SUMMARY OF LOAD FOR DEMAND LESS THAN
100KVA(~140A)
MAP A
Project Name : 2 UNIT RUMAH KAMPUNG 1 FASA KG JERAM Application Number : PRJ-000-010-9430
A.BASIC INFORMATION
1. Address of Installation LOT 682,KG JERAM,-,16800 PASIR PUTEH,KEL
2. Site Location(Lot & Mk Number) LOT 682
3. Premises Category Multi Premises
4. Total Gross Built-in Floor Area
5. Total Land Area
6. Architect
Name
Address
Telephone No
Fax No
E-Mail Address
7. Surveyor
Name
Address
Telephone No
Fax No
E-Mail Address
8. Owner/Developer
Name ZURAINI @ ZALANI BINTI CHE MAT
IC/Company No 680124-03-5400
Address LOT 3252,JALAN CABANG TIGA PENDEK,KAMPUNG BINJAL
LARAK,15100 KOTA BHARU,KELANTAN
Telephone No 0123541474
Fax No
E-Mail Address mzafri2808@gmail.com
9. Consultant Engineer
Name
Company No
Address
Telephone No
Fax No
E-Mail Address
10. Electrical Contractor
Name MZ ELEKTRIK
Contractor No KT0347175H
Address LOT 1965,KG TEGAYONG,MELOR,16400 KOTA BHARU,KEL
Telephone No 0199734669
Fax No
E-Mail Address zaf2811@yahoo.com
Page1/2
SUMMARY OF LOAD FOR DEMAND LESS THAN
100KVA(~140A)
MAP A
11. Requirement For Temporary Supply MD(kW): Date Supply Required:
Voltage(V):
12. Date Supply Required - ORIGINAL MD(kW):1 Date Supply Required:22-Oct-2023
- FINAL MD(kW): Date Supply Required:
13 PLANS-CERTIFIED BY PROFESIONAL ENGINEER
3 SETS-Please specify Plan no & date below
13a. Master Development/Layout plan Plan No : Date :
(Approve by JPB&D)
13b. Site Plan/Proposed Sub-station Sites Plan No : Date :
13c. Layout Plan of Sub-station Building Plan No : Date :
(Stand-Alone/Compartment)
13d. Layout Plan of Main Switch Rooms Plan No : Date :
13e. Single Line Diagram/Schematic of Installation Plan No : Date :
14. Front elevation of building requiring supply
NOTES:
I The Master Development/ Layout Plans (13a) are approved by Local Authority/ Jabatan Perancangan Bandar & Desa/ Jabatan Tanah &
Galian. These plans should already contain TNB preliminary comments on sub-station and right of way/wayleave requirement, as the case
may be.
II The Site Plans/ Proposed Sub-stations Sites (13b) indicate the locations of sub-station sites for the overall development area.
III The Layout Plans of sub-station building (13c) must show the cable entry locations, trencing and ducting details according to TNB
specifications.
IV Layout Plans of Main Switch-room (13d) must indicate the location of MSB, trenching/ ducting details for cable entry.
V The wiring diagrams should indicate incoming switches, metering location and devices, protection schemes and devices, bus-bar and
switchgear rating
IV All drawings and plans are to be submitted in three (3) complete sets. Soft copies in ACAD are also preferable.
Page2/2