100% found this document useful (1 vote)
2K views2 pages

Scaffold Inspection Checklist

HSE Officer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views2 pages

Scaffold Inspection Checklist

HSE Officer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Doc.

Code

SCAFFOLD INSPECTION Rev. No. 0


Eff. Date
CHECKLIST Page No. 1 of 2
Bin Quraya Est.

Project Name:
Project Location:
Purpose of Scaffold:
Name of Erector: SI Control No.
Name of User: Scaf Tag. Issued No.

Scaffold Types
Independent Mobile/Hanger Drop/Hanging (Suspended)

Item Description Status


1 Stable / Level Ground Yes No N/A

2 Base Plates Yes No N/A

3 Adjustable Base Plates Yes No N/A

Standards (check only one), Light Duty, Medium Duty, Heavy Duty,
4
All Duty
3.0 meters (10 ft.) Max. Longitudinal Spacing (Light Duty) Yes No N/A

2.4 meters (8 ft.) Max. Longitudinal Spacing (Medium Duty) Yes No N/A

1.98 meters (6.5 ft.) Max. Longitudinal Spacing (Heavy Duty) Yes No N/A

1.8 meters (6 ft.) Max. Longitudinal Spacing (for all types) Yes No N/A

5 Ledger

At 2.0 meters (6.5 ft.) Vertical Headroom Yes No N/A

Secured to Standard w/ Load Bearing Coupler Yes No N/A

6 Transom

Secured to Standard w/ Load Bearing Coupler Yes No N/A

Bearing Upon Ledger (never fix under Ledger) Yes No N/A

Within 1-foot of Standard (offset) Yes No N/A

7 Board bearer / Intermediate Transom Yes No N/A

8 Ledger (Cross) Brace (Transversal) every 3rd Post / 4th Runner Yes No N/A

9 Sway Brace (Longitudinal @ 45 degrees) Yes No N/A

10 Toe Boards (4 high-minimum-all sides) Yes No N/A

11 Guard Rails (all sides) Yes No N/A

Top Rail (36 42 high) Yes No N/A

Mid Rail Yes No N/A

12 Decking Yes No N/A

Secured / No Openings Yes No N/A


Doc. Code

SCAFFOLD INSPECTION Rev. No. 0


Eff. Date
CHECKLIST Page No. 2 of 2
Bin Quraya Est.

2 Plank Minimum Width Yes No N/A

End Plank Overhang within 6 12 (10 Plank); 6 18 (>10 Plank) Yes No N/A

Level (Max. Slope: (1 Vertical to 4 Horizontal) Yes No N/A

13 Ties (At each End; Every 26 Vertically; 30 Horizontally) Yes No N/A

14 Personnel Access / Ladders Yes No N/A

Adequate Access Ladders Yes No N/A

Extended (36 Minimum) Beyond Stepping-Off Point Yes No N/A

Securely Fixed by Side Rails (Stiles) NOT by Rungs Yes No N/A

Safety Gate Provided at Access Point(s) Yes No N/A

Obstruction Free Yes No N/A

Rungs Not Loose / Stiles Damage Free Yes No N/A

75 degrees Angle (Inclined Ladder) Yes No N/A

Side-Step Position (To & From Landing) Yes No N/A

15 Mobile Scaffolds Yes No N/A

Maximum Height = 4 x Minimum Base Width Yes No N/A

Caster w/ brake, Wheels fixed to base w/ Locking Pins Yes No N/A

Outriggers Required / Provided (beyond 4:1 height-base ratio) Yes No N/A

Remarks

Authorized Scaffold Inspector:


Name: Signature: Date:

Prepared by: Approved by: Noted by:

HSE Manager Project Manager

You might also like