SURVEY WORK (Private Agencies)
Survey-P
Rate for the year
Item No.& 2008-2009
Description of Items Unit
Item code Completed Labour
Rate Rate
1 Reconnaissance survey including study of
survey sheets, maps etc. for alignment including
three dimensional of apexes,chain and compass
or cross staff survey,fixing pegs, fixing apex
stones of size 0.15 x 0.15 x 0.60 cm in 1:2:4
cement concrete at every apex point and 200 m.
and preparation of alignment plan with all types
of compliance, if required from department etc.
complete.
As directed by Engineer-In-Charge.
a) excluding fixing of apex stone. Km. 5998.00 -
b) including fixing of apex stone. Km. 7043.00 -
2 Procurement of Village map/Forest map/Land
plan from Forest/Revenue authority for
prepartation of land plan record,including
necessary payment for the plans and other
documents as required for this survey,plotting
and demarcation works etc.complete.
As directed by Engineer-In-Charge. No. 71.00 -
3 Prepartion of land plans of road ( New
alignment) with fixing boundaries on both sides
of centre line of Road / Existing road up to road
boundary, including carrying out detailed plain
table survey along the centre line of the road,
showing details of permanent / semi-permanent
structures, trees, telefone-lines, pipe-lines, field-
bunds, cross-roads upto 100m or as
directed,plotting work of surveyed area etc.
complete.
As directed by Engineer-In-Charge. Km. 5308.00 -
4 Preparation of land plans (Tracing) on polyester
tracing film of approved make 60/65 micron on
one side matt,including taking out prints and
binding the same in Road wise etc.complete.
As directed by Engineer-In-Charge. Job 260.00 -
170
Survey-P
Rate for the year
Item No.& 2008-2009
Description of Items Unit
Item code Completed Labour
Rate Rate
5 Scanning and digitizing the surveyed plane table
on Autocad14 & preparing computor disk.
As directed By Engineer-In-Charge. Km. 2195.00 -
6 Providing'7' copies of computor printouts of
plans duly bound in the form of booklet.
As directed By Engineer-In-Charge. Km. 3369.00 -
7 Preparation of villagewise Land acquisition
proposals in five sets as required by Revenue
Authorities (SLAO) including procurement of
necessary 7/12 extracts, preparation of Land
schedule, tracing out of village maps (at the
same scale of revenue map), and taking out
ammonia prints (5copies), colouring the same,
showing the alignment on village map, taking out
5xerox copies of questionnaries schedule of
land to be aquired respective 7/12 extracts &
binding in booklets (5Nos.) etc. complete.
As directed By Engineer-In-Charge. Km. 3959.00 -
8 Providing and fixing boundary stone (R.C.C.M-
15)of standard size 15cm.dia.on top, 25cm dia.
@ bottom and 90 cm in length with 4 bars of 6
mm dia.&5 stirrups as per IRC:25-1967,including
oil painting with two coats in white colour to
visible portion on all faces and lettering “R.B.”
with black oil paint etc. complete.
Spec. No.:Rd.70 P- 244 & MoRT&H-806. No. 110.00 -
Rd. 70.
9 Preparing detailed Plans and estimates of road
including typing in 5copies in proper file
including colouring ammonia prints of plans,
indexing and paging, with all types of
compliance, if required from department
etc.complete.
As directed by Engineer-In-Charge. Job 2284.00 -
171
Survey-P
Rate for the year
Item No.& 2008-2009
Description of Items Unit
Item code Completed Labour
Rate Rate
10 Preparing detailed estimate of C.D.Works with
fine typed copies in proper file, including taking
out L-section of road,preparing catchment area
plan by traverse method, taking one trial pit of
size 1.0 x 1.0 x 1.5 mtr. with all types of
compliance,if required from department
etc.complete.
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 2809.00 -
b) including taking trial pit. Job 3347.00 -
11 Carrying out survey for Minor Bridge including
taking L-section of existing road, two define
cross sections for, one at U/S, second at D/S,
one vergin cross section at alternate proposed
site, taking L-section of stream upto sufficient
length with chain and compass, taking three trial
pits of size 2.00 x 2.00 x 3.00 M. and collecting
samples of bed materials from trial pit for
ascertaining the silt factor unit test etc.complete.
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 17330.00 -
b) including taking trial pit. Job 20790.00 -
12 Carrying out Contour survey of stream on U/S
and D/S of proposed bridge site,including chain
and compass survey, taking levels at every 30 x
30 metre, preparing contour map and supplying
ammonia prints in 5 sets etc.complete
As directed by Engineer-In-Charge.
a) excluding chain and compass survey. Sq.Km. 17900.00 -
b) including chain and compass survey. Sq.Km. 20990.00 -
13 Preparing plans and estimates of minor bridge
with the help of approved detailed survey data
given by the competent authority, including
typing in 5 copies, ammonia prints, site plan,
other drawings with colouring of plans, proper
filling, indexing and paging,with all types of
compliacne, if required from department
etc.complete.
As directed by Engineer-In-Charge. Job 4391.00 4391.00
172
Survey-P
Rate for the year
Item No.& 2008-2009
Description of Items Unit
Item code Completed Labour
Rate Rate
14 Carrying out detailed survey of major bridge
including taking out L-section of existing road,
two define cross sections for,one at U/S and
second at D/S, one vergin cross section at
alternate proposed site, L-section of stream upto
sufficient lengths with chain and compass,
taking five trial pits, three in bed and two on
banks of size 2.00 x 2.00 x 3.00 m,collecting
samples from trial pit,sending samples to
Government approved laboratories (testing
charges to he borne by agency) for ascertaining
the silt factor, carrying out unit test & specific
gravity, preparation of detailed survey data and
submission of the project fully typed colouring of
the ammonia prints, site plan and other
drawings,with all types of compliance if required
from department etc.complete.
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 25720.00 -
b) including taking trial pit. Job 33810.00 -
15 Preparing detailed plans and estimate of major
bridge in 5 copies typed,on the basis of the
approved line diagram and technical note from
the competent authority including ammonia
prints of site plan,other drawings with colouring
of plans,proper filling, idexing and paging,with all
types of compliance if required from department
etc.complete
As directed by Engineer-In-Charge. Job 4838.00 4838.00
173
Survey-P
Rate for the year
Item No.& 2008-2009
Description of Items Unit
Item code Completed Labour
Rate Rate
16 Carrying out detailed survey of Raised cause
way including taking L-section of existing road,
taking two define cross sections for, one at
vergin, one at alternate proposed site,taking L-
section of stream upto sufficient length with
chain and compass, taking two trial pits of size
2.00 x 2.00 x 3.00 m.,collecting sample from trial
pits sending samples to Government approved
laboratory (testing charges to he borne by
agency) for ascertaining the silt factor,carrying
out unit test & specific gravity, preparation of
detailed survey data and submission of the
project fully typed copies,colouring of the
ammonia prints, site plan and other drawings
with all types of compliance if required from
department etc.complete.
As directed by Engineer-In-Charge.
a) excluding taking trial pit. Job 9839.00 -
b) including taking trial pit. Job 12060.00 -
17 Preparing detailed plans and estimate of Raised
causeway in 5 copies duly typed,on the basis of
the approved detailed survey data given by
competent authority including ammonia prints of
site plan and other drawings, colouring of plans,
proper filling, indexing and paging with all types
of compliance if required from department etc.
complete.
As directed by Engineer-In-Charge. Job 3951.00 3951.00
18 Conversion of Taluka map and cutting in to
standard A size sheet for scanning,scanning of
A size sheets of maps by sending to Advanced
Scanning center at Mumbai with courier,editing
of scanned images including Scaling,Positioning
and Speckling,raster to Vector conversion of
images using RTOV legal softwares,stitching of
converted images by way of GCP into single
Vector drawing AUTOCAD vcr.12 legal software,
Layering of
174
Survey-P
Rate for the year
Item No.& 2008-2009
Description of Items Unit
Item code Completed Labour
Rate Rate
drawing for colour separation purpose
organizing data by way to logical grouping,
assigning different colours of National Highway,
State Highway, Major district road etc.,assigning
different line types for existing and proposed
works,assigning different line widths for villages,
boundaries, forest areas etc.,blocking the
different roads with the symbols for National
Highway, State Highway, Main District Road
etc.,instating symbols for villages etc.,inserting
text in English at proper locations for villages
names, roads and important places etc.,Trial plot
for making corrections on A1/A2 size, multiple
colours plotter in foot scale on white papers
making appropriate corrections in vector drawing
and updating all imformation,plotting of drawing
with high quality colour plotter as a final out put
etc complete.
As directed by Engineer-In-Charge. Tal. 5861.00 -
19 Preparing District map including stitching of all
village maps by way of CCP in to single sector
drawing using AUTOCAD vcr.12 legal software,
Trial plot for making corrections on A1/A2 size
multi colour plotter in foot scale on white
paper,ploting drawing by high quality colour
plotter as a final output etc.complete
As directed by Engineer-In-Charge. Job 2165.00 -
20 For text of villages in deonagari font extra work
would be follows including inserting text in
deonagari font at proper locations for village
names, roads and important place etc.,Trial plot
for making corrections on A1/A2 size multi
colour plotter in foot scale on white paper,ploting
of drawing on high quality colour plotter as final
output etc.complete
As directed by Engineer-In-Charge. Dist. 2888.00 -
175