Oshimanoki Myanmar Co.,Ltd. New Factory: Schematic Design (基本計画書) 14 JULY 2017

The document is a schematic design for a new factory building in Myanmar. It includes architectural, structural, mechanical, electrical, and civil drawings. The drawings cover site plans, building elevations and sections, mechanical and electrical systems, equipment lists, and other design elements of the new factory building.

Uploaded by

Van Diep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
222 views24 pages

Oshimanoki Myanmar Co.,Ltd. New Factory: Schematic Design (基本計画書) 14 JULY 2017

The document is a schematic design for a new factory building in Myanmar. It includes architectural, structural, mechanical, electrical, and civil drawings. The drawings cover site plans, building elevations and sections, mechanical and electrical systems, equipment lists, and other design elements of the new factory building.

Uploaded by

Van Diep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

OSHIMANOKI MYANMAR CO.,LTD.

NEW FACTORY
SCHEMATIC DESIGN )
14 JULY 2017
ARCHITECTURIAL
MACHANICAL
00 DRAWING LIST ME-01 M&E SCOPE OF WORK-1

P-01 PERSPECTIVE - 1 ME-02 M&E SCOPE OF WORK-2

P-02 PERSPECTIVE - 2 ME-03 M&E SCOPE OF WORK-3

P-03 PERSPECTIVE - 3 ME-04 ELECTRICAL OUTLINE CONDITION (1)

A-01 GENERAL & BUILDING SCOPE OF WORKS ME-05 ELECTRICAL OUTLINE CONDITION (2)

A-02 EXTERIOR FINISHING SCHEDULE-1 ME-06 ELECTRICAL ROOM CONDITION

A-03 EXTERIOR FINISHING SCHEDULE-2 ME-07 MECHANICAL SYSTEM OUTLINE

A-04 INTERIOR FINISHING SCHEDULE-1


M-01 EQUIPMENT LIST-01
A-05 SITE PLAN
M-02 EQUIPMENT LIST-02
A-06 ENLARGE OFFICE PLAN
M-03 PLUMBING SYSTEM SCHEMATIC DIAGRAM
A-07 ROOF PLAN
M-04 VENTILATION SYSTEM SCHEMATIC DIAGRAM
A-08 SECTION A, B
M-05 AIR CONDITION PIPING SYSTEM SCHEMATIC DIAGRAM
A-09 SECTION C
M-06 COMPRESSED AIR, LPG, STEAM SYSTEM SCHEMATIC DIAGRAM
A-10 ELEVATION 1, 2
M-07 PLUMBING SYSTEM SITE PLAN
A-11 ELEVATION 3, 4
M-08 UTILITY SYSTEM (COMPRESSED AIR, LPG, STEAM) SITE PLAN
A-12 DOOR & WINDOW SCHEDULE-1
M-09 VENTILATION SYSTEM SITE PLAN
A-13 DOOR & WINDOW SCHEDULE-2
M-10 VENTILATION SYSTEM OFFICE PLAN
A-14 GUARD HOUSE & BIKE PARK
M-11 AIR CONDITION PIPING SYSTEM OFFICE PLAN
A-15 CIVIL, EXTERNAL WORK & LANDSCAPE PLAN

ELECTICAL
STRUCTURE
E-01 SINGLE LINE DIAGRAM
S-01 STRUCTURAL DESIGN CONDITION
E-02 LAYOUT OF PANEL & MAIN FEEDER

E-03 LAYOUT OF LIGHTING SYSTEM (FACTORY)

E-04 LAYOUT OF LIGHTING SYSTEM (OFFICE)

E-05 LAYOUT OF EMERGENCY & EXIT LIGHT

E-06 LAYOUT OF RECEPTACLE (FACTORY & OFFICE)

E-07 SCHEMATIC DIAGRAM FOR TELEPHONE, LAN & MATV

E-08 SCHEMATIC DIAGRAM FOR FIRE ALARM & PUBLIC ADDRESS SYSTEM

E-09 LAYOUT OF TELEPHONE, LAN & MATV OUTLET (FACTORY & OFFICE)

E-10 LAYOUT OF PUBLIC ADDRESS SYSTEM

E-11 LAYOUT OF FIRE ALARM SYSTEM

DRAWING LIST
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY 00
PERSPECTIVE - 1
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY P-01
PERSPECTIVE - 2
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY P-02
PERSPECTIVE - 3
14 JULY 2017
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY P-03

/ Description /Works Works / Remarks / Description /Works Works / Remarks


Included Excluded
Included Excluded
5) /BUILDING WORKS
1) / DESIGN SERVICE

B. / Building Works
A. / Schematic Design

B. / Building Permit Drawings / Piling


a)
C. / Working Drawings Works
b) / Sub Structure Works
D. / Perspective Drawings
/ Super Structure
c)
E. / Scale Models Works
d) / Finishing Works
F. / As-Built Drawings / Company Sign on External
e) 2 nos.
Wall
G. / As-Built Photos
f) / Fire Proof for Steel Structure Not required by law.

g) /
2) / SURVEY AND SITE RELATED WORKS Foundations for Bldg. Services

Equipment

A. / Site Survey

B. ) / Soil Investigation C. / Furniture, Fitting and Equipment

C. / Land Reclamation / Built in


a)
Furniture
D. / Grading
b) / Loose Furniture
/ Removal of existing obstructions on
E. c) / Blind Box For Windows in Office Area
site
d) / Blind, Curtain
F. / Demolition underground obstructions / Lighting Box for
e)
Toilet
f) / Hand Wash Sink
3) / PERMITS AND SERVICES APPLICATIONS / Pantry Sink w/Cup
g)
Board
A. / Building Permit h) / Kitchen Counter

Fee shall be paid by the owner. The contractor i) / Guard Post for SHUTTER DOORS
B. / Connection of Services such as Water shall provide the necessary assistances for the /Column Corner
Supply, Waste Water, Storm Water, Electricity, etc. owner in obtaining the building permit. j)
Guard
/ Steel Ladder For
k)
C. / Environmental Application (ECPP) The contractor shall assist preparation of drawings and
Roof
documents. l) / Room name plate
m) / Column Numnber Paint
D. /Other Relevant Government Permit / Reception
n)
Counter
/ Kitchen
o)
Equipment
4) / CEREMONY
p)
/ Entrance Lobby Company Sign
A. / Ground Breaking Ceremony numbers of guests to be around 20 people
B. / Topping Up Ceremony
D. / Others
C. / Completion or Opening Ceremony
/ Production Machine
a)
Foundation
b) / Steel Plates for Prod. Machine
5) / CIVIL AND EXTERNAL WORKS
A. Site Works c) / Overhead Crane
a) / Main Entrance Gate d) / Dock Leveler
b) / Company Sign at Entrance Gate / Dock
e)
SHELTER
c) / Flag Pole w/Foundation
f) / Roof Ventilation Natural ventilation monitor
d) / Lawn
/ Water
e) / Trees g)
Tank
f) / Internal Road Paving h) / Transformer Yard Transformer to be installed in Electrical Room

i) / Truck Scale
g) / Traffic Signs Road Marking only.
j) / Gas Governor Room
h) / Car Park Roof k) / Lift
I) / Bike Park Roof 10 nos l) / Dumbwaiter
j) / Boundary Fences m) / Conveyer System
k) / Storm Water Drainage / Waste Water
n)
Treatment
l) / Spirit House o) / Master Key
m) / Guard House p) / Termite Control on Ground
n) / Drivers' Room
o) / Billboard
p) / Pipe Rack
q) / Sub station building

GENERAL & BUILDING SCOPE OF WORKS


14 JULY 2017 A-01
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY
EXTERIOR FINISHING SCHEDULE-1 S=N/A
14 JUL 2017
A-02
EXTERIOR FINISHING SCHEDULE-2 S=N/A
14 JUL 2017
A-03
INTERIOR FINISHING SCHEDULE-1 S=N/A
14 JUL 2017
A-04



4


20m

1
150mm
4K3010kg/cm3


1


200mmHeavy Duty Area150mmLight Duty Area

CBR6
CBR2000

0.57kN/()0.35kN/()

1
1,2
1,2

STRUCTURAL DESIGN CONDITION


14 JULY 2017 S-01
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY

/ DESCRIPTION /REMARKS /Description /REMARKS
INCLUDE EXCLUDE INCLUDE EXCLUDE

A) / ELECTRICAL SYSTEM
1 115kV / 115kV HV. INCOMING N/A 23 / ALARM MONITORING SYSTEM N/A
2 115KV / 115kV SUB-STATION SYSTEM N/A 24 / LIGHTNING PROTECTION SYSTEM
3 33KV / 33kV HV. INCOMING SYSTEM 25 AV / AV SYSTEM
4 33KV / HIGH VOLTAGE SWITCH GEAR Conpact type 27 115KV / 115KV APPLICATION FEE DRAWING SUPPORT ONLY

5 / TRANSFORMER 28 33KV / 33KV APPLICATION FEE DRAWING SUPPORT ONLY


6 (MDB) / MAIN DISTRIBUTION BOARD(MDB) 29 TEL / TELEPHONE SYSTEM APPLICATION FEE DRAWING SUPPORT ONLY
7 (MDB -> PANEL) / MAIN FEEDER FOR GENERAL(MDB -> PANEL) 30 LAN / LAN SYSTEM APPLICATION FEE DRAWING SUPPORT ONLY
PANEL FOR LIGHTING, RECEPTACLE, GENERAL VENT,
8 /
PUMP 31 CATV / CATV SYSTEM APPLICATION FEE DRAWING SUPPORT ONLY

9 (PANEL -> EQUIPMENT) / SECONDARY POWER SUPPLY(PANEL -> EQUIPMENT)


10 / EMERGENCY POWER SUPPLY SYSTEM (GENERATOR)
11 (UPS, CVCF) / SPECIAL POWER SUPPLY SYSTEM(UPS, CVCF) N/A
12 / LIGHTING
13 / EXTERNAL LIGHTING
14 / RECEPTACLE
15 / TELPHONE SYSTEM B) / ELECTRICAL SYSTEM FOR PROCESS

/ MAIN EQUIPMENT PABX, MDF 1 / POWER SUPPLY FOR PROCESS MACHINE

/ WIRING (MDB -> PANEL) / MAIN FEEDER FOR PROCESS(MDB -> PANEL)
& / PIPING & OUTLET BOX / PANEL FOR PROCESS MACHINE
/ TELEPHONE HANDSET (PANEL -> EQUIPMENT) / SECONDARY POWER SUPPLY(PANEL -> EQUIPMENT)
16 LAN / LAN SYSTEM 2 / MACHINE GROUNDING

/ MAIN EQUIPMENT SERVER, HUB, ROUTER / GROUNDING ROD N/A


/ WIRING (->) / PIPING & WIRING(ROD->TERMINAL BOARD) N/A
& / PIPING & OUTLET BOX (->) / PIPING & WIRING(TERMINAL BOARD->ROD) N/A
17 / INTERCOM SYSTEM
/ MAIN EQUIPMENT Entrance to 2FL office

/ WIRING
/ PIPING
18 / FIRE ALARM SYSTEM
19 / PUBLIC ADDRESS SYSTEM
/ MAIN EQUIPMENT
, , / PIPING, WIRING & SPEAKER
20 / MATV/CATV SYSTEM
/ MAIN EQUIPMENT ANTENA,

/ WIRING
& / PIPING & OUTLET BOX Canteen, office

/ TV
21 / CCTV SYSTEM
, , , / MAIN EQUIPMENT, CAMERA, WIRING, MONITOR N/A
/ PIPING N/A
22 / ACCESS CONTROL SYSTEM
, / EQUIPMENT & WIRING N/A
/ PIPING N/A
IC / IC CARD N/A

M&E SCOPE OF WORK-1


14 JULY 2017 ME-01
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY

/ DESCRIPTION /REMARKS /Description /REMARKS
INCLUDE EXCLUDE INCLUDE EXCLUDE
C)/PLUMBING SYSTEM D)/HVAC SYSTEM
1 / DOMESTIC WATER SUPPLY SYSTEM 1 / CHILLED WATER SYSTEM(FOR AIR CON)
/ INCOMING METER
/ WATER COOLED CHILLER N/A
/ INCOMING PIPE
, / COOLING TOWER, COOLING WATER PUMP N/A
/ WATER TANK
() / CHEMICAL FEEDER N/A
/ BOOSTER PUMP
/ SUPPLY PIPE TO EACH EQUIPMENT
() / SOFTENER N/A
2 () /
DOMESTIC HOT WATER SUPPLY SYSTEM(CENTRAL / AIR COOLED CHILLER N/A
SYSTEM)
/ HOT WATER TANK N/A
/ CHILLED WATER PUMP N/A
/ HOT WATER PUMP N/A / CUSHION TANK N/A
/ SUPPLY PIPE TO EACH EQUIPMENT N/A / EXPANSION TANK N/A
3 () /
DOMESTIC HOT WATER SUPPLY SYSTEM(INDIVIDUAL
2F shower booth 2 / HOT WATER SYSTEM(FOR AIR CON)
SYSTEM)
4 / SEWAGE DRAINAGE SYSTEM / AIR COOLED HEAT PUMP CHILLER N/A
/ PIPE / HEAT EXHANCHANGER N/A
/ SUBMERGIBLE PUMP FOR SEWAGE / HOT WATER PUMP N/A
/ SUMP PIT / CUSHION TANK N/A
/ SEPTIC TANK FOR SEWAGE N/A / EXPANSION TANK N/A
/ INSPECTION PIT 3 () / AIR CONDITIONING SYSTEM(WATER COOLED)
5 / SANITARY FIXTURES wash-let(2F only)
/ AHU N/A
6 / GUARDEN FAUCET
/ FAN COIL UNIT N/A
7 / FIRE PROTECTION SYSTEM
4 () / AIR CONDITIONING SYSTEM(AIR COOLED)
/ PORTABLE FIRE EXTINGUISHER
/ INDOOR HYDRANT SYSTEM 150L/min set (, / CDU & FCU
/ OUTOOR HYDRANT SYSTEM 300L/min set 5 / PIPE FOR AIR CON SYSTEM

/ SPRINKLER SYSTEM N/A / CHILLED WATER N/A


/ FOAM FIRE EXTINGUISHING SYSTEM N/A / HOT WATER N/A
/ GAS FIRE EXTINGUISHING SYSTEM N/A / REFREGERANT
/ DRY CHEMICAL EXTINGUISHING SYSTEM N/A / AC DRAIN
ANN () / ANN N/A
5 / VENTILATION SYSTEM
(ANN) / WIRING(SUPERVISORY SWITCH->ANN) N/A
6 / SMOKE EXHAUST SYSTEM N/A
(ANN) / WIRING(FLOW SWITCH->ANN) N/A
7 / BUILDING MONITORING SYSTEM N/A

8

/ COLD WATER APPLICATION FEE



9 / WASTE WATER APPLICATION FEE N/A

E) /KITCHEN SYSTEM


() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A No kitchen
10 / GAS APPLICATION FEE N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A No kitchen

() / DRAINAGE PIPE (IN CYNDER CONCRETE) N/A No kitchen

() / DRAINAGE PIPE (AFTER GUTTER) N/A No kitchen

/ GREASE TRAP N/A No kitchen

/ SEPTIC TANK FOR KITCHEN N/A No kitchen

LPG / LPG GAS CYLINDER N/A No kitchen

/ KITCHEN EQUIPMENT N/A No kitchen

/ DRINKING WATER SUPPLY SYSTEM


/ SUPPLY & EXHAUST FAN N/A No kitchen

/ SUPPLY & EXHAUST DUCT N/A No kitchen

/ EXHAUST HOOD N/A No kitchen

/ POWER SUPPLY TO KITCHEN EQUIPMENT N/A No kitchen

M&E SCOPE OF WORK-2


14 JULY 2017 ME-02
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY

/ DESCRIPTION /REMARKS /Description /REMARKS
INCLUDE EXCLUDE INCLUDE EXCLUDE
F) / UTILITY SYSTEM(PROCESS)
F) / UTILITY SYSTEM
1 () / COMPRESSED AIR SYSTEM(LOW PRESSURE)
9 / SPECIAL GAS SUPPLY SYSTEM
/ MAIN EQUIPMENT 37kw, INV, oil free
/ MAIN EQUIPMENT N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE)
() / PIPE(MAIN PIPING ->BRANCH VALVE) N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE)
,() / COOLING TOWER, COOLING WATER PUMP N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A
/ CHEMICAL FEEDER N/A 10 / PROCESS EXHAUST SYSTEM

/ SOFTENER N/A / EXHAUST FAN N/A


2 () / COMPRESSED AIR SYSTEM(LOW PRESSURE) (->) / DUCT(MAIN DUCT ->BRANCH DAMPER) N/A
/ MAIN EQUIPMENT N/A (->) / DUCT(BRANCH DAMPER->PROCESS MACHINE) N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A / EXHAUST AIR TREATMENT Scraber
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A 11 / DUST COLLECTOR SYSTEM
,() / COOLING TOWER, COOLING WATER PUMP N/A
(, ) / DUST COLLECTOR , FAN N/A
/ CHEMICAL FEEDER N/A
(->) / DUCT(MAIN DUCT ->BRANCH DAMPER) N/A
/ SOFTENER N/A

(->) / DUCT(BRANCH DAMPER->PROCESS MACHINE) N/A
12 / HVAC SYSTEM FOR PROCESS
3 / COOLING WATER SUPPLY SYSTEM FOR PROCESS

/ MAIN EQUIPMENT N/A
/ MAIN EQUIPMENT N/A
/ AUTOMATIC CONTROL N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A
13 / REFREGERATOR SYSTEM N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A
/ CHEMICAL FEEDER N/A
/ SOFTENER N/A


4 / PROCESS CHILLED WATER SUPPLY SYSTEM


/ MAIN EQUIPMENT N/A
() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A
() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A
5 RO / RO WATER SUPPLY SYSTEM
/ MAIN EQUIPMENT N/A G) /OTHERS

() / PIPE(MAIN PIPE ->BRANCH VALVE) N/A 1 / AIR CURTAIN


() / PIPE(BRANCH VALVE->PROCESS MACHINE) N/A 2 , , / AIR SHOWER, PATHBOX, CLEAN BENCH
6 / STEAM SUPPLY SYSTEM
/ MAIN EQUIPMENT Future
() / PIPE(MAIN PIPE ->BRANCH VALVE) Future
() / PIPE(BRANCH VALVE->PROCESS MACHINE) Future

/ STEAM DRAIN PIPE Future

/ STEAM TRAP Future

7 / WASTE WATER TREATMENT SYSTEM FOR PROCESS

/ MAIN EQUIPMENT Future
() / PIPE(MAIN PIPE ->BRANCH VALVE) Future
() / PIPE(BRANCH VALVE->PROCESS MACHINE) Future
8 / FUEL SUPPLY SYSTEM LPG
/ MAIN EQUIPMENT 3t bulk tank
() / PIPE(MAIN PIPE ->BRANCH VALVE)
() / PIPE(BRANCH VALVE->PROCESS MACHINE)

M&E SCOPE OF WORK-3


14 JULY 2017 ME-03
OSHIMANOKI MYANMAR CO.,LTD. NEW FACTORY