A Brief Profile
Founded in 1992.Emerges as Inverter Industry
  in 1998.
 Annual turn over of 1000 Cr. in 2013-14.
 Investment from Reliance India Power Fund
  (A JV between Reliance ADAG and Tamasek
  Holdings, Singapore).
 In House R & D recognised by Govt. Of India.
 Indias leading producer and supplier of power
   inverters. Headquartered in Gurgaon,India with global
   presence in 71 countries.
 Manufacturing units  6; Employees  2100
 More than 600 service engineers and 80 service center across India
 24X7 customer service.
    Patents, Registration & Certifications
   In-house Research & Development team with over:
      70+ technology patents
      50+ designs Patents
      53 trademarks
      141 copyrights
   Quality certifications:
      ISO 9001
      ISO 14001
      UL and CE Certificate
Reach-27 Branches
            NORTH: Delhi, Jaipur,
            Jammu, Ludhiana, Lucknow,
            Kanpur, Dehradun, Ambala,
            Ghaziabad
            EAST: Kolkata, Patna,
            Ranchi, Guwahati
            WEST: Mumbai, Pune,
            Indore, Vadodara, Nagpur,
            Chhattisgarh
            SOUTH: Hyderabad,
            Bangalore, Chennai, Cochin
     World Class Production Facilities
   Inverter Plant          SMF Battery Plant       High Capacity Inverter Plant
       Baddi                    Katha                       Gurgaon
Telecom Inverter Plant   UPS Manufacturing Plant     Tubular Battery Plant
      Gurgaon                    Baddi                       Baddi
                                  Global Reach
Branch office in UAE, & Nigeria.
Having Manufacturing set up in Nepal.
2000 + dealers worldwide.
Biggest brand in 22 countries.
                                                 3
                  Customer Service
 71 service centers spread geographically
 600 Service Engineers
 Inbound call centre, in house with agents on company rolls
 100 + Service Vans
 Mandated Induction and Regular On-Roll and New Product Training to
  Service Engineers
 Qualified Service Team - 73% of Service Engineers Graduate/Diploma
  holder or more
 Using the latest international CRM software Salesforce.com (Worlds No. 1
  in Innovation  Forbes
A Few Partners
Su-kam Power Systems Limited
    SOLAR POWER PROJECTS
Corporate & Institutional sector
                     NHPC Corporate office in Faridabad is
                        Powered by Solar(Grid Tie 70 kW)
System Details :280 nos. of 250Wp solar panels, 2 Nos. of 30 kW, 1 no. of 20 kW Grid
tie String inverters, Scada etc.
Challenge Faced: Foundation has been designed on the dead load concept with no
penetration in the rooftop
                      EIL R&D Complex in Gurgaon Powered by
                                        Solar(Grid Tie 90 kW)
                                                                        PV: 300 Wp
Systems Details : 300 Nos. of 300Wp solar panels, mounting structure, 3 Nos. of 30 Kw Grid Tie
String inverters & Scada
Challenge Faced: 90 Kw plant on the rooftop building was not sufficient for installation of the
standard design, the meticulous customized plan was prepared to accommodate the 90 kWp
plant and delivered a solution meeting the stringent norms of the EIL team.
                       Ujjayanta Market Complex of Municipal
                      Corporation powered by Solar(Off Grid 45 kW)
System Details: 180 nos. of 250Wp solar panels, mounting structure, 2 nos. of 65 KVA 360V Su-
kam inverters, 800 Ah tubular type LMLA battery
25% of the buildings total requirement shall be met by the solar PV power plant installed in the
market complex.
             Vanbhavan, Nagpur powered by solar(Off Grid 35 kW)
System Details : 141 nos. of 250Wp solar panels, mounting structure, 1 nos. of 50 KVA 360V Su-
Kam Inverter, 3 nos. of 30Amp/360V Su-kam Solar Charge Controllers, 1360Ah/360V battery
bank, water Distillation Plant through which Distilled water can be prepared and can be used for
Battery Water Topping.
                   NITTTR, Chandigarh powered by solar(Grid Tie 50 kW)
System Details: 200 nos. of 200Wp solar panels, mounting structure, 2 Nos. of 20 Kw and 30 kw
Grid Tie String inverters, Scada, water pump for cleaning of modules.
Challenges Faced:
 25 years old NIIITR building was not allowed to puncture
 Foundation are designed on dead load concept
Educational Institute
  Educational Institute Powered by Solar(Grid Tie)
Shivalik Public School, Patiala(50 kW) No Grid Power is used by School
  Mount Litera Zee School, Bijnor, U.P is powered by
                Solar ( Off Grid 30 Kw)
System Details : 120 nos. of 250Wp solar panels, mounting structure, 1 Nos. of 30 Kw Off-grid
Solar Inverter (3 Ph in 3 Ph out) ,3 nos. Solar Charge controller 30A360V & 300AH360V Solar
Tubular Battery bank.
Challenge Faced: Challenge was to find 360 Sq meter space for installation solar PV Modules in
the premises of the school. Fially PV panels were ground mounted
                             Punjab Engr. College, Chandigarh to be powered by Solar
   1000 Kw system to be installed at 16 different roofs
   Roof distances 1.5 km and needed to be integrated at a single point for power injection
   Roof Construction was very old
   GI Structure members had to efficiently designed to offer strength
   Remote monitoring of arrays on multiple roofs is being done
   No access to roof in most buildings men and material had to be shifted using cranes
DEFENCE PROJECTS
Solar Power Plant, Assam Rifles(North East)
  Energizing Assam Rifles 2012-13: 450 kWp
  Energizing Assam Rifles 2013-14: 850 kWp
                 Total Qty(nos.):
                 PV Panel: 6,615
                 PCU: 18
                 Battery: 16,600 Ah
                 Challenges Faces:
                  Bandhs and terror threats
                  Site development issues
                  Weather conditions
                  Transportation
                  Communication Problem
                  Availability of Manpower
       Solar Power Plant(Off Grid): North East
Governor House of Arunachal      Assam State Electricity Board
Pradesh in Itanagar is powered   office in Guhati powered by
by solar(40 kW)                  Solar Plant(100 kW)
Hospital Solar Projects
             97 Primary Health Center and hospitals in 8
             districts of Tripura powered by solar(600 kW)
Su-kam to install cumulative capacity of 600 Kw to electrify hospitals and primary health
centers at 95 sites across 8 districts of Tripura
Lalitha Devi Nursing Home in Parakhal, Warangal
Andhra Pradesh is powered by solar
                           10 kw solar pv plant at Lalitha Devi Nursing
                           Home in Parakhal, Warangal Andhra
                           Pradesh is powered by solar
PETROL PUMPS
     Su-kams Unique Initiative to solarize petrol
       pumps in India(4 Kw to 10 Kw Capacity)
   Indian Oil Petrol Pump, Sonepat : 4 Kw
   Hindustan Petroleum Pump, Chandragiri & Tirupati: 6 Kw
   Indian Oil petrol pump at Chahal, Punjab
   Shivalik Oil Company, Kala Amp, Ambala: 10 Kw
   APG Oil Company, Saha, Ambala: 10 Kw
   Indian Oil Pump: 10 KVA
Solar Home Lighting and Street
          Lighting
  LOHIYA AVAS of UTTAR PRADESH.
Energizing homes 2013-14:40,000 Nos.
                                            Total Qty(nos.):
                                            PV Panel: 40,000
                                            SCC: 40,000
                                            Battery: 40,000
                                            LED:120,000
                                            FAN: 40,000
     Challenges Faced:
      Installations are in rural area (villages)
      Reach of remote locations
      Transportation
      Educate people for solar energy
      Lack of availability of skilled manpower.
                        Centralized Solar Street Light System-TEDA
                         Energizing Street light 2011-12 : 3220 nos.
                         Energizing Street light 2012-13 : 3495 nos.
Total Quantity:          Challenges Faced:                   Street Light Features:
                          Remote Locations                     Remote Monitoring
PV Modules: 2220 nos.                                           Auto on and off
PCU: 555 nos.             Logistics
                                                                Auto dimming
                          Educate people for solar energy
Battery: 1110 nos.                                              3 days autonomy
                          Skilled manpower                     Hybrid Pcu
LED: 6715 nos.            Non-availability of grid power       Direct EB supply
Chief Minister's Solar Powered Green House Scheme.
                  Energizing homes 2012-13:12,778 Nos.
                  Energizing homes 2013-14:20,000 Nos.
                                      Total Qty(nos.):
                                      PV Panel: 32,778
                                      PCU: 32,778
                                      Battery: 45,556
                                      CFL:163890
                Challenges Faced:
                 Remote Locations
                 Logistics
                 Educate people for solar energy
                 Skilled manpower
                 Non-availability of grid power
Thank You For Your Attention