0% found this document useful (0 votes)
8 views1 page

Construction of New Gor Near Dha, Phase 9 Lahore

The document outlines excavation activities for the construction of a new GOR near DHA, Phase 9 Lahore, managed by Iftikhar & Co under the Infrastructure Development Authority of Punjab. It includes a level sheet detailing the proposed, previous, and present thickness levels at various chainages, along with remarks on remaining fill. The document is structured to track excavation progress and measurements at specified locations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

Construction of New Gor Near Dha, Phase 9 Lahore

The document outlines excavation activities for the construction of a new GOR near DHA, Phase 9 Lahore, managed by Iftikhar & Co under the Infrastructure Development Authority of Punjab. It includes a level sheet detailing the proposed, previous, and present thickness levels at various chainages, along with remarks on remaining fill. The document is structured to track excavation progress and measurements at specified locations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Contractors Infrastructure Development Authority of Punjab Consultant

CONSTRUCTION OF NEW GOR NEAR DHA, PHASE 9 LAHORE


IFTIKHAR & CO

ACTIVITY: EXCAVATION LEVEL SHEET I.R NO______________

LOCATION: TRENCH M.H 1-2 DATE:__________________


DATE:______________
PROPOSE PREVIOUS PRESENT REMAINING
Sr. No. CHAINAGE THICKNESS DIFF. REMARKS
LEVEL LEVEL LEVEL FILL
1 M.H 1 701.81 701.80 0.01
701.76 701.76 0.00
2 CENTER 701.71 701.72 -0.01
701.66 701.66 0.00
3 M.H 2 701.61 701.61 0.00
4
5
6
7
8
9
10
11
12
13
14
15

CONTRACTORE____________ CONSULTANT___________