0% found this document useful (0 votes)
91 views1 page

Program of Work: Application No: Drawing Ref:-S.No Type of Work Start Date End Date No - of Days Remarks

This program of work document outlines a 3-phase construction project taking place from May 28 to June 4, 2017. The project includes demarcation, excavation from May 28-30, cable laying on May 31 with cables supplied by the client, and backfilling, tile reinstatement and soil testing from June 1-4 except for a holiday on June 2.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views1 page

Program of Work: Application No: Drawing Ref:-S.No Type of Work Start Date End Date No - of Days Remarks

This program of work document outlines a 3-phase construction project taking place from May 28 to June 4, 2017. The project includes demarcation, excavation from May 28-30, cable laying on May 31 with cables supplied by the client, and backfilling, tile reinstatement and soil testing from June 1-4 except for a holiday on June 2.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROGRAM OF WORK

Application No: Drawing Ref:-

S.No Type Of Work Start Date End Date No.of Days Remarks

1 28.05.2017 30.05.2017 3 -
Demarcation,Excavation
Cable Supplyed By
2 31.05.2017 31.05.2017 1
Cable Laying Client

3 Back Filling & Tiles Reinstatement 01.06.2017 04.06.2017 4 Friday Holiday


Work & Soil Test