Jabatan Kerja Raya Preliminary Detailed Abstract For

This document is a preliminary detailed abstract for a construction project. It provides a breakdown of the estimated costs for the project. The costs are broken down into various categories including preliminaries, piling/foundation, building construction by type, internal services, external works, variation of prices, contributions to utilities, miscellaneous costs, contingencies, supervision, professional fees, and the total cost of the project. Quantities and unit costs are provided for many line items. The document was prepared by a Quantity Surveyor and Estimating Officer and approved by various Directors of Works.

Uploaded by

Fadzlini Ramli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views2 pages

Jabatan Kerja Raya Preliminary Detailed Abstract For

This document is a preliminary detailed abstract for a construction project. It provides a breakdown of the estimated costs for the project. The costs are broken down into various categories including preliminaries, piling/foundation, building construction by type, internal services, external works, variation of prices, contributions to utilities, miscellaneous costs, contingencies, supervision, professional fees, and the total cost of the project. Quantities and unit costs are provided for many line items. The document was prepared by a Quantity Surveyor and Estimating Officer and approved by various Directors of Works.

Uploaded by

Fadzlini Ramli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

(PWD 142A - Rev.

`91)
JABATAN KERJA RAYA
PRELIMINARY DETAILED ABSTRACT FOR

HEAD SUBHEAD YEAR TOTAL PROVISION $

PROVISION FOR CONSTRUCTION $

BRIEF DESCRIPTION OF BUILDINGS


BUILDING Frame Wall Roof Floor Ceiling Window Standard
a
b
c
d
e
f
g
h
j
k

BREAKDOWN OF PRELIMINARY COST ESTIMATE COST $

1 PRELIMINARIES
2 PILING/SPECIAL FOUNDATION
Type and Size
a
b
c
3 BUILDING Drawing No. Floor Area m2 Cost/m2
a
b
c
d
e
f
g
h
j
k
g
4 INTERNAL SERVICES
a Plumbing Installation
b Sanitary Appliances
c Electrical Installation
d Fire Protection Installation
e Air Conditioning Installation
f Lift & Conveyor Installation
g Communication Installation
h
j
k
h

SUBTOTAL carried forward


BREAKDOWN OF PRELIMINARY COST ESTIMATE (CONT'D) COST $
SUBTOTAL brought forward
5 EXTERNAL WORKS
a i) Site Preparation
ii) Earthwork
b Roads,Hardstanding,
Footpaths & Paving
c Fencing & Gates
d Turfing & Soft Landscaping
e Surface Drainage
f Sewerage
g External Electrical Installation
h External Water Supply Installation
i External Telephone Installation
j
k
6 VARIATION OF PRICES
7 CONTRIBUTION FEE TO LOCAL & UTILITY AUTHORITY
a Tenaga Elektrik Nasional
b
c
8 MISCELLANEOUS
a Advertisement
b Documentation
c
9 CONTINGENCIES
ALL IN UNIT R (of Total items 1 to 9) TOTAL (items 1 to 9)
Total Floor Area m2 : Cost/m2 :
10 SUPERVISION
11 PROFESSIONAL FEES
a Architect
b Civil & Structural Engineer
c Mechanical Engineer
d Electrical Engineer
e Quantity Surveyor
f
TOTAL COST OF PROJECT

Quantity Surveyor / Estimating Of State Director of Works Portfolio Branch


Director of Works

Date: Date: Date:

* Only necessary if PDA is prepared at


JKR State level