficient clearance for
4
maintenance removal etc.
Confirm that inlet and outlet piping to valve mating flanges are in parallel and
5 angular alignment with the correct gaskets installed. Complete ITR M-27A.
Ensure that on tightening bolts no imposed stress is applied to valve.
Check all PSVs installed, undamaged and seals intact – complete ITR form
6
M-28A for PSVs
Confirm that valve lubrication is completed to the required specification
7
(Record Type / details of valve lubricant in Remarks below)
Ensure that handwheel, lever or geared actuator is fitted and that valve can be
8
operated without undue strain across complete operating range.
Confirm that valve actuator is installed satisfactory and that any interlock
9 mechanisms associated are fitted correctly.
Ensure interlock keys are safely stored.

10 Check Earth bonding Strap if required is installed.

11 Hand operated valves are to be stroked (open/closed) to confirm that valve is


not tight or seized.
Remarks / Comments :

ITR Input to Data


Completed By Approved By Accepted By
Base
Company
Signature
Print Name
Date of signing