(PWD 142A - Rev.
`91)
JABATAN KERJA RAYA
PRELIMINARY DETAILED ABSTRACT FOR
HEAD SUBHEAD YEAR TOTAL PROVISION $
PROVISION FOR CONSTRUCTION $
BRIEF DESCRIPTION OF BUILDINGS
BUILDING Frame Wall Roof Floor Ceiling Window Standard
a
b
c
d
e
f
g
h
j
k
BREAKDOWN OF PRELIMINARY COST ESTIMATE COST $
1 PRELIMINARIES
2 PILING/SPECIAL FOUNDATION
Type and Size
a
b
c
3 BUILDING Drawing No. Floor Area m2 Cost/m2
a
b
c
d
e
f
g
h
j
k
g
4 INTERNAL SERVICES
a Plumbing Installation
b Sanitary Appliances
c Electrical Installation
d Fire Protection Installation
e Air Conditioning Installation
f Lift & Conveyor Installation
g Communication Installation
h
j
k
h
SUBTOTAL carried forward
BREAKDOWN OF PRELIMINARY COST ESTIMATE (CONT'D) COST $
SUBTOTAL brought forward
5 EXTERNAL WORKS
a i) Site Preparation
ii) Earthwork
b Roads,Hardstanding,
Footpaths & Paving
c Fencing & Gates
d Turfing & Soft Landscaping
e Surface Drainage
f Sewerage
g External Electrical Installation
h External Water Supply Installation
i External Telephone Installation
j
k
6 VARIATION OF PRICES
7 CONTRIBUTION FEE TO LOCAL & UTILITY AUTHORITY
a Tenaga Elektrik Nasional
b
c
8 MISCELLANEOUS
a Advertisement
b Documentation
c
9 CONTINGENCIES
ALL IN UNIT R (of Total items 1 to 9) TOTAL (items 1 to 9)
Total Floor Area m2 : Cost/m2 :
10 SUPERVISION
11 PROFESSIONAL FEES
a Architect
b Civil & Structural Engineer
c Mechanical Engineer
d Electrical Engineer
e Quantity Surveyor
f
TOTAL COST OF PROJECT
Quantity Surveyor / Estimating Of State Director of Works Portfolio Branch
Director of Works
Date: Date: Date:
* Only necessary if PDA is prepared at
JKR State level