Bid Evaluation Report

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Bid Evaluation Report

Project:

PHD surrounding wall

Evaluated by:

Eng. Ghani

Report submitted to:

Dr. Ziaullah Shafiq

Date:
No

2
3
4
5
6
7
8
9
10

15/07/2014
Evaluation points
Gulab
Ikhlas
( GICC)

Afghan
Nijrab
(ANCC)

Seddiqee
Karimi
(SKCC)

Companies
Amin
Kapisa
(AKCC)

Project Price

1151740
(20075.6
49)

1094000
(19069.
2)

1141089.
3
(19890)

1832225.
69
(31937)

1834612.
28
(31978.
6)

Bid Security
Project Work plan
License
Work experience in
Kapisa Province
Bank statement
Appreciation letters
Quality control and
safety plan
Engineer
certificates and CVs
Equipment list

N/A
yes
yes

N/A
yes
Yes
yes

N/A
yea
yes

N/A
Yes
yes

yes
yes

yes
-

yes

yes

yes

yes

Pamir
One
(POCC)

Faqir
Zada
Constructi
on
Company
(FZCC)
-

Shiragh
Adil
Constructi
on
Company
(SHACC)
-

N/A
yes
yes

yes
yes
-

yes
-

Yes

yes

yes

yes

11
12

Experience of
similar wok
Organization chat

yes

yes

yes

yes

yes

yes

yes

yes

Based on Financial evaluation ANCC is No. 1, GICC is No.2, SKCC is No.3 and AKCC is No. 4 and Pamir one is
No. 5
Based on technical evaluation AKCC is No.1, GICC is No. 2, ANCC is No. 3, Pamir one is No. 4 and SKCC is No.
fifth
ANCC as the first lowest and GICC as the second lowest bidders has to be checked their references with PHD.
We distributed bidding documents to 7 companies, but we received back the documents from 5 companies,
(FZCC) and (SHACC) didnt submit their bidding documents
The above report is submitted for further actions.
Thanks and regards,
Eng. Ghani

Bid Evaluation Report


Project:
Evaluated by:

Eng. Abdul Ghani

Report submitted to:

Dr. Zia ullah Shafiq

Date:
No

Evaluation points

Project Price

2
3
4
5

Bid Security
Project Work plan
License
Work experience in
Kapisa Province
Bank statement

Jamalagha BHC

15/07/2014
Companies
Gulab
Ikhlas
( GICC)

Afghan
Nijrab
(ANCC)

Seddiqee
Karimi
(SKCC)

Amin
Kapisa
(AKCC)

Pamir
One

1040408
(18135.0
53)

1016244
(17713.8
57)

1128049
(19662.7
)

1459317.
24
(25436.9
4)

1449105.
38
(25258.
94)

N/A
yes
yes

N/A
yes
Yes
yes

N/A
yea
yes

N/A
Yes
yes

yes

Faqir
Zada
Constructi
on
Company
(FZCC)
-

Shiragh
Adil
Constructi
on
Company
(SHACC)
-

N/A
yes
yes

7
8
9
10
11
12

Appreciation letters
Quality control and
safety plan
Engineer certificates
and CVs
Equipment list
Experience of similar
wok
Organization chat

yes
yes

yes
-

yes
-

yes
-

yes

yes

Yes

yes

yes
yes

yes
yes

yes
yes

yes
yes

yes

yes

yes

yes

Based on Financial evaluation ANCC is No. 1, GICC is No.2, SKCC is No.3 and Pamir One is No. 4 and AKCC is
No. 5
Based on technical evaluation AKCC is No.1, GICC is No. 2, ANCC is No. 3, Pamir one is No. 4 and SKCC is No.
fifth
ANCC as the first lowest and GICC as the second lowest bidders has to be checked their references with PHD.
We distributed bidding documents to 7 companies, but we received back the documents from 5 companies,
(FZCC) and (SHACC) didnt submit their bidding documents
The above report is submitted for further actions.
Thanks and regards,
Eng. Ghani

You might also like