ABSTRACT OF COST
Ite                                Description of Items                                Unit    Quantity    Rate    Amount      Remar
 m                                                                                                        (Nrs.)   (Nrs.)        ks
No.
1.0 SITE CLEARANCE
1.1 Clearing and grubbing road land including uprooting rank vegetation, grass,
    bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of
    trees cut earlier and disposal of unserviceable materials and stacking of      sq.m          200.00 #NAME?      1,314.00
    serviceable material to be used or auctioned, up to a lead of 30 meters
    including removal and disposal of top organic soil not exceeding 150 mm in
    thickness, all complete.
2.0 EARTHWORK
2.1 Earthwork in Excavation in foundations in all type of soils for foundation,
    trenches, footing, pits etc. to the required depth including dewatering as per
    specifications, providing crossing of track, shoring, strutting, timbering and
    buttressing with appropriate materials and all such measures necessary to
    retain in position the sides of the foundation pit and including watering,     cu.m         1,125.61 #NAME?    #NAME?
    ramming, leveling the site and disposing off the unusable earth to outside the
    construction premises, etc. all complete as per drawings, technical
    specifications (DOR SSRBW - Section 907) and instructions of the engineer,
    all complete. [10% manual & 90% mechanical]
2.2 Supplying and Placing of graded filter materials in backfilling of structures
    and cross drainage works as per (DOR-SSRBW Section No.: 2404,3110), all           cu.m        56.25 1,379.89   77,618.81
2.3 complete.
    Backfilling in layers in foundation pits, trenches, structure with suitable
    common material including compaction and watering etc., as per DOR         cu.m              660.00   573.92 378,787.20
2.4 SSRBW
    Providing908,
               andall complete.
                   placing  geo-textile (filter fabrics), as per drawings,
    specifications as per (DOR-SSRBW Section No.: 2404, 3110) and instructions sq.m              264.00 #NAME?     #NAME?
    of site engineer,
3.0 SOLING    WORKS   all complete.
3.1 Supplying and placing stone soling with sand blending in perfect line & level
    including proper compaction, as per DOR-SSRBW and instructions of site             sqm        47.48 1,167.21   55,419.13
    engineer,WORKS
4.0 STONE     all complete.
 4.1 Providing and laying un-coursed random rubble stone masonry in 1:4 cement
      sand mortar for structure work including scaffolding, curing, preparation of      cu.m     116.39 #NAME?      ###
      mortar, provisions for weep hole as necessary etc., as per DOR SSRBW -
      Section 2607, all complete.
 5.0 PIPE WORKS
 5.1 HDPE Pipe
6.1.1 Supplying and placing, 100 mm dia. Nepal Standard HDPE Pipe (6 kg/cm2)
      for weep hole, drainage outlet, subsoil drain pipe in subsoil drains, etc. as per rm       135.00   806.57 108,886.95
      DOR SSRBW 701 & 2414 and instruction of site engineer, all complete.
6.0 CONCRETE WORKS
6.1 Providing and placing P.C.C. works M 10/20 (1:3:6) including compaction,
    curing, etc., as per DOR SSRBW - Section 2000 and instructions of site            cu.m        28.02 #NAME?     #NAME?
    engineer, all
6.2 Providing andcomplete.
                    placing P.C.C. works M 20/20 including compaction, curing,
     etc., as per DOR SSRBW - Section 2000, all complete.                             cu.m       237.00 #NAME?      ###
7.0 REINFORCEMENT WORKS
7.1 Supplying & placing TMT high tensile strength steel reinforcement of
    specified grade (Fe 500) for RCC works including cutting, bending, centring        MT         21.46   ###       ###
    & binding in position, etc., as per DOR SSRBW - Section 2000 & 2014, all
    complete.
 A                                                                                Total Estimated Cost (NRs.)           ###
 E                                                                   VAT @ 13% of Total Estimated Cost (NRs.)           ###
 F                                                                                      Total with VAT (NRs.)           ###
                                                                 Page 1 of 8
                                                                    SUMMARY OF QUANTITY
Item                                       Description of Items                                          Concrete   DRAIN    CASCADE      Total    Unit   Remar
 No.                                                                                                      Wall                          Quantity            ks
 1.0    SITE CLEARANCE
 1.1    Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,                         200.00                200.00 sq.m
        shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and
        disposal of unserviceable materials and stacking of serviceable material to be used or
        auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not
2.0     exceeding
        EARTHWORK  150 mm in thickness, all complete.
2.1     Earthwork in Excavation in foundations in all type of soils for foundation, trenches, footing,     940.63    13.85     171.13   1,125.61 cu.m
        pits etc. to the required depth including dewatering as per specifications, providing
        crossing of track, shoring, strutting, timbering and buttressing with appropriate materials
        and all such measures necessary to retain in position the sides of the foundation pit and
        including watering, ramming, leveling the site and disposing off the unusable earth to
        outside the construction premises, etc. all complete as per drawings, technical
        specifications (DOR SSRBW - Section 907) and instructions of the engineer, all complete.
        [10% manual & 90% mechanical]
2.2     Supplying and Placing of graded filter materials in backfilling of structures and cross             56.25                          56.25 cu.m
        drainage works as per (DOR-SSRBW Section No.: 2404,3110), all complete.
2.3     Backfilling in layers in foundation pits, trenches, structure with suitable common material        660.00                         660.00 cu.m
        including compaction and watering etc., as per DOR SSRBW 908, all complete.
2.4     Providing and placing geo-textile (filter fabrics), as per drawings, specifications as per         264.00                         264.00 sq.m
        (DOR-SSRBW Section No.: 2404, 3110) and instructions of site engineer, all complete.
4.0     SOLING WORKS                                                                                                                          -
4.1     Supplying and placing stone soling with sand blending in perfect line & level including             30.60    16.88                 47.48 cu.m
        proper compaction, as per DOR-SSRBW and instructions of site engineer, all complete.
5.0     STONE WORKS                                                                                                                           -
5.1     Providing and laying un-coursed random rubble stone masonry in 1:4 cement sand mortar                        17.26      99.13     116.39 cu.m
        for structure work including scaffolding, curing, preparation of mortar, provisions for weep
        hole as necessary etc., as per DOR SSRBW - Section 2607, all complete.
 6.0    PIPE WORKS                                                                                                                            -
6.1.1   Supplying and placing, 100 mm dia. Nepal Standard HDPE Pipe (6 kg/cm2) for weep hole,              135.00                         135.00   rm
        drainage outlet, subsoil drain pipe in subsoil drains, etc. as per DOR SSRBW 701 & 2414
        and instruction of site engineer, all complete.
7.0     CONCRETE WORKS                                                                                                                        -
7.1     Providing and placing P.C.C. works M 10/20 (1:3:6) including compaction, curing, etc., as           10.20    13.74       4.08      28.02 cu.m
        per DOR SSRBW - Section 2000 and instructions of site engineer, all complete.
7.2     Providing and placing P.C.C. works M 20/20 including compaction, curing, etc., as per DOR          237.00                         237.00 cu.m
        SSRBW - Section 2000, all complete.
7.3     Providing and placing P.C.C. works M 35/20 including compaction, curing, etc., as per DOR                                              -   cu.m
        SSRBW - Section 2000, all complete.
8.0     REINFORCEMENT WORKS                                                                                                                   -
8.1     Supplying & placing TMT high tensile strength steel reinforcement of specified grade (Fe            21.46                          21.46   MT
        500) for RCC works including cutting, bending, centring & binding in position, etc., as per
        DOR SSRBW - Section 2000 & 2014, all complete.
                                                                               Page 2 of 8
                                          DETAIL QUANTITY ESTIMATE OF CANTILEVER RETAINING WALL
                         Wall       Structur                             Graded
                   Lengt       Wall          Structural Backfil Backfill                                                    Concre            Geotexti
S Chaina                 Heig        al Cut                               Filter            Stone Soling      PCC, M10             Rebar HDPE
         Side        h        Count             Cut     l Area Quantity                                                     te M20               le
N   ge                    ht          Area                               Material           Thck.   Area    Thck.   Vol.
                                              Quantity
                     m     m       nos     m2       m3       m2       m3          m3         m      m2       m      m3       m3      MT     rm      m2
1   0+015 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
2   0+020 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
3   0+025 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
4   0+030 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
5   0+035 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
6   0+040 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
7   0+045 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
8   0+050 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
9   0+055 Right      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
10 0+060 Right       5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
11 0+065   left      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
12 0+070   left      5     5       1.00     16.16    80.80   11.00    55.00        4.69      0.15    2.55    0.05    0.85    19.75   1.79   11.25   22.00
                  Total Quantity                    969.60    ###    660.00       56.25      1.80   30.60   1.50    10.20     ###    ###     ### 264.00
                                                                              Page 3 of 8
                                                                                    Bar Bending Schedule
         Barbending Schedule for RCC Retaining Wall
                      Height of Wall Start (H)= 5.00 m
                       Height of Wall End (H)= 5.00 m                     2.67% gradient of Wall Top
                       Take Length of wall (L)= 10.00 m
                                                                                                                                                                                              Dimension of Wall as per Typical Wall
                                                                                    Length    Dia of bar   Spacing   No of                   Unit Wt
  S.N.   Bar Code           Shape of Bar                a      b             c                                                Total Length                 Weight in Kg      Remarks     H     B       T       T1       T2       X      Y
                                                                                     (m)        (mm)        (mm)     bars                    (Kg/Rm)
                                c
                            b                                                                                                                                                Full Bar
   1        S1                                          0.07       4.85      0.05    4.97       12.00       200      51.00      253.317        0.888             224.893                 4    2.60    0.50    0.20     0.60     0.60   1.50
                                                                                                                                                                             Average
                                        a
                                            c
                                                    b                                                                                                                        Full Bar
   2        S2                                          0.31       4.87      0.05    5.23       16.00       200      51.00      266.832        1.578             421.141     Average     5    3.00    0.50    0.20     0.60     0.85   1.65
                                            a
                                                    b                                                                                                                      Curtail Bar
   3        S2'                                         0.31       2.07      0.15    2.53       16.00       200      51.00      129.132        1.578             203.809    (H-T2)/2     6    3.60    0.60    0.20     0.60     0.87   2.13
                                            a                                                                                                                               Average
   4        S3          a           b           c       0.05       9.90      0.05   10.00       12.00       140      31.00        310          0.888             275.216                 7    4.20    0.72    0.20     0.60     0.90   2.58
   5        S4          a           b           c       0.05       9.90      0.05   10.00       12.00       140      31.00        310          0.888             275.216                 8    4.80    0.85    0.20     0.60     1.00   2.95
   6        S5          a           b           c       0.25       9.90      0.25   10.40       12.00       140      44.00       457.6         0.888             406.254                 9    5.40    1.00    0.20     0.70     1.00   3.40
   7        S6          a           b           c       0.25       9.90      0.25   10.40       12.00       140      44.00       457.6         0.888             406.254                 10   6.00    1.10    0.20     0.80     1.00   3.90
   8        S7          a                       c       0.25       4.10      0.25    4.60       12.00       180      56.00       257.6         0.888             228.695
                                    b
   9        S8          a           b           c       0.25       4.10      0.25    4.60       20.00       100      100.00      460.0         2.466            1134.402
                    `
                                                                                                                                  Total Re-bar for 10 m        3575.879 Kg
                                                                                                                                          Re-bar for 1 m         357.59 Kg
         Summary of Bars Per Rm:
         Dia(mm)          Weight/(Kg)
            12               136.29
            16                45.36
            25               175.94
                             357.59
Note : Dowel Bar will be providedas per site condition- (Ld development length)
                     Detail Dimensions of Different Components of Retaining Wall
                                                            Area                       Concre
                                                                 Total Backfill Concre   te
                    Top                          Base Base Stem
   Height,H                                                     Structur Area te Area Volume
            H3     Width,   b1     b2     b3     Width,
SN    2                                                          al Cut                       Remarks
                     b                             B                            Base+S Triang
                                                        3  1+2   Area    4+5
                                                                                tem     ular
       m     m       m      m      m      m        m      m2     m2     m2      m2      m2      m3
Cantilever Wall
 1    10.00 1.00     0.40   1.10   1.80   5.50     8.40   8.40   ###    77.16   55.00   19.40        Refer fig. 1
 2     9.00 0.90     0.30   1.00   1.50   4.95     7.45   6.71   8.10   61.82   44.55   14.81        Refer fig. 1
 3     8.00 0.80     0.30   0.90   1.40   4.40     6.70   5.36   6.80   49.58   35.20   12.16        Refer fig. 1
 4     7.00 0.70     0.30   0.80   1.00   3.85     5.65   3.96   4.55   37.35   26.95    8.51        Refer fig. 1
 5     6.00 0.60     0.30   0.70   0.70   3.30     4.70   2.82   3.00   27.22   19.80    5.82        Refer fig. 1
 6     5.50 0.60     0.30   0.70   0.70   3.30     4.70   2.82   2.75   25.32   18.15    5.57        Refer fig. 1
 7     5.00 0.50     0.30   0.60   0.60   2.20     3.40   1.70   2.25   16.16   11.00    3.95        Refer fig. 1
 8     4.50 0.50     0.30   0.50   1.00   3.00     4.50   2.25   2.93   20.10   13.50    5.18        Refer fig. 1
 9     4.00 0.40     0.30   0.50   0.50   1.76     2.76   1.10   1.60   10.73    7.04    2.70        Refer fig. 1
                                                    Cascade
                                              0.3                                                  0.3
                                                                                                                                           GL
                                                                                                                                            0.15
                    RRM                                         PCC       0.1
                                                                                                                                             1.2
                                                                                                                                             0.4
                                 0.9625                               2                                      0.9625
                            Length                    =             18
                            Ground Slope              =           0.75
                            Riser                     =            2.1                             No of Steps               =            6.2069
                            Tread                     =               2
                            Pipe Diameter             =               2
Item                Basis of Estimate                                                                                                              Unit    Quantity
Earthwork Excavation
                   For both inclined and Horizontal Part
                      =      3.925     *       1.6       *                     26                        =                   163.28
                   For Cut-off Walls
                      =      3.925     *        2        *                      1                        =                    7.85
                                                                                           Total         =                   171.13                m3       171.130
Rubble Masonry
                    For Inclined Part
                    =(              2     *               0.4     +       2(              0.63125 *                   1.75     ))*           18
                                                                                                                =            54.1688
                    For Horizontal Part
                    =(             2    *                 0.4     +       2(              0.63125 *                   1.75        ))*         8
                                                                                                                =                24.075
                    For Cut-off Walls
                    =              2*                      1*                  3.925                            =                  7.85
                    For Steps
                    =       1/2       *             6.2069 *                        2.1 *                     2=             13.0345
                                                                                        Total                  =              99.128               m3       99.128
For PCC
                    For Steps
                    =         6.2069 *                     2*                        2*                      0.1 =           2.48276
                    For Horizontal Part
                    =              2*                      8*                       0.1                         =                   1.6
                                                                                          Total                 =             4.0828               m3     4.082758621
                                                                Structure (Drain) Quantity
                                                     Summary of Quantity
                Item Code            Name                       Quantity                      Unit
                 20.01    PCC Capping M10                                      13.74 M3
                 26.06(A) RRM (1 in 6 C/S Ratio)                               17.26 M3
                 10.08    Stone Soling                                         16.88 M3
                                                                             Structure (Drain) Quantity
                                                                                               Right
Chainag Lengt
 e (m) h (m)      Drain      PCC Capping M10 M3            RRM (1 in 6 C/S Ratio) M3    PCC Base M10 M3           Stone Soling M3
 0+025      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+030      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+035      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+040      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+045      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+050      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+055      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+060      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+065      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+070      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+075      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+080      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+085      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+090      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+095      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+100      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+105      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+110      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+115      5 DrainA                               0.125                       0.863                      0.562               0.844
 0+120      5 DrainA                               0.125                       0.863                      0.562               0.844
                                         Summary of Quantity EarthWork
                     Item Code         Name               Quantity            Unit
                    09.01(I-B)     Cut                 440.831           M3
                    09.09(B)       Fill                182.415           M3
                    09.04(I-B-i)   StructureCut        940.627           M3
                    BFIC1          BackFill            287.125           M3
          Mean                                         AREA (m2)                                                    VOLUME (m3)
Chainage
         Distance       Cut              Fill           Structure Cut     Drain Cut     BackFill   Cut      Fill    Structure Cut   Drain Cut    BackFill
  (m)
           (m)          Cut              Fill           StructureCut      DrainCut      BackFill   Cut      Fill    StructureCut    DrainCut     BackFill
   0+000     2.50           0.15                0.01               -               -          -      0.38    0.01             -             -         -
   0+005     5.00           0.87                  -                -               -          -      4.37      -              -             -         -
   0+010     5.00           1.87                  -                -               -          -      9.33      -              -             -         -
   0+015     5.00           6.36                  -             17.87              -        4.90    31.81      -           89.32            -      24.49
   0+020     5.00           4.85                0.01            17.29              -        4.19    24.24    0.03          86.46            -      20.94
   0+025     5.00           3.43                1.08            11.63              -        1.62    17.12    5.40          58.16            -       8.11
   0+030     5.00           1.64                6.28             5.53              -        2.43     8.20   31.41          27.66            -      12.13
   0+035     5.00           2.08                7.12             5.80              -        2.60    10.39   35.60          28.99            -      12.99
   0+040     5.00           3.27                5.08             8.40              -        4.83    16.36   25.41          41.99            -      24.14
   0+045     5.00           6.23                0.12            14.78              -        2.80    31.14    0.59          73.90            -      14.02
   0+050     5.00           4.60                3.23            10.64              -        6.83    23.00   16.14          53.20            -      34.15
   0+055     5.00           3.96                3.56             7.99              -        4.52    19.77   17.80          39.95            -      22.59
   0+060     5.00           6.35                0.36            14.36              -        3.15    31.76    1.78          71.79            -      15.75
   0+065     5.00           7.74                0.12            30.40              -        7.95    38.69    0.59         151.98            -      39.72
   0+070     5.00           7.22                1.93            24.38              -        9.14    36.11    9.63         121.90            -      45.70
   0+075     5.00           2.82                0.31             4.05            0.23       0.87    14.11    1.57          20.23          1.13      4.35
   0+080     5.00           1.75                0.98             2.32              -        0.43     8.74    4.87          11.59            -       2.15
   0+085     5.00           0.98                1.37               -             0.68         -      4.92    6.84             -           3.38        -
   0+090     5.00           1.23                1.92                               -        0.22     6.16    9.59           7.95            -       1.09
   0+095     5.00           2.57                0.05                             0.25       0.07    12.87    0.23           3.98          1.26      0.36
   0+100     5.00           2.13                1.15                               -        0.27    10.65    5.77           8.75            -       1.37
   0+105     5.00           5.56                  -                              0.38       0.29    27.80      -           15.60          1.88      1.45
   0+110     5.00           2.64                0.21                             0.41       0.23    13.19    1.04           7.76          2.07      1.15
   0+115     5.00           2.64                  -                              0.68         -     13.22      -              -           3.38        -
   0+120     5.00           1.14                0.49                             0.16       0.10     5.69    2.43           5.63          0.78      0.49
   0+125     5.00           0.78                0.03                               -          -      3.90    0.14             -             -         -
   0+130     5.00           1.11                  -                  -             -          -      5.54      -              -             -         -
   0+135     5.00           1.10                0.74                 -             -          -      5.49    3.71             -             -         -
   0+140     5.00           1.18                0.37                 -             -          -      5.90    1.84             -             -         -