Map A

This document provides information for a load demand application of less than 100kVA (~140A) for a new electricity connection. It includes basic information about the installation address, developer, consultant engineer, and electrical contractor. It also lists the required plans that must be certified by a professional engineer, including the master development plan, site plan, substation layout, main switchroom layout, and single line diagram. The notes provide additional requirements for the plans to meet TNB specifications.

Uploaded by

Pacu Berjemaah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
435 views2 pages

Map A

This document provides information for a load demand application of less than 100kVA (~140A) for a new electricity connection. It includes basic information about the installation address, developer, consultant engineer, and electrical contractor. It also lists the required plans that must be certified by a professional engineer, including the master development plan, site plan, substation layout, main switchroom layout, and single line diagram. The notes provide additional requirements for the plans to meet TNB specifications.

Uploaded by

Pacu Berjemaah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SUMMARY OF LOAD FOR DEMAND LESS THAN

100KVA(~140A)
MAP A
Application Number : PRJ-000-004-0329
A.BASIC INFORMATION
1. Address of Installation 1 - 12,LOT PT6293,JALAN BALING-GERIK,09200 BALING,KEDAH
2. Site Location(Lot & Mk Number) LOT PT6293
3. Premise Category Multi Premise
4. Type of Premise
5. Total Gross Built-in Floor Area
6. Total Land Area
7. Architect
Name JAMIL ARCHITECT
NO 21, JALAN PERDANA HEIGHTS 1/1, PERDANA HEIGHT,
Address 08000 SUNGAI PETANI, KEDAH
Telephone No
04-4218767
Fax No
E-Mail Address jamilarchitect@yahoo.com
8. Surveyor
Name
Address
Telephone No
Fax No
E-Mail Address
9. Owner/Developer
Name LEMBAGA KEMAJUAN WILAYAH KEDAH (KEDA)
IC/Company No 580920-10-5723
Address 1 - 12,LOT PT6293,JALAN BALING-GERIK,09100 BALING,KEDAH
Telephone No 047205300
Fax No
E-Mail Address pacuberjemaah@gmail.com
10. Consultant Engineer
Name SEJATI ENGINEERS SDN BHD
Company No 847269-V
Address NO 7,JALAN PERMATANG GEDONG,TAMAN SEJATI INDAH,08000
SUNGAI PETANI,KEDAH
Telephone No 044304778
Fax No 044304779
E-Mail Address sejatiengineers@gmail.com

Page1/2
SUMMARY OF LOAD FOR DEMAND LESS THAN
100KVA(~140A)
MAP A
11. Electrical Contractor
Name WAHI MAKMUR ENTERPRISE
Contractor No AS 0275955-M
NO 41, JALAN VISTANA INDAH 1,TAMAN VISTANA INDAH,
Address JALAN LANGGAR,06500 ALOR SETAR,KEDAH DARUL AMAN.
Telephone No
04-7876387
Fax No
E-Mail Address WAHIMAKMUR@YAHOO.COM
12. Requirement For Temporary Supply MD(kW): Date Supply Required:
Voltage(V):
13. Date Supply Required - ORIGINAL MD(kW):80.00 Date Supply Required:21-Jan-2018
- FINAL MD(kW): Date Supply Required:
14 PLANS-CERTIFIED BY PROFESIONAL ENGINEER
3 SETS-Please specify Plan no & date below
14a. Master Development/Layout plan Plan No : Date :
(Approve by JPB&D)

14b. Site Plan/Proposed Sub-station Sites Plan No : Date :

14c. Layout Plan of Sub-station Building Plan No : Date :


(Stand-Alone/Compartment)

14d. Layout Plan of Main Switch Rooms Plan No : Date :

14e. Single Line Diagram/Schematic of Installation Plan No : Date :

15. Front elevation of building requiring supply

NOTES:
I The Master Development/ Layout Plans (14a) are approved by Local Authority/ Jabatan Perancangan Bandar & Desa/ Jabatan Tanah &
Galian. These plans should already contain TNB preliminary comments on sub-station and right of way/wayleave requirement, as the case
may be.
II The Site Plans/ Proposed Sub-stations Sites (14b) indicate the locations of sub-station sites for the overall development area.
III The Layout Plans of sub-station building (14c) must show the cable entry locations, trencing and ducting details according to TNB
specifications.
IV Layout Plans of Main Switch-room (14d) must indicate the location of MSB, trenching/ ducting details for cable entry.
V The wiring diagrams should indicate incoming switches, metering location and devices, protection schemes and devices, bus-bar and
switchgear rating
IV All drawings and plans are to be submitted in three (3) complete sets. Soft copies in ACAD are also preferable.

Page2/2

You might also like