                 HVAC Engineer interview 70 question & answers
                 (Mechanical engineer)
                 HVAC:-
                     1)What is the Unit of Heat?(1M)
                           Ans) Units: BTU (British Thermal
                           Units)1BTU: It is the amount of energy
                           required to raise 1 Degree Fahrenheit
                           temperature of 1 Pound of water(OR)It is
                           the amount of heat when added to 1 Pound
                           of water increases the temperature of water
                           to 1 Degree Fahrenheit1 Lb = 0.45 Kgs
                           (or) 1kg = 2.2 Lbs. Types of Heat:-Sensible
                           Heat: It can be sensed or measured by an
                           ordinary drybulb thermometer.Eg: Human
                           body temperature can be measured using
                           thermometerLatent Heat: It can’t be sensed
                           or measured by an ordinary dry bulb
                           thermometer. It is a hidden heat.
                           Latent heat is absorbed or released when
                           ever there is a change inphase.Eg: When
                           the water becomes vapor and vice versa
                     2)What is TON & 1 TON = ?(2M)
                           ANS) TON or Ton of refrigeration:
                           It is the amount of energy required
                           to Freeze 1 pound of water in 24 hours (or)It
                           is the amount of energy required to Melt 1
                           Ton of Ice in 24 Hours
https://informations786.blogspot.qa/                                                                              1/16
12/31/2017                                           Information
                3)Volume Of Air is measured in?(2M)
                    ANS) Volume of air is measured in terms
                    of:CFM = Cubic Feet per MinuteCMH =
                    Cubic Meter per HourM3/Sec = Cubic Meter
                    per SecondL/Sec = Liters per secondCMH
                    = 1.7 x CFMCFM = 2118 x m3/secCFM =
                    2.119 x l/sec
                4)What is ASHRAE?
                  Answer- ASHRAE: American Society of
                  Heating Refrigeration and Air-conditioning
                  Engineers
                5)What is the Room Temperature that you
                  maintain in any room?(1M)
                    Answer- 24 Degree Celsius or 76 Degree
                    Fahrenheit                                     Ad
              6)CFM = Velocity(usually 1500) * Area in sqft
                {(d/2)^2*3.1416/144}
         7) 1 ton = 12000 BTU/hr = 3.516 KW.
         8) Heat Transfer Coefficient (U):
           1 (Btu/hr. sqft . *f) = 5.6782 (watt/m^2 . Calvin)
           Thermal Conductivity (K):
           1 (Btu/hr.ft.*f) = 1.73 (watt/m. calvin)
         9) Q-9-What is CFM
           Answer - Cubic feet minute, it is the unit of air
           flow.
         10)    Q-10-What is Aspect Ratio?
           Ans- it is the ratio between ht n length of the
           duct generally we take 1:2 can vary with space
           and size up till 1:4.
         11)    Q-11-What is Collar Length?
           Ans-it is the strip left at the joining of duct and
           machine.                                                Informantion
https://informations786.blogspot.qa/                                              2/16
12/31/2017                                         Information
         12)    Q-12-What are the important things to be            SYED MUHAMMAD AFREEN ALI
                                                                 View my complete profile
           considered before selecting devices like AHUs
           and Chillers:                                         Blog Archive
                                                                 ▼ 2017 (7)
             Ans-For AHU/FCU for chilled water system =            ▼ November (5)
                                                                      HVAC Engineer interview 70 question &
             CFM, Static pressure, Ton (capacity), Air Temp,            answers (Mec...
                                                                      What is the duties and Responsibilities of
             water flow (gpm).                                          Civil S...
                                                                      Electrical Engineer job description in
             For AHU/FCU for direct system = CFM, Static                 constructio...
                                                                      What are the key responsibilities of hvac
             Pressure, Ton, Sensible.                                   site eng...
                                                                      What are the key responsibilities of Fire
             For Chiller: Ton, outside air temp, GPM,                   Fighting...
                                                                   ► October (1)
             Note:                                                 ► January (1)
             (Sensible/3.4 = heating capacity.)                  ► 2016 (13)
             Static pressure to be considered to make fan
             selection.
             1GPM = 2.4 Ton (we need gpm in finding pipe
             dia)
         13)     Q-13-What is Pumps supply fittings:
           Ans- Thermometer, Shutoff valve, pressure
           gauge, strainer, test point, drain cock, union
           flexible connector, and Eccentric reducer.
         14)     Q-14-What is Pumps return fittings:
           Ans-Eccentric reducer, flexible connector, union
           test point, check valve, strainer, gate valve,
           check valve, temp sensors,
         15)    Q-15-CFM distribution wrt the given floor
           plan?
             Ans-Use ductulator.
         16)    Q-16-Calculating loads wrt any plan by
           using software.
             Ans- Use Hap-4.32 or any to find the loads.
         17)      Q-17-Type of Dampers?
                Ans-Fire dampers = Butterfly damper, Non
                Return Damper, Motorized Damper, Fire
                damper, Smoke damper, Gravity damper.
         18)          Q-18-Types of motorized damper?
https://informations786.blogspot.qa/                                                                               3/16
12/31/2017                                        Information
             Ans- Motorized volume damper, Motorized fire
             and smoke damper.
         19)     Q-19-Types of grills and diffusers?
           Ans = 2-way, 3-way, 4-way, 1-way, jet diffusers
           with fan.
         20)    Q-20-What is VFD?
           Ans-Variable frequency drive-it is use to control
           the speed of motor by controlling the frequency
           applied to it. It is used with Chillers; AHU etc.
           (use to control the RPM of pumps)
         21)     Q-21-How do you control or balance the
           chilled water
           Ans - Double regulating valve in main line return
           (usually controlled from return using drv)
         22)    Q-22-How do you control the noise or
           vibration in the duct
           Ans- lining (nc-35) and Rainforcement.
         23)     Q-23-Temperature of water at outlet of
           chiller and inlet of AHU ?
           @ outlet of chiller - 6-7^c & @ inlet of AHU – 7
           – 8^c
           @ outlet of AHU – 10 - 11^c & @ inlet of Chiller
           - 13-15^c.
         24)    Q-24-What are primary pumps and
           secondary pumps
           Ans - the pumps from chiller to building is
           Primary and in building transfer is Secondary.
         25)     Q-25- AHU & FCU Valve connection
           details ?
           Ans- check my AHU installation details video .
         26)   Q-26- What is CFM value?
           Ans-CFM = 0.417 L/s.
         27)     Q-27-What are the refrigerants used in
           split unit?
             Ans - R22, R12, R34 (Depends).
https://informations786.blogspot.qa/                            4/16
12/31/2017                                              Information
         28)     Q-28-What are duct heaters and why do
           we use them if we already have heating option
           in AHU.?
               - Just to provide heating in some specific
                  areas .
               -
         29)     Q-29-What is VAV and its working?
           = Ans- Pressure dependent & Pressure
           independent:
               - To control the flow of air and temp.
                  (variable air volume).
               - Pressure dependent:- The volume of air
                  supplied by the terminal unit varies
                  depending upon the static pressure
                  (SP) in the primary air duct.
               - Pressure independent terminal units:-
                  have flow-sensing devices that limit the
                  flow rate through the box. They can
                  control the maximum and minimum cfm
                  that can be supplied and are therefore
                  independent of the SP in the primary air
                  duct.
               - Almost all HVAC systems installed or
                  retrofitted at present have pressure
                  independent VAV terminals. Pressure
                  independent systems can be balanced
                  and will allow the correct airflow from
                  each terminal.
               -
         30)     Q-30-What is 3 way valve and 2 way
           valve. Where we will use them and why?
           Ans-2 way valve = it will regulate the flow as per
           demand and it will be fitted in the return line.
           3 way valve = if the AHU is closed and is
           running on min load then it will by-pass
           (Connected to BMS).
         31)     Q-31-What is duct guage normally we use
           in buildings for cooling and for exhaust ducts?
           Ans-For supply we use 22 guage and for
           exhaust we use 18 guage.
         32)      Q-32-Types of Duct joints ?
                Ans- Slip joint, flange joints etc.. see ‘internet.’
https://informations786.blogspot.qa/                                   5/16
12/31/2017                                         Information
         33)       Q-33-Standard books for HVAC?
                Ans- we follow in duct designing are Ashrae
                and Smacna, .
         34)     Q-34-What is smoke and light test?
           Ans-Check ‘HVAC smoke test and light test in
           internet’.
         35)     Q-35-What are the different method used
           for duct sizing?
           Ans-Equal Friction, Velocity,Static Regain.
         36)     -Q-36-How do you measure & control the
           noise level in A/C system?
           Ans-Noise level can be measured by dB
           meter.It can be controlled by providing acoustic
           to the unit panels, if the sound crosses the set
           noise criteria we have to go for sound
           attenuatos.
         37)    Q-37-What are the recommended
           pressure drop in Chilled water pipes?
             Ans- 210 PASCAL'S per meter (0.84 inches).
         38)     Q-38-Where do you use Fire
           Damper,Spliter Damper & Non Return Damper?
           Ans-Fire dampers (FD) are used to stop the fire
           wherever duct passes thro fire wall.
           Spliter dampers(SD) are used to split the main
           duct for propotional air balancing
           Non Return Dampers(NRD) are used to stop
           the back flow of air in the duct. NRD's used in
           exhaust and ventilation system only.
         39)     Q-39-What are the different types of
           exhaust fans used to extract the air?
           Ans-Axial type propeller fan, forward curved,
           twin fan, direct driven centrifugal fan.
         40)   Q-40-What are different duct shapes
           normally used?
           Ans-Rectangular, Round, Spiral, Oval.
https://informations786.blogspot.qa/                             6/16
12/31/2017                                         Information
         41)    Q-41-How do you control vibration of AHU
           & Chillers?
           Ans-Spring vibration isolators, Rubbers pads,
           Kinetic Chain, flexible bellows.
         42)   Q-42-What is the difference between VAV
           & CAV?
           Ans-Variable Air Volume & Constant Air Volume.
         43)     Q-43-Mention typical valve arrangement
           for chiller connection?
           Ans Check internet for ‘HVAC’.
         44)    Q-44-What do you consider while making
           plant room layout explain briefly?
           Ans-Space, site orientation, plant room location,
           A/C unit (ready made or tailor made).
         45)     Q-45-What are the different type of
           Louvers used?
           Fresh air louvers, sand trap louvers, door
           louvers, acoustic louvers, supply air and return
           air louvers.back draft louvers.
         46)     Q-46-Classify the different types of
           chillers?
             Ans-Air Cooled & Water Cooled. With
             Compressors -
             Reciprocating,screw,centrifugal & scroll
             chillers.
         47)     Q-47-What are the standard test pressure
           for chilled water piping for Industrial application?
             Ans- Test pressure 1.5 times of working
             pressure.
         48)     Q-48-What are the Securities checking in
           chillers?
           Ans-Flow switch, Chiller and Pump interlocking,
           High Pressure cut-out, Oil Pressure switch,
           High Suction superheat, Anti Freeze.
         49)    Q-49-What are the temperature & RH
           required for human comfort?
https://informations786.blogspot.qa/                              7/16
12/31/2017                                          Information
                Ans- 22 ±2 degree celcius & 50%RH.
         50)   Q-50-At what temperature degree
           Ferhenite & degree Celcius are same?
           Ans- -40°C.
         51)     Q-51-Which gas is used to purge the
           refrigerant line during the brazing?
           Ans-Nitrogen gas.
         52)          1 TR= 365 to 400 CFM, 3.516KW.
         53)     Q-53-How much design velocity required
           in the main duct of an office building?
           Ans-900-1100 FPM
                54)    How we install internal insulation in
                Ducts?
                And What is the insulation thickness of inside
                and outside ducts?
                Ans- 25mm inside and 50mm outside and
                ducts passing thru unconditioned spaces.
                55)    Q-55-Difference between nominal
                capacity and Actual capacity?
                Ans-Ceckk on internet.
                56)    Q-56-Is this nominal capacity equal in
                every country?
                Ans- Yes.
         57)         Q-57-How to find Weight of Duct?
                     Wt in Kg = 8.0318 x Thickness x Perimeter
                     = ____Kg.
                     Where Perimeter of Duct = (W x D)²/1000
         58)     Q-58-What are the different materials used
           for underground chilled water supply?
           Ans-Pre-insulated Black steel pipe sch-40 with
           rubber cladding.
         59)    Q-59-How to find velocity (FPM)?
           Ans-We need to know GPM and Friction. Then
           coincide them in a graph and you will get
https://informations786.blogspot.qa/                              8/16
12/31/2017                                         Information
             velocity. And for chilled water we need to know
             no. of cycles per year (in
             ksa=6months*30days*24hrs = 4320) search for
             this value in the annexure of ashrae to find the
             FPM. The fpm you get will be for the roof , to
             get the fpm in risers take 20% of roof and to get
             in runners take 20% of risers.
         60)    What Is The Fcu?
           A Fan Coil Unit (FCU) is a simple device
           consisting of a heating and/or cooling heat
           exchanger or 'coil' and fan. It is part of an HVAC
           system found in residential, commercial, and
           industrial buildings
         61)     What Is The Function Of Ahu?
           An Air Handling Unit (AHU) is used to re-
           condition and circulate air as part of a heating,
           ventilating and air- conditioning system. The
           basic function of the AHU is take in outside air,
           re-condition it and supply it as fresh air to a
           building.
         62)    What Are The Types Of Air Conditioning
           Systems?
           Types of Air Conditioning Systems The choice
           of which air conditioner system to use depends
           upon a number of factors including how large
           the area is to be cooled, the total heat
           generated inside the enclosed area, etc. •
           Window Air Conditioner. • Split Air Conditioner. •
           Packaged Air Conditioner. • Central Air
           Conditioning System.
         63)    What Does A Hvac Engineer Do?
           An HVAC engineer's job duties can include the
           design, installation, maintenance, and repair of
           heating, ventilation, air conditioning, cooling,
           and refrigeration systems.
https://informations786.blogspot.qa/                             9/16
12/31/2017                                        Information
         64)     What Is The Hvac System?
           While the Energy Center usually tries to avoid
           the use of acronyms, HVAC is in common use in
           the heating and cooling industry. It stands for
           "heating, ventilation and air conditioning," three
           functions often combined into one system in
           today's modern homes and buildings
         65)     What Is The Meaning Of Btu In Air
           Conditioners?
           Btu – British Thermal Unit (Btu) is the
           international measure of energy. A Btu is the
           amount of heat needed to raise 1 (one) pound
           of water by 1(one) degree Fahrenheit. In HVAC
           industry, Btu's measure the quantity of heat a
           conditioning unit can remove from a room per
           hours. One BTU per hour is equal to 0293 watts
         66)     What Is Variable Air Volume System &
           Dual Duct System?
           Variable Air Volume (VAV) is a type of heating,
           ventilating, and/or air- conditioning (HVAC)
           system. Unlike constant air volume (CAV)
           systems, which supply a constant airflow at a
           variable temperature, VAV systems vary the
           airflow at a constant temperature.
         67)     What Is Constant Volume System?
           Constant Air Volume (CAV) is a type of heating,
           ventilating, and air- conditioning (HVAC)
           system. In a simple CAV system, the supply air
           flow rate is constant, but the supply air
           temperature is varied to meet the thermal loads
           of a space. Most CAV systems are small, and
           serve a single thermal zone.
         68)     What Is Centralised Air System?
           The most common central cooling system is a
           split system, which includes an outdoor cabinet
           containing a condenser coil and compressor,
https://informations786.blogspot.qa/                            10/16
12/31/2017                                                               Information
             and an indoor evaporator coil, usually installed
             in conjunction with your furnace. or air handler .
             The compressor pumps a chemical called
             refrigerant through the system
         69)     What Is The Meaning Of Fahu?
           FAHU is the abbreviation used for FRESH AIR
           HANDLING UNIT. These are usually centralized
           units employed to induce fresh air quantities to
           the confines spaces. They come into picture
           wherever there are limitations to fresh air intake
           either directly or through AHUs.
         70)     What Is Cfm & Infiltration?
           The infiltration rate is the volumetric flow rate of
           outside air into a building, typically in cubic feet
           per minute (CFM) or liters per second (LPS).
           The air exchange rate, (I), is the number of
           interior volume air changes that occur per hour,
           and has units of 1/h. 4
              Posted by SYED MUHAMMAD AFREEN ALI at 07:43   1 comment:
             Saturday, 11 November 2017
             What is the duties and Responsibilities of Civil Site
             Engineer?
             What is the duties and Responsibilities of Civil Site Engineer?
            There are two types of site civil engineer ,
            Work activities vary depending on the type of employers and
            nature of the project but typically involve:
         1.   First job is a supervisory one if he works with the consultant,
         2.   In this case he needs to make sure that the document in hand is
            the correct designed and issued for construction ,
         3.   Then he will supervise the construction contractor to make sure
            that work is being carried out as designed and in accordance to
            standards.
https://informations786.blogspot.qa/                                                   11/16
12/31/2017                                                                             Information
         4.      The second type , is the execution part where he works with the
              construction contractor,
         5.      In this case he has more responsibilities,
         6.      Where he has to adhere to the design document,
         7.      Quality of work, the schedule, safety of the people,
         8.        Costs and more over to satisfy the consultant at a personal
              level
         9.        Work activities vary depending on the type of employers and
              nature of the project but typically involve:
                 10. Acting as the main technical adviser on a construction site
                     for subcontractors, crafts people and operatives;
                 11. Setting out, leveling and surveying the site;
                 12. Checking plans, drawings and quantities for accuracy of
                     calculations;
                 13. Ensuring that all materials used and work performed are as
                     per specifications;
                 14. Overseeing the selection and requisition of materials and
                     plant;
                 15. Agreeing a price for materials, and making cost-effective
                     solutions and proposals for the intended project;
                 16. Managing, monitoring and interpreting the contract design
                     documents supplied by the client or architect;
                 17. Liaising with any consultants, subcontractors, supervisors,
                     planners, quantity surveyors and the general workforce
                     involved in the project;
                 18. Liaising with the local authority (where appropriate to the
                     project) to ensure compliance with local construction
                     regulations and by-laws;
                 19. Liaising with clients and their representatives (architects,
                     engineers and surveyors), including attending regular
                     meetings to keep them informed of progress;
                 20. Day-to-day management of the site, including supervising
                     and monitoring the site labour force and the work of any
                     subcontractors;
                 21. Planning the work and efficiently organizing the plant and
                     site facilities in order to meet agreed deadlines;
                 22. Overseeing quality control and health and safety matters on
                     site;
                 23. Preparing reports as required;
                 24. Resolving any unexpected technical difficulties and other
                     problems that may arise.
               Posted by SYED MUHAMMAD AFREEN ALI at 23:11   No comments:
              Monday, 6 November 2017
              Electrical Engineer job description in construction DUTIES
              AND RESPONSIBILITIES.
              HI Viewers I am Afreen Ali .I bring this video for Electrical Engineer job description in
              construction. Kindly Subscribe my channel. AfreenAli
              Electrical Engineer job description in construction
https://informations786.blogspot.qa/                                                                      12/16
12/31/2017                                                             Information
             DUTIES AND RESPONSIBILITIES.
             Generally responsible for implementations and monitoring of all
             electrical related works at site.
             1. Estimates, prepares and assigns the resources such as manpower,
             materials, consumables, equipment, tools, etc., required for all
             electrical and related works prior to execution.
             2. Plans and analyses all possible construction methodologies and
             recommends the best options to the Asst. Project Manager for approval
             prior to execution at site.
             3. Interprets construction drawings and studies the contract documents
             and applicable standards or specifications prior to execution of any
             jobs.
             4. Manages directly and provide engineering and technical supports to
             all the electrical work groups at site.
             5. Plans the execution of all electrical related works and coordinates
             the works to mechanical and civil groups.
             6. Coordinates with Client / Consultant’s representatives for any site
             instructions and inspection of works.
             7. Assign targets for accomplishments and ensure targets are met on
             daily basis for all electrical groups at site.
             8. Submits site daily reports, inspection requests, estimates and all
             applicable monitoring reports on regular basis or as required.
             9. Supports the Asst. Project Manager in accomplishing all the goals
             and targets for the electrical groups at site.
             10. Ensures that all the works done are in accordance with the
             approved construction drawings, contract documents, project
             specifications, and all applicable standards whether local, national or
             international standards.
             11. Ensures that all site works are done according to all applicable
             quality standards.
             12. Directly responsible for the safety of all electrical groups’ personnel
             of the project by ensuring that the project execution will be done
             according to all applicable health, safety, sanitary and environmental
             standards.
             13. Evaluates electrical systems, products, components, and
             applications by designing and conducting research programs; applying
             knowledge of electricity and materials.
             14. Confirms system's and components' capabilities by designing
             testing methods; testing properties.
             15. Develops electrical products by studying customer requirements;
             researching and testing manufacturing and assembly methods and
             materials.
             16. Develops manufacturing processes by designing and modifying
             equipment for building and assembling electrical components; soliciting
https://informations786.blogspot.qa/                                                       13/16
12/31/2017                                                                   Information
             observations from operators.
             17. Assures product quality by designing electrical testing methods;
             testing finished products and system capabilities.
             18. Prepares product reports by collecting, analyzing, and
             summarizing information and trends.
             19. Provides engineering information by answering questions and
             requests.
             20. Maintains product and company reputation by complying with
             federal and state regulations.
             21. Keeps equipment operational by following manufacturer's
             instructions and established procedures; requesting repair service.
             22. Maintains product data base by writing computer programs;
             entering data.
             23. Completes projects by training and guiding technicians.
             24. Maintains professional and technical knowledge by attending
             educational workshops; reviewing professional publications;
             establishing personal networks; participating in professional societies.
             25. Contributes to team effort by accomplishing related results as
             needed.
             26. Performs other related duties as may be required by the Asst.
             Project Manager.
              Posted by SYED MUHAMMAD AFREEN ALI at 08:31   No comments:
             Thursday, 2 November 2017
             What are the key responsibilities of hvac site engineer?
             HI Viewers I am Afreen Ali . I brought this video for basic
             What are the key responsibilities of hvac site
             engineer?
             Kindly Subscribe my channel
                      AfreenAli
                1. Get approved HVAC Shop Drawings, MEP- Coordination Drawings,
                   Work method statement and Project Specification from Project
                   Engineer.
                2. Ensure the HVAC Ducts, Fittings, accessories and Child water pipes,
                   fittings, accessories are available and approved by Inspection
                   department prior to installation
                3. Ensure sufficient hand tools, power tools, ladder and scaffolding are
                   available for installation
                4. Coordinate with other discipline and ensure site clearance is
                   available to start the HVAC Activities
                5. Arrange the sufficient manpower such as Supervisor, Foreman, Duct
                   fitter, pipe fitter, Assistant duct and pipe fitter etc.., and ensure all of
                   them attended safety orientation and having proper PPE’s prior start
                   installation activities at site
                6. Provide approved HVAC Shop drawing, MEP Co-ordination Drawing
                   to site supervisor (or) Foreman and inform them to shift the required
https://informations786.blogspot.qa/                                                              14/16
12/31/2017                                                                            Information
                    ducting and piping approved material from warehouse to site and
                    arrange required material to avoid progress delay.
                 7. Prior to start HVAC activities notify to QC Personal for surveillance to
                    ensure the quality work
                 8. To maintain safe all construction HVAC and Chilled water piping
                    activities are carried out in accordance with the Company’s safety
                    policies and procedures; ensure that appropriate safety and
                    protective equipment is used by Company & Contractor staff.
                 9. Closely monitor site activities to ensure quality of work is in
                    compliance with approved shop drawing and Specificationand get
                    daily progress report from site supervisor (or) foreman and update to
                    project Engineer (or) Manager
               10. Preparing relevant documents to conduct inspection for completed
                   installation activities and raise RFI to QC-Inspector (To ensure that
                   any activity offered for inspection has an attachment of IFC drawing,
                   method statement (if required), Inspection & Test Plan (ITP) followed
                   by check list)
               11. Carry out all planned site inspections as per the intervention points
                   marked in the relevant drawing and standard
               12. Preparing the relevant documents to Conduct Testing inspection
                   such as Duct light testing for Ducts and Hydro test for Above ground
                   and Underground chilled water piping’s, systems.
               13. Active involvement in weekly meetings with the Project management
                   & QC Supervisor and manager to resolve the site related issues.
               14. Assist the Commissioning Team in Pre-commissioning &
                   Commissioning stages of all HVAC Equipment’s.
               15. Assist the Commissioning Team on Testing, Adjusting & Balancing
                   (TAB) stages of the Air and Hydronic Piping’s.
               16. Assist the Project Engineer during Preparation of final Test Reports,
                   as built drawings, Operation & Maintenance manual and handing
                   over the project to client
              Posted by SYED MUHAMMAD AFREEN ALI at 10:17   No comments:
                                                   Home                                         Older Posts
             Subscribe to: Posts (Atom)
                                                                     Simple theme. Powered by Blogger.
https://informations786.blogspot.qa/                                                                          15/16
12/31/2017                             Information
https://informations786.blogspot.qa/                 16/16