Cost Estimate
Page 1
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Qty
Price UM Draw
Me
Total
IMPORTANT: BE SURE TO INCLUDE
SALES TAX AND DELIVERY CHARGES
LAND
TOTAL LAND (LINES 5-8)
0.00
0.00
0.00
0.00
0.00
TOTAL DESIGN (LINES 12-15)
0.00
0.00
0.00
0.00
0.00
TOTAL LOAN (LINES 19-24)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Lot Price
Closing Costs on Lot
Interest On Lot
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LAND
DESIGN
* Architecture
Engineering
Blueprints
CONSTRUCTION LOAN
Appraisal
Point(s)
Closing Costs
Interest
Builder's Risk Insurance
Initial Survey
PERMITS
TOTAL PERMITS (LINES 29-37)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL UTILITIES (LINES 40-44)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE TOTALS (LINES 9, 16, 26, 37, 45)
0.00
0.00
0.00
Septic Tank
Building
Electrical (usually included in electrician's quote)
Mechanical (HVAC) (usually included in heating quote)
Plumbing (usually included in plumber's quote)
Tree Removal
Curb Cut
UTILITIES
Underground Electric Service
Water Tap and Meter
Sewer Tap and Connect Fee
Temporary Electric Power
50
1990-2012
Home
Building
UM
= Unit
Measure
(ea,
ft, etc.)
Note:
For each
item
onsqyour
estimate enter a quantity (Qty),
a unit price
(Price),
andAnswers
the
amount (if any) you plan to pay personally (Me) rather from your construction loan (Draw).
For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump
Sum quote in the Price Column. Excel will do all of the other calculations including what will
be paid for each item from your construction loan draw, the total for each item, Section
Totals, Page Totals, and Summary Page Totals.
B
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
I
Page 2
Qty
Price
UM
Draw
Me
Total
Cost Estimate
2
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
Description
SITE PREPARATION
TOTAL SITE PREP (LINES 52-55)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL FOOTINGS (LINES 60-63)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL FOUNDATIONS (LINES 67-77)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE TOTALS (LINES 57, 64, 79)
0.00
0.00
0.00
Rough Stake
Clearing, Grading, Hauling
Fill Dirt
Locate Corners
FOOTINGS
Layout, Dig, and Pour
Steel
Concrete
Drains
FOUNDATIONS
Concrete
Brick
Block
Mortar
Sand
Steel
Vents
Damp Proofing
Backfill
Labor
Foundation Survey
100
Home Building
Answers
UM
= Unit
Measure
(ea,
ft, etc.)
Note:
For each
item
onsqyour
estimate enter a quantity (Qty),a 1990-2012
unit price (Price),
and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
Price Column. Excel will do all of the other calculations including what will be paid for each item
from your construction loan draw, the total for each item, Section Totals, Page Totals, and
Summary Page Totals.
Cost Estimate
Description
101 SLAB (IF APPLICABLE)
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
Qty
Price
UM
Fill Dirt
Sand
Backfill Labor
Polyethelene
Wire Mesh
Styrofoam (Perimeter Insulation)
Steel
Grade Stakes
Form Materials
Concrete
Set Up and Finishing
TOTAL SLAB (LINES 102-112)
SOIL TREATMENT FOR TERMITES
Draw
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Me
0.00
Page 3
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL FLOOR AND WALL FRAMING (LINES 119-139)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE TOTAL (LINES 114, 116, 143)
0.00
0.00
0.00
FRAMING - FLOORS
Sills
Steel Posts
Steel Beams
Microlams
Joists
Hangers
Cross Bracing
Floor Decking
Glue
FRAMING - WALLS
Base Plates
Studs
Top Plates
Header Materials
Corner Bracing
Sills, Jacks, and Cripples
Back Out Materials
Insulated Sheathing
Chimney Framing Materials
Bracing Materials
150
1990-2012
Homeand
Building
Answers
UM
= Unit
(ea,on
sqyour
ft, etc.)
Note:
For Measure
each item
estimate enter a quantity (Qty),
a unit
price (Price),
the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
Price Column. Excel will do all of the other calculations including what will be paid for each item
from your construction loan draw, the total for each item, Section Totals, Page Totals, and
Summary Page Totals.
Click "Page 4" below
Cost Estimate
Description
151 FRAMING - CEILINGS
Page 4
Qty
Price
UM
Draw
Me
Total
0.00
152 Beams
0.00
0.00
153 Ceiling Joists
0.00
0.00
154 Headers and Trimmers
0.00
0.00
155
156 FRAMING - ROOF
0.00
0.00
157 Truss Package
0.00
158 Bracing Materials
0.00
0.00
159 Ridge Board
0.00
0.00
160 Ridge Rafter
0.00
0.00
161 Valley Rafter
0.00
0.00
162 Rafters
0.00
0.00
163 Lookout Material
0.00
0.00
164 Barge Rafter
0.00
0.00
165 Dormer Materials
0.00
0.00
166 Cricket Materials
0.00
0.00
167 Roof Decking
0.00
0.00
168 Roof Clips
0.00
0.00
169 15# Felt
0.00
0.00
170 Gable Vents
0.00
0.00
171 Strong Ties
0.00
0.00
172 Framing Labor
0.00
0.00
173
CEILING AND ROOF FRAMING (152-172)
0.00
0.00
0.00
174
175
TOTAL FRAMING (LINES 143, 174)
0.00
0.00
0.00
176
177
178 MASONRY WALLS
0.00
0.00
179 Block
0.00
0.00
180 Sills
0.00
0.00
181 Lintels
0.00
0.00
182 Block Ties
0.00
0.00
183 Sand
0.00
0.00
184 Mortar
0.00
0.00
185 Steel
0.00
0.00
186 Concrete
0.00
0.00
187 Masonry Labor
0.00
0.00
188
TOTAL MASONRY WALLS (LINES 179-187)
0.00
0.00
0.00
189
190
191
192
PAGE TOTAL (LINES 174, 189)
0.00
0.00
0.00
193
194
195
196
197
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
198
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
199
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
200 Column. Excel will do all of the other calculations including what will be paid for each item
Price
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 5" below
Cost Estimate
Description
Qty
Price
UM
Draw
Me
Page 5
Total
201 ROOF
0.00
0.00
202 Roofing Shingles
0.00
0.00
203 Eave Drip
0.00
0.00
204 Flashing
0.00
0.00
205 Ridge Vents
0.00
0.00
206 Roof Ventilators
0.00
207 Nails
0.00
0.00
0.00
208 Roofing Labor
0.00
0.00
209
TOTAL ROOFING (LINES 202-208)
0.00
0.00
0.00
210
211
212
0.00
0.00
213 WINDOWS
214
215 EXTERIOR DOORS
0.00
0.00
216 Exterior Doors
0.00
0.00
217 Garage Door
0.00
0.00
218
TOTAL EXTERIOR DOORS (LINES 216, 217)
0.00
0.00
0.00
219
220
221 CORNICE, VENEER, & EXTERIOR TRIM
0.00
0.00
222 Siding
0.00
0.00
223 Masonry Veneer
0.00
0.00
224
Brick
0.00
0.00
225
Stone
0.00
0.00
226
Sand
0.00
0.00
227
Mortar
0.00
0.00
228
Ties
0.00
0.00
229
Lintel
0.00
0.00
230 Masonry Labor
0.00
0.00
231 Stucco (Including Materials)
0.00
0.00
232 Cornice Materials
0.00
0.00
233
Sub Fascia
0.00
0.00
234
Fascia
0.00
0.00
235
Soffit
0.00
0.00
236
Soffit Vents
0.00
0.00
237
Frieze Board
0.00
0.00
238
Shingle Mould
0.00
0.00
239
Dental Mould
0.00
0.00
240
Crown Moulding
0.00
0.00
241 Corner Trim
0.00
0.00
242 Window Trim/Mould
0.00
0.00
243 Door Trim and Mould
0.00
0.00
244 Flashing
0.00
245
CORNICE, VENEER, EXTERIOR TRIM CONTINUED ON NEXT PAGE
246
247
Note:
For each item onPAGE
your estimate
a quantity
(Qty),
a unit
the amount
TOTAL* enter
(LINES
210, 213,
219,
220)price (Price),
0.00 and0.00
0.00
248
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
249
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
Total"
on this
page
lines222-245.
for these
arepaid
included
on line
250 "Page
Price
Column.
Excel
will do
all excludes
of the other
calculationsTotals
including
whatlines
will be
for each
item264
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 6" below
Cost Estimate
Description
Qty
Price
UM
Draw
Me
Page 6
Total
251 CORNICE, VENEER, EXT. TRIM CONTINUED
0.00
0.00
252 Shutters
0.00
0.00
253 Porch Columns
0.00
0.00
254 Pediment and Pilasters
0.00
0.00
255 Porch Materials
0.00
0.00
256 Flooring
0.00
0.00
257 Ceiling
0.00
0.00
258 Columns/Posts
0.00
0.00
259 Handrail
0.00
0.00
260 Trim
0.00
0.00
261 Nails
0.00
0.00
262 Siding and Trim Labor
0.00
0.00
263
TOTAL CORNICE, VENEER, EXTERIOR TRIM (222-262)
0.00
0.00
0.00
264
265
266 FIREPLACE
0.00
0.00
267 Face Brick
0.00
0.00
268 Fire Brick
0.00
0.00
269 Flue Liner
0.00
0.00
270 Mortar
0.00
0.00
271 Sand
0.00
0.00
272 Lintel
0.00
0.00
273 Damper
0.00
0.00
274 Ash Dump
0.00
0.00
275 Gas Lighter (Including Gas Line)
0.00
0.00
276 Masonry Labor
0.00
0.00
277 Prefab Fireplace
0.00
0.00
278 Chase Top
0.00
0.00
279 Hearth and Profile (Materials and Labor)
0.00
0.00
280
TOTAL FIREPLACE (LINES 267-279)
0.00
0.00
0.00
281
282
283 ELECTRICAL
0.00
0.00
284 Subcontract - Includes: Labor, Wire, Outlets,
0.00
0.00
285
Switches, Boxes, Connectors, Meter,
0.00
0.00
286
Service Entrance, Panel and Breakers,
0.00
0.00
287 Lighting Fixture (Allowance) Includes: Door Bell,
0.00
0.00
288
and Smoke Detectors
0.00
0.00
289 Ceiling Fan
0.00
0.00
290 Whole House Fan
0.00
0.00
291
TOTAL ELECTRICAL (LINES 284-290)
0.00
0.00
0.00
292
293
294
295
PAGE TOTAL (LINES 264, 281, 292)
0.00
0.00
0.00
296
297
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
298
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
299
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
300 Column. Excel will do all of the other calculations including what will be paid for each item
Price
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 7" below
Cost Estimate
Description
Qty
Price
UM
Draw
Me
Page 7
Total
301 APPLIANCES AND SPECIAL EQUIPMENT
0.00
0.00
302 Range
0.00
0.00
303 Range Hood
0.00
0.00
304 Cook Top
0.00
0.00
305 Oven
0.00
0.00
306 Microwave
0.00
0.00
307 Trash Compactor
0.00
0.00
308 Disposal
0.00
0.00
309 Refrigerator
0.00
0.00
310 Dishwasher
0.00
0.00
311 Electronic Air Filter
0.00
0.00
312 Intercom System
0.00
0.00
313 Built-In Vacuum System
0.00
0.00
314 Security System
0.00
0.00
315 Garage Door Opener
0.00
0.00
316
TOTAL APPLIANCES (LINES 302-315)
0.00
0.00
0.00
317
318
319 HVAC SYSTEM
0.00
0.00
320 Subcontract - Includes: Labor; Heating/Air
0.00
0.00
321
Conditioning System; Humidifier and
0.00
0.00
322
Dehumidifier; Ducts, Dampers, and Vents
0.00
0.00
323
For Range Hood, Fireplace, Bath Fans,
0.00
0.00
324
and Dryer.
0.00
0.00
325
TOTAL HVAC (LINE 320)
0.00
0.00
0.00
326
327
328 PLUMBING
0.00
0.00
329 Subcontract - Includes: Labor; Supply,
0.00
0.00
330
Waste, and Vent Pipes, and Fittings;
0.00
0.00
331
Bathtubs, Prefab Showers and Shower Pans,
0.00
0.00
332
Sinks, Vanity Bowls, and Toilets; Shower
0.00
0.00
333
Heads, Faucets, Sill Cocks; Water Heater;
0.00
0.00
334
Gas Lines
0.00
0.00
335
TOTAL PLUMBING (LINE 329)
0.00
0.00
0.00
336
337
0.00
0.00
338 WELL
339
0.00
0.00
340 SEPTIC TANK
341
0.00
0.00
342 SOLAR SYSTEM (LABOR AND MTLS)
343
344
PAGE TOTAL (LINES 317, 326, 336, 338, 340, 342)
0.00
0.00
0.00
345
346
347
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
348
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
349
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
350 Column. Excel will do all of the other calculations including what will be paid for each item
Price
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 8" below
Cost Estimate
Description
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
Qty
Price
UM
INSULATION - Materials and Subcontract
DRYWALL - Materials and Subcontract
INTERIOR DOORS AND TRIM
Doors
Base Moulding
Base Cap
Casing
Crown Moulding
Chair Rail
Shoe Mould
Shelving
Closet Rods
Rod Cups
Shelf and Rod Brackets
Shelf Cleating
Stairs
Stringers
Treads
Risers
Handrail & Fittings
Newells
Balusters
Skirt Board
Pre-Fab Unit
Panelling
Plywood
Picture Mould
Panel Mould
1x Materials
Window Trim
Stool
Mull
Stop
Apron
Drop Ceiling Mtls.
Disappearing Stairs
Nails
Glue
Trim Labor Incl Shoe Mould and Undercut Doors
TOTAL INTERIOR DOORS AND TRIM (LINES 356 -391)
PAGE TOTALS (LINES 351, 353, 393)
Draw
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
397
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
398
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
399
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
400 Column. Excel will do all of the other calculations including what will be paid for each item
Price
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 9" below
Me
Page 8
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
Building
tals,
PageHome
Totals,
and Answers
Cost Estimate
Description
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
Qty
Price
UM
HARDWARE
Entry Lockset
Bedroom Locksets
Bathroom Locksets
Passage Doorsets
Dummy Locksets
Deadbolts
Window Locks And Sash Lifts
Door Stops (Base Board)
Door Stops (Hinge Type)
Bath Accessories
Towel Holders
Soap Dish
Toothbrush Holder
Tumbler Holder
Medicine Cabinet
Shower Curtain Rod
Glass Fireplace Door
Hardware Labor
TOTAL HARDWARE (LINES 402-419)
Draw
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CABINETS AND VANITIES
Wall Cabinets, Base Cabinets, and Vanities
Including Installation
"Cultured" Marble Vanity Tops
TOTAL CABINETS AND VANITIES (PAGES 424-426)
PAINTING (Mtls and Labor)
0.00
0.00
0.00
0.00
0.00
0.00
WALLPAPER
Wallpaper
Labor Including Sizing And Paste
TOTAL WALLPAPER (LINES 433, 434)
WROUGHT IRON (Mtls and Labor)
0.00
0.00
0.00
0.00
0.00
GLASS
Mirror
Tub Enclosure
Shower Enclosure
Installation Of Glass Products
TOTAL GLASS (LINES 441-444)
0.00
0.00
0.00
0.00
0.00
0.00
447
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
448
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
PAGE TOTAL (LINES 421, 428, 430, 436, 438, 446)
0.00
449
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
450
Price Column. Excel will do all of the other calculations including what will be paid for each item
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 10" below
Me
Page 9
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
price (Price), and the amount
n loan (Draw). For "Lump
0.00
0.00
the Lump Sum quote in the
at will be paid for each item
990-2012
Building
tals,
PageHome
Totals,
and Answers
Cost Estimate
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
Description
CERAMIC TILE - Materials and Labor
Qty
Price
UM
Draw
FLOORS AND FLOOR COVERINGS
Carpet Including Pads and Installation
Vinyl Tile Including Installation
Wood Floors Including Installation
TOTAL FLOOR COVERING (LINES 454-456)
0.00
0.00
0.00
0.00
0.00
SCREEN PORCH
TOTAL SCREEN PORCH (LINES 461-466)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL DECK (LINES 471-476)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Framing And Ceiling Materials
Screening
Screen Mould
Screen Door
Screen Door Hardware
Labor
DECK
Concrete (Footings)
Framing Materials
Decking
Handrail Materials
Nails
Labor
WALKS, DRIVES, AND PATIOS
TOTAL WALKS, DRIVES, PATIOS (LINES 481-487)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE TOTAL (LINES 451, 458, 468, 478, 489)
0.00
Form Materials and Stakes
Wire Mesh
Joint Materials
Concrete
Labor
River Rock Or Other Special Finishes - Materials
and Subcontract
497
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
498
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
499
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
500 Column. Excel will do all of the other calculations including what will be paid for each item
Price
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Page 11" below
Me
Page 10
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
Building
tals,
PageHome
Totals,
and Answers
Cost Estimate
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
Description
LANDSCAPING
Qty
Price
UM
Subcontract - Includes: Finish Grading,
Seeding, Sodding, Shrubs, Ground
Covers, and Trees.
Other Landscape Construction (Retaining Walls,
Steps, Etc.) Including Materials and Labor
TOTAL LANDSCAPING (502-506)
GUTTERS AND DOWNSPOUTS
Draw
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CLEANING
Site Clean Up - Haul Trash
Clean Out House During Construction
Final House Cleaning Incl. Windows
Cleaning Brick and Concrete Surfaces
TOTAL CLEANING (LINES 513-516)
0.00
0.00
0.00
0.00
0.00
0.00
EQUIPMENT RENTAL
0.00
INSPECTIONS
0.00
SUPERINTENDING
0.00
CONTINGENCY
0.00
PAGE TOTALS (LINES 508, 510, 518, 520, 522, 524, 526)
0.00
GRAND TOTALS (FROM PAGE TOTALS)
#REF!
547
Note:
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
548
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
549
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
550 Column. Excel will do all of the other calculations including what will be paid for each item
Price
Totals,
1990-2012
Building
UM
= your
Unit Measure
(ea, sqloan
ft, etc.)
from
construction
draw, the total for each item, Section
PageHome
Totals,
and Answers
Summary Page Totals.
Click "Summary " below
Me
0.00
Page 11
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
Building
tals,
PageHome
Totals,
and Answers
Cost Estimate
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
LAND
DESIGN
CONSTRUCTION LOAN
PERMITS
UTILITIES
SITE PREPARATION
FOOTINGS
FOUNDATIONS
SLAB
SOIL TREATMENT
FRAMING
MASONRY WALLS
ROOFING
WINDOWS
EXTERIOR DOORS
CORNICE, VENEER, & EXTERIOR TRIM
FIREPLACE
ELECTRICAL
APPLIANCES AND SPECIAL EQUIPMENT
HVAC SYSTEM
PLUMBING
WELL
SEPTIC TANK
SOLAR SYSTEM
INSULATION
DRYWALL
INTERIOR DOORS AND TRIM
HARDWARE
CABINETS AND VANITIES
PAINTING
WALLPAPER
WROUGHT IRON
GLASS
CERAMIC TILE
FLOORS AND FLOOR COVERINGS
SCREEN PORCH
DECK
WALKS, DRIVES, AND PATIOS
LANDSCAPING
GUTTERS AND DOWNSPOUTS
CLEANING
EQUIPMENT RENTAL
INSPECTIONS
SUPERINTEND
CONTINGENCY
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
Line
9
16
26
37
45
57
64
79
114
116
176
189
210
213
219
264
281
292
317
326
336
338
340
342
351
353
393
421
428
430
436
438
446
451
458
468
478
489
508
510
518
520
522
524
526
Draw
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Me
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
47
48
49
GRAND TOTAL
0.00
0.00
50
UM = Unit Measure
1990-2012 Home Building Answers
Summary
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
012 Home Building Answers