        SAFETY
        THICKENING
        AND DRYING
        SCREENING
        AND WASHING
        IPCC
        DEVELOPMENTS
        DRONES
        AND UAVS
RZ_Eickhoff_Urkunde_E_170803.indd 1   03.08.17 17:12
CONTENTS _proof 29/09/2017 14:30 Page 1
                                                                                   10              CONTENTS
                                                                                                   OCTOBER 2017
                                                                                                 40 IPCC DEVELOPMENTS
                                                                                                     With a major acquisition, plus new designs and
                                                                                                     technologies, the IPCC market seems to be
                                                                                                     picking up again, reflecting renewed market
                                                                                                     interest, reports Paul Moore
                                                                                     40          51 SAFETY
                                                                                                     John Chadwick looks at new products and
                                                                                                     ideas across a broad range of safety needs
64 airships
                                                                                                                                      www.im
                                                                                                                                             -mining.
                                                                                                                                                     com
                                          This months cover shows an example of a CDE customisable plant configuration               IInfo
                                                                                                                                        nforrme
                                                                                                                                             med and
                                                                                                                                                 and   in-d
                                                                                                                                                       in ept
                                                                                                                                                             h editor
                                                                                                                                                                     ial on
                                                                                                                                                                              the wo
                                                                                                                                                                                    rld min
                                                                                                                                                                                           ing ind
                                                                                                                                   SAFETY
                                          for mining and specialist sand applications. The CDE M5500 plant shown
                                                                                                                                                                                                  ustry
                                                                                                                                  THICKE
                                                                                                                                         NI
                                                                                                                                  AND DR NG
                                          incorporates feeding, screening, classifying, dewatering and stockpiling onto a        SCREEN
                                                                                                                                         YING
                                                                                                                                        ING
                                                                                                                                 AND W
                                          single chassis. Users can produce up to 550 t/h of high quality washed sands                 ASHING
                                          that will be ready for market from exiting the belt, thanks to CDEs high-tech
                                          materials washing and classification technology. Designed to optimise energy
                                          and water savings, CDEs wet processing equipment gives quarrying and
                                          mining operations a competitive edge and fast return on investment. This and
                                                                                                                             IPCC
                                          other CDE solutions are covered in this months Screening and Washing              DEVELO
                                                                                                                                   PMENTS
                                                                                                                            DRONES
                                          report. www.cdeglobal.com                                                         AND UA
                                                                                                                                  VS
AROUND THE WORLD 3 The Leader 4 World Prospects 76 & IBC Forthcoming Events and Classifieds
THE LEADER VO LU M E 1 2 N U M B E R 1 0
         Editor
         Paul Moore B.Sc (Hons), M.Sc.
                                                         T       its passage through Cuba is a tragedy. In a
                                                                 country so heavily controlled by the
                                                         government, many are asking where is the
                                                                                                                     mine at Castellanos and
                                                                                                                     Emincar General Manager
                                                                                                                     Jose Vila explains: We are
         Email: paul@im-mining.com
                                                         government, when they need it.                             now exploiting the deposit
         Editorial Board
                                                            Perhaps this a salutary message for those                below the oxide cap. He
         Professor Malcolm Scoble
         Robert E. Hallbauer                             interested in developing Cuban mineral resources as         does not rule out the
         Chair in Mining Engineering.,
         University of BC, Vancouver
                                                         the cash-strapped, communist countrys government           potential to produce gold there also. The mine has
         Peter Knights                                   opens up that source of wealth to more foreign              current mineable reserves of 11 years, while the
         Professor and Head of Division of Mining        investment.                                                 nearby Santa Lucia deposit has enough for another
         Stephen Stone
                                                            Cuba plans to produce 54,500 t of nickel and             10 years, Vila said.
         West One Management
         Perth, Western Australia                        cobalt sulphides this year, state-run television               Sarah Marsh writing for Reuters reported that in
         Dr. Andrew M. Robertson                         announced in July. Nickel is one of the countrys           its annual investment portfolio released late last
         President, Robertson GeoConsultants
         Vancouver, Canada.                              most important exports, but revenue from it has             year, Cuba published dozens of opportunities for
         Ed McCord                                       suffered in recent years due to a decline in                foreign investors to explore, exploit and
         Project Consultant
                                                         production and prices. The country was ranked 10th          commercialise precious metals, base metals and
         Caterpillar Global Mining, USA
         Jason Nitz                                      in world nickel production in 2016 and sixth in             other minerals of interest.
         Fleet Management & Dispatch                     cobalt, according to the USGS.                                 Cuba hopes foreign investment will boost its
         Superintendent
         Newmont Mining Corporation, USA                    Cuba produced on average 74,000 t/y of nickel            economy that managed to climb out of a recession
         Dr Terry Mudder                                 plus cobalt during the first decade of this century,        in the first half of 2017. The island is under severe
         Managing Director, TIMES Ltd, USA
                                                         but the oldest of three plants was shuttered in 2012        strain due to lower exports and a drop in cheap oil
         Simon Tarbutt
         Consultant, Santiago, Chile                     and another has suffered from obsolescence and              shipments from ally Venezuela.
         Dr. Mike Daniel                                 hurricane damage. Who knows what further                       The USGS reports other mineral commodities
         Comminution Process Consultant                  hurricane damage there has been. Cuban nickel               produced in the country include bentonite, cement,
         CMD Consulting Pty Ltd
                                                         industry executives told Reuters a year ago that the        crushed stone, feldspar, gypsum, lime, limestone,
         Editorial Enquiries:
         Tel: +44 (0)1442 870 829                        industry was averaging 56,000 t/y.                          marble, nitrogen, salt, silica sand, and sulphuric acid.
         Fax +44 (0)1442 870 617                            Sherritt International Corp has announced that it           The last USGS Cuba report available is for 2014 in
         Advertising Sales:                              has completed a preliminary review of its operations        which it notes the Portfolio of Opportunities for
         Phil Playle
         Email: phil@im-mining.com                       and confirmed that all of its Cuba-based personnel          Foreign Investment (POFI) announcing ten mining
         +44 1442 87 77 77                               are safely accounted for. It also confirmed that the        sector projects. The country was offering
         Advertising Production                          facilities associated with its Moa nickel joint venture     international economic associations, including
         Lynne Lane
         Email: lynne@im-mining.com
                                                         as well as its oil and gas and power operations incurred    prospects for copper, gold, lead, silver, and zinc in
                                                         only minimal damages as a result of the hurricane.          the regions of Central Cuba, Ciego-Camaguey-Tunas,
         Design & Production
         Trevor Sheldon                                  Sherritt and its partners are currently focused on clean-   Holguin and Macizo-Baracoa, and Sierra Maestra. As
         Email: sheldonmann@gmail.com
                                                         up efforts and restoring all operations to normal           of 2013, Cuba had produced more than 2.9 Mt of
         Circulation Enquiries                           capacity  aiming for 36,000 t this year.                   nickel and cobalt and had about 43 identified
         circulation@im-mining.com
                                                            Cubaniquel operates the Che Guevara plant,               deposits of nickel. The country offered investment
         Website:
         www.im-mining.com                               aiming to produce 19,500 t this year.                       opportunities for the development of the Cajalbana,
         Annual Subscription Enquiries:
                                                            Cubas National Minerals Resource Center has             Colas Rojas de Moa, and San Felipe laterite
         Emma Smith                                      reported that the country has around a third of the         deposits, which are located in the Provinces of Pinar
         Email: emma@im-mining.com
                                                         world's known nickel reserves.                              del Rio, Moa, and Camaguey, respectively.
         Annual Subscription
                                                            A new lead and zinc mine in northwest Cuba was,             Cubas mining sector is regulated by the Ley de
         UK and Europe 160, 230
         Rest of the world US$270                        before the hurricane, on track to start production in       Minas (law No. 76 of January 23, 1995). The law
         International Mining (ISSN No: 1747-146X) is    October. Trafigura Mining Group is opening the              establishes the mining policy and legal regulations,
         published monthly by Team Publishing Ltd, GBR
         and is distributed in the USA by Asendia USA,
                                                         countrys first new mine for many years. The $278           which guarantee the protection, development, and
         17B South Middlesex Avenue, Monroe NJ 08831     million Castellanos mine will produce 100,000 t/y of        rational use of the mineral resources. The Ministerio
         and additional mailing offices. Periodicals
         postage paid at New Brunswick NJ.
                                                         zinc concentrate and 50,000 t/y of lead concentrate,        de Energa y Minas (Law Decree No. 301) is the
         POSTMASTER: send address changes to             according to executives at Emincar, the joint venture       entity responsible for establishing Government
         International Mining, 17B South Middlesex
         Avenue, Monroe NJ 08831
                                                         between Swiss-based commodities giant Trafigura             policy for the energy and mining sectors. In March
                                                         and Cuban state firm Geominera.                             2014, Cubas National Peoples Power Assembly
         Printed by The Manson Group, St Albans
          Team Publishing Ltd 2017                         We are reviving the small and medium-size               approved the new Ley de Inversion Extranjera (law
         ISSN 1747 -146X                                 mining sector in Cuba from this investment, said           No. 118). The law establishes the new legal
                                                         Justo Hernndez Prez, Emincar deputy general               framework for foreign investment in the country.
                     IM uses, as preference,             manager, during a visit by foreign journalists to the                                                 John Chadwick
            SI units throughout, so, for example, all
           tonnes are metric unless otherwise stated.    mine in the province of Pinar del Rio. "This is just                                                        Founder
           All dollars are US unless otherwise stated
                                                         the start.                                                                                    john@im-mining.com
WORLD PROSPECTS
       Evolution at Robit
             he 30-year history of Robit has seen an ever-   behave, how rock fractures,
WORLD PROSPECTS
       20% higher compared to conventional hard rock        simulations clearly show that the new model isnt       with the excellent performance and noted better
       button bits.                                        just easy on the eye. The flow pattern is more          flushing and longer grinding intervals. Across
          In the medium to large sizes significant          even, which reduces bit erosion. The pressure           sizes, the Evolution designs have systematically
       performance strides were taken by diving deep        distribution is more uniform, and the smoother          excelled. The 102 mm bits were tested in
       into flushing properties. Here in particular, the    side channels along larger main grooves increase        extremely hard and abrasive rock formations in
       computational fluid dynamics (CFD) simulations       airflow ensuring efficient flushing. Dead-space         Pennsylvania, USA, where we had been facing a
       proved their strong added value as they drove the    across the face is significantly cut by introducing     common challenge with a customer to find the
       pre-test phase for fast finding of optimal           an extra flushing hole in the middle, clearing the      perfect bit for those conditions. The new formula
       solutions and truly significant impacts. The 76-     centre area better of cuttings.                        allowed us to out-perform competition and more
       mm Retrac button bit body has the signature             All in all, Robit says field tests confirmed what    than double our achieved metres compared to
       Robit curving grooves and the sleek geometry         the technical simulation background work had            our previous model.
       flows through to the new face design. The           already proven. Our partner drillers were happy        www.robit.fi
       Weir continues to expand network                                                                             This service centre holds essential wear parts
                                                                                                                    stock for maintenance and shut-downs, and the
                ith changing market conditions and          and proficiency to our service offering, ensuring       on-site team is available 24 hours a day to
       Polyus Natalka starts production                                                                             including the primary crusher, the crushed ore
                                                                                                                    conveyer, the primary SAG mill and the main ball
              JSC Polyus, the largest gold producer in      the companys current life of mine plan, the            mill, is currently in operation having undergone
      Particle physics
                                                                                                             L-Class vibrating screen, uses a double-shaft
                                                                                                             overhead drive system, with direct-mounted
                                                                                                             motors, to provide multiple speed and stroke
                                                                                                             combinations in a compact design. With a
                                                                                                             horizontal screen, material spends more time on
       Washing and screening go hand in hand across a whole                                                  the deck for optimal cleanliness.
       range of mining applications, from iron ore to silica sand                                               The HC1000 Wash Plant includes
                                                                                                             serviceability features for maximum
       and coal. Paul Moore reports on some new technologies                                                 convenience and safety. Haver & Boecker
       and innovations                                                                                       manufactures the plant with stairs, eliminating
                                                                                                             the dangers of carrying parts and tools up
                 odularisation and portability are            Haver & Boecker combines the Hydro-Clean       ladders. In addition, mechanics can easily use
       washing plant at CONEXPO-CON/AGG 2017, the                                                               for our purposes and replacing them with a
       M5500. The UK-headquartered company said in                                                              single plant and process was beneficial in terms
       a statement that the new machine can produce                                                             of footprint, value for money and efficiency.
       up to 550 t/h of washed materials on a single                                                               Late last year, McCloskey International
       chassis. Kevin Vallelly, Head of Product                                                                 announced the launch of McCloskey Washing
       Development at CDE, said: This latest addition                                                          Systems (MWS), a new business division
       to the M-Series combines feeding, screening,                                                             focused on washing and classifying across
       washing and stockpiling onto one chassis, and                                                            multiple applications. The new unit designs and
       packs an extra punch with unique features.                                                               manufactures a full range of mobile, modular
       These include a higher capacity of 550 t/h, a                                                            and static material and mineral washing
       five-product capability and triple pass cyclone                                                          equipment. While McCloskey International has
       sand washing.                                                                                           been producing equipment for the quarrying,
          A selection of Infinity screens, the companys                                                        recycling, mining and industrial sand sectors for
       new development in screening technology, were                                                            over 30 years, this new division has been
       also launched on the North American market                                                               created to provide 100% focus on the
       along with other new technologies.                                                                       development of class-leading innovative and
          Adapted to applications in both dry and wet                                                           efficient equipment for washing and classifying
       screening situations across a wide range of         Wayne Warren, Business Development Manager           material and mineral products.
       materials, the new CDE Infinity technology is of    for sub-Saharan Africa at CDE; with Kobus Jv            McCloskey Internationals President and CEO
                                                           Rensburg of Cluster Holdings
       particular interest to operators looking for                                                             Paschal McCloskey said: Our customers are
       sturdier and more economical vibrating screens.                                                          always looking for more modern, flexible and
          Neil Mullan, Design Engineer at CDE, said:       but did not achieve the desired results in quality   cost-effective solutions. Our customer-driven
       We sell over 200 screens every year to the         and led to wet stockpiles.                           approach to product development has led us to
       global market, either as part of (our) modular         Wayne Warren, Business Development                invest significantly in the establishment of this
       equipment or as stand-alone. The new weld-free      Manager for sub-Saharan Africa at CDE, noticed       new division, with the aim to be the design and
       Infinity screens can generate the same              Cluster Holdings operations while on the road       manufacture of high quality washing equipment
       acceleration as conventional screens with less      to visit a client and stopped by. He said: Being    that is easy to install, maintain and operate.
       weight, resulting in a reduction in power           in a reasonably remote area, the road past              The products produced by the new division
       consumption and in operational costs, which         Cluster Holdings mining area allows you to get      will deliver significant advantages to
       presents significant benefits to our clients       an overview of their operations. I could see         customers, including lower cost of ownership,
       operations.                                        where issues might be and knew that CDE had          lower cost of production, and making more
          According to CDE, its materials washing          solutions that could up production at most           projects viable for their business.
       equipment allows for more accurate material         current washing plants. Little did I realise that       The three model SandStorm range is made up
       classification than traditional sand washing        this site had such extreme potential in what up      of the 516, 620 and 824 machines which can
       methods, higher quality washed sand, reduced        until then was called waste. In effect, unknown      process up to 550 t/h, and producing up to four
       costs of pond excavation, and reduced risks on      to our customer, plaster sand was laying in          grades of aggregate and two grades of classified
       site. The final product exits the plant ready for   abundance, hidden at the bottom of ponds, and        sand. SandStorm has also been enhanced with
       use, having been dewatered to 15% moisture.         with adapted CDE technology could be                 the new S-Line range, that offers the benefits of
          CDE says its customer Cluster Holdings in        recovered and processed into a valuable              the modular plant with the McCloskey range of
       West Rand, South Africa, had given up on ever       product.                                            Sand Screws. Finally, the new McCloskey
       recovering fines their sand screw classifier           Kobus Jv Rensburg of Cluster Holdings,            Washing Systems AggStorm Range can operate
       system had discharged into ponds but with the       provided samples for tests. It turned out that      as stand-alone units or can integrate with the
       introduction of the CDE EvoWash 71 sand             the waste sand had one of the best plaster sand      SandStorm wash plants. They can handle
       washing plant to their operations, they are now     grading I had come across in some time and it        various types of clay-bound material where
       producing high quality plaster sand from waste      became Cluster Holdings priority to recover it.    more aggressive scrubbing and washing is
       pond material. With CDE technology, fines are         CDE has a good footprint in South Africa, so      needed rather than simple screening alone.
       fully recovered and turned into profit and a very   the customer had the opportunity to visit a few
       competitive return on investment.                  sites showcasing the CDE EvoWash in action.          Screening and screen media
          The quarry is located half way between           Having witnessed the efficiency of the EvoWash       technologies
       Carletonville and Randfontein. Rich in              that produced a sand dry enough to be handled        Screening media specialist Multotec is using its
       decomposed granite, it was ideal terrain to         and loaded as it came off the stockpile conveyor,    deck map methodology to constantly raise the
       develop a materials processing business to          Cluster Holdings opted for CDE technology. An        bar in optimising screen output and lifespan,
       supply local construction companies with            EvoWash 71 materials washing plant was               according to Shawn Faba, Multotec
       washed plaster sand. At the start of its washing    commissioned and installed to process the raw        Manufacturing Product Manager Screening.
       operations in 1986, the company opted for sand      decomposed granite feed. The EvoWash                 Multotec has built on its concept of the
       screw classifiers to wash the granite, a cheap      removes the -75  fines from the sand slurry         composite deck for over a decade, and
       and popular choice in South Africa, but also an     feed and dewaters it to produce up to 50 t/h         differentiated ourselves by developing the deck
       option that creates a lot of waste to ponds and     within specification for plaster sand.               map to design specific screening solutions for a
       loss of potential profits. The subsequent switch       Jv Rensburg comments: After years of trial       wide range of materials with various
       to a cyclone tower resulted from identifying the    and error, we are delighted with our choice. We      characteristics, says Faba.
       potential in the plaster sand market in the area,   had two plants that were not efficient enough           The panels are easily interchangeable on
          From a structural standpoint, they are               demand for increasingly consistent sand             the opportunity to witness the reliability and
       fabricated with A572 Gr 50 plate (45% higher            gradings. Given the increased requirement for       hard-wearing of the CDE offer.
       yield strength than traditional A36 plating) for        sand and coarse aggregates for our downstream          Kevin Vallelly, Head of Product Development
       maximum strength. Side plates are a fully bolted        products, the time has come to grow our             at CDE commented on Roadstones new Infinity
       construction, which reduces and eliminates              production capability. As a result, we needed to    screen with VibroCentric electric drive system:
       cracking due to stress caused by welding. The           upgrade in order to ensure that we achieve          A key success of the VibroCentric drive system
       bolted construction also makes it easier to             maximum tonnes per hour every hour and that         is the harnessing of the power used and
       change out worn components without cutting.             our plant is capable of adapting to challenges      ensuring the maximum transfer of energy to the
          Bronze sleeves are integrated on both ends of        such as variable deposit moisture content           material being screened. This system is
       the shaft for protection in instances where the         brought by weather and natural variations within    employed on the Infinity P-Line range of inclined
       outer race of the bearing could potentially turn        the deposit. We have nurtured a solid               sizing screens. A unique shaft design allows for
       on the shaft. This reduces unnecessary downtime         relationship of trust with CDE over the years and   a significant reduction in the weight of the drive
       and only requires the sleeve to be replaced. All        had no hesitation in turning to them for an         system and the screen assembly which results in
       components slide onto the shaft, allowing for           upgrade of our existing CDE equipment. CDE          a significant reduction in overall power
       easy removal and installation. The straight shaft       equipment is used across most of Roadstones        consumption. As a result, dewatering
       features jacking bolts in the mechanism tube that       sand and gravel sites in Ireland and we have had    performance is maximised to allow the final
       support the shaft during change outs, eliminating
       the need for a crane and thus improving safety
       while minimising downtime. Screens are also
       equipped with a quick change spring kit that
       allows for the removal of the spring pack with
       only minimal vertical clearance and no need for
       an overhead crane.
          The company told IM: Operators looking to
       upgrade their screening operations can have a
       solution that fits directly into their operation with
                                                                                                                   {   CUT
       no rework to existing structures. McLanahans
       MAX Series Vibrating Screens make it easy to get
       more from your screen without needing to
       change your entire operation. Customers can be
                                                                                                                       SCREEN MEDIA
                                                                                                                       CHANGE-OUT TIME
                                                                                                                       IN HALF
       sure they are getting a solution that will give
       them more uptime, easier maintenance and a
       safer working environment.
       given us the kind of support that we need in            screening media used in minerals processing by        our extensive wear parts portfolio with an
       terms of technical advice, sales and support of         investing in three new injection presses. The         industry standard such as 1 ft x 1 ft screening
       their machines, he adds.                               presses will be installed at Metso's facilities in    media is a natural step in strengthening this
          The staff at the Middelburg branch are              Australia, India and Sweden by early 2018. The        position. We are the only supplier able to provide
       excellent and Workshop Manager, Johan Herbst            1.7 million investment will significantly increase   everything that a mine needs in a comminution
       provides the kind of support that we, as                Metsos global rubber screening media                 circuit, from spare and wear parts to equipment
       contractors, cannot do without. ELB Equipment           manufacturing capacity. The demand for Metso's        and service, says Jose Perez, Senior Vice
       also trains our operators professionally, which         screening media has grown in the mining               President, Crushing and Screening Wears, Metso.
       makes it easier to get the best out of our machines.   segment after the introduction of 1 ft x 1 ft            Downtime is costly for screens in minerals
          JP Durandt, Area Sales Manager for ELB               modular screening media, Trellex 305PS, in           processing and aggregates production. Metso in
       Equipment also compliments Two Pedestrians              2016. In addition to Trellex 305PS, Metso             September 2017 introduced its new hammerless
       Mining for the professional way the machines are        customers can follow the screen media wear rate,      attachment system for its Trellex screening media
       employed, operated and cared for by the                 plan maintenance and keep track of cost per           which offers increased productivity and makes
       operators and mechanical staff.                         tonne using Screen Planner, its new,                  media change-outs safer and faster than with
          Through the years we have built up a special        complementary software and web-based tool.            traditional systems. Up until now, the removal of
       relationship with the owners and managers of               Uptime and availability mean the world to our     worn-out pin and sleeve screening media
       the company and, very importantly, we have built        customers. A mine can easily consume thousands        modules has been a time-consuming and
       up a special report with the operators and              of screening media modules in a year. During          potentially unsafe undertaking. Metso's
       mechanical staff who are in regular                     maintenance, the right modules simply have to         innovative new attachment system improves
       communication with us regarding their                   be at the right place at the right time. With this    worker safety during change-outs. There is no
       machines, says Durandt.                                investment, we can answer our customers needs        need to use a hammer when installing and
          They tell us that they prefer the Warrior           and ensure on-time delivery, says Claes Larsson,     removing screening media. The specially
       1400X and similar machines from Powerscreen,            Product Manager, Screening Media, Metso. The 1        developed pins can be screwed into place as well
       saying that they work harder than other machines in     ft x 1 ft (305 mm x 305 mm) screening media           as removed using an impact driver. Accidents that
       their class, and are easier to operate and maintain     module size is a standard in major mining             occur when pins that are stuck get torn off by
       due to their easy-to-use controls, he says.            markets, due to safety and compatibility reasons.     force can be avoided. In addition to improved
                                                               Metso made the decision to include the size in its    safety, the new attachment system cuts the
       Metso expands screening media                           Trellex product range, based on customer              change-out time considerably, resulting in higher
       technology and capacity                                 demand.                                               uptime and productivity.
       In March, Metso announced it is expanding its              We are already the number one service                In the past year, we've launched the web-
       global manufacturing capacity for rubber                partner for the mining industry. Complementing        based Screen planner wear monitoring system
       )DVWHUVLPSOHU	VDIHULQVWDOODWLRQV
       FLOWROX PACKAGED PUMPING SYSTEMS
            (QJLQHHUHGSXPSXQLWVHTXLSSHGZLWKVLPSOHVLWHFRQQHFWLRQV
            )OH[LEOH	FRPSDFWPRXQWHGPRGXODUGHVLJQ
            $FFXUDWHDQGUHSHDWDEOHRZ
            5HGXFHGPDLQWHQDQFHWLPHDQGFRVW
                  OW             O
                       R O X.C
SCREENING AND WASHING_proof 26/09/2017 11:24 Page 7
        Q Is the mining industry as in other equipment areas now trying to keep         A At Weir Minerals we work with both EPCMs and mine companies. In
        existing screens running for longer with maintenance/service rather than        recent years, mining companies have started to rely on OEMs to assist with
        having to buy new screens? Being a robust steel product is there also a         screen selection and design, but this is mostly due to the shift to a
        market in used screens from closed mines?                                       brownfield project environment. Mines are constantly trying to optimise
                                                                                        their operations to increase profits. For products such as screens, mining
        A This is a topic that we are constantly discussing with customers.             companies may ask us to optimise to suit their needs, and this is an
        Commodity price drops and a decline in market demand have put a strain          important part of our solutions offering. When more greenfield projects
        on operating profits. This has led to reduced budgets for capital equipment     get underway, EPCM companies will once again be involved.
        as mine owners are struggling to keep their mines running. We have found
        success with employing Aftermarket Product Support Specialists in our           Q Is screening competing with alternative equipment in some cases or in
        sales regions, offering regular equipment audits and ensuring our screens       most applications is there no alternative?
        run optimally. If out of specification conditions are picked up early
        enough, failures can be prevented. I believe that going forward OEMs will       A In very fine screening (<200 m), you could compete with hydrocyclones.
        start packaging screens with Condition Monitoring systems as part of the        For larger applications, traditional screening is still the accepted method
        offering. At one of our Synertrex trial sites, we have proven the value of     of mineral separation. For dewatering applications, various alternatives
        real-time condition monitoring. We predicted an imminent failure and            exist including filter-presses, trommels etc. It completely depends upon
        responded proactively by replacing the defective component, thereby             the customers requirements and we work with them to provide the right
        avoiding an unplanned shutdown. Regarding the use of second-hand               solution, be that screening or hydrocyclones.
        screens, this is uncommon in the mining environment and relates more to
        short-term project and quarry clients.
       and invested in screening media manufacturing        possible, and have       Experienced Kwatani service
       capacity. The introduction of the hammerless         worked closely with team personnel on site
       attachment system is yet another step we are         end-users and            inspecting a screen prior to
                                                                                     installation
       taking to help our screening media customers         panel suppliers to
       minimise downtime and maximise productivity,        find optimal
       says Larsson.                                        solutions.
          The new attachment system is currently               Kwatanis
       available as a standard option for Trellex 305PS     qualified and
       screening media in the most common build             experienced in-
       heights (40-60 mm), and will soon be introduced      house design and
       for additional build heights.                        technology teams
                                                            undertake custom
       Screen OEM and media supplier                        designs to
       collaboration                                        customers specific
       Collaboration between the OEM of vibratory           application and
       screens and the screen media supplier is key to      processing
       ensuring the lowest possible cost of ownership       requirements.
       while continuously meeting tonnage throughput        These designs are supported by finite element         to expectation in terms of recoveries, tonnages
       requirements.                                        analysis (FEA) modelling competency, a                and efficiencies.
          According to Derrick Alston, Executive Director   sophisticated test laboratory, and years of              We also ask whether there have been any
       of vibratory screen OEM Kwatani, the company         research and development.                             changes in the upstream process, says
       engineers screening machines for a certain                                                                 Schoepflin. This is to check whether the feed
       weight and performance of screen panel.              Screen maintenance  the right                        that the vibrating machine is receiving is still in
          We then test the screen extensively in our       approach                                              line with the original specification of the unit;
       modern workshop facilities to ensure that the        Cost pressures often force mines to make difficult    orebodies often change, and this can affect the
       screen panels specified by the customer will         decisions about how they approach the                 material and the processing requirements. We
       deliver certain throughputs and end-products for     maintenance of their vibrating screens; OEMs can      need to establish whether the equipment is
       that application, says Alston. When screens are    ease the trade-offs by offering solutions that        actually still fit for the purpose for which it was
       later changed, they still need to be carefully       match customers specific needs and resources,        designed.
       integrated with the structural and mechanical        according to Kwatani CEO Kim Schoepflin.                 This leads to a list of issues that must be
       features of the screening machine.                     While most mines have been through a              addressed, which in turn must be prioritised;
          Kwatani custom engineers and manufactures         difficult period, each one has had to deal with it    starting with any vibrating machine that is close
       vibrating equipment for all feeding and screening    in its own way, says Schoepflin. As an OEM, we      to destruction as costly downtime due to sudden
       requirements, from smaller machines of less than     need to understand their specific conditions and      failure must be decisively avoided.
       a tonne to 50 t machines with throughputs of up      constraints before we can build a solid               Refurbishment of the equipment by the OEM is
       to 7,000 t/h.                                        partnership that works for both parties.             usually significantly more cost effective,
          Kenny Mayhew-Ridgers, Kwatanis Chief                She says its about adopting a consultative        compared to a new replacement, when it is
       Operations Officer, says that once the machine is    approach when dealing with customers, not just        performed timeously.
       operating in the field, there are instances where    taking them a catalogue of products and services.        On the basis of this assessment and the
       panels are fitted that add substantial extra         Listening carefully to the customer is vital, to      resulting priority areas, we then agree on an
       weight to the screen.                                learn what their challenges and limitations are.      action plan with the mine that takes into account
          We sometimes find that the screening panels         Mines have tended to cut capital expenditure       their human and financial resources, she says.
       on our operating machines substantially exceed       as a result of depressed commodity prices, which      Low commodity prices have also meant that
       the weight of what the machine was initially         means that the working life of equipment, like        mines have lost vital skills to operate and service
       designed to take, says Mayhew-Ridgers. This        screens, is being extended. At the same time,         their equipment.
       extra weight can change the dynamics and the         however, the necessary maintenance is often also         Along with many maintenance positions on
       centre of gravity of the screen so that for          cut back, creating a serious risk of failure and      mines being consolidated to aid cost cutting
       example, it is no longer aligned with the exciter    unscheduled downtime.                                 efforts, there are also high levels of staff
       drive. This can cause damage to the machine and         A vibrating screen is one of the smaller and      turnover; for OEMs, this means often having to
       even the building if not quickly identified and      less costly items in a plant, but it is a critical    deal with new and inexperienced staff who need
       resolved.                                           element that can bring a whole module, or even        considerable support in guiding the maintenance
          Alston highlights the importance of keeping       the entire plant, to a standstill if it fails         process.
       OEMs in the loop when changing panel types,        unexpectedly, she says.                                 The maintenance teams are frequently
       so that the fitting of new types of panel does not      At Kwatani, we typically start our intervention   responsible for a wide range of different
       have unintended impacts that could be                with an on-site audit to assess the situation in a    equipment, and lack the specialised knowledge
       detrimental to the machines life-span or            plant, beginning with a look at the mechanical        that is so crucial to keeping vibrating screens
       performance.                                         state of the vibrating equipment in its operational   performing optimally, she says. This is an area
          With our depth of expertise, we can advise       and non-operational state.                           where close and ongoing contact between the
       from a mechanical point of view on areas where          A visual inspection allows any damage to the       mine and the OEM is crucial to achieving the
       problems could arise, he says. We aim to           steel section or wear to be identified. The next      lowest possible ownership cost over the life of
       cooperate with other stakeholders wherever           question is whether the equipment is performing       the machine. IM
 TAKRAF
 In-Pit Crushing, Conveying and Spreading
 TAKRAF is a key supplier of individual machines and integrated systems to the mining industry.
 Each project is approached from the end-users viewpoint with the aim of meeting and exceeding
 requirements and expectations.
 Safe, environmental friendly and efficient material movement - In-Pit Crushing and Conveying
 (IPCC) systems cut truck haulage to a minimum and build operational resilience - they substan-
 tially reduce the operational expenditures and hold other environmental and safety benefits too.
                TAKRAF GmbH
                Torgauer Strae 336
                04347 Leipzig, Germany      Tenova, a Techint Group company, is a worldwide partner for
                takraf.sales@tenova.com     innovative, reliable and sustainable solutions in the mining and
                www.takraf.com              metals industries. www.tenova.com
COUNTRY FOCUS FOCUS- ECUADOR_proof 27/09/2017 09:10 Page 1
COUNTRY FOCUS
          Ecuador awakens
           John Chadwick looks
           at a country that is
           busy pushing mining
           to the fore, with
           some success
t was only in 2015, that the Ecuador Production of mined copper decreased by Drilling on Lumina Gold's Cangrejos project
                                                                                                    www.dxbpumppower.com
              QUARRY AND MINE DEWATERING PUMPSS
               DIRECT FROM THE UK MANUFACTURER
                                            ER
                   3 UP TO
                            O 12 OR 80mm TO 300mm
                                                  m
                   FLOWS UP 8,000m3/hr OR 2200 l/s
                                                 /s
                   HEADS UP TO 400m OR 40 BAR
                                            AR
                   ELECTRIC OR ENGINE DRIVEN
                                            N VOLVO, SCANIA AND CAT
                                                                  AT
                   SLURRIES UP TO 60% SOLIDSS (NEW)
                                                  W)
                   EFFICIENCIES UP TO 89%
                                         %
                   STORM & STONE PROTECTION SYSTEM
                                                  M
                   SKID, TRAILER, CONTAINER OR PONTOON DESIGNS
                                                             NS
COUNTRY FOCUS
       Mirador copper
       Immediate employment generation will be led
       by the environmentally-challenged Mirador
       copper project, which has a committed
       investment of $1,700 million by EcuaCorriente. In
       2009, Corriente Resources Inc estimated Mineral
       resources at Mirador to include Measured and
       Indicated of 438 Mt at 0.61% Cu, 0.19 g/t Au and
       1.5 g/t Ag and Inferred of 235 Mt at 0.52% Cu,
       0.17 g/t Au and 1.3 g/t Ag. Corriente completed
       a feasibility study on milling 30,000 t/d from a
       181 Mt in-pit resource, over a 19 year mine life,
       and with a 0.8:1 strip ratio.
          In 2010 Corriente Resources was acquired by
       CRCC-Tongguan Investment Co, which is jointly-
       owned by Tongling Nonferrous Metals Group
       Holdings Co and China Railway Construction
       Corp. There is conflict between the mining          Fruta del Norte                                       prepared by Amec Foster Wheeler, with the
       company and local communities.                      Also in the Cordillera del Cndor region, the         support of four other globally recognised,
          This project is expected to be the first large   Fruta del Norte (FDN) deposit is located within a     leading engineering firms in a Technical Report
       scale open pit mining operation in Ecuador. The     150 km long copper-gold metallogenic sub-             filed on SEDAR in accordance with NI 43-101.
       company expects to start the commissioning by       province. Loja, the fourth-largest city in Ecuador,   Highlights:
       the end of 2018 with a milling capacity of 30,000   is the nearest city to the project area. FDN is       I Probable Mineral Reserves totalling 4.82 Moz
       t/d ore and two years later raise the capacity to   situated about 139 km east-northeast of Loja.              of gold and 6.34 Moz of silver (15.5 Mt at
       60,000 t/d ore.                                        An independent feasibility study was                    9.67 g/t Au and 12.7 g/t Ag)
                                                                                                                 I Estimated average annual gold production of
                                                                                                                      340,000 oz at an average life of mine (LOM)
                                                                                                                      total cash cost of $553/oz and an estimated
                                                                                                                      LOM all-in sustaining cash cost (AISC) of
                                                                                                                      $623/oz, placing FDN in the lowest cash
                                                                                                                      cost quartile globally
                                                                                                                 I Estimated LOM production of approximately
                                                                                                                      4.4 Moz of gold and 5.2 Moz of silver over
                                                                                                                      an initial 13-year mine life using an average
                                                                                                                      gold recovery of 91.7% and average silver
                                                                                                                      recovery of 81.5%
                                                                                                                 I Estimated project capital cost, including
                                                                                                                      contingency, of $669 million, net of taxes.
                                                                                                                     On May 30, Lundin Gold reported the start of
                                                                                                                 construction of the mine development support
                                                                                                                 facilities. In addition, it had completed a project
                                                                                                                 update for FDN, including a revised mine plan,
                                                                                                                 updated capital and operating costs and a new
                                                                                                                 execution plan based on a self-perform
                                                                                                                 approach versus EPCM.
                                                                                                                     Lundin Gold President and Chief Executive
                                                                                                                 Officer, Ron Hochstein: "A remarkable amount
                                                                                                                 of work has been accomplished over the past
       Banktrack produced this map of the Mirador project saying it threatened to poison rivers in the           year to provide a comprehensive update to the
       Upper Amazon Basin. The project is controversial, lying in the Cordillera del Condor, a richly            project. The result of these efforts has led to a
       biodiverse area and the territory of indigenous Shuar and Awajn people, which extends across the
       border into Peru                                                                                          more technically robust and constructible
COUNTRY FOCUS
www.dsiunderground.com
COUNTRY FOCUS
                                                                                                                 Inferred category
                                                                                                            I Mineralisation is contained in two VMS
                                                                                                                 lenses
                                                                                                            I 2,300-ha project in two concessions, strikes
                                                                                                                 for almost 4 km and includes six priority
                                                                                                                 exploration targets.
                                                                                                               Salazar Resources is engaged in the
                                                                                                            exploration and development of prospective
                                                                                                            areas in Ecuador. Led by a senior Ecuadorian
                                                                                                            management team and most notably, Fredy
                                                                                                            Salazar, this team has been instrumental in
                                                                                                            several major discoveries throughout Ecuador.
                                                                                                            The property portfolio (four projects - 45,250
                                                                                                            ha) includes the Curipamba project; a VMS
                                                                                                            district located in central-west Ecuador in the
                                                                                                            Western Mountain range's Macuchi Group about
                                                                                                            a 2.5-hour drive from Guayaquil and about 250
                                                                                                            km southwest of Quito.
                                                                                                               Mendez is located in the Province of Morona
                                                                                                            Santiago, Cantones Limn Indanza, Santiago de
                                                                                                            Mendez and Suca. The project area covers
                                                                                                            9,472 ha and is a Cu-Zn-Mo (gold) porphyry
                                                                                                            system. The copper mineralisation is associated
                                                                                                            with 2-3% of sulphides and multi-directional
                                                                                                            veinlets in a granodioritic to quartz diorite
       And more.                                         134,573 ha.                                       composition of the complex porphyritic events.
       Ro Blanco (Chinas Junefield Mineral Resources)      Toachi Mining has an option to earn between       Salazar owns 100% of Rumiahui project that
       is a $79 million underground gold and silver       a 60%-75% interest in La Plata gold-copper-zinc   covers a total area of 2,910 ha of prospective Au-
       mine development expected to come on stream        volcanogenic massive sulphide (VMS):              Cu-Ag. The property is located about 100 km
       this year. It production, according to             I Former Cambior project from 1996-2000 and       northwest of Quito.
       BNAmericas, is estimated 67,910 oz/y gold and          Cornerstone Capital,2006-2007                    The 100% owned Santiago project is located
       478,456 oz/y silver.                               I High grade gold-rich VMS deposit which          within Tertiary volcanics, in a geological setting
          The project is located approximately 50 km          supported small-scale operations, 1975-       similar to the Loma Larga deposit and the Rio
       west of Cuenca and some 320 km southwest of            1981                                          Blanco deposit, 110 km west of FDN gold deposit
       Quito. The property is situated on the western     I Historic resources based on drilling by         and 60 km south from Loma Larga.
       flank of the Western Cordillera in southwest           Cambior and Cornerstone were estimated at        Chinese company Ecsa Ecuacorriente is
       Ecuador.                                               913,977 t grading 8.01 g/t Au, 88.3 g/t Ag,   exploring the San Carlos Panantza copper
          The Cascabel project is a porphyry copper-          5.01% Cu, 6.71% Zn and 0.78% Pb in the        project. Like Mirador, this project is in conflict
       gold deposit located in the north. It lies just                                                      with the indigenous Shuar people.
       off the main road, an easy three-hour drive                                                              Returning to the 2014 USGS report, it notes:
       north of Quito. Cascabel is SolGold's flagship                                                       Mineral deposits in Ecuador were determined
       project and shows significant promise of                                                             to include antimony, copper, gold, iron ore, and
       hosting a Tier 1 resource, the company                                                               silver. Five districts, all of which encompassed
       reports.                                                                                             some amount of protected area, were identified
          Exploraciones Novomining (ENSA) holds                                                             as prospective for metal deposits; they were the
       100% of the Cascabel concession and SolGold                                                          Alao Paute, the Azuay, the Imbaoeste, La Plata,
       owns 85% of ENSA. It is a JV between ENSA                                                            and the Zamora Districts. About two dozen
       and Cornerstone Capital Resources. SolGold                                                           foreign mining companies had active projects in
       owns 11% of Cornerstone. The tenement area                                                           Ecuador by the early 2000s, and the country
       is 50 km.                                                                                           was known to host worldclass copper and gold
          Lumina Gold is a Vancouver based Canadian                                                         deposits. Continued structural reform and policy
       precious and base metals exploration and                                                             revisions in the mineral sector, which resulted in
       development company focused on gold and                                                              one of the highest tax rates in Latin America,
       copper projects in Ecuador. The Cangrejos Au-                                                        contributed to decreased exploration investment
       Cu project (4 Moz Au Inferred Resource) is                                                           as well as disinvestment or divestiture by
       located in El Oro province, southwest Ecuador,                                                       mining companies already active in Ecuador. In
       and the Condor Au-Ag-Cu project (8 Moz Au                                                            2014, the Governments efforts in the mining
       Indicated Resource) is located in Zamora-                                                            industry were focused on eradicating artisanal
       Chinchipe Province, southeast Ecuador.                                                               mining operations and mitigating the barriers to
       Lumina also holds a large and highly                                                                 foreign investment that had been in place since
       prospective land package in Ecuador of over                                                          the late 2000s. IM
ADVERTISEMENT FEATURE
                                                                        series of quality and productivity         generate high volumes of dilution liquor and
                                                                        incidents related to the leach feed        optimise flocculant flow rates and mixing. The
                                                                        thickener had delayed                      E-Volute Feedwell is marked by feed stream
                                                                        corresponding improvements in total        dissipation, optimal mixing energy and shear
                                                                        output.One of the sites primary          profiles and an even feed distribution into the
                                                                        concerns was around what was               thickener tank.
                                                                        considered to be excessive                    The mine agreed to this solution as it directly
                                                                        consumption of flocculant.                 targeted the identified under-performance
                                                                           FLSmidth are our on-site               characteristics  low flocculant efficiency and
                                                                        maintenance contractors and                feed distribution. We gave FLSmidth the
                                                                        although the thickener wasnt one of       contract partly because of the solution they
                                                                        theirs we asked them to take a look        offered, partly because of their experience with
                                                                        and come up with a solution that           thickeners and primarily because they could
       Outotec Directional Autodil and Outotec            would reduce floc consumption and improve               handle the total project from design to handover.
       Turbodil are the first thickening systems to       performance and reliability of the thickener, said a   They were responsible for all engineering,
       auto-dilute feed while optimising performance
       and flocculant consumption                          mine spokesperson.                                      planning and scheduling, project management
                                                              Essentially, the thickener was undersize for         and installation and commissioning.No one else
       ensures all particles are aggregated by the         the job it was being asked to do. It was an off-        could give us that end to end solution.
       flocculant. Efficient operation is maintained in    the-shelf design and not optimised for the duty,           Additionally, economies of scale and a range
       this upper zone over varying feed rates.            meaning any increase in feed led to immediate           of efficiency savings were realised because
          The lower zone promotes gentle mixing for        performance issues. The feed system was found           FLSmidth could retain the whole project in-
       continued aggregate growth, with the option for     to be too small and hampered by the amount of           house, including fabrication of all components
       secondary flocculant dosing. This zone also         air being drawn into the feedwell. The outdated         at the companys Welshpool facility.
       enables the uniform discharge of aggregates         density-reliant feed dilution system meant that            FLSmidth says the upgraded thickener is
       under low shear conditions.                         the feed system was not being diluted, resulting        delivering impressive results. Data received from
          To decrease the level of feed solids prior to    in high flocculant consumption, poor overflow           the mine shows a marked reduction in flocculant
       flocculation, Outotec developed a patented          quality and lower than desired density.                 consumption. At steady-state operation above
       directional autodilution system that harnesses         The technology in place also suffered                900 t/h, consumption has been reduced by some
       the natural head difference across the feedwell     markedly from biased feed distribution into the         34% on a gram per tonne basis. Based solely on
       wall. This drives supernatant liquor into the       thickener, resulting in a constrained surface area      anticipated flocculant savings, the ROI for the
       feedwell, where slurry dilution, mixing, and        and residence time available for compaction.            upgrade is expected to be around twelve months.
       flocculation take place. Autodilution ensures the   The biased flows also increased feedwell exit              Additionally, average thickener underflows
       density in the feedwell is within the optimum       shear rates and would have significantly                have been increased by 2% (w/w)  a level that
       range for flocculation, irrespective of feed flow   reduced overall agglomerate size at the feedwell        has been set to limit increases in viscosity in the
       rate or density.                                    exit, requiring an excessive flocculant                 CIL. They are now held at 50% - up from 48%,
          The company has also developed the Outotec       consumption rate.                                       which gives an additional 6% residence time in
       Turbodil patented system of forced dilution to         Following sedimentation performance tests, a         the leach circuit, which helps to maximise
       provide an effective feed dilution scheme for       process and mechanical review and full                  recoveries. According to the mine, the upgrade
       alternative process requirements. The system        structural analysis of the bridge and thickener         project went flawlessly, so much so that the
       uses a low head axial pump to drive dilution        by FLSmidth, the solution offered was a proven          shutdown schedule was reduced by three shifts.
       water into the feedwell.                            combination of the companys E-Duc dilution            Being able to return to full production 36 hours
          Outotec Turbodil can help meet your             technology and the E-Volute Feedwell. The              ahead of schedule has been a significant win for
       requirements when the process requires further        E-Duc system uses feed stream momentum to             our production.
       dilution of already low feed concentrations; high
       volumes of feed dilution flow are required to
       bring the incoming feed to the required density;
       large variations in feed conditions are
       anticipated; or low slurry specific gravity
       differential exists between the feed slurry and
       the overflow liquor due to the particles in the
       slurry having a low specific gravity.
       Metso IPS units allow                                                              guarantees equal        highest availability. For 30 years, DELKOR high
       positioning of specifically
       designed feed ports for an                                                         distribution to all     quality drives have set the standard and with the
       optimum ratio between the                                                           inclined plate pack    more recent advent of FEA, the designs have
       clarification and                                                                   chambers with          been refined and improved to work seamlessly
       thickening area
                                                                                            minimum               with the tracking system. The high torque and
                                                                                      turbulence at the entry     stresses associated with paste have made the
       large Setl type settlers have                                                 points.                      drive design and selection even more important.
       been operating successfully                                                  The solids settle onto and       DELKORs Auto Dilution system has the
       for a number of years.                                                     slide down each plate pack      capability of adding very large volumes of
          Prefabricated units are                                             to the sludge tank where the        dilution liquor through the double concentric ring
       available with up to a 500 m2                                          solids are further thickened and    design. Operating data from one installation
       settling area. The Inclined                                          compressed with the assistance of     shows high feed volumes at 40% being diluted to
       Plate Settler (IPS) consists of                                      the raking system.                    12% solids using the system. This unique design
       two main components, the                                                                                   of high dilution capability enhances flocculation
       upper tank containing the                                           Thickener drives from                  that contributes to reduced polymer usage.
       lamella plates inclined at 55                                      DELKOR                                    DELKORs patented Forced Dilution system is
       and the lower conical or                                             DELKOR, the solid liquid              also capable of adding additional overflow liquor
       cylindrical sludge tank.                                                   separation specialist that is   into the feed of a thickener using a low head
       The feed for the IPS                                                           part of the Tenova          axial pump to drive dilution water into the
       enters through                                                                   TAKRAF group, provides    feedwell. The main advantage of the Forced
       vertical chambers                                                               proven thickener drive     Dilution system is that it takes the overflow
       on either side of the                                                          technology including        liquor from a large surface area  negating the
       plate packs and passes                                                     single planetary units          risk of causing localised high internal rise rates.
       into each plate gap through                                        delivering 1.2 MNm of torque as well    The system then optimally mixes with the feed to
       slotted feed ports. Clarification takes place above   as multi-pinion centre drive systems capable of      produce an ideal slurry concentration prior to
       the suspension inlet so there is no mixing of the     14 MNm of torque. With more than a thousand         flocculation, which improves setting and reduces
       clarified fluid with the incoming feed.               operating thickeners  our drive design is well      flocculant consumption. Another advantage of
          Above each pack is a full-length overflow          known to be highly reliable and can be operated      DELKORs patented Forced Dilution system is its
       launder fitted with throttling holes to create a      hydraulically or electrically. As process plants     ability to draw large volumes from the surface of
       slight hydraulic back pressure on the incoming        seldom include standby thickeners, we focus on       the thickener. This attribute enhances the
       feed stream. This method of feed control              providing the best design to ensure the client       withdrawal and elimination of froth layers.
www.aqseptence.com
       with a proven technology capable of producing a       The ThyssenKrupp POLSHAFT                                                 retention time in the unit of
                                                             dryer operates according to the
       drip-free cake from concentrates and a wide           counterflow principle                                                     only a few seconds until
       range of waste material. Customers looking to                                                                                   they are completely dry. This
       reduce or eliminate settling/tailings ponds, as       continuous supply of hot gas. The                                         is very important, for
       well as those unable to receive permitting, are       material is swirled up by the                                             example, in the case of
       cited as ideal candidates for Filter Presses.         paddle shafts which are                                                   temperature-sensitive
       Additionally, customers who currently have belt      integrated into the bottom of the                                         materials.
       presses, centrifuges or screw presses, but are        dryer and provide the conditions                                             The thermal shock,
       looking for a better solution that produces a drier   for fast and very intensive                                               which results from the
       product should contact McLanahan about the            vapourisation of the hot gas                                              material surface water
       benefits of this equipment. It can help with          owing to convection. Depending                                            spontaneously and violently
       reclamation or reduce transportation and              on the material properties, the                                           evaporating, causes
       disposal costs of waste products.                    material can simultaneously be                                            possibly existing larger
          Unlike the traditional plate and frame press,      disagglomerated and                                                       agglomerations to burst
       McLanahans Filter Ppress line features either        subsequently, the product quality                                         even at the feed point. On
       recessed plate or membrane plates, both of            can be increased.                                                         the other hand, micro-
       which create a chamber for dewatering the slurry         The retention time of the                                              agglomerations survive the
       without trapping the cakes within the frames.         material can also be influenced by                                        drying process. The flash
       This allows the dewatered cakes to discharge          the design of the special                                                 dryer is suitable for
       more easily than with traditional plate and frame     internals; the material is                                                interconnection with other
       presses. Recessed plates dewater using hydraulic      transported within the dryer both                                         machines, eg a mill or a
       pressure created from feed pumps, while               by the paddle shafts and                                                  POLCAL gas suspension
       membrane plates are designed to squeeze the           pneumatically by the hot gases.                                           preheater.
       cake once the chamber is full of slurry.                 The next design, the POLSHAFT
          In an effort to provide a safer, simpler and       dryer, operates according to the                                          Fluid bed technology
       smarter design, McLanahan has also engineered         counterflow principle. It is                                                Metsos fluid bed technology
       its Filter Presses to feature overhead beams and      specifically designed to reduce                                             is just one of its drying
       a single piston design. The combination of four       the moisture content of pellets or briquettes to a   options and is applicable in a multitude of
       tension shafts and a single cylinder results in       level acceptable for the kiln feed. Its unique       industries and in minerals processing such as
       less horsepower, fewer control valves, and less       design enables efficient heat exchange and           mineral sands (ilmenite,rutile, zircon, leucoxene,
       complexity, all while still isolating the overhead    generates only a small amount of fines, this         garnet), iron ore drying, diatomaceous earth,
       beams from dynamic loads. The overhead beam           improving the overall plant efficiency. Preheated    phosphates & potash, lithium (spodumene), lime
       style results in faster opening and closing for       air (eg. 300C) reaches the upper as well as the     and various other industries. Fluid bed
       greater production and better cake release, as        lower part by means of a drying air fan. In the      technology can be for stand-alone units or
       well as providing larger plate openings for better    upper section the hot gas enters the chamber         complete system deliveries including PLC control,
       access for cleaning and maintenance.                  and flows through a bundle of pipes from top to      dust/product collection, product conveying (feed
          Due to the variability in permeability and        bottom. The pipes warm up and contribute to the      and discharge), exhaust gas handling, heat
       surface area, each material should be tested          drying process. To reach the required heat, the      exchanging, and fuel delivery systems. The
       prior to the sizing a Filter Press. Other             drying air is heated to a constant and controlled    introduction of an appropriate air flow into the
       parameters are used for greenfield sites when         drying temperature by using an air heater. In the    system brings about the onset of
       testing isnt possible. McLanahan is able to offer    lower section a cross construction and an            fluidisation.The air flow passes through the bed
       both lab and on-site pilot testing.                  arrangement of gas entry and exit cones ensure       of material and suspends the particles in a fluid
                                                             the distribution of the hot gas which passes         state.The bed has the appearance of a
       ThyssenKrupp drying options                           through the material in counterflow. The dried       vigorously boiling liquid, and will flow steadily
       Moving on to drying technology, with one of the       material is discharged through a cone into a tube    through the vessel from one side to the other and
       widest ranges of dryers in the industry,              which empties into a vibrating feeder.               discharge over a set weir plate or bed level
       ThyssenKrupp can offer solutions to most drying          The company also supplies Rotary Dryers,          control feeder. Each particle is suspended by its
       tasks in the mining and minerals industry. The        used in the minerals industry for drying wet         own pocket of gas maximising the heat transfer
       key components of the Rapid Dryer are a               and/or abrasive materials. They are designed for     rate.This results in an extremely efficient heat
       compact stationary housing in welded design, a        very high throughputs and can process materials      transfer process.
       paddle-shaft unit (consisting of one or two           with diverse granulometric properties.                  Metso has supplied over 4,000 dryers for over
       paddle shafts which are integrated in the dryer          In a Flash Dryer, the material is fed into the    400 different materialsfor operations around the
       bottom), special dryer internals for the hot gas      riser duct of the dryer, through which hot drying    world. This experience translates into better
       and material conveyance, as well as connections       gases from a combustion chamber, or exhaust          performance, higher availability and easier
       for the hot gas and material supply. The product      gases from other thermal processes, flow from        maintenance. Materials act differently during
       is discharged either through a gate valve for         the bottom to the top. The gas and material are      drying. They may be sticky whenbeing fed to the
       solids in the bottom of the Rapid Dryer or            mixed intensively due to the special design. The     dryer, or they may become sticky during drying.
       together with the stream of hot gas.                  dried product is normally collected in a cyclone.    They may agglomerate during drying, or become
          The moist and lumpy or fine-grained raw            Excellent mixing of the material and good flow       dust. In some cases the material needs to be
       material is fed into the Rapid Dryer and dried in     conditions ensure very high drying speeds, such      dried completely, bone dry, and in some cases
       the housing in the parallel flow due to               that even very moist materials often need a          the material is only partially dried. IM
HIGH PROFILE
         Flooded riches
                                                                                                                    software and communications still ongoing, civil
                                                                                                                    works at Lee Moor started in June. A safe
                                                                                                                    working area was required, to bring in the
                                                                                                                    equipment with heavy transport trucks and
                                                                                                                    launch the system components. Also a slurry
       Paul Moore spoke to Jenny Rainbird, Senior Project                                                           depot was created on land, which will capture
       Manager, BMT Group, about progress with the VAMOS!                                                          the material being pumped up as a slurry while
                                                                                                                    mining underwater. Meanwhile the site set-up
       underwater mining project, while the project team have                                                       has been completed with offices, fencing,
       provided an update on the first trials in the UK                                                             welfare and workshop units.
                                                                                                                       During the trials, the Lee Moor site operates a
              s populations grow and per capita              increased safety and a reduction of costs make         strict safety regime in accordance with the UK
IPCC
        In-pit insights
                                                                                                                   options that includes belt wagons, mobile belt
                                                                                                                   bridges and the FLSmidth RAHCO mobile reclaim
                                                                                                                   conveyor technologies.
                                                                                                                      Through combined capabilities for large
                                                                                                                   (>22,000 t/h) capacity conveying capabilities
        With a major acquisition, new designs and technologies,                                                    and references, large capacity stacking and
        the IPCC market seems to be picking up again, reflecting                                                   reclaiming ranges, coupled with a range of
                                                                                                                   portable conveyors, large range of boom
        renewed market interest reports Paul Moore                                                                 spreaders, as well as FLSmidth mobile stacking
               he big news in the IPCC market is that         stations, two more will be delivered going           conveyor technologies, the company says it
        GET A GRIP ON
        OVERBURDEN
         Global mining is changing: rising costs and environmental pressures have
         called time on traditional standalone truck and shovel methods. For nearly
         40 years, MMDs innovative, greener In-Pit Sizing & Conveying (IPSC)
         technology has been at the forefront of this revolution.
IPCC
        FLSmidths portfolio from the recent Sandvik        criteria for the largest mobile stacking conveyor      leverage process data and analytics for
        Mining Systems acquisition will enable us to        system in the world for a mine in Mexico that          monitoring, benchmarking their performance and
        integrate from pit into processing plant: by        has now been operating for close to a year. With       predicting maintenance of their equipment.
        knowing what will be coming into processing         an effective stacking length of over 300 m, and
        you can optimise the overall process. We can        with a stacking capacity of 12,000 t/h, FLSmidth       MMD Fully Mobile Surge Loader
        help bridge the gap between the pit people and      has supplied the highest capacity heap leach           MMDs latest offering, a Fully Mobile Surge
        the processing people, and increase overall         mobile stacking conveyor system in the world           Loader, is poised to help open-pit mines harness
        process efficiency. Automation and smart           for Southern Copper Corporation's Cananea              the benefits of continuous mining, using their
        system development, implementation and on-         copper mine in northern Mexico. The system is          existing truck fleet. Shovels represent
        going data analytics of the well-known ground-      fully automated based on GPS and a self-               significant CAPEX and OPEX costs, and yet the
        breaking Vale S11D IPCC system, as well as          alignment system that ensures the ore is               efficiency of a shovel rarely exceeds 60% of its
        inclusion on more recent waste stacking             stacked accurately, thereby optimising leaching        capability. We recognised we could design a
        systems being built at present, will complement     efficiency. With the integrated GPS system, the        piece of kit that would harness the capability of
        and strengthen FLSmidths efforts to provide        machine knows exactly where it is located on a         the shovel and revolutionise the speed of
        pro-active condition monitoring and data            real-time basis and the machine auto-self-aligns       loading trucks, says David Pitchford, President,
        collection for IPCC equipment with associated       as it progresses forward. The target is to build a     MMD Mineral Sizing Americas.
        data analytical reports designed to identify        consistent pile to a depth of 80 m across the             Accepting direct loading from excavators,
        damage or wear and tear ahead of any failure.       valley. FLSmidth conveyed +350 mm lumps of             shovels or an MMD Fully Mobile Sizer, the Surge
        This is with the intention of offering value        crushed ore at around 6m/sec across this               Loader stockpiles material and delivers a
        proposition through preventative maintenance,       sophisticated stacking system, similar to an           regulated flow to the waiting truck fleet. Based
        as well as identifying critical component status    IPCC application.                                      on simulation data, MMD believes an operator
        or poor operation/misuse for improved                   FLSmidth is also developing and installing         could get 12 to 14 more loads per hour from
        productivity at the mine site.                     one of the largest Hybrid Apron Belt (HAB)             their shovels. Key benefits are summarised as
           He adds: FLSmidth intends to be on the          feeders in the world that is under the largest         follows:
        forefront of IPCC systems and technologies          filter press built to date. The HAB has               n Optimises shovel production capability
        going forward with a focus that will allow          performed flawlessly to date and exceeded              n Increases truck utilisation
        clients to reduce CAPEX, OPEX and increase          expectations, so on the back of this product           n Improves truck fill factors
        throughput in order to increase their               development success, FLSmidth has                      n Reduces truck body wear
        productivity. With this offering FLSmidth will      investigated its use for IPCC applications to          n Reduced truck spotting time
        help our mining customers rebuild profitability,    combine apron feeder, dribble belt and                 n Lower cost per tonne
        improve mine safety and reduce environmental        discharge conveyor into one unique unit, the           n Minimal capital investment for significant
        footprint.                                         Incline HAB. Although conceptual at this stage,            improvements.
                                                            this will allow more compact truck tip or shovel           MMDs new system design is built upon its
        Market outlook for IPCC and project                 fed stations that could feed to a secondary            combined experience at the Drummond
        update                                              station housing the mineral sizer, all of which        Pribbenow coal operation in Colombia some 12
        To increase productivity, miners must improve       with the intent of smaller more compact and            years ago, and seen first hand by IM, and its
        two of three variables: OPEX, CAPEX and             mobile in pit equipment.                              more recent IPSC (In-Pit Sizing & Conveying)
        throughput. FLSmidth states: The tendency in           FLSmidth has also announced the Coffer Dam         installation at the Pingshuo Chinese coal mine.
        the past has been the temptation to increase        concept, developed for an IPCC oil sands               In Colombia, MMD had installed a number of
        throughput by adding trucks and shovels to          application, and previously discussed in IM. The       Heavy Duty Apron Plate Feeders that could be
        existing fleets and infrastructure  and granted,   concept is simple, low capital and OPEX cost           loaded directly from a dragline. An awaiting
        when compared with an IPCC system that is a         effective, in that it eliminates the need for costly   queue of trucks were loaded both efficiently
        lower initial CAPEX investment. However,            retaining walls associated with large semi-            (nearly three times faster) and accurately (98%
        ignoring the long term OPEX costs will be           mobile or relocatable stations.                        fill factor) one after the other, by the
        detrimental in the new norm for the mining              Digitalisation is also a major area of             hydraulically regulated feeder. In China, MMDs
        industry.                                          investment for FLSmidth which is relevant to           flagship Fully Mobile Sizer station convincingly
           Emerson told IM: The interest for IPCC has      IPCC: remotely operated and fully automated            proved the system setup of allowing the shovel
        increased in the last several months: We have       systems with on board sensor technologies,             to dig continuously and load the mobile sizers
        been approached by clients from South America,      data capture capabilities and data analytics.          receiving hopper, without having to stop. The
        Europe, Russia, India and South East Asia in        Emerson adds: We want to provide our full flow        shovel operator has been able to load 9,000 to
        particular  requesting scoping studies and         sheet of premium technologies embedded in a            12,000 t/h until he needs to reposition.
        budget pricing requests for IPCC systems. The       unique combination of leading process know             Combining the experience in Colombia and
        positive response from several major clients, in    how and services; by understanding                     China, MMD has designed the Surge Loader for
        response to our pending Sandvik Mining              performance data and optimising customers             loading trucks in existing mines where
        Systems acquisition is a clear indication the       operations, while minimising the environmental         conveyors are not practical, or investment in
        market is starting to look quite closely again at   impact. In collaboration with GE we are creating       truck fleets needs to be retained. Trucks often
        IPCC systems and in the pit mining solutions for    digital solutions for increasing productivity in       dont receive 90% of their fill factor, and
        the future, and in some cases stay in business      the mining industry. In this collaboration,            typically shovels dont sustain 6,000 t/h, when
        requirements, of large scale mines.                FLSmidth is building our solutions on top of GEs      they should be loading at 10,000 t/h, says
           On ongoing IPCC related projects, FLSmidth       Predix platform with applications for managing         Pitchford.
        has successfully run and met performance            process flows thereby allowing customers to                The Surge Loader can be deployed
IPCC
IPCC
IPCC
        gearboxes, belts and pulleys. Proper drive control can also increase the
        lifetime of major mechanical gears.
            Dirscherl adds: Another area gaining attention is preventive
        maintenance. Here the goal is to minimise unexpected shutdowns caused
        by system failures. A continuous recording system  or data logging system
         is connected to all components of the conveying system, including
        mechanical and electrical parts. The mass of produced data is then
        integrated with data from other sources, such as field service reports.
        Through advanced analytics, experts can predict impending failures and
        take action in time. An added advantage is that they can also uncover
        opportunities for performance improvements, as well as energy and cost
        savings.
            The technologies behind preventive maintenance have given rise to
        another trend: remote asset health management services. For this, Siemens
        can go online from a competence centre and provide instruction to help
        mine personnel fix a problem. Should a service engineer have to be sent to
        the site, he or she is very well prepared and knows exactly what spares to
        bring along. In either case, coming up with a viable solution is simply faster.
            From innovative conveyor technologies to an intelligent use of data,
        mine owners have a whole range of possibilities to improve their
        operations. But in regard to the former, South American mines were early to
        start benefitting from direct conveyor drive systems, which boast the
        highest availability and overall efficiency of available drive systems. In the
        meantime, mines in other regions of the world are beginning to follow suit.
        As a guideline, direct conveyor drive systems make sense when power
        requirements are more than 2,500 kW for a drive pulley.
        New ABB Medium Power GCD on excavator at the LEAG-owned                           Consider it done.                     redpathmining.com
        Jaenschwalde lignite mine close to Cottbus
IPCC
        handles up to 14,000 m/h of overburden sand              Through a primary crusher at the                            accommodates most loading styles.
                                                                  base of the opencast mine, a
        but with large contained rocks derived from the           MegaPipe conveyor provides                                      The units are built in 48 in (1,219 mm) or 72
        Ice Age. The design temperature is -25C to +             the steep transport at                                      in (1,828mm) wide models and can transfer
        40C, with harsh shock and vibration parameters           right angles to the                                       material at rates up to 1,500 t/h.
                                                                  opencast mine
        to withstand; as well as limited space.                   embankment                                                  Superior told IM that heap leach mining
                                                                                                                          operations now require greater capacity,
        MegaPipe comparison study                                                                                         continuous material flow, and reduced downtime.
        ContiTech, Siemens and thyssenkrupp have                                                                          In any precious metal application  including
        founded a research and development consortium                                                        expected     gold, copper and ore  these challenges are
        to develop and market the Chevron-                                                      lifetime of chevron       ongoing top-of-the-mind initiatives, particularly
        MegaPipe conveyor. The new conveyor                                                 cleat ribs referring to a    due to the complexity of stacking plans. Material
        design is set to help reduce conventional                                         wear and a profile bond-        handling equipment must be highly mobile and
        heavy-duty truck traffic and the resulting high                               strength to the belt surface        extremely flexible. And, for optimum
        operating costs in open-pit mines. High-                                  under the extreme opencast              performance, more and more operations are
        strength, ribbed steel cable Chevron-MegaPipes                         mining conditions.                         utilising integrated conveyor systems, which can
        with a nominal strength of up to 9,500 N/mm and                      The newly developed chevron cleat rib        be custom-engineered for the specific pad
        an outer diameter of up to 900 mm facilitate cost-        exhibits longer durability than the 14 mm thick         design. The speedy payback from the latter is
        effective conveyance of ore and overburden with           upper rubber cover plate of the basic belt 2000         measured in more tonnes per move, larger leach
        lump sizes up to 350 mm over mine slopes with             St3150 14:7 DIN-X. Taking into account the              pad footprints and increased profitability.
        angles of inclination of 30 to approximately 45.        measured hours of use until the profiles wear in            Because every heap leaching operation
        The solution has already proven itself in a feasibility   the material transfer station, the theoretical          maintains a specific process with unique
        study for a 350 m deep open-pit mine with a mass          durability of the chevron profiles was calculated       characteristics, mines are far more likely to
        flow of 5,000 t/h.                                        as approximately five years or more.                    improve efficiency with a customised and
           In a recent project, the cost-effectiveness of                                                                 comprehensive material handling system, says
        continuous conveying technology in opencast               Superior mobile conveyors for leach                     Jarrod Felton, VP of Engineering for Superior.
        mining was compared to discontinuous transport            operations                                                  Felton says that an integrated heap leach
        using heavy-duty traffic involving trucks and rail.       Superior Industries Inc, the US-based                   system is comprised of a core group of mine-duty
        Through a primary crusher at the base of the              manufacturer and global supplier of bulk material       conveyors, with the customisation of the system
        opencast mine, a MegaPipe conveyor provides               processing and handling systems, recently               being applied with various belt lengths and
        the steep transport at right angles to the                completed manufacturing of its first Razerlink         widths, belt speeds, and load areas; as well as
        opencast mine embankment. Comparison                      Mobile Conveyora multi-functional machine              choices in hoppers, mobile tracks, control
        calculations were based on conveying capacities           designed to load, unload, transfer, and/or              systems, electrical components, and the total
        using heavy-duty trucks and rail in a well-known          stockpile material.                                    number of jump or grasshopper conveyors. This
        iron ore surface mine in Eastern Europe.                     According to Superior engineers, by combining        strategically selected system of machines and
           In this opencast mine with the dimensions              mobility with telescoping conveyor technology           machine attributes ensures smooth material
        L 5,000 m x W L 3,000 m x H L 480 m,                      the Razerlink Mobile Conveyor limits downtime           transfer and far greater efficiency over that of
        approximately 50 Mt/y of material per year are            and accelerates material handling. Additionally,        older, conventional methods.
        transported out of the mine by 27 heavy-duty              one time handling of material aids in maintaining           Felton explains that currently many heap leach
        trucks (payload 120 t) and 36 hopper trains               high quality material spec.                             mining operations work in a manual radial
        (payload 1,000 t).                                           Each unit is tailor-made to the exact conditions     stacking mode. Operators will move the radial
           Alternatively, using a single Chevron-                of the customers operation, whether it be a            stacker with a loader to a given location, leaving
        MegaPipe with a diameter of 900 mm and a                  barge, rail, quarry, mining or construction site        it to stack there while they perform other
        conveying speed of 4 m/sec and a fill factor of           application. Mobility options include conveyor          maintenance duties. Later the operators return to
        approx. 50%, the equivalent annual conveying              tracks, drive tyres, or towable tyres. For              either fill in holes or move the stacker to the next
        capacity of 50 Mt could be transported with an            applications not requiring telescoping capabilities,    location. This typically results in saw-tooth pile
        operational availability of 8,322 hours. Using an         the Razerlink Mobile Conveyor can be fitted with a      tops, which are not ideal for irrigation, he says.
        IPCC system (here with MegaPipe conveying out             fixed length, radial, or luffing conveyor. The units       Alternatively, automated heap leach conveying
        of the opencast mine) reduces operating,                  feed design can come in the form of a drive over        systems are programmed to stack per desired lift
        personnel and maintenance costs while                     ramp, back up ramp, or feed hopper, which               specifications. At the core of the system is the
        simultaneously reducing environmentally harmful
        CO2 emissions.
           An interesting aspect of the MegaPipe design
        are its chevron cleat ribs, which will stop material
        slipping at high angles and maximise capacity, so
        are fundamental to the design success.
        Experimental investigations of the impact-
        strength, bond-strength and wear-resistance of
        the new chevron cleat ribs on the ContiTech
        impact test rig and in a belt system transfer
        station in the Oetelshofen Limestone Opencast
        Mine in Germany were used to determine the                Superior recently completed manufacturing of its first Razerlink Mobile Conveyor
                                                                                                                                                                                  IM
IPCC_proof 27/09/2017 07:38 Page 7
IPCC
           mine-duty Superior TeleStacker Conveyor, which            Integrated with the telescoping radial stacker     systems, there are super portable grasshopper
           is engineered with an internal stinger conveyor         is the Horizontal Index Conveyor (HIC), a fully-      conveyors that range from 215 to 250 ft in length.
           that maintains constant motion along a cell,            skirted unit with a frame that mounts to the             The companys Trailblazer Portable
           distributing material evenly to achieve a flat top      stacker. For greater heap leach site mobility, the   Groundline Conveyor can also be used to replace
           to each heaped pile, while also piling more             track drive on the unit is designed to move itself    some of the grasshopper conveyors. This gives
           material per move. Its longer stinger conveyor,        and the radial stacker along the cell centreline     the system the advantage of fewer transfer
           over that of conventional radial telescoping units,     and for maximum flexibility, the HIC can be fed at    points and electrical connections, and lesser
           allows for greater flexibility in complex valley fill   any point along the length of the conveyor, says     move frequency.
           applications, says Felton. He explains that the        Felton. He adds that when combined with                  Northern Vertex Mining Corp recently
           conveyor is equipped with the FD Series Axle            portable jump or grasshopper conveyors, the HIC       confirmed that it had awarded Superior
           assembly, a technology that allows a quick              minimises the frequent removal or adjustments         Industries the contract for the overland conveyor,
           transition from radial to linear mode, enabling         of the jump conveyors along the material transfer     grasshopper conveyors and radial stacker for its
           movement along the leach pad cell centreline.           line. Ultimately, the combined mobility and          Moss gold mining project near Bullhead City,
           Also, the unit features the patented FB                flexibility of the HIC is key to building larger      Arizona. The original feasibility study states on
           Undercarriage support system, which is                  leach pad footprints, he says.                       the design: Crushed ore will be reclaimed from
           constructed of durable steel and a tubular braced          Next, Felton explains that a horizontal feed       the stockpile with a front-end loader, which will
           structure that prevents any twisting and shifting.      conveyor runs perpendicular to both the HIC and       transfer the ore to a feed hopper. A belt feeder
           This level of stability is required for the uneven     the grasshopper conveyors. It transfers material     will draw ore from the hopper and transfer the
           ground and the constant movement typically seen         from the grasshopper conveyor to the HIC to           crushed ore to a belt conveyor that feeds an
           in the heap leach environment, he stresses.            maintain a consistent, steady material flow, he      agglomeration drum, approximately 2.7 m in
              As to additional mobility options, Felton says       says.                                                 diameter and 9.2 m in length.Cement will be
           that operations may utilise radial travel tracks           Built in standard lengths of 100 ft or             added to the agglomeration drum feed conveyor
           and/or a track-mounted mobile pivot base in             engineered in custom lengths, multiple                and raw water will be added in the drum for the
           conjunction with the telescoping conveyor.              grasshopper conveyors comprise a substantial          binding process, at a moisture content of
           Radial travel tracks are a cost-effective method       length and are combined consecutively to              approximately 7% by weight. The agglomerated,
           to gaining optimum flotation and traction. When         transfer material to the stacking conveyors.          crushed ore will discharge from the drum onto an
           combined with the mobile pivot base, operations         Felton says that retreat stacking will move in        overland conveyor for transfer to the heap leach
           can achieve free-ranging onsite and transfer            increments of the grasshopper conveyor length         pad. The overland conveyor will discharge onto a
           point mobility as well as radial travel capability     by removing one at a time, while advance              series of several mobile, grasshopper-type
           all while reducing the need for multiple trucks         stacking requires the insertion of a jump             conveyors. Units of grasshopper-type conveyors
           and loaders, he says.                                  conveyor upon moving forward. For very large          will be added or removed as required dependent
:PTWSLPUZ[HSSH[PVU
5VLKNLN\PKLYVSSLYZ
            +LZPNULKMVYVW[PT\T^VYRSPML
             ^P[OOLH]`K\[`JVTWVULU[Z
               0UUV]H[P]LJVU]L`VYZVS\[PVUZ
                 MVYI\SRTH[LYPHSOHUKSPUN                                                          www richwood
                                                                                                      www.richwood.com
                                                                                                                 dc
                                                                                                               phone (304) 525-5436 email: info@richwood.com
                                                                                                                                                                     Richwood 2016
IPCC
                                                                 the pit perimeter and elsewhere have                   Group Ltd (CREC). CRECs senior representative
                                                                 demonstrated successful handling of primary            responsible for the project, Cai Zemin said, We
                                                                 crushed ore and waste rock.                            are pleased and excited that this major milestone
                                                                    Finally, the UHAC is a prospective application      for progressing the CEIP has been achieved. It
                                                                 for Western Australia. It is designed as the vital    demonstrates the strong joint commitment of
                                                                 link to salvage an existing IPCC system that has       CREC, Iron Road and the South Australian
                                                                 proven sluggish due to its dependency on long          Government to the construction and operation of
                                                                 low angle conventional conveyors that link the         Australias next major mining and infrastructure
                                                                 IPCC system to the remote spoiling system.             project; one that will have a significant impact on
                                                                 Operation of the present system proved                 the strength of the mining sector in the State.
                                                                 impractical largely due to the extensive planning         The only remaining primary government
                                                                 required, much non-productive movement,                approval for the CEIP is under the Commonwealth
                                                                 excavation, re-handling and grading work required      environmental legislation. The Commonwealth
                                                                 to accommodate the present low angle link.             Minister for Environment and Energy will
                                                                 Presently the system sits idle awaiting the vital      consider the assessment report provided by the
                                                                 link that will free the rigid interdependency of the   South Australian Government with a decision
                                                                 in-pit system and the remote spoiling system.         expected to be announced soon. The CEIP mine
                                                                    Dos Santos argues that the UHAC promises a          will produce at least 21.5 Mt/y of high grade, low
                                                                 viable solution, providing a compact mobile link,      impurity iron concentrate.
                                                                capable of elevating or lowering the primary               Joint venture company and IPCC specialist
        UHAC Universal High Angle Conveyor design
                                                                crushed 350 mm minus waste rock at 8,000 t/h.           Thiess-RWE in 2014/2015 was tasked with
        upon the stacking location on the pad. The final        Designed with the emphasis on versatility the           validating the technical feasibility of a hybrid
        conveyor will be a radial-type mobile stacker that      UHAC can operate in either direction (elevating or      IPCC/truck-excavator mining operation for CEIP
        will place agglomerated ore in lifts, up to 10 m in     lowering the material) and at any level from            and to demonstrate improvements in mining
        height.                                                tramming on grade to a 3 x 12 m bench                   costs compared to a pure truck-excavator base
                                                                operation. The UHAC offers the vital versatile         case. Phase 1 saw analysis and comparison of
        Dos Santos on sandwich high angle                       link for surface spoiling (elevating) or backfilling    several alternative mine design methods and
        conveyors                                               of the mined out pit (lowering).                       equipment system layouts to select the preferred
        Suitability for IPCC systems has been                                                                           hybrid IPCC solution. Phase 2 included complete
        demonstrated with Dos Santos Sandwich Belt              Project update  Iron Road                              mine planning, engineering and project cost
        high angle conveyors with a number of units the         Iron Road Ltd recently advised in May 2017 that         estimating to demonstrate project improvement
        company says handling ore and rock at very high         the Premier of South Australia, the Hon Jay             by application of IPCC technology.
        rates. The key question is can they handle large,       Weatherill MP and the Minister for Mineral                 Most recently in July 2017, Iron Road stated:
        heavy, primary crushed ore and waste rock.              Resources and Energy, the Hon Tom Koutsantonis          Thiess-RWE, a leading expert and contractor in
           President and Founder of DSI, Joe Dos Santos         MP, had announced the granting of the two key           continuous mining systems such as in-pit
        told IM: Clearly, large lump size is relative. 350   approvals required for the Central Eyre Iron            crushing and conveying, has been appointed to
        mm lumps are too large to handle at a sandwich          Project (CEIP). The CEIP has generated significant      conduct a final, short mine plan review at CEIP.
        belt of only 1,000 mm width, but not at a               momentum towards financing and construction,            The review is expected to drive additional mine
        sandwich belt of 2,600 mm width. Indeed, to             with the rail and port components declared a            establishment efficiencies around the planned
        have compatibility of belt width and material size      Priority Project by Infrastructure Australia in         use of in-pit crushing and conveying.
        we limit the material size with regards to the          September 2016, and three major Chinese banks              Findings were anticipated during August 2017,
        trough depth. For predominantly lumpy material,         formally indicating in April 2017 lending appetite      and will shape a key component of the Independent
        we limit the lump size to the depth of the trough.      for the CEIPs requisite debt financing.               Technical Expert report that will be provided to
        For occasionally lumpy material (less than 10%             Progress has been backed by a strong                 Chinese banks and other financial institutions
        large lumps), we increase the size criteria to          relationship with strategic partner China Railway       during respective due diligence processes. IM
        125% of the trough depth. This is to limit the
        separation of the belts, preserving a good
        covering over the bulk material and positive belt
        to belt contact at the edges of the sandwich.
           Before founding DSI, Dos Santos, while
        employed with a major US conveyor
        manufacturer, engineered the high angle
        conveyor at Majdanpek copper mine in Serbia,
        one of the only true IPCC applications to date. It
        is no longer operational, but during its lifetime,
        250 mm lumps were easily handled on the 2,000
        mm wide belts. Five years after start up the
        system had precluded tripling of the truck fleet;
        precluded the need for 4 km of haulage ramps,
        3.5 km of which would be of constant ascent; and        Joint venture company and IPCC specialist Thiess-RWE in 2014/2015 was tasked with validating the
        saved $12 million per year. Other installations at      technical feasibility of a hybrid IPCC/truck-excavator mining operation for CEIP
SAFETY
n April Global Mine Design noted: "The Lovells in Johannesburg, South Africa), in an In underground mines, it is vital to have safe
SAFETY
       mining sector.                                        top working order and able to detect irregular     to adhere strictly to operational safety
          So, while great inroads are being made in          levels of CO and other potentially toxic fumes,    procedures. Employers need to provide the right
       terms of legislation and policy making, there is a    vapours and gases. Make sure you have a            tools and training to every employee to protect
       long journey between legislation and boots on        regularly scheduled maintenance and testing        the life, health and safety of the workforce, as
       the ground worker safety. "Global Mine Design        plan for this equipment.                           well as to protect valuable worksites and assets.
       always has an eye for the practical application          Mine operators must know the location of       As leading mining organisations already know,
       of safe, economic, and productive mine design,        every worker at every moment of each shift.        creating a safe working environment means a
       and part of that comes from seeing the                Double-check your worker identification and        more productive and profitable mining
       implementation of safety practices across             check-in/check-out system.                         operation. It also leads to higher levels of
       multiple mining jurisdictions around the world."         Periodic disaster evacuation drills and        worker morale and job satisfaction, which in
          Grainger offers a wide range of safety             testing emergency communication and                turn improves employee retention. Taking a
       equipment. It provides useful notes that, while       signalling systems prepare workers on what to      holistic view toward improving worker safety
       specific to underground, are widely applicable        do if theres an emergency. Emergency gear,        education and safe work practices is a sound
       throughout the industry.                              such as HAZMAT suits and breathing apparatus       business investment that pays dividends for
          According to the US Department of Labor,           should be available for first responders and       long-term success.
       Mining Health and Safety Administration               rescue teams.
       (MHSA), 70% of mine accidents in the US are              Experienced miners know what gear they         Where are they?
       related to using heavy machinery and other            need to prevent or at least minimise injuries on   In Australia, NLTs N-Connex received a 2017
       equipment at the work site. Among the top ten         the job. For newcomers, however, its important    Good Design Selection in the Product Design
       most cited causal factors contributing to             to include information on selecting Personal       Category. The jury commented: High-end
       accidents in 2012 were: lack of safety training;      Protective Equipment (PPE) in their training.      design for a rugged, no-fuss utility product. It is
       hazard communication; machine guarding;               Manufacturers of PPE have made significant         clear that a professional design team worked on
       lockout/tag out precautions; and electrical wiring.   improvements in the materials they use. Take a     every aspect of this product. The end result is a
          As Grainger states, modern equipment, more        look at what youre using for PPE. It might be     professionally executed product that does what
       automated mining techniques, and better mine          time for change.                                   it has to do with elegance and simplicity.
       engineering have significantly reduced some of           Todays glove manufacturers have made             N-Connex (gigabit version) uses an NLT
       these safety risks, leading global mine               significant improvements in glove designs, using   supplied mil-spec two-core pre-terminated fibre
       operators to incorporate rigorous safety              lighter-weight and more breathable fabrics.        for the high speed network backbone. N-Connex
       procedures and health and safety standards,           Some if these materials even offer better cut      can also work with other fibre combinations.
       while taking a proactive approach to worker           and puncture resistance. Take a look at the        Access to the network is provided by N- Connex
       education and training.                               gloves your workers are using. There may be        Bolt Access Points and/or PoE ports on the core
          While improvements have been made and             better options available.                          Distribution module. The system is fully 802.11
       much more is known about the dangers and the             Todays work boots are higher to prevent       compatible; therefore any WiFi or Ethernet client
       risks, it makes sense to periodically evaluate        ankle rollover. Specially insulated boots can      can function over N- Connex.
       your safety strategy to ensure youre doing all       protect feet in both extreme cold and heat. Sole      N-Connex is an IP67 rated modular solution
       you can to provide the safest, most up-to-date        platforms are now wider and thicker to provide     that simplifies installation and maintenance
       work environment possible. While the list below       surer footing and better balance.                  while allowing easy expansion of the network
       may seem obvious, it never hurts to revisit your         In addition to LED-lighted hard hats, many     and solutions offered. While a range of modules
       safety program. Heres a checklist of reminders       miners require safety glasses. Todays eyewear     to suit most requirements is offered, the
       to consider when re-evaluating your safety            designs include improved scratch abrasion and      proprietary IP67 enclosures easily support new
       program for an underground mine.                      fog resistance.                                    functions and solutions, or new modules.
          For general tunnelling operations, the MHSA          Mine blasting and excessive noise generated       N-Connex, being fully compatible with
       requires a minimum illumination intensity of 5        by diesel-powered equipment can                           industry 802.3 and 802.11 standards
       foot-candles, although 10 foot-candles must be        cause lasting damage to miners                                                       supports all
       provided for shaft heading during drilling,           hearing. Hearing protection in the
       mucking and scaling. Check all lamps regularly.       form of earplugs and coverings
          Check all signage to make sure its highly        can be used, depending on the
       visible and legible.                                  ambient decibel levels in work
          Make sure all telephones and other                areas.
       signalling devices are fully operational at all          To be successful, safety best
       times. These devices can be critical in the event     practices in any organisation must
       of an unexpected incident or accident.                be deeply ingrained into the
          Routine equipment checks and maintenance          corporate culture and supported
       programs ensure that equipment and vehicles           from top management on down
       used in the mine or on the site are performing        through the ranks. Safety is truly
       properly and reliably, and do not pose any            everybodys job. This is especially
       dangers to their operators or workers nearby.         important in mining where safety                   N-Connex
          Where ladders and scaffolds are needed,           awareness and consistency are                      modules are simply
       make sure you have the proper harnesses, belts        essential in helping to prevent accidents,         clipped to the customised frame and connected
                                                                                                                via a Cat5 cable to the main Distribution
       and other safeguards to prevent falling.              injuries and fatalities.                           module, as all devices support Power over
          Air quality sensors and alarms should be in          Mine managers and individual miners need       Ethernet (PoE) connectivity
SAFETY
       Ethernet and WiFi devices. NLTs range                                                                           (sometimes constructed with fibre and
       of solutions can be used over the N-                                                                             steel belts) have to be sliced with two-
       Connex network including Voice, Data                                                                             handed box cutters before being spliced
       and Video solutions. Some of the                                                                                 back together with steel staples.
       solutions include:                                                                                                  Maintenance crews are often positioned
       n Voice  IP Radio Handsets and VoIP                                                                             on their knees during these dangerous
           phones can be used for two-way                                                                               cutting operations and must pull knife
           voice communications                                                                                         blades directly toward them, not the most
       n Data  network connectivity allows                                                                             ideal work environment. Recordable
           access to Intranets and the Internet                                                                         injuries from deep punctures and
       n Video  monitor critical points                                                                                lacerations are often serious - and in some
           through your operation                                                                                       cases, life-threatening.
       n Tracking  know where your people                                                                                 HexArmor engineered a new level of
           and assets are via WiFi (or RFID)                                                                            protection against punctures and
           Tracking and make use of NLTs                                                                               lacerations with the development of a
           powerful digital mine software suite                                                                         dedicated conveyor belt chap. This was an
       n Monitoring  ventilation, gas levels,                                                                          answer to a call from a major mining
           environmental conditions or ground                                                                           company that had been experiencing a
           strata changes can all be monitored                                                                          high level of recordable injuries (punctures
           over N-Connex                                                                                                and lacerations) in its belt conveyor
       n PLCs  Ethernet connectivity for PLC              A key part of an MST network infrastructure                  splicing operations. After conducting an
           networks to remotely control and monitor        (NS50 AP/Switch) in a Russian mine                    onsite review of the companys maintenance
           electrical equipment.                                                                                 operations, and working directly with the
          MST Globals Wireless Repeater Node (WRN)        American and Glencore, that are using Short           companys safety committee, HexArmor
       also received a 2017 Good Design Selection in       Interval Control to proactively monitor, analyse,     engineered a conveyor belt chap designed to
       the Product Design Category. The jury               report and manage their underground processes         deflect the cutting blades and knives used in belt
       commented: The WRN is a rugged, fit for            more effectively.                                    splicing maintenance. The result: belt conveyor
       purpose design that has been executed                  The WRN is a specific device, just part of MSTs   maintenance and installation injuries were
       flawlessly. User controls, ergonomics, choice of    much broader IMPACT Wi-Fi suite, but a new and        completely eliminated after the introduction of
       materials, fit and finish are as good as it gets.   important element to that suite. It enables easy,     the HexArmor chap.
       This is an excellent product and deserves           wireless connectivity in that difficult last mile     The company says that HexArmor with
       recognition at the highest level.                  into the dynamic areas of the mine  the mining       SuperFabric brand materials provides some of
          MST Global has a range of products that fit      faces.                                                the highest cut resistance in the industry today,
       within four main technology groups. From ULF to                                                           featuring ANSI/ISEA Level A7 and CE Level 5 cut
       VHF and UHF, through to digital Wi-Fi based         What are they wearing?                                resistance ratings. The cut, puncture, and
       systems, MST has developed a number of              Engineering the right type of PPE for mine            abrasion resistant 9911 chap provided mine
       proprietary products to address particular          workers and maintenance crews is critical. For        maintenance workers with full front and back leg
       requirements and to complement third party          example, in almost all mining operations, high        coverage plus a double-layer knee patch to
       products that may be used in a system.              capacity belt conveyors are used and they require     reduce wear in specific splicing task positions.
          MSTs product suites can be used in isolation    frequent maintenance and repair. Splicing is             The 9911 Chap was developed with extra
       or in combination to provide a total solution to    hazardous work for maintenance crews. Belts           room in the thigh area to offer easy movement
       mine operators requirements. Voice
       communications, data communications, people
       tracking, emergency messaging, asset tracking &
       management, wireless telemetry and proximity
       detection are all functions delivered by these
       systems.
          MST was the first company to broadly
       introduce Wi-Fi in underground mines in 2004.
       Denis Kent, General Manager, explains this was
       done to leverage the bandwidth of Wi-Fi networks
       to improve communications and track people in
       the mien, a step change in safety.
          But the same technology also is being
       leveraged to improve productivity.
          In fact now we have moved beyond just mine
       worthy infrastructure, but into devices and
       applications to deliver business value from the
       collected data and available communications. An
       example is how MST is an integral part of the
       activities of mining companies, such as Anglo       The 9911 HexArmor Chap completely eliminated belt conveyor maintenance and installation injuries
SAFETY
       and comfort, not to mention the chaps are cooler     luminous flux on a
       and lighter than the leather alternative products.   surface. It decreases
       Another benefit is that the chaps are fully          by the square of the
       washable, lowering replacement costs and             distance (inverse
       improving hygiene.                                  square law) of the
         HexArmor also provides a wide range of PPE         surface from the light
       such as protective gloves, arm guards, jackets,      source:
       and aprons. The mining industry demands grip            E(lx) = luminous
       and dexterity to allow maintenance workers to        flux (lm)/area (m2).
       handle tools and knives without slipping under          What is the
       extreme pressure. HexArmor has a variety of grip     difference between a
       solutions for the toughest mine site applications.   lumen and a candela?
                                                            Lumen = luminous
       Mine lighting                                        flux = the complete
       In the lead to this article, the importance of       quantity of light
       lighting has been demonstrated by Airfal. Nordic     emitted by a source.
       Lights is one of the leading global suppliers of    Candela = luminous
       Heavy Duty LED, HID & Halogen lighting               intensity = quantity of
       solutions. It defines Heavy Duty work lights as      light radiated in a particular direction.             Recommended Nordic Lights LEDs for various
       lamps specifically designed to be suitable for         Theoretical lumen output cannot be achieved       machines
       use in extremely demanding environments and          in real life. It is a calculated value showing what
       applications. They are most commonly used to         would be possible under absolute ideal                turn the LEDs on and off extremely rapidly (<300
       provide illumination of working areas close to the   conditions where no optical, electrical or thermal    Hz). However, the human eye cannot see this (the
       machine to which they are attached. However,         losses occur in the system. This value can often      eye can only see flicker below about 200 Hz).
       some heavy duty lights are also suitable for road    be 60% higher that the true lumen output.                If LED flickering is noticeable then there could
       and signalling use.                                    Operational lumen output takes thermal,           be various reasons:
          Nordic Lights provides useful reference           optical and electrical loss into account. It is the   n Cheap LED lamps may be designed with too
       information, like the difference between lumen       true representation of the lumen output from the          low LED switching frequency
       and lux. A lumen is the unit of measurement of      lamp in real life conditions.                         n There may be a fault in the lamp circuitry
       the complete quantity of light emitted by a light       Why do LEDs flicker, or appear to flicker?        n There may be an intermittent connection of a
       source  the luminous flux. Lux is the quantity of   Lamps using switched power supplies actually            component on the circuit board
SAFETY_proof 26/09/2017 14:26 Page 5
SAFETY
       n There may be an intermittent supply                      sphere angles, normally 90o in all directions (a
           connection to the lamp (eg loose, or poorly            half sphere). As a result we get the nominal
           plugged in connector)                                  illumination values of all detected section angles.
       n The flicker may be fake; eg the light may              With our software Helios, we analyse the
           actually be reflecting from a vibrating shiny          measured values and generate the correct lumen
           surface. So, the light itself isnt flickering, but    output. All measurements are performed at an
           because the shiny surface is moving rapidly, the       ambient temperature of 23C. The light output is
           reflected light is also changing direction rapidly.   measured after thermal stabilisation time of the
          Nordic Lights offers many different types of            light unit after 30 minutes in function; the LEDs      lighting solutions. Exceeding ATEX and IECEx
       LED work light. This is because an LED is not a            have then reached their operating temperature.        safety requirements, SLAM FIXED is fit for the
       standardised light source like a halogen or HID                The company is now offering new extreme            most demanding conditions in hazardous work
       bulb. LEDs vary, particularly in physical size and         corrosion resistant work lights with a special         areas.
       lumen output. This allows the flexibility to               coating to improve the resistance of its mining           The lightweight yet extremely durable lights
       produce lamp designs suitable for a wide variety           work lights in harsh conditions. For its NanoSafe      are mounted using acid-resistant steel brackets,
       of applications and customer requirements. A               coating, it implemented three more layers to           and operate reliably in temperatures from 40 C
       lamp with lower lumen output typically requires            make lights more corrosion resistant and               to +40C. The antistatic and extremely rugged Ex-
       less, or lower power LEDs than a lamp with a               implemented a non-stick and easy to clean              plastic casing of the lights enhances working
       much higher output. The lamps physical                    surface coating. These three additional layers         safety in explosion hazardous areas.
       dimensions, shape and lumen output can be                  lead to a much higher and longer resistance               Thanks to LED technology, maintaining SLAM
       tailored for various situations. Using                     against corrosion.                                     FIXED lights is easier and less frequent than with
       combinations of lenses and LEDs can also create                Its RFCommSafe products were developed in          traditional lamps. SLAM FIXED light fittings are
       products with identical appearance but with                recognition that some radio communication              safer and more cost-effective than other
       differing light patterns and output.                       equipment can self-tune to be very sensitive in        industrial lighting solutions. Thanks to both low
          On mounting lights, Nordic Lights notes that            remote areas.                                          maintenance and low energy consumption, SLAM
       aside from the physical dimensions and size of                                                                    FIXED lights also represent an environmentally
       mounting bolts, the main differences are in the                                                                   sound solution.
       material used and their ability to withstand
       vibration, shock and corrosion. Basic brackets are                                                                Mine utility vehicles for safety
       made of steel and have basic shock & vibration                                                                    Underground machinery is normally specialised
       resistance. Cast brackets have a far greater                                                                      to fit only one purpose, but in mining it is
       vibration and shock resilience. They are also                                                                     commonly needed for one machine to fulfil
       more corrosion resistant. The best performing                                                                    several requirements. This is where Paus took the
       brackets in terms of resistance to vibration and                                                                  initiative and designed the MinCa 18A with a
       shock are our patented Quake Damped brackets                                                                      unitised modular system. It offers a maximum
       available for the Scorpius range of lamps.                                                                       payload of 3.8 t and enough room to transport up
          HELLA Mining warns that there is currently no                                                                  to 18 passengers. However, it is not only
       universally recognised standard for measuring                                                                     equipped with a standard passenger cabin.
       the photometric properties of solid state (LED)                                                                      There are a variety of convenient cassettes
       lighting. This has resulted in many                                                                              available as well. These cassettes include fuel
       manufacturers and resellers using theoretical              HELLA Mining lumen measurement                         tanks, lifting/scissor platforms,
       data (eg raw lumens) which offers no actual                                                                       equipment/material transporters and fire-
       useful comparison data for the purchaser, who is              Every LED lamp contains electronic circuitry,     fighting/ambulance cassettes. The Paus fire truck
       either unaware or unable to calculate the actual           HELLA Mining explains. It is essential that this      offers a water tank with an average of 1,600 litres
       light output taking into account optical, electrical       circuitry does not cause harmful interference to       of water and other versions or customised
       and thermal losses. The IES (illumination                  other devices and at the same time is not              solutions are also available on request. The
       Engineers Society) released in 2008 a standard             susceptible to radiation from other devices. The       comfortable and innovative suspension, shock
       for testing amongst other things, the total                limits prescribed by regulatory requirements and       absorbers and oscillated axles lead to an
       luminous flux of LED fixtures. This publication            as defined in international standards such as          outstanding driving comfort at speeds of up to 33
       appears to be the front runner in becoming the             CISPR15 or relevant UNECE standards may not be         km/h. That way the ambulance version is well
       benchmark standard in testing solid state                  sufficient to ensure there is no interference with     developed for a safe and convenient passenger
       luminaire photometrics, and has been adopted               very sensitive radio communication equipment.          transport.
       by most top tier manufacturers, including HELLA            Lamps marketed as RFCommSafe are designed to              In close cooperation with an initiating mine
       Mining. In simple terms, the test will determine           go well beyond the requirements of CISPR15,            and Drger, a leading company regarding
       the effective light output of a luminaire, ideally         CISPR25 and UNECE standards.                          medical and safety technology, Paus also
       using specialised photometric equipment in a                  Atexor says its first fixed Ex-lighting solution   developed a special rescue vehicle which is
       NATA accredited laboratory. For the purpose of             exceeds safety requirements and provides               already in use. The MRV 9000 is based on the
       this comparison, only data obtained using the              powerful yet energy efficient light in extreme         mentioned Paus MinCa 18A. The drivers cabin
       LM-79-08 standard is utilised.                             conditions.                                            and the rescue cassette include ROPS and FOPS
          The correct way to measure the light output               The SLAM FIXED range of fixed luminaires          and have been tested accordingly. The most
       of head- and work lights is usage of a                     offers the same high quality features and              important feature of this vehicle is that it is
       goniometer. This instrument measures defined               robustness as the well-known Atexor portable           totally equipped with an own closed pressurised
www.ansul.com/mining-solutions
SAFETY
           
	                                                           safety and usability of
                                                                                     the MRV 9000 for
                                                                                                                environment where miners are actively involved
                                                                                                                in operation, as it is designed not to cause any
                                                                                     instance a gas             harm to man and machine. The discharge
          210/./-0,+*)(                                                              monitoring system,         mechanism is free of any particles that might
          '.&%+$0#,"+!0 /+-."+0%%+))"+)(                              thermal imaging            cause physical harm. The most common
          0/.-,.+*)('&%($#",(!. ,*(*&-("-*+(0*+"*,(0")             cameras, acoustic          installations are on continuous miners, within the
          $"-/+.( .*(.* #(+.*(..)+.*(
*-.."*,
          **(
	00(0.&($0(*"-.(0*-"-("-"-(+.,/* ,(        signals or further         roadway and on longwalls.
          	-*+-".-("-"-                                                       solutions if special          An ExploSpot AESS installed on a continuous
          '0-, /-0,+*)                                                            requirements exist.        miner is a single suppression system interfacing
          '.&%+$0#,"+!0 /+-."+&-1+))"+)                                                            the continuous miner with a power supply, water
          0/.-,.+*)('&%(.* #(*+.,( ,,*("-*+(
 "/*-(0+*&     Explosion                   supply and preferably a communication interface.
          ($,,."*,(+"-)"-(0. ".-,("-,(*+",((*",(.*,*
          
0(
	00(0")( .*(*-.*(!
($)-*(*+"         suppression                 In the case of a longwall face area, the area will
          
((	-*+-".-("-"-                                               Arend Spaeth, CEO of        be split into multiple AESS barrier zones. Each
                                                                                    ExploSpot Systems says      zone will be protected by a dedicated AESS. The
          
-00%/.11 
+*)
          	-,0%"+.--."+ ,%+)))"+)                                       the implementation of      difference in function of the AESS on longwall
          0/.-,.+*)('&%( .*((	-*+-".-("-"-                              an active explosion         installation compared to that on a continuous
                                                                                    suppression system          miner is that an explosion might have two
          ! /.-,.1%+-,%.1+*)
          	-,0%"+.--."+ ,%+))"+)                                       (AESS) in a mine can be     propagation routes. So, the AESS must create an
          0/.-,.+*)('&%(
	00( .*(	-*+-".-("-"-((
           
                                     
	
   suppression is to prevent   operation in intake or return air drifts. These
                                                                                    injuries, fatalities and    AESS systems are placed in an environment that,
SAFETY
SAFETY
SAFETY
       need for an effective ventilation system.               Sanders Senior Vice President, Howden.               MSAs line of best-in-class XCell sensors with
          The most robust primary ventilation system             Craig Stewart, founder of Chasm Consulting        TruCal technology. Among their many
       for a mine with a surface ramp is to have at least      said: The combination of Howden and Ventsim         capabilities, these innovative sensors
       one surface intake shaft and one surface exhaust        will offer exceptional value for our customers by    automatically compensate for environmental shift
       shaft servicing all main working levels. The            providing a key advantage to optimise fan            and sensor drift, meaning operators dont have to
       intake shaft can be equipped with a ladderway           selection and ventilation system designs. When I     touch or calibrate the gas monitor for up to 18
       (or set up for emergency winding) and acts as           visit clients across the globe I notice that fan     months.
       both a secure second means of egress and also           sizing is often neglected, resulting in elevated        These systems are true game-changers that
       provides secure fresh air bases on each working         operating costs due to low efficiency or fan         will further strengthen MSAs market-leading
       level. The ramp operates as a neutral intake, ie        replacements/upgrades resulting in costly            position in the global fixed gas and flame
       downcasts only sufficient intake air from surface       production stoppage. Howden will now have the        detection market, said William M. Lambert, MSA
       for its own purposes (ie to ventilate itself ) and is   ability to provide the end-product that the          Chairman, President and CEO. We know, from a
       not used to feed air into the working levels. This      customers really need  in other words, not just     tremendous amount of voice-of-customer input,
       provides a highly secure and robust ventilation         fans but air. I believe this is a revolutionary      our customers wanted a tough, user friendly and
       system. However, if under the ALARA principle,          change in the business of mine ventilation. I have   reliable system they can set, forget, and know
       the operation cannot support such a design and          no doubt it will improve ventilation as well as      workers are protected. With the S5000 and
       only one surface shaft can be provided, then            health and safety. I am looking forward to helping   Ultima X5000 Monitors, operators can do just
       serious consideration should be given to using          create the next generation of products and           that  and trust these new systems will function
       this surface shaft as the intake and using the          continuing to work with our existing and new         as designed, and do so at a significantly lower
       ramp as the primary exhaust, under the influence        customers to help design and optimise their          overall cost of ownership, he said.
       of a surface blowing fan.                               ventilation systems.                                   MSAs Series 5000 Transmitters are designed
          In all cases, the operation of the ventilation                                                           for a broad range of applications where toxic and
       system must be carefully integrated with site           Gas monitoring                                       combustible gases pose a workplace hazard. The
       operating practices and other controls, such as         One of the global safety equipment                   two new systems are designed as a replacement
       the selection and use of suitable self-contained        manufacturing leaders, MSA Safety announced          option for the companys large installed base of
       self-rescuers, refuge chambers, fire detection          last April it is redefining expectations for gas    previous generation systems. The S5000 model,
       systems and personnel notification systems.            detection technology with the launch of a new        which the company will market under its General
          Howdens current strategy is to become the           line of advanced gas detection monitors. The         Monitors brand, represents a premium option
       worlds leading provider of mine ventilation            S5000 and Ultima X5000 gas monitors  known         designed for use in particularly harsh
       solutions and its latest move in this has been to       collectively as MSAs Series 5000 Transmitters      environments. For all other applications, the
       acquire Chasm Consulting and its world leading          enhance facility and worker safety while             Ultima X5000 offers the industrys most intuitive
       product Ventsim. Providing industry-leading 3D         significantly simplifying and minimising system      and user-friendly interface for customers who
       design and simulation capability, the Ventsim           maintenance requirements.                           want to standardise and simplify their gas
       software is widely used among the global mine              The S5000 and Ultima X5000 systems are the        detection program.
       ventilation community. Howden will now offer a          result of a four-year research and development          Lambert commented that the new gas
       full suite of solutions for mine ventilation, from      effort involving three MSA global design centres.    detection monitors provide a good example of
       modelling and design software to full turnkey           This represents the companys largest ever new       how MSAs core product focus and R&D
       projects including main and auxiliary fans,             product development effort in the area of fixed      investments are yielding innovative safety
       instrumentation, automation and Ventilation on          gas and flame detection.                             solutions that support the companys growth
       Demand via the Simsmart product line.                      In use, the Series 5000 Transmitters are          strategy and market leadership goals. At MSA,
          This acquisition is part of our mission to          mounted at a fixed point and protect assets and      we often talk about the value of safety, he said.
       better serve our customers by providing the             workers within a facility by sensing low levels of   These new gas detection systems are great
       complete suite of solutions for any type of mine        toxic or combustible gases in the air. The new       examples of that mindset in action, where we are
       ventilation system. The Ventsim software has            systems are powered by advanced and                  using breakthrough technology and innovation to
       earned a strong reputation in the market place. It      differentiated technology that provides improved     generate value for all MSA stakeholders.
       will remain a stand-alone product, and we will          facility and worker safety at a lower cost of           Scott Safety, a global leader in innovative
       continue to enhance its functionality, said Mark       operation. The nerve centre of this system is        personal protective equipment and safety
              t0QUJNVNNBUFSJBMnPX                                                                                               t7JSUVBMMZNBJOUFOBODFGSFF
              t6QUPEFDSFBTFJO                                                                                            t(SFBUMZSFEVDFETQJMMBHF
                 NBUFSJBMEFHSBEBUJPO                                                                                               t4JHOJmDBOUSFEVDUJPOJO
              t3FEVDFEEVTUBOEOPJTFMFWFMT                                                                                         CFMUEBNBHF
SAFETY
SAFETY
                                                             system.
                                                                Tommy Knockers
                                                             offer:
                                                             n Portable design
                                                                 allows for ease of
                                                                 transport, can be
                                                                 hoisted, dragged,
                                                                 rolled, or forklifted
       A MineARC refuge system underground                   n Double door entry
                                                                 system for control of
                                                                 outside air
          The internal atmosphere must be sealed from        n Positive air pressure                 	
       the external threat. The refuge should offer a            minimises outside air
       breathable air supply and redundancies,                   ingress into chamber
       including:                                            n Comfortable bench
       n An appropriately filtered, dry compressed air           seating for chamber
           connection                                            occupants
       n Internal, chemically controlled recirculation       n Storage area for
           (scrubbing) system and oxygen supply                  consumables in
       n Air conditioning, including temperature and             cabinets and under
           humidity control                                      seat
       n Uninterruptable power supply (UPS) and              n Sectioned off area for
           secure storage                                        toilet
DRONES/UAVS
Flight support
nmanned aerial vehicles (UAVs), BMA recounts the BHP Billiton experience: PRODRONE has developed the PDH-02C Auto-
DRONES/UAVS
DRONES/UAVS
                                                                                            NEW
                                                                                            RIEGL VZ-2000i
                                                                                            FOR TOPOGRAPHY AND MINING
DRONES/UAVS
         NVIDIA researchers built their drone with                                   payloads and batteries are     purpose capability of the platform opens up the
         off-the-shelf components to reduce costs                                    automatically exchanged        possibilities for entirely new solutions and
         and equipped it with the NVIDIA Jetson TX1                                  with the robotic swapping      missions that drones have never been used for
         and two cameras
                                                                                     mechanism, enabling a          before.
                                                                                     diversity of payloads and         The team at Airobotics fuses expertise in
                                                                                     mission types.                 aerospace hardware design, robust electronic
                                                                                        Optimus streams video       systems, leading software engineering, and years
                                                                                     from the drone, providing      of experience in commercial drone operations.
                                                                                     customers with real-time          Like systems using operators, Airobotics
                                                                                     aerial insight into critical   drone solution provides critical information in the
                                                                                     events and increasing their    following areas:
                                                                                     situational awareness.         n Exploration and prospecting
                                                                                        Airbase is a completely     n Stockpile volumes and end-of-month
                                                                                     automated base station             reconciliation
                                                                                     from which the Optimus         n Terrain mapping and change detection
           To keep costs low, researchers built their         drone launches and lands on its own, without any      n Asset management and scheduling
       drone with off-the-shelf components. The drone         human intervention. There is a custom designed        n Situational awareness and emergency
       navigates without GPS and relies instead on deep       robotic arm. Designed for speed and reliability,          response
       learning.                                              the arm automatically swaps batteries and             n Infrastructure and equipment inspection
           Although the technology is still experimental,     payloads once the drone returns to Airbase,           n Security and surveillance.
       it could eventually search for miners in               minimising downtime between flights.                     Airobotics also suggests hauling optimisation
       underground accidents. We chose forests as a             The Airbase provides status updates, anomaly       with automated drones:
       proving ground because theyre possibly the            detection, and alerts. The Airbase is completely      n Optimise fleets - provide current 3D models
       most difficult places to navigate, Smolyanskiy        sealed, waterproof, durable, and corrosion                to engineers and planners which can be used
       said. We figured if we could use deep learning        resistant.                                                to improve fleet fuel consumption. Use
       to navigate in that environment, we could                 The Airobotics software is integrated, dynamic         damage and traffic flow data to inform most
       navigate anywhere.                                    software that enables users to control and                optimal maintenance scheduling
           Unlike a more urban environment, where             manage missions with one click. Pre-designed,         n Damage identification - identify road damage
       theres generally uniformity to, for example, the      repeatable missions are despatched on-demand              features using images, video, or surface
       height of kerbs, shape of letterboxes and width        or through the flight scheduling system. The              models to prevent future incidents and
       of pavements, the forest is relatively chaotic.        software is both a complete operating system            eliminate the need of personnel to physically
       Trails in the woods often contain no markings.         and an open platform, designed with scale in            enter the haul road network
       Light can be filtered through leaves; it also varies   mind. Third parties can build and customise the       n Emergency oversight - view streaming footage
       from bright sunlight to dark shadows. And trees        payloads, along with software apps to support           of incidents, including tyre overheating and
       vary in height, width, angle and branches.             and manage various new missions.                        unresponsive driver, to support decision
           Our whole idea is to use cameras to                  Harvested data passes through the processing         making
       understand and navigate the environment,              pipeline, translating raw data forms into concise,    n Minimise personnel in dangerous areas -
       Smolyanskiy said. Jetson gives us the                 actionable information. Additionally, users             reduce risk of injury by using aerial data
       computing power to do advanced AI on board the         interact with real-time and processed data to           instead of manned-inspection for incident
       drone, which is a requirement for operating in         extract insights and improve decision-making            response.
       remote environments.                                  processes.
           As a completely automatic and operated aerial         The systems swappable payload mechanism,           Airobotics stylised UAV task. First, user selects a
                                                                                                                     pre-planned scheduled or on-demand mission,
       system, Airobotics empowers industrial                 together with its software, positions Optimus as       designed to scan areas throughout the site.
       companies to leverage the power of drones              a multi-tool drone capable of carrying various         Then the drone harvests data along flight paths.
       without the need for skilled and expensive drone       sensors and payloads. The dynamic, multi-              Thirdly, data collected from the Optimus drone is
                                                                                                                     processed into final digital elevation models and
       operators. Its platform enables customers to run                                                              other file types. Finally, the user receives
       missions autonomously to monitor, inspect,                                                                    analysed data that supports critical operations
       survey, and secure strategic sites.
           Airobotics delivers an automatic drone
       platform capable of executing a nearly infinite
       number of missions for its operators. By taking
       the drone pilot and operator out of the equation,
       Airobotics removes the most expensive and hard
       to find component of industrial drone operations.
       The system is comprised of three major
       components.
           Optimus is a large, high capacity drone
       capable of flying 30-minute missions while
       carrying a 1 kg mission specific payload. It
       employs premium military grade avionics for
       flight performance and reliability. Optimuss
DRONES/UAVS
                                                           a preset flight path while recording a short video    Pioneers community are early-stage companies
                                                           and tracking a subject along the way. Users can       from around the world that are involved in the
                                                           now control which circular direction the drone        design, development and deployment of new
                                                           flies during Circle and Helix modes to give them      technologies and innovations, and are poised to
                                                           more cinematic control when filming. Other            have a significant impact on business and
                                                           QuickShot modes have also been improved by            society. There are 30 technology pioneers that
                                                           increasing the height gained during Dronie mode       made it to the final selection.
                                                           and smoothing out the cameras pitch in Rocket            Following Airwares selection as Technology
                                                           mode.                                                 Pioneer, the companys Founder and CEO
                                                               Spark also adds new photo shooting features       Jonathan Downey has plans to attend the Annual
                                                           that maximise the cameras capabilities. In           Meeting in Davos, in January 2018, and continue
                                                           addition to the existing Vertical and Horizontal      to participate in dedicated Technology Pioneer
                                                           Pano modes, a new 180 mode stitches 21                community events in the course of the next two
                                                           individual photos together to capture 1,80o           years.
       Instructing the DJI Spark camera drone. To          panoramic images. The photo resolution when               We welcome Airware in this group of
       perform the Record gesture, stand within 2 m of     shooting in ActiveTrack and Gesture Modes has         extraordinary pioneers, says Fulvia Montresor,
       the drone and raise one arm out to your side        also been improved to capture images at 12-           Head of Technology Pioneers at the World
       until it is about 45o above parallel with the
       ground. The front LEDs will slowly blink red        megapixel resolution of 3,968 x 2,976 pixels.         Economic Forum. We hope that thanks to this
       when the drone recognises the Gesture video             The firmware update has also made                 selection, the World Economic Forum can
       mode. The front LEDs will blink quickly             improvements on the overall performance of            facilitate greater collaboration with business
       indicating the camera is ready to record. Perform
       the hand gesture again to stop recording            Spark including better responsiveness to input        leaders, governments, civil society and other
                                                           from the remote controller, enhanced                  relevant individuals to accelerate the
       Technology pioneers                                 connectivity between the aircraft and remote          development of technological solutions to the
       DJI has released new features for its Spark         controller, as well as flight logging for the         worlds greatest challenges.
       camera drone that make it easier than ever to       Intelligent Battery system.                               We are humbled by this prestigious
       capture pictures. Spark is DJIs smallest and           Airware, which provides end-to-end solutions      recognition and look forward to working closely
       smartest drone that lets users control it with      that turn aerial data into actionable business        with other thought leaders as a Technology
       hand gestures alone. Made possible through a        intelligence for enterprises, was selected among      Pioneer over the next two years, said Downey.
       recent firmware update, the new features deliver    hundreds of candidates as one of the World            In an industry that is crowded and competitive,
       a powerful combination of video and photo           Economic Forums technology pioneers, a             its an honour to be acknowledged as a leader in
       improvements to Spark users worldwide               selection of the worlds most innovative              the commercial drone market for our
       including:                                          companies. Airware has been recognised for its        unparalleled ability to help businesses collect
       n A new gesture to start and stop video             leading set of technologies that provides             and make the best use of their aerial data.
           recording                                       everything enterprises need to collect, manage,           The Technology Pioneers were selected by a
       n Enhanced QuickShot video features for more        and analyse aerial data. It offers its customers an   selection committee of more than 60 academics,
           cinematic control                               accurate view of their world to drive business        entrepreneurs, venture capitalists and corporate
       n An 1,80o photo shooting mode and improved         outcomes, including operational cost savings,         executives. Notable members of the committee
           photo image resolution                          enhanced worker safety, and improved decision         include Geoffrey Moore (Adviser, Geoffrey Moore
          Paul Pan, Senior Product Manager at DJI          making  for example, mining companies                Consulting, USA), Yossi Vardi (Chairman,
       explained that these updates deliver on our        measuring excavation yield.                           International Technologies, Israel) and Lee Sang-
       vision to make Spark an easy and fun camera             The World Economic Forums Technology             Yup (Distinguished Professor and Dean, Korea
       drone that anyone can use, even if youve                                                                       Advanced Institute of Science and
       never flown a drone before.                                                                                    Technology, Republic of Korea). The
          Through its innovative 3D Sensing                                                                            committee based its decisions on criteria
       System, Spark has groundbreaking                                                                                including innovation, potential impact and
       features like Gesture Mode and                                                                                  leadership. Past recipients include Airbnb,
       PalmControl. Users can control Spark with                                                                       Google, Kickstarter, Mozilla, Palantir
       hand movements, giving it commands to                                                                           Technologies, Scribd, Spotify, Twitter and
       follow them, take aerial pictures, send the                                                                     Wikimedia.
       drone away, and beckon it to come back.                                                                            VTOL AEROSPACE is introducing the UAV
       With the addition of the new Record                                                                             Converticopter line (CVC), adding
       gesture, users can now start and stop                                                                           unmanned versions to its manned
       video recording with a simple arm                                                                               convertiplanes. Since its creation in 2013,
       movement, giving them the freedom and                                                                           the company has made extensive use of
       flexibility to capture videos whenever the                                                                      flying proof-of-concepts at different scales,
       right moment strikes using Sparks image                                                                        going from compact unmanned test vehicles
       stabilised 1080p HD camera.                                                                                     up to a 8.5-m manned prototype.
          Sparks QuickShot Intelligent Flight                                                                            Founder and CTO Oliver Garrow says
       Modes that make creating professional                                                                           putting these test vehicles through their
       videos easy have also been enhanced.                                                                            paces, meaning flying them in real
                                                           Airware schematic summarising drone
       Using QuickShot, Spark automatically flies along    possibilities                                         conditions at a runway, has provided invaluable
DRONES/UAVS
DRONES/UAVS
DRONES/UAVS
DRONES/UAVS
PROJECT FOCUS
PROJECT FOCUS
       carry 20 t of cargo (containerised or bulk                Dorey: We believe that our Hybrid Airships             Rob Weiss, Executive Vice President and
       loaded) and up to 19 passengers. First                 will provide significant benefits in reaching           General Manager, Lockheed Martin Advanced
       commercial deliveries are scheduled in 2019.           remote locations such as the Strange Lake               Development Programs (Skunk Works) said:
          The LMH-1 combines the technology of lighter        complex. Removing the need for expensive,               Alaska is an ideal location for the Hybrid
       than air aircraft with airplanes, helicopters and      intrusive infrastructure, it is a significant step in   Airship to operate. The airship enables access to
       hovercraft. Helium provides 80% of the lift,           redefining the way transport works in remote            Alaskas most isolated regions, and is designed
       while the remaining lift comes from the                regions.                                               to protect the sensitive ecological environment.
       aerodynamic shape of the aircraft and its four            Rob Binns, Chief Executive Officer, Hybrid              In Alaska PRL Logistics offers a variety of
       thrust vectoring engines. The airship, costing         Enterprises: Lockheed Martins Hybrid Airship          project services and comprehensive logistics
       some $40 million, also features a unique hovercraft-   represents a revolution in remote cargo delivery.       solutions including: project management,
       like Air Cushion Landing System that facilitates       The Quest Strange Lake project is a prime               project planning, modelling, safety, procurement
       taxiing and grips the craft firmly on the ground.      example of how our Hybrid Airship enables a             and field execution. It serves a broad range of
          They can taxi and park securely for safe            cost effective and environmentally friendly             projects and clients in the oil and gas, mining,
       emplaning/deplaning of passengers and roll-            solution to accessing strategically important           defense, industrial, construction and
       on/roll-off cargo movements without the                mineral deposits.                                      environmental industries.
       problems of mast-moored airships that                     Quests initial plan was to build a 168-km              PRLs understanding of the complexities of
       constantly shift with a surface wind.                  road from Strange Lake to Anaktalak Bay off the         working in Alaskas extremely remote site and
          Other considerations in the airships favour        Atlantic coast. That would have cut across a            our partnership with Straightline Aviation,
       include:                                               caribou migration route. The company now says           whose airship operating experience is
       n The ability to operate with similar ground-          flying airships from the mine over 200 km to            unparalleled, means this will be a true game
            handling parameters to a standard cargo jet       Schefferville will save money in the long run,          changer. It affordably opens up many projects
            such as a Boeing 737                              despite the extra distance.                             currently inaccessible without the development
       n Offer greater range and significantly lower             Building a road would cost about C$350               of the costly infrastructure required by
            costs per tonne-km than heavy lift helicopters    million, with construction starting two or three        traditional modes of transportation, said Ron
            and other traditional modes of transport          years before the mine begins producing ore. So          Hyde, PRL CEO
       n Reduce operating expenses through a                  the company would have to finance the road                 US Senator from Alaska, Dan Sullivan, also a
            combination of greater fuel-efficiency and        and pay interest. Then there's the cost of road         former Commissioner for the Alaska Department
            lower maintenance downtime than helicopters.      maintenance and winter servicing. By                    of Natural Resources: Alaska is a storehouse of
          Dorey also comments that the hybrids save          comparison the airships are expected to cost            immense natural resource wealth. This
       on significant upfront infrastructure capital          C$85 million a year to operate.                         combination of technology and innovation will
       expenditure prior to revenue generation. This             Quest will only pay for airship use when it is       enable access to resources and provide needed
       has the added benefit of reducing project risk         needed. Looking into the future, it is already          benefits to our infrastructure. It is an example of
       and making these ventures more investable.            anticipating Lockheed Martin's next generation          a company operating to provide a transportation
          This should be a cost-effective and                 of airships, which could be ready by 2025. That         solution to meet Alaskas unique challenges.
       environmentally-friendly solution to Quests           may well be an airship that can carry 90 to 100 t,         It is anticipated that airship operations will be
       transport challenges. It is not only designed to       some five times the current payload. With such a        based at the PRL Logistics Operations Center in
       use less fuel, emit less carbon dioxide and            plane, the cost per tonne-kilometre will drop           Kenai, Alaska and supported by other PRL
       produce less noise than conventional aircraft, it      dramatically by 50 or 60%.                              locations throughout the state. The Kenai
       also eliminates the need for costly ground-level          Last year SLA signed a letter of intent to           Facility has overland, marine, and aviation
       infrastructure, avoiding impact on the areas          purchase up to 12 of the Lockheed Martin                access and will also be the base operations
       wildlife habitat compared to road transport and        airships, with a potential value of approximately       centre for the Hybrid Airship.
       trucking along a road corridor to the Labrador         $480 million. At the time Mike Kendrick, SLA Co-
       Sea coast.                                             Founder and CEO said: We are delighted to be           And in Tanzania
          This new transportation solution will also          first in line with this magnificent aircraft that is    At the beginning of April, Hybrid Enterprises
       stimulate employment and business                      going to dramatically change the way cargo is           announced a strategic partnership with Helium
       opportunities for regional and Indigenous              moved around the world. The clear-cut economic          One, an explorer, developer and producer of
       communities increasing the socio-economic              and environmental advantages of these Hybrids           high value bulk liquid helium for the
       benefits to the area around the mine site.             are attracting vast amounts of attention from a         international market. Helium One will use the
          The service agreement represents a value of         wide-range of potential end users."                     LMH-1 Hybrid Airship to safely transport helium
       about $850 million, including fuel costs, over a          Headquartered in the UK with offices in New          out of its deposit sites in Tanzania.
       10-year period that starts in 2019, with further       York and Los Angeles, SLA was co-founded by a              Helium One holds a prospecting license
       extensions of up to 20 additional years in line        team of highly experienced airship and aviation         across three project areas in Tanzania,
       with the current projected life of the mine.           executives with the sole purpose of bringing            encompassing more than 4,500 km of land with
          Pierre Lortie, Executive Chairman of the            Hybrids into operation.                                 helium concentrations up to 10.5%. With
       Board, Quest, said of the agreement that his              Headquartered in Atlanta, Georgia, Hybrid            significant operational, technical and
       company and SLA make ideal partners  we are          Enterprises is the exclusive reseller of Lockheed       commercial experience, the Helium One team is
       well positioned to fully leverage the cost             Martin's Hybrid Airships.                               well positioned to capitalise on opportunities
       efficiencies and environmental advantages of                                                                   within the global helium market. This strategic
       the LMH-1, and are truly excited to be among           And Alaska                                             collaboration would provide a safe and
       the first companies to implement such an               Last August, PRL Logistics announced it was             sustainable solution for transporting helium
       innovative transport solution.                        teaming with SLA for operations in Alaska.              from mining sites in Tanzania. IM
          www.ansul.com/mining-solutions         www.srk.com
          BELAZ                            8-9   Sulzer                                    31        Santiago, Chile.
          www.belaz.by                           www.sulzer.com                                      https://gecamin.com/procemin.geomet
          BME  a member                         Tenova TAKRAF                             23
          of the Omnia Group                 2   www.takraf.com                                      17-19 October:
          www.bme.co.za                          www.tenova.com                                      Metallic Mining Hall, Seville,
          CDE Global                        FC   thyssenkrupp Industrial Solutions         43        Spain.
          www.cdeglobal.com                      www.thyssenkrupp-industrial-                        www.mmhseville.com
          CMS Cepcor                        45   solutions.com                                       31 October - 2 November:
          www.cmscepcor.com                      Weba Chute Systems                        61        FEM 2017, Levi, Lapland,
          Diemme Filtration  a brand            www.webachutes.com                                  Finland. http://fem.lappi.fi
          of Aqseptence Group               35   Weir Minerals                             27
          www.aqseptence.com                     www.warman.weir                                     13-16 November:
          DSI Underground                   29   www.minerals.weir                                   Flotation '17, Cape Town,
          www.dsiunderground.com                 Yours Mined Ours                         IBC        South Africa.
          DXB Pump & Power                  25   @WeDigItYouLiveIt                                   www.min-eng.com/flotation17
          www.dxbpumppower.com
          Eickhoff                         IFC                                FORTHCOMING EVENTS
          www.eickhoff-bochum.de/en/
          eickhoff_mining_technology              October 2017                                     17-19: Metallic Mining Hall 
          Flotation 17 - MEI Conferences    58                                                     2nd Edition, Seville, Spain.
                                                  2-7: Rock Mechanics for Africa 2017,
          www.min-eng.com/flotation17                                                              www.mmhseville.com
                                                  Cape Town, South Africa.
          Flowrox                           19
                                                  www.saimm.co.za                                  18-19: Xplor, Quebec Mining Exploration
          www.flowrox.com
                                                                                                   Convention, Montreal, Canada.
          FLSmidth                          11    11-13: International Conference on
          www.flsmidthminerals.com                                                                 www.aemq.org
                                                  Underground Mining Technology UMT
          Geobrugg                          59    2017, Sudbury, Canada.                           18-21: IMMAT International Mining
          www.geobrugg.com/mining                 www.acg.uwa.edu.au                               Machinery and Technological Congress,
          HARD-LINE                      14-15                                                     Izmir, Turkey. www.immat.org.tr
          www.hard-line.com                       16-18: AusIMM Underground Operators'
          Haver & Boecker Canada            17    Conference 2017 13th Anniversary,               31-November 2: Fennoscandian
          www.havercanada.com                     Broadbeach Island, Australia.                    Exploration and Mining FEM 2017,
          InfoMine                          71    www.ausimm.com.au                                Lapland, Finland. www.lapinliitto.fi
          predictyourprofits.com
          Kidde Fire Protection Services    53              ADVERTISING SALES REPRESENTATIVES
          www.kiddefiresystems.com
                                                 UK, Europe (exc. Italy) & CIS, South Africa,    South America
          Komatsu                           37   US East Coast & Canada                          Contact: Ricardo Corts
          www.komatsu.com                        Contact: Phil Playle                            Editec S.A.
          ME Elecmetal                      21   Lansdowne Media Services Ltd                    Tel: +56 2 2757 4210 or +56 2 2757 4200
          www.me-elecmetal.com                   Tel: +44 (0)1442 877 777                        rcortes@editec.cl
                                                 Fax: +44 (0)1442 870 617
          Metso                           OBC    phil@im-mining.com                              Japan Contact: Akiyoshi Ojima
          www.metso.com                                                                          Japan Advertising Communications, Inc
          MMD Mineral Sizing                41   Western USA                                     Tel: 81(0)45 319 4742 Fax: 81(0)45 319 4743
                                                 Contact: Bob Warren                             ojima@media-jac.co.jp
          www.mmdsizers.com                      Lansdowne Media Services Ltd
          Motion Metrics                     5   Tel: +44 (0)1442 877 777                        China Contact: Huang Shusheng()
          www.MotionMetrics.com                  Fax: +44 (0)1442 870 617                        Tel: +86 10 13901065576
                                                 bob@im-mining.com                               Fax: +86 10 81573510
          PAUS                              63                                                   huang_shusheng@hotmail.com
          www.paus.de                            US Mid-West, Cent & Mt
          PressurePro                       55   Contact: Kevin Lapham                           India Contact: Deven Singh
          www.pressurepro.us                     J.P. Media Inc                                  Block 10/502 Heritage Estate, Dodaballapur Road
                                                 Tel: +1 (630) 420 9752 Fax: +1 (630) 420 9763   Yelahanka, Bangalore - 560064
          Rajant Corporation                65   lapham@jpmediainc.com                           Tel: +91 74064 64314
          www.rajant.com/drones                                                                  devksingh2005@gmail.com
          Redpath                           47   Brazil
                                                 Contact: Joseph Young                           Italy
          www.redpathmining.com                  Minrios & Minerales Magazine                   Contact: Claudio Sanfilippo
          Richwood Industries, Inc.         49   Tel: +55 11 3895 8590                           or Andrea Rancati
          www.richwood.com                       josephyoung@terra.com.br                        Rancati Advertising
                                                                                                 Tel: +39 02 70300088 Fax: +39 02 70300074
          RIEGL Laser Measurement Systems 67     Australia and New Zealand                       csanfilippo@rancatinet.it
          www.riegl.com                          Contact: David Lansdowne or Marika Cooper       or arancati@rancatinet.it
          Robit                             13   Lansdowne Media Services Ltd
          www.robitgroup.com                     Tel: +44 (0)1442 877 777                        Classified Advertising
                                                 Fax: +44 (0)1442 870 617                        Contact: Emma Smith or Lynne Lane
          Sandvik Mining                     7   david@im-mining.com                             Tel: +44 (0)1442 870 829
          www.mining.sandvik.com/mysandvik       or marika@im-mining.com                         emma@im-mining.com or lynne@im-mining.com
#TheMetsoWay